Loading...
HomeMy WebLinkAboutAGENDA REPORT 1998 0902 CC REG ITEM 10GAGENDA REPORT CITY OF MOORPARK TO: The Honorable City Council FROM: Dirk Lovett, Assistant City Engineer DATE: August 21, 1998 (Council Meeting of 9 -2 -98) TE1V�_..l� • I CITY OF NIt ORPk", C_�l.tt oWNIA City Council i►iectin"y of ACTIOti: p prdyeol _..- re c 0 him e h1 6 ►� IJ i fi o r C O nS ruepel% SUBJECT: Consider Authorization to Advertize for Receipt of Bids for the Construction for the Widening of Peach Hill Road at Spring Road BACKGROUND In August 1997 the City Council authorized the preparation of a design to widen Peach Hill Road, just east of the intersection of Spring Road, to provide sufficient width to allow a designated left turn lane. DISCUSSION A. Project Description The project calls for the widening of the south side of Peach Hill Road by six feet (6') and will provide the following street section: a) one twelve foot (12') wide eastbound thru lane; b) one twelve foot (12') wide westbound thru lane; c) one twelve foot (12') wide westbound left turn lane; d) two five foot (5') wide bike lanes; and e) two six and one -half foot (6 -1/2') wide sidewalks A storm drain catch basin in Peach Hill Road will require reconstruction and relocation. One fire hydrant and existing traffic signal poles and equipment will require relocation at the southeast corner of the intersection. B. Additional Street Right of Way Six feet (6') of additional street right of way is necessary from the Moorpark Presbyterian Church. An eight foot (8') grading easement, beyond the new right of way, will also be necessary from the church to facilitate a new 4:1 graded slope. In addition, two trees will be required to be relocated further back onto the church property and ground cover will be provided. The deed for the additional street right of way has been signed by the Presbyterian Church and is being recorded. The Church has agreed to the design concept discussed above. C. Plans and Specifications A copy of the plans and specifications for the project have been placed in the City Council office for your review. U0ol1il D. Fiscal Impact 1. 2. 3 Project Cost Estimate Note: a: Repair and replacement of the irrigation system and landscaping is to be done by the City's landscape maintenance contractor. FY 1998/99 Budget Account Number Description Amount 400.801.8030.802.9102 Design 1,000 400.801.8030.802.9102 Construction 100,000 400.801.8030.802.9102 Admin / Insp 12.000 Total 113,000 Funding Source This project is funded by a loan from the Gas Tax Fund [Fund 2401, to be repaid by development fees to be paid by the developers of the Carlsberg Specific Plan for the purpose of easing traffic congestion on streets within and adjacent to that development. At the time of award of contract, a resolution will be presented to the City Council revising the FY 1998/99 Budget to accurately reflect this loan. Note:Revenues from the Development Fees to be paid by the developers of the Carlsberg Specific Plan are anticipated to exceed $324,339. The base year amounts for these fees are as follows: Residential: $1,587 per lot; Commercial /Industrial: $4,443 per acre. The fee will be adjusted monthly at the annual rate of six percent (6%). All fees must be paid within ten years of the date the first building permit is issued. 00012(1 i Prior Element Years FY 98/99 Total Design 13,000 13,000 R -O -W 0 0 Construction Contract 48,000 48,000 48,000 Contingency 4,800 4,800 4,800 Others 2,000 a 2,000 2,000 Contract Admin/Insp 7.500 7.500 Total 13,000 62,300 75,300 Note: a: Repair and replacement of the irrigation system and landscaping is to be done by the City's landscape maintenance contractor. FY 1998/99 Budget Account Number Description Amount 400.801.8030.802.9102 Design 1,000 400.801.8030.802.9102 Construction 100,000 400.801.8030.802.9102 Admin / Insp 12.000 Total 113,000 Funding Source This project is funded by a loan from the Gas Tax Fund [Fund 2401, to be repaid by development fees to be paid by the developers of the Carlsberg Specific Plan for the purpose of easing traffic congestion on streets within and adjacent to that development. At the time of award of contract, a resolution will be presented to the City Council revising the FY 1998/99 Budget to accurately reflect this loan. Note:Revenues from the Development Fees to be paid by the developers of the Carlsberg Specific Plan are anticipated to exceed $324,339. The base year amounts for these fees are as follows: Residential: $1,587 per lot; Commercial /Industrial: $4,443 per acre. The fee will be adjusted monthly at the annual rate of six percent (6%). All fees must be paid within ten years of the date the first building permit is issued. 00012(1 i E. Schedule During the next several months, Peach Hill Road will be used as a Detour Route during the construction of improvements to Spring Road by the developers of the Carlsberg Specific Plan. That work is expected to be completed in November, at which time the use of Peach Hill Road as a detour route will be terminated. However, the commencement of work on the reconstruction of the Spring Road bridge is scheduled for April 1999. During the reconstruction of the bridge Peach Hill Road will again be used as a detour route. It is the intent of City staff to attempt to have the subject work done during this "window" when the volume of traffic on Peach Hill Road is reduced. Accordingly, the tentative schedule of the subject project is as follows: • Advertise: September 1 • Open Bids: October 20 • Award Contract: November 4 • Start Construction: November 16 • End Construction: January 15 RECOMMENDATION Staff recommends that the City Council approve the plans and specifications and authorize staff to advertise for receipt of bids for the construction for the subject project. cc: chron 86.360 QQ01 zl-