Loading...
HomeMy WebLinkAboutAGENDA REPORT 1998 0701 CC REG ITEM 10AITEM io-Ae CITY OF MOORPARK, CALIFORNIA City Council Meeting of ACTION : ��► e �'� °�d C ie� �! r c of AGF+NDA REPORT �;rriocnc'ucj in !?11' 41'1c (fiovl C =TY OF BY• TO: The Honorable City Council FROM: Kenneth C. Gilbert, Director of Public Works DATE: June 18, 1998 (Council Meeting 7 -1 -98) SUBJECT: Consider Request to Restrict Traffic on Spring Road to Facilitate Road Improvements DISCUSSION A. Closure of Spring Road South of Peach Hill Road Due to the nature of the construction of the proposed improvements on Spring Road south of Peach Hill Road, the developer of the Carlsberg Specific Plan was advised that this street segment could be closed during construction to better facilitate both the construction activities and public safety. The developer was advised that said closure could only occur when and if the southerly portion of Science Drive was opened to traffic so that it could be used as a DETOUR route. The developer was also advised that southbound Spring Road traffic south of Christian Barrett Drive would be required to be kept open to avoid forcing eastbound traffic to turn left at the uncontrolled intersection of Tierra Rejada Road and Southhampton Road. As stated above, the closure of the road was deemed necessary and appropriate due to the nature of the required improvements to be constructed on Spring Road south of Peach Hill Road. The scope of that work includes: • pave -out and widening to the east side of the street south of Peach Hill Road; • the construction of center medians; and, • the reconstruction of the entire street along the frontage of the Market Place development. That portion of Science Drive south of Peach Hill Road, is scheduled to be opened to traffic by July of this year. It is the intent of the developer to immediately proceed with the construction of the street improvements on Spring Road south of Peach Hill Road, and to implement the road closure to facilitate same. sprgclos 000080 Closure of Spring Road July 1, 1998 Page 2 B. Spring Road: Peach Hill Road to Bridge 1. Request for Full Road Closure: It had been the intent of the developer to construct the required Spring Road street improvements between Peach Hill Road and the Arroyo Simi bridge, during the period when the road was to be closed by the City's bridge reconstruction project. As you know, that project has been delayed. The developer has advised the City that it is not possible for them to defer these improvements to the Spring and Summer of 1999. The developer (Simi - Conejo Properties) has requested, therefore, that they be allowed to close this segment of Spring Road to facilitate the construction of the required street improvements to this segment of the street. 2. Duration: The developer's construction schedule anticipates the completion of the southerly section of Spring Road (S /O Peach Hill Rd.) and the northerly section of Science Drive (N /O Peach Hill Rd . ) by August 15th. They have requested that they be allowed to close Spring Road between the bridge and Peach Hill Road, when these street segments are complete and opened to the public. They anticipate that the road will have to be closed for approximately two months. 3. Scope of Work: The scope of the required street improvements along the segment of Spring Road includes the following: • the removal of the existing guardrail along the east side of the street; • the construction of the street to • the construction sidewalks and a n street; • the construction systems; • modifications to the intersection • the construction entire length of of a retaining wall along the east side support the required street widening; of street widening (curbs, gutters, aw guardrail) along the east side of the of certain underground storm drain the traffic signal and detector loops at Df Peach Hill Road and Spring Road; and, of a raised center median along the this street segment. 4. Two -Way Traffic Not Possible: Due to the above described nature of the work, it will not be possible to maintain two - way traffic on this street segment during construction, for the following reasons: • as stated above, the guardrails along the east side of the road will be removed; • construction personnel, materials and equipment will be placed along the east side of the road during the widening process; sprgclos 0 ":7 `. U F 1 Closure of Spring Road July 1, 1998 Page 3 • in order to protect both the driving public and the construction workers, it would be necessary for the contractor to place and maintain a K -Rail concrete barrier wall along the westerly edge of the construction area; • in order to provide an area wide enough to safely accommodate the construction activity, the K -Rail will have to be placed in a manner which will not leave enough room for two lanes of traffic. 5. Raised Center Median: It should be noted that if the construction of the raised center median were to be done after the east side widening was completed, it may be possible to perform this work with traffic open in both directions and with no need for the placement of K -Rail. 6. One -Way Alternating Traffic: One option would be to allow the one travel lane to be opened to both northbound and southbound traf f is via the use of f lagmen or the installation of a temporary traffic signal. This alternating traffic flow would require a rather long staging area for southbound traffic. This staging would be located north of the bridge, in a highly congested area. The length of the staging area is not long enough to accommodate the staged number of vehicles anticipated. It is also likely that the traffic congestion would back -up to and adversely affect traffic on Los Angeles avenue. For these reasons, staff does not recommend this alternative. 7. One -Way Only: One option would be to restrict traffic to one -way only. If this option is selected, it is recommended that the road be opened to southbound only. Staff is recommending this option. 8. Complete Road Closure: K -Rail would not be required if the developer were permitted to completely close the road during the construction period. This is the developer's preferred alternative. 9. Pedestrian / Bicycle Traffic: It should be noted that pedestrian and bicycle traffic can and will be maintained open during construction, in any of the alternates discussed above. C. Options It appears that there are two options available to the City Council. 1. One option is described a paragraph B -7 above -- the restriction of traffic to one -way (southbound) only. This is the option recommended by staff. sprgclos 000052 Closure of Spring Road July 1, 1998 Page 4 2. The other option is described a paragraph B -8 above -- the complete closure of the street during construction. This is the option requested by the developer. D. Conditions It is recommended that the developer be allowed to close Spring Road to northbound traffic between the Arroyo Simi Bridge and Peach Hill Road, subject to the following conditions: 1. The partial road closure shall not occur prior to the completion of the construction of required street improvements and the opening to traffic of the following street segments: a) Spring Road between Peach Hill Road and Tierra Rejada Road; and, b) Science Drive between New Los Angeles Avenue and Tierra Rejada Road. 2. The preparation of all required Road Closure and Detour plans, approved by the City and Caltrans. 3. Compliance with any and all other requirements of the City Engineer related to the subject road closure. 4. Payment of all plan checking and inspection fees related to the subject road closure. 5. Pedestrian and bicycle traffic shall be maintained open. 6. The closure shall be limited to eight weeks. Staff recommends that, in order to facilitate the construction of required street improvements, that the developer of the Carlsberg Specific Plan be allowed to close Spring Road to northbound traffic between the Arroyo Simi Bridge and Peach Hill Road, subject to the conditions set forth in this report. sprgclos �1