SUBJECT: Consider the Conceptual Design for Senior Center Expansion
Background
The City Council is being asked to consider and approve the conceptual design for the Senior
Center expansion. Previously, the City Council appropriated $258,000 from Community
Development Block Grant (CDBG) funds to expand the Senior Center which was budgeted in the
FY 1997/98 Budget. An additional $35,000 was appropriated to the project in April, 1998,
effective in the FY 1998/99 Budget, to make ADA accessability improvements to the Senior
Center and Community Center, bringing the project's total budget to $293,000. The City has
secured the services of Meyer and Associates to design the expansion and develop construction
specifications, at a cost not to exceed $23,615. To date, the design budget includes the room
expansion adjacent to, and west of, the Citrus Room, the room addition adjacent to, and southeast
of the Senior Center, and ADA modifications to the Senior Center and Community Center.
Discussion
Conceptual Design Options
For purposes of this discussion, the room addition to the west of, and adjacent to, the Citrus
Room is referred to as the "Citrus Addition ". The room addition adjacent to, and southeast of,
the Senior Center is referred to as the "South Addition ". Lastly, the enclosure of the breezeway
under the arches at the front of the Senior Center is referred to as the "Breezeway Enclosure ".
Throughout the Committee Senior Center Advisory Committee's discussions with the architect
and staff, various conceptual design options were identified and are being presented for the City
Council's consideration. Design Concept "I" (Attachment A) is the most extensive expansion
option and provides for the Citrus Room Addition, South Addition, and the Breezeway
Enclosure. It also provides for an operable sound resistant wall and automatic sliding front doors.
It is estimated that this option will cost approximately $442,000 ($394,000 for construction and
$48,000 for design and project management). If the City Council elected to approve this option,
an additional $149,000 would need to be allocated to the project.
C:\DOCS\SENIORS\SREXPANS.AGD
zml�
Senior Center Expansion
Page 2
Design Concept "II" (Attachment B) is the design preferred by the Senior Center Advisory
Committee. It includes the Citrus Room Addition, the Breezeway Enclosure, and meeting rooms
within the Senior Center. The total estimated cost of Concept "II" is $307,000 ($266,000 for
construction and $41,000 for design/project management). If approved, this option would require
an additional allocation of approximately $14,000.
Design Concept "III" (Attachment C) more closely reflects the City Council's direction on July 2,
1997, at which time it indicated its preference for including the South Addition and excluding the
Breezeway Enclosure. The total cost estimated for Concept "III" is $312,000 ($269,000 for
construction and $43,000 for design and project management). This option would require an
additional allocation of approximately $19,000.
Design Concept "IV" (Attachment D) is an attempt to present a design that has an estimated cost
that meets or is under the budget previously appropriated by the City Council. Concept "IV"
includes only the Citrus Room Addition and meeting rooms within the Senior Center. The total
cost estimate for Concept "IV" is $236,000 ($205,000 for construction and $31,000 for design
and project management). This option would create a savings of approximately $57,000.
Variations of the aforementioned concepts are also possible.
Senior Center Advisory Committee's Recommendations
On two separate occasions, the Senior Center Advisory Committee met with the project architect
to discuss and critique various design options created based on input from the Committee, and
participated in no less than five planning meetings with staff. While the Advisory Committee
initially expressed its support for Design Concept "I ", because it believed that the design most
closely meets the current and future needs of the Senior Center, the cost estimates provided by
the architect convinced the Committee that it needed to look at a more moderate project.
Therefore, the Committee is recommending Design Concept "II ". This design includes the
Breezeway Enclosure and the Citrus Addition; and excludes the South Addition.
The Senior Center Advisory Committee strongly favored the enclosure of the breezeway in place
of the South Addition. When ranked in order of priority, the Committee identified the desirability
of the potential room additions as follows: 1) Citrus Room Addition, 2) Breezeway Enclosure, 3)
South Addition. Under the Committee's recommendation, the enclosed breezeway provides for a
lobby, office, and work space at the front of the building. This leaves space within the Center for
small meeting rooms to conduct social service and information and referral services, such as
health sceenings, tax assistance, and mental health interviews. The Committee believes locating
reception functions in a lobby area, outside of the existing Senior Center, would greatly facilitate
their programs and activities. Reception/check -in types of activities currently take place within
C:\DOCS\SENIORS\SREXPANS.AGD
OOOOS9
Senior Center Expansion
Page 3
the existing senior center space, just inside the front door. When activities are held in the Senior
Center, they have a difficult time performing reception -type activities or answering the phone
because of the noise or the need to speak softly. For these reasons, the Committee believes that
the Senior Center would be better served with a lobby inside of the proposed enclosure of the
breezeway. Additionally, the Committee reasoned that the Breezeway Enclosure would cost less
than the South Addition, and would net more square footage.
Under Design Concept 11 ", the larger Citrus Addition has been identified as a multi purpose
room. Early on in the process, the Senior Center Advisory Committee identified the need for a
sound resistant operable wall, which would allow the Citrus Addition to be divided into two
rooms. While it still remains a strong desire of the Committee, it has suggested that the operable
wall (with an estimated cost of $21,500) be held back as a bid option, in the event that
additionally funding becomes available, and/or construction cost prove to be less than anticipated.
The Committee also feels strongly about the inclusion of automatic sliding front doors (estimated
to cost $10,000) to facilitate frail and handicapped seniors' access to the building. Participants
have been known to complain that the wind makes it very difficult to open the front door. But
again, in light of the architect's costs estimates, the Committee suggests that the automatic doors
be identified as a bid alternative.
While their resources are limited, the Senior Center Advisory Committee has offered to assist with
fund raising efforts to complete desirable Senior Center Expansion design components,
specifically the inclusion of an automatic front entry door (estimated cost - $10,000).
Public Works, Facilities, and Solid Waste Committee's Recommendation
On May 21 and June 10, the City Council's Public Works, Facilities, and Solid Waste Committee
(Councilmembers Evans and Wozniak) met to review the Senior Center Advisory Committee's
recommendation to enclose the breezeway (Breezeway Enclosure), and to expand the project
beyond its original scope. The Council Committee did not specifically reject the idea of enclosing
the breezeway, but felt strongly about not allocating any additional funds to the project, which
would be required under the Senior Center Advisory Committee's recommendation. The
Committee expressed the recommendation that the City adhere to the original concept for the
expansion which involved the Citrus Room Addition. This recommendation is consistent with
Design Concept "IV ", and its estimated total cost is $236,000. Since the City has appropriated
$293,000 for the project, the Council could consider a bid option involving either the South
Addition or the Breezeway Enclosure. If the cost proposals receive by the City identify lower
costs than estimated by the architect, the Council could elect to expand the scope of work at the
time it awards the construction contract.
C:\DOCS\SENIORS\SREXPANS.AGD
000050
Senior Center Expansion
Page 4
Enclosed Breezeway
As you may recall, the City Council previously considered the option of enclosing the breezeway.
On July 2, 1997, staff requested the Council's consideration of an additional room expansion, in
addition to the expansion adjacent to the Citrus Room (Citrus Room Addition). The options
considered by the Council included adding the room addition adjacent to the southeast corner of
the Senior Center and/or enclosing the breezeway. The Council expressed concerns about
impacts to the aesthetics of the building and whether enclosing the area within the arches would
detract from the building's design. The Council elected to approve an additional room expansion
involving the area adjacent to the southeast corner of the Senior Center (South Addition) and not
the breezeway.
Staff and the Senior Center Advisory Committee consulted with the architect on the feasibility and
desirability of enclosing the breezeway. The architect has indicated that the enclosure could be
designed in such a way as to carry on the existing "theme" of the building, so as not to detract
from the design of the building. Additionally, the architect suggests that the City identify a bid
alternate in the Request of Proposal document to provide for additional work that would involve
constructing new arches further out on the patio area, flush with the front of the Community
Center (estimated cost - $24,400).
Additionally, the Public Works, Facilities, and Solid Waste Committee also discussed the Senior
Center Advisory Committee's recommendation to enclose the breezeway. The Committee
expressed concern about turning the breezeway area into a "lobby" and /or reception area for the
Senior Center. As identified in Design Concepts "I" and "II ", the breezeway would function as
the lobby /reception area for the Senior Center. When the public walks into the front door, they
would, in effect, be walking into the Senior Center. To access the main entrance of the Citrus
Room, the public would have to first enter the Senior Center. The issue of concern is that the
Citrus Room will still function as a multi purpose room in the "Community Center ". It will
continue to be available for use by the general public and for other City functions; it is not for
exclusive use by the Senior Center. Therefore, the public should be able to access the Citrus
Room without having to go through the Senior Center.
If the City Council elects to approve the Senior Center Advisory Committee's recommendation or
a variation which includes the Breezeway Enclosure, the Public Works, Facilities, and Solid
Waste Committee recommended that the breezeway area be designed for minimal Senior Center
office space (or possibly no office space) and small meeting rooms, with a general foyer. If Senior
Center office space is to be allocated within the breezeway, the Committee believes that it should
be located at the southern end; the small meeting rooms should be located on the northern end,
and could be used for other general purposes when not in use by the Senior Center. The official
reception area for the Senior Center should be located within the existing Senior Center. This
C:\DOCS\SENIORS\SREXPANS.AGD
o0oo5l,
Senior Center Expansion
Page 5
would preserve the "Community Center" feel when the public first enters the front doors, and
would not require the general public to enter the Senior Center to access the Citrus Room.
Staff Proposal
If the City Council has no objections regarding the Breezeway Enclosure, other than it would
require additional funding, staff proposes that the Breezeway Enclosure be included in the final
design as a bid option. The architect would be authorized to proceed with design and
construction specifications for the Breezeway Enclosure. Contractors submitting cost proposals
would be required to provide the City with a separate cost for the Breezeway. At the time the
Council is asked to award the construction contract, it would have an opportunity to, again,
consider proceeding with the Breezeway Enclosure or rejecting it. The opportunity to review
cost proposals from contractors may assist the Council in arriving at a comfortable decision
regarding the inclusion of the Breezeway Enclosure.
The design cost would be consistent with Design Concept "II" ($26,000), and would not require
an amendment to the City's contract with the architect, since the contract already includes two
room additions. Additionally, the City would not be obligated to proceed with construction of the
Breeze Enclosure if it was not satisfied with the cost proposals and/or was not able to resolve
design conflicts.
Estimated Costs
Staff has provided cost summaries of the various conceptual design scenarios identified in this
Agenda Report. As stated above, to date the City Council has appropriated $293,000 from
Community Development Block Grant (CDBG) to fund this project. As previously noted, under
each of the design concept options identified in this Agenda Report, the architect's construction
estimates exceed the project's funds appropriated by the City Council, with the exception of
Design Concept "IV".
If the City Council desires to proceed with design concept "I", "II", or "III ", as identified, or a
version thereof, it will need to appropriate additional funds. The following is a summary of the
Design Concept costs and resulting deficits:
Design
Concept
Recommended by...
Estimated Cost
Funding
Deficid Surplus
Concept "I"
$442,000
$(149,000)
Concept "II"
Sr. Center Advisory Com
$307,000
$(14,000)
Concept "III"
$312,000
$(19,000)
Concept "IV"
PW, F, SW Com
$236,000
$ 57,000
C:\DOCS \SENIORS \SREXPANS.AGD 000092
Senior Center Expansion
Page 6
If the City Council wishes to increase the Senior Center Expansion budget to accommodate
designs "I ", "II ", or "III ", staff recommends that it consider using some of the CDBG funds
allocated to the City's Affordable Housing Program. On March 18, 1998, the Council
reappropriated $119,917 to the Affordable Housing Program from FY 1995/96 and 1996/97
CDBG fund savings originally budgeted for street improvement projects, and an additional
$141,241 from the City's FY 1998/99 CDBG allocation ($261,158 total). The $261,158 has been
included in the City's FY 1998/99 Budget. It appears unlikely that the City will spend a
significant portion of the funds appropriated to the Affordable Housing Program by the end of FY
1998/99; however, staff does anticipate being able to complete the Senior Center Expansion
project by that time (both the Senior Center Expansion and Affordable Housing are eligible uses
for CDBG capital funds). When the City receives its next allocation of CDBG funds (FY
1999/2000), the Council could take action to appropriate funds for the Affordable Housing
Program to bring it back up to its previous budgeted amount. The County has indicated that the
City would not be required to hold a public hearing to reappropriate funds from the Affordable
Housing Program to the Senior Center Expansion project.
While not recommended, the City Council may wish to consider other potential funding sources
including the City's General Fund and /or the Park Improvement Fund. If the City Council elects
to approve additional funds for the Senior Center Expansion project, staff will prepare a budget
amendment and respective resolution for Council's approval at a later Council meeting.
Recommendation
Staff recommends that the City Council:
Approve the design of Design Concept "II" as proposed by staff, with the
Breezeway Enclosure as a bid option; and
2. Direct staff to complete the design plans, construction specifications, and a bid
document, identifying Design Concept "II" and the Breezeway Enclosure as a bid
option, for City Council approval.
C:\DOCS\SENIORS\SREXPANS.AGD
KITCHEN
SOUTH
ADDITION
21'X 213'
TOILET RMS. I
STOR; WK. RM. I E AN. HALL
CORRIDOR
FCONJF�J SOR. g X g
I CONF.
h' X 10'
MEETING RM.
0'X21
21'X 24'
X
J�
/- ----WALL CABINETS VEST.
/ BASE CABINETS
'CITRUS ADDITION
MEETING RM,
21'X24'
o O
SENIOR CENTER ROOM CITRUS ROOM
O 0
WORK RM.
OFFICE 11'X 15'
SUPPLIES
BREEZEWAY ENCLOSURE
RECEPTION
COUNTER
LOBBY
11 "X 20' RECEPTION DIR. OFFICE
11'X 18' 11 "X .18'
IXXXXXXXI --
Sliding Doors
SOUND -RATED
OPERABLE WALL
COMPUTER
EQUIPMENT
EQUIPMENT
STORAGE
10'X 16'
Citrus Room
Addition ..............$163,000
South Addition ..............64,000
MECH.
Breezeway Enclosure....
61,000
Senior Center Meeting
Rooms ....................14,000
ADA Restroom
Modifications .........
20,000
ADA Door Hardware
Improvements.........
8,000
KITCHEN
Movable Sound Wall ....
21,500
Storage Cabinets
(Citrus Room) ........
4,000
Storage Cabinets
(Breezeway) ..........
3,500
Automatic Doors ........... 10,000
Building Facade ............
25,000
SUBTOTAL: $394,000
TOILET RMS.
Design . ........................$30,000
Project Management...
18.000
SUBTOTAL:
$48,000
HALL
TOTAL: $442,000
ATTACHMENT A
Design Concept I
CORRIDOR N w
i
CONF STOR.
X g'
O
0
SENIOR CENTER ROOM
OFFICE
SUPPLIES
BREEZEWAY ENCLOSURE
"1 n
Slid' Doors
MEETING RM.
21'X 24'
CABI S
/—BASE CABINETS
/CITRUS ADDITION
MEETING RM.
O
CITRUS ROOM
TOILET RMS.
ATTACHMENT B
C Design Concept II
S
SOUND -RATED
OPERABLE WALL
,.,-- COMPUTER
EQUIPMENT
STORAGE
10'X 16'
Citrus Room
Addition ..............$163,000
Breezeway Enclosure.... 61,000
MECH.
Senior Center Meeting
Rooms ....................14,000
ADA Restroom
Modifications ......... 20,000
ADA Door Hardware
Improvements.... 8,000
KITCHEN
SUBTOTAL: $266,000
Design ......................... $ 26,000
Project Management... 15.000
SUBTOTAL: $41,000
TOTAL: $307,000
TOILET RMS.
ATTACHMENT B
C Design Concept II
KITCHEN
SOUTH
ADDITION
21'X 28'
TOILET RMS.
STOR. WK. RM. I
JAN. HALL I
CORRIDOR
7.
CST X 9'
r.CONF.
10' X 10'
O
SENIOR CENTER ROOM
WORK RM.
OFFICE 11' X 15'
SUPPLIES ri
BREEZEWAY ENCLOSURE
LOBBY
11
RECEPTION
COUNTER
21'X24'
O
CITRUS ROOM
0
MEETING RM.
i
STOR.
I
,,— COMPUTER
0'X21
EQUIPMENT
� -7ON
21'X 24'
10'X 16'
Citrus Room
Addition ..............$163,000
L C I ETS
VEST.
MECH.
B E CA ETS
i
CITRUS ADDITION
ADA Restroom
MEETING RM.
Modifications ......... 20, 000
ADA Door Hardware
Improvements:... 8.000
KITCHEN
RECEPTION
COUNTER
21'X24'
O
CITRUS ROOM
0
TOILET RMS.
HALL
1
S
SOUND -RATED
OPERABLE WALL
,,— COMPUTER
EQUIPMENT
� -7ON
STORAGE
10'X 16'
Citrus Room
Addition ..............$163,000
South Addition ..............64,000
MECH.
Senior Center Meeting
Rooms ....................14,000
ADA Restroom
Modifications ......... 20, 000
ADA Door Hardware
Improvements:... 8.000
KITCHEN
SUBTOTAL: $269,000
Design . ........................$28,000
Project Management... 15,000
SUBTOTAL: $43,000
TOTAL: $312,000
TOILET RMS.
HALL
1
DIR.OFFICE
� -7ON
11'X18'
Sli nO
Doors
ATTACHMENT C
® Design Concept III
KITCHEN
TION
X 28'
II (
TOILET RMS. MEETING RM. I
I STOR.
0'X21
21'X 24'
STOR. WK. RM.
L CABI T VEST.
JAN. HALL BA CABIN
CORRIDOR CITRUS ADDITION
i
MEETING RM.
CONE. STOR.
10'X10' 8'X9 21'X24'
�+. CONF. I il
110' X 10'
0
SENIOR CENTER ROOM
0
WORK RM.
OFFICE 11' X 15'
SUPPLIES
BREEZEWAY ENCLOSURE
RECEPTION
COUNTER
LOBBY
X xx�
S1' ng Doors
O
CITRUS ROOM
0
DIR. OFFICE
8' 11' X 18'
S
SOUND -RATED
OPERABLE WALL
,,— COMPUTER
EQUIPMENT
STORAGE
10'X 16' Citrus Room
Addition .............. $163,000
Senior Center Meeting
MECH. Rooms ....................14,000
ADA Restroom
Modifications ......... 20,000
ADA Door Hardware
Improvements.... 8.000
SUBTOTAL: $205,000
KITCHEN
Design . ........................ $20,000
Project Management... 11.000
SUBTOTAL: $31,000
TOTAL: $236,000
TOILET RMS.
HALL
ATTACHMENT D
Design Concept IV