F. Consider Award of Contract to Pavement Coatings Co. for the 2018 Slurry Seal
and Pavement Rehabilitation Project (Project No. M0042). Staff
Recommendation: 1) Award construction contract to Pavement Coatings Co.
and authorize the City Manager to execute the construction contract in the
amount of $299,817 for the subject project, subject to final language approval by
the City Manager; 2) Authorize the City Manager to amend the construction
contract for project contingencies in an amount not exceed $27,102 (10%), if and
when the need arises for extra work and services for Schedule A; and 3)
Authorize the City Manager to amend the construction contract for project
contingencies in an amount not exceed $21,200, if and when the need arises for
extra work and services for Schedule B.
Item: 10.F.
MOORPARK CITY COUNCIL
AGENDA REPORT
TO: Honorable City Council
FROM: Sean Corrigan, City Engineer/Public Works Director
DATE: 10/17/2018 Regular Meeting
SUBJECT: Consider Award of Contract to Pavement Coatings Co. for the 2018
Slurry Seal and Pavement Rehabilitation Project (Project No. M0042)
BACKGROUND
On August 1, 2018, the City Council approved the Plans and Specifications for the 2018
Slurry Seal and Pavement Rehabilitation Project and authorized staff to advertise the
project to obtain construction bids. The project scope of work consists of crack-filling
and placement of approximately 625,000 square feet of Type 2 slurry seal on local
residential streets in the Campus Canyon Road – University Drive area. The following
is a list of residential streets that staff recommended for slurry seal:
• Alumni Way • Griffith Lane • Sophomore Court
• Bitner Place • Harte Lane • Sosna Court
• Borges Court • Imbach Place • Stanley Court
• Borges Drive • Mahan Court • Swift Place
• Braun Court • Mallory Court • Thionnet Place
• Campus Canyon
Drive
• Miline Court • Shakespeare
Place
• Doris Court • Monroe Avenue • Trollope Court
• Freshman Court • Rains Court • University Drive
• Graduate Place • Seitz Court
In addition to the slurry seal maintenance work, staff was tasked to recommend an
interim repair for deteriorated pavement along Princeton Avenue. Based on field
evaluations and measurements, staff determined that approximately 10,000 square feet
Item: 10.F.
95
Honorable City Council
10/17/2018 Regular Meeting
Page 2
of pavement could be patched as an interim solution, until the construction of the
Princeton Avenue Improvement Project is complete. With the rising cost of
construction, staff included a unit price bid item for asphaltic concrete pavement repair.
The unit bid price was based on an initial area of 3,750 square feet of pavement repair
with the intention to reassess the scope when actual construction bid prices are
received.
DISCUSSION
A public Notice Inviting Sealed Bids was published on September 5th and 10th, 2018
with a bid opening date on September 28, 2018. Staff received two construction bids:
Contractor Bid Amount
Pavement Coatings Co. $299,817.00
All American Asphalt $340,069.50
The lowest, responsible bidder is Pavement Coatings Co., located in Jurupa Valley,
California. The Bid Schedule contained two separate schedules with the following
breakdown from Pavement Coatings Co.:
Bid Schedule Bid Amount
Schedule A – Slurry Seal (University Drive - Campus Canyon) $271,017.00
Schedule B – Pavement Rehabilitation (Princeton Avenue) $28,800.00
Total Bid $299,817.00
During the project planning and preparation of the Fiscal Year 2018/2019 Capital
Improvement Budget, the construction cost estimate for the scope of work in Schedule
A was $250,000. This amount is also reflected in the adopted budget. Since that time,
the construction industry has seen costs for material and personnel increase throughout
the Southern California region. This cost increase is reflected in the bid proposal
amounts received and are higher than the initial cost estimate and budget amounts,
which were prepared in early 2018.
FISCAL IMPACT
The lowest, responsible construction bid received for the project (Schedule A and B) is
$299,817.00. As previously mentioned, construction bids were obtained for two
separate Schedules of Work. The bid amount for Schedule A is $271,017 and will be
funded by Project M0042. A 10% project contingency, in the amount of $27,102, will
bring the total budget amount for Schedule A work to $298,119. No new funding
96
Honorable City Council
10/17/2018 Regular Meeting
Page 3
appropriations are needed for Schedule A work but a budget line item adjustment is
required as follows:
Account Number Current Budget Revision Amount Amended Budget
2416-311-M0042-55200 $250,000.00 $50,000.00 $300,000.00
2416-311-M0042-55300 $50,000.00 ($50,000.00) $0.00
Total Project Budget $300,000.00
The bid amount for Schedule B, $28,800, is based on performing an asphalt overlay of
3,750 square feet on Princeton Avenue. Staff is requesting City Council consider
budgeting $50,000 for Schedule B for additional pavement repair on Princeton Avenue.
All pavement repair efforts along Princeton Avenue will be within City owned and
maintained right-of-way. No pavement repairs are recommended along Princeton
Avenue that is within Caltrans right-of-way (underneath SR-118). No funding for new
appropriations are being requested for Schedule B work and will be funded by the
Princeton Avenue Improvement Project (C0020) Infrastructures Account No. 2014-311-
C0020-55200. The Princeton Avenue Improvement Project (C0020) current budget is
as follows
Account Description Current Budget
2014-311-C0020-53000 Property Maintenance $1,500.00
2014-311-C0020-55100 Land Acquisition $4,624.00
2014-311-C0020-55200 Infrastructure $5,819,537.00
2014-311-C0020-55210 Building & Structures $601.00
2014-311-C0020-55300 Professional Services $68,458.00
2409-311-C0020-55200 Infrastructure $1,087,244.00
Total $6,981,964.00
STAFF RECOMMENDATION
1. Award construction contract to Pavement Coatings Co. and authorize the City
Manager to execute the construction contract in the amount of $299,817 for the
subject project, subject to final language approval by the City Manager;
2. Authorize the City Manager to amend the construction contract for project
contingencies in an amount not exceed $27,102 (10%), if and when the need
arises for extra work and services for Schedule A;
97
Honorable City Council
10/17/2018 Regular Meeting
Page 4
3. Authorize the City Manager to amend the construction contract for project
contingencies in an amount not exceed $21,200, if and when the need arises for
extra work and services for Schedule B.
Attachments
Construction Agreement – Pavement Coatings Co.
98
AGREEMENT BETWEEN THE CITY OF MOORPARK AND
PAVEMENT COATINGS CO., FOR 2018 SLURRY SEAL AND PAVEMENT
REHABILITATION PROJECT (M0042), SPECIFICATION NO. MPK 18-01
THIS AGREEMENT, executed as of this ____ day of _____________________,
2018, between the City of Moorpark, a municipal corporation (“City”) and Pavement
Coatings Co., a private corporation (“Contractor”). In consideration of the mutual
covenants and conditions set forth herein, the parties agree as follows:
WHEREAS, City has the need for construction services related to pavement
preservation and rehabilitation; and
WHEREAS, Contractor specializes in providing such services and has the proper
work experience, certifications, and background to carry out the duties involved; and
WHEREAS, on October 17, 2018, the City Council of the City of Moorpark
authorized the City Manager to enter into this Agreement after public bidding in
accordance with California Public Contract Code Section 20160, et seq.
NOW, THEREFORE, in consideration of the mutual covenants, benefits, and
premises herein stated, the parties hereto agree as follows:
1. TERM
The term of the Agreement shall be from the date of execution until completion of
the work identified in the Scope of Services and in conformance with Exhibit C, unless
this Agreement is terminated or suspended consistent with Section 6 of this Agreement.
2. SCOPE OF SERVICES
City does hereby retain Contractor in a contractual capacity to provide
construction services related to pavement preservation and rehabilitation, as set forth in
Exhibit C: Contractor’s Bid Proposal, dated September 24, 2018, which exhibit is
attached hereto and incorporated herein by this reference as though set forth in full and
hereinafter referred to as the “Proposal” and as set forth in Exhibit C, which include (i)
Standard Specifications; (ii) Special Provisions; (iii) Workers’ Compensation Insurance
Certificate (Labor Code 1860 and 1861); (iv) Payment and Performance Bonds; and (v)
Insurance Certificate for General Liability and Automobile Liability, attached hereto and
incorporated herein by this reference as though set forth in full and hereinafter referred
to as Exhibit C. Where said Scope of Services as set forth in Exhibit C is modified by
this Agreement, or in the event there is a conflict between the provisions of said Scope
of Services and this Agreement, the language contained in this Agreement shall take
precedence.
Contractor shall perform the tasks described and set forth in Exhibit C.
Contractor shall complete the tasks according to the schedule of performance which is
also set forth in Exhibit C.
99
Compensation for the services to be performed by Contractor shall be in
accordance with Exhibit C. Compensation shall not exceed the rates or total value of
Two Hundred Ninety-Nine Thousand Eight Hundred Seventeen dollars ($299,817.00)
as stated in Exhibit C, without a written amendment to the agreement executed by both
parties. Payment by City to Contractor shall be as referred to in this Agreement.
City and Contractor acknowledge that this project is a public work to which
prevailing wages apply, and that a public work project is subject to compliance
monitoring and enforcement by the California Department of Industrial Relations (DIR).
Contractor agrees to comply with and be bound by all the terms, rules and regulations
described in (a) Division 2, Part 7, Chapter 1 (commencing with Section 1720) of the
California Labor Code, including without limitation Labor Code Section 1771 and (b) the
rules and regulations established by the DIR implementing such statutes, as though set
forth in full herein, including any applicable amendments made thereto during the term
of this Agreement. For every subcontractor who will perform work on this project,
Contractor shall be responsible for subcontractor’s compliance with (a) and (b) and
Contractor shall take all necessary actions to ensure subcontractor’s compliance. Labor
Code Section 1725.5 requires all contractors and subcontractors to annually register
with the DIR before bidding or performing on any public work contract.
3. PERFORMANCE
Contractor shall at all times faithfully, competently, and to the best of Contractor’s
ability, experience, and talent, perform all tasks described herein. Contractor shall
employ, at a minimum, generally accepted standards and practices utilized by persons
engaged in providing similar services as are required of Contractor hereunder in
meeting its obligations under this Agreement.
4. MANAGEMENT
The individual directly responsible for Contractor’s overall performance of the
Agreement provisions herein above set forth and to serve as principal liaison between
City and Contractor shall be Tom Mucenski, and no other individual may be substituted
without the prior written approval of the City Manager.
The City’s contact person in charge of administration of this Agreement, and to
serve as principal liaison between Contractor and City, shall be the City Manager or the
City Manager’s designee.
5. PAYMENT
The City agrees to pay Contractor monthly, in accordance with the terms and the
schedule of payment as set forth in Exhibit C, attached hereto and incorporated herein
by this reference as though set forth in full, based upon actual time spent on the above
tasks. This amount shall not exceed Two Hundred Ninety-Nine Thousand Eight
Hundred Seventeen dollars ($299,817.00) for the total term of the Agreement unless
additional payment is approved as provided in this Agreement.
Pavement Coatings Co. Page 2 of 18
100
Contractor shall not be compensated for any additional services rendered in
connection with its performance of this Agreement, unless such additional services and
compensation are authorized, in advance, in a written amendment to this Agreement
executed by both parties. The City Manager, if authorized by City Council, may approve
additional work not to exceed ten percent (15%) of the amount of the Agreement.
Contractor shall submit invoices monthly for actual services performed. Invoices
shall be submitted on or about the first business day of each month, or as soon
thereafter as practical, for services provided in the previous month. Payment shall be
made within thirty (30) days of receipt of each invoice as to all non-disputed fees. If the
City disputes any of Contractor’s fees it shall give written notice to Contractor within
thirty (30) days of receipt of any disputed fees set forth on the invoice. Contractor shall
provide appropriate documentation, as determined by the City, for all reimbursable
expenses.
6. TERMINATION OR SUSPENSION WITHOUT CAUSE
The City may at any time, for any reason, with or without cause, suspend, or
terminate this Agreement, or any portion hereof, by serving upon the Contractor at least
ten (10) days prior written notice. Upon receipt of said notice, the Contractor shall
immediately cease all work under this Agreement, unless the notice provides otherwise.
If the City suspends or terminates a portion of this Agreement such suspension or
termination shall not make void or invalidate the remainder of this Agreement.
The Contractor may terminate this Agreement only by providing City with written
notice no less than thirty (30) days in advance of such termination. In the event of such
termination, Contractor shall be compensated for such services up to the date of
termination. Such compensation for work in progress shall be prorated as to the
percentage of progress completed at the date of termination.
If the City Manager or the City Manager’s designee determines that the
Contractor is in default in the performance of any of the terms or conditions of this
Agreement, the City may proceed in the manner set forth in Section 6-4 of the
Greenbook.
7. DEFAULT OF CONTRACTOR
The Contractor’s failure to comply with the provisions of this Agreement shall
constitute a default. In the event that Contractor is in default for cause under the terms
of this Agreement, City shall have no obligation or duty to continue compensating
Contractor for any work performed after the date of default and can terminate this
Agreement immediately by written notice to the Contractor. If such failure by the
Contractor to make progress in the performance of work hereunder arises out of causes
beyond the Contractor’s control, and without fault or negligence of the Contractor, it
shall not be considered a default.
Pavement Coatings Co. Page 3 of 18
101
If the City Manager or the City Manager’s designee determines that the
Contractor is in default in the performance of any of the terms or conditions of this
Agreement, he/she shall cause to be served upon the Contractor a written notice of the
default. The Contractor shall have five (5) working days after service upon it of said
notice in which to cure the default by rendering a satisfactory performance. In the event
that the Contractor fails to cure its default within such period of time, the City shall have
the right, notwithstanding any other provision of this Agreement, to terminate this
Agreement without further notice and without prejudice to any other remedy to which it
may be entitled at law, in equity or under this Agreement.
8. LIQUIDATED DAMAGES
If the Contractor fails to complete the work, or any portion thereof, within the time
period required by this Agreement or as duly extended in writing by the City Manager,
Contractor shall forfeit and pay to the City, as liquidated damages, the sum of One
Thousand dollars ($1,000.00) per day for each calendar day the work, or portion
thereof, remains uncompleted after the above specified completion date. Liquidated
damages shall be deducted from any payments due or to become due to the Contractor
under the terms of this Agreement [Government Code Sec. 53069.85]. Progress
payments made by the City after the above specified completion date shall not
constitute a waiver of liquidated damages by the City.
9. OWNERSHIP OF DOCUMENTS
Contractor shall maintain complete and accurate records with respect to sales,
costs, expenses, receipts, and other such information required by City that relate to the
performance of services under this Agreement. Contractor shall maintain adequate
records of services provided in sufficient detail to permit an evaluation of services. All
such records shall be maintained in accordance with generally accepted accounting
principles and shall be clearly identified and readily accessible. Contractor shall provide
free access to the representatives of City or its designees at reasonable times to such
books and records; shall give the City the right to examine and audit said books and
records; shall permit City to make transcripts therefrom as necessary; and shall allow
inspection of all work, data, documents, proceedings, and activities related to this
Agreement. Notification of audit shall be provided at least thirty (30) days before any
such audit is conducted. Such records, together with supporting documents, shall be
maintained for a period of ten (10) years after receipt of final payment.
Upon completion of, or in the event of termination or suspension of this
Agreement, all original documents, designs, drawings, maps, models, computer files,
surveys, notes, and other documents prepared in the course of providing the services to
be performed pursuant to this Agreement shall become the sole property of the City and
may be used, reused, or otherwise disposed of by the City without the permission of the
Contractor. With respect to computer files, Contractor shall make available to the City,
at the Contractor’s office and upon reasonable written request by the City, the
necessary computer software and hardware for purposes of accessing, compiling,
transferring, and printing computer files.
Pavement Coatings Co. Page 4 of 18
102
10. INDEMNIFICATION AND HOLD HARMLESS
Contractor shall indemnify, defend with legal counsel approved by City, and hold
harmless City, its officers, officials, employees and volunteers from and against all
liability, loss, damage, expense, cost (including without limitation reasonable legal
counsels’ fees, expert fees and all other costs and fees of litigation) of every nature
arising out of or in connection with Contractor's negligence, recklessness or willful
misconduct in the performance of work hereunder or its failure to comply with any of its
obligations contained in this Agreement, except such loss or damage which is caused by
the sole or active negligence or willful misconduct of the City. Should conflict of interest
principles preclude a single legal counsel from representing both City and Contractor, or
should City otherwise find Contractor’s legal counsel unacceptable, then Contractor shall
reimburse the City its costs of defense, including without limitation reasonable legal
counsels fees, expert fees and all other costs and fees of litigation. The Contractor shall
promptly pay any final judgment rendered against the City (and its officers, officials,
employees and volunteers) with respect to claims determined by a trier of fact to have
been the result of the Contractor’s negligent, reckless or wrongful performance. It is
expressly understood and agreed that the foregoing provisions are intended to be as
broad and inclusive as is permitted by the law of the state of California and will survive
termination of this Agreement.
Contractor obligations under this section apply regardless of whether or not such
claim, charge, damage, demand, action, proceeding, loss, stop notice, cost, expense,
judgment, civil fine or penalty, or liability was caused in part or contributed to by an
Indemnitee. However, without affecting the rights of City under any provision of this
agreement, Contractor shall not be required to indemnify and hold harmless City for
liability attributable to the active negligence of City, provided such active negligence is
determined by agreement between the parties or by the findings of a court of competent
jurisdiction. In instances where City is shown to have been actively negligent and where
City active negligence accounts for only a percentage of the liability involved, the
obligation of Contractor will be for that entire portion or percentage of liability not
attributable to the active negligence of City.
Contractor agrees to obtain executed indemnity agreements with provisions
identical to those set forth here in this Section from each and every subcontractor or any
other person or entity involved by, for, with, or on behalf of Contractor in the
performance of this Agreement. In the event Contractor fails to obtain such indemnity
obligations from others as required here, Contractor agrees to be fully responsible
according to the terms of this Section.
Failure of City to monitor compliance with these requirements imposes no
additional obligations on City and will in no way act as a waiver of any rights hereunder.
This obligation to indemnify and defend City as set forth here is binding on the
successors, assigns, or heirs of Contractor and shall survive the termination of this
Agreement or Section.
Pavement Coatings Co. Page 5 of 18
103
This Indemnity shall survive termination of the Agreement or Final Payment
hereunder. This Indemnity is in addition to any other rights or remedies that the
Indemnitees may have under the law or under any other Contract Documents or
Agreements. In the event of any claim or demand made against any party which is
entitled to be indemnified hereunder, City may, in its sole discretion, reserve, retain, or
apply any monies to the Contractor under this Agreement for the purpose of resolving
such claims; provided, however, City may release such funds if the Contractor provides
City with reasonable assurance of protection of the Indemnitees’ interests. City shall, in
its sole discretion, determine whether such assurances are reasonable.
11. INSURANCE
Contractor shall maintain prior to the beginning of and for the duration of this
Agreement insurance coverage as specified in Exhibit A attached hereto and
incorporated herein by this reference as though set forth in full.
12. INDEPENDENT CONTRACTOR
Contractor is and shall at all times remain as to the City a wholly independent
Contractor. The personnel performing the services under this Agreement on behalf of
Contractor shall at all times be under Contractor’s exclusive direction and control.
Neither City nor any of its officers, employees, or agents shall have control over the
conduct of Contractor or any of Contractor’s officers, employees, or agents, except as
set forth in this Agreement. Contractor shall not at any time or in any manner represent
that it or any of its officers, employees, or agents are in any manner officers,
employees, or agents of the City. Contractor shall not incur or have the power to incur
any debt, obligation, or liability against City, or bind City in any manner.
No employee benefits shall be available to Contractor in connection with the
performance of this Agreement. Except for the fees paid to Contractor as provided in
the Agreement, City shall not pay salaries, wages, or other compensation to Contractor
for performing services hereunder for City. City shall not be liable for compensation or
indemnification to Contractor for injury or sickness arising out of performing services
hereunder.
13. LEGAL RESPONSIBILITIES
The Contractor shall keep itself informed of local, state, and federal laws and
regulations which in any manner affect those employed by it or in any way affect the
performance of its service pursuant to this Agreement. The Contractor shall at all times
observe and comply with all such laws and regulations, including but not limited to the
Americans with Disabilities Act and Occupational Safety and Health Administration laws
and regulations. The City and Contractor shall comply with Exhibit B, California Public
Contract Code Section 9204, when applicable. The City, and its officers and
employees, shall not be liable at law or in equity occasioned by failure of the Contractor
to comply with this Section.
Pavement Coatings Co. Page 6 of 18
104
14. ANTI DISCRIMINATION
Neither the Contractor, nor any subcontractor under the Contractor, shall
discriminate in employment of persons upon the work because of race, religious creed,
color, national origin, ancestry, physical disability, mental disability, medical condition,
genetic information, marital status, sex, gender, gender identity, gender expression,
age, sexual orientation, or military and veteran status of such person; or any other basis
protected by applicable federal, state, or local law, except as provided in Section 12940
of the Government Code. The Contractor shall have responsibility for compliance with
this Section, if applicable [Labor Code Section 1735].
15. UNDUE INFLUENCE
Contractor declares and warrants that no undue influence or pressure is used
against or in concert with any officer or employee of the City in connection with the
award, terms, or implementation of this Agreement, including any method of coercion,
confidential financial arrangement, or financial inducement. No officer or employee of
the City will receive compensation, directly or indirectly from Contractor, or any officer,
employee, or agent of Contractor, in connection with the award of this Agreement or any
work to be conducted as a result of this Agreement. Violation of this Section shall be a
material breach of this Agreement entitling the City to any and all remedies at law or in
equity.
16. NO BENEFIT TO ARISE TO LOCAL EMPLOYEES
No member, officer, or employee of the City, or their designees or agents, and no
public official who exercises authority over or responsibilities with respect to the Project
during his/her tenure or for one (1) year thereafter, shall have any interest, direct or
indirect, in any agreement or sub-agreement, or the proceeds thereof, for work to be
performed in connection with the Project performed under this Agreement.
17. CONFLICT OF INTEREST
Contractor covenants that neither they nor any officer or principal of their firm
have any interests, nor shall they acquire any interest, directly or indirectly, which will
conflict in any manner or degree with the performance of their services hereunder.
Contractor further covenants that in the performance of this Agreement, they shall
employ no person having such interest as an officer, employee, agent, or subcontractor.
Contractor further covenants that Contractor has not contracted with nor is performing
any services directly or indirectly, with the developer(s) and/or property owner(s) and/or
firm(s) and/or partnership(s) and/or public agency(ies) owning property and/or
processing an entitlement application for property in the City or its Area of Interest, now
or within the past one (1) year, and further covenants and agrees that Contractor and/or
its subcontractors shall provide no service or enter into any contract with any
developer(s) and/or property owner(s) and/or firm(s) and/or partnership(s) and/or public
agency(ies) owning property and/or processing an entitlement application for property in
the City or its Area of Interest, while under contract with the City and for a one (1) year
time period following termination of this Agreement.
Pavement Coatings Co. Page 7 of 18
105
18. NOTICE
Any notice to be given pursuant to this Agreement shall be in writing, and all such
notices and any other document to be delivered shall be delivered by personal service
or by deposit in the United States mail, certified or registered, return receipt requested,
with postage prepaid, and addressed to the party for whom intended as follows:
To: City Manager
City of Moorpark
799 Moorpark Ave.
Moorpark, CA 93021
To: Doug Ford, President
Pavement Coatings Co.
10240 San Sevaine Way
Jurupa Valley, CA 91752
Either party may, from time to time, by written notice to the other, designate a
different address or contact person, which shall be substituted for the one above
specified. Notices, payments and other documents shall be deemed delivered upon
receipt by personal service or as of the third (3rd) day after deposit in the United States
mail.
19. CHANGE IN NAME
Should a change be contemplated in the name or nature of the Contractor’s legal
entity, the Contractor shall first notify the City in order that proper steps may be taken to
have the change reflected in the Agreement documents.
20. ASSIGNMENT
Contractor shall not assign this Agreement or any of the rights, duties, or
obligations hereunder. It is understood and acknowledged by the parties that Contractor
is uniquely qualified to perform the services provided for in this Agreement.
21. LICENSES
At all times during the term of this Agreement, Contractor shall have in full force
and effect, all licenses required of it by law for the performance of the services in this
Agreement.
22. VENUE AND GOVERNING LAW
This Agreement is made, entered into, and executed in Ventura County,
California, and any action filed in any court or for arbitration for the interpretation,
enforcement or other action of the terms, conditions, or covenants referred to herein
shall be filed in the applicable court in Ventura County, California. The City and
Pavement Coatings Co. Page 8 of 18
106
Contractor understand and agree that the laws of the state of California shall govern the
rights, obligations, duties, and liabilities of the parties to this Agreement and also govern
the interpretation of this Agreement.
23. ENTIRE AGREEMENT
This Agreement contains the entire understanding between the parties relating to
the obligations of the parties described in this Agreement. All prior or contemporaneous
agreements, understandings, representations, and statements, oral or written, are
merged into this Agreement and shall be of no further force or effect. Each party is
entering into this Agreement based solely upon the representations set forth herein and
upon each party’s own independent investigation of any and all facts such party deems
material.
24. CAPTIONS OR HEADINGS
The captions and headings of the various Articles, Paragraphs, Sections, and
Exhibits of this Agreement are for convenience and identification only and shall not be
deemed to limit or define the content of the respective Articles, Paragraphs, Sections,
and Exhibits hereof.
25. AMENDMENTS
Any amendment, modification, or variation from the terms of this Agreement shall
be in writing and shall be effective only upon approval by both parties to this Agreement.
26. TIME OF COMPLETION
City and Contractor agree that time is of the essence in this Agreement. City and
Contractor further agree that Contractor’s failure to perform on or at the times set forth
in this Agreement will damage and injure City, but the extent of such damage and injury
is difficult or speculative to ascertain. Consequently, City and Contractor agree that any
failure to perform by Contractor at or within the times set forth herein shall result in
liquidated damages as defined in this Agreement for each and every day such
performance is late. City and Contractor agree that such sum is reasonable and fair.
Furthermore, City and Contractor agree that this Agreement is subject to Government
Code Section 53069.85 and that each party hereto is familiar with and understands the
obligations of said Section of the Government Code.
27. PRECEDENCE
Contractor is bound by the contents of City’s Bid Package and Proposal, Exhibit
C attached hereto and incorporated herein by this reference as though set forth in full.
In the event of conflict, the requirements of the City’s Bid Package and this Agreement
shall take precedence over those contained in the Proposal.
Pavement Coatings Co. Page 9 of 18
107
28. INTERPRETATION OF AGREEMENT
Should interpretation of this Agreement, or any portion thereof, be necessary, it is
deemed that this Agreement was prepared by the parties jointly and equally, and shall
not be interpreted against either party on the ground that the party prepared the
Agreement or caused it to be prepared.
29. WAIVER
No waiver of any provision of this Agreement shall be deemed, or shall
constitute, a waiver of any other provision, whether or not similar, nor shall any such
waiver constitute a continuing or subsequent waiver of the same provision. No waiver
shall be binding unless executed in writing by the party making the waiver.
30. AUTHORITY TO EXECUTE
The person or persons executing this Agreement on behalf of the Contractor
warrants and represents that he/she has the authority to execute this Agreement on
behalf of the Contractor and has the authority to bind Contractor to the performance of
obligations hereunder.
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be
executed the day and year first above written.
CITY OF MOORPARK PAVEMENT COATINGS CO.
_____________________________ _____________________________
Troy Brown, City Manager Doug Ford, President
Attest:
_____________________________
Maureen Benson, City Clerk
Pavement Coatings Co. Page 10 of 18
108
EXHIBIT A
INSURANCE REQUIREMENTS
Prior to the beginning of and throughout the duration of the Work, Contractor will
maintain insurance in conformance with the requirements set forth below. Contractor
will use existing coverage to comply with these requirements. If that existing coverage
does not meet the requirements set forth here, it will be amended to do so. Contractor
acknowledges that the insurance coverage and policy limits set forth in this section
constitute the minimum amount of coverage required. Any insurance proceeds available
to City in excess of the limits and coverage required in this Agreement and which is
applicable to a given loss, will be available to the City.
Contractor shall provide the following types and amounts of insurance:
Commercial General Liability
Commercial General Liability Insurance shall be provided by an Insurance
Services Office “Commercial General Liability” policy form CG 00 01 or the exact
equivalent. Defense costs must be paid in addition to limits. There shall be no cross
liability exclusion for claims or suits by one insured against another. Limits shall be no
less than $5,000,000 per occurrence for all covered losses and no less than
$10,000,000 general aggregate.
Contractor’s policy shall contain no endorsements limiting coverage beyond the
basic policy coverage grant for any of the following:
a. Explosion, collapse or underground hazard (XCU)
b. Products and completed operations
c. Pollution liability
d. Contractual liability
Coverage shall be applicable to City for injury to employees of contractors,
subcontractors, or others involved in the project. Policy shall be endorsed to provide a
separate limit applicable to this project.
Workers’ Compensation
Workers’ Compensation insurance shall be provided on a state-approved policy
form providing statutory benefits as required by law with employers’ liability limits no
less than $1,000,000 per accident for all covered losses.
Pavement Coatings Co. Page 11 of 18
109
Business Auto Coverage
Business Auto Coverage on ISO Business Auto Coverage form CA 00 01 06 92
including symbol 1 (Any Auto) or the exact equivalent shall be provided. Limits shall be
no less than $1,000,000 per accident, combined single limit. If Contractor owns no
vehicles, this requirement may be satisfied by a non-owned auto endorsement to the
general liability policy described above. If Contractor or Contractor’s employees will use
personal autos in any way on this project, Contractor shall provide evidence of personal
auto liability coverage for each such person.
Excess or Umbrella Liability
Excess or Umbrella Liability insurance (Over Primary) if used to meet limit
requirements, shall provide coverage at least as broad as specified for the underlying
coverages. Coverage shall be provided on a “pay on behalf” basis, with defense costs
payable in addition to policy limits. There shall be no cross liability exclusion precluding
coverage for claims or suits by one insured against another. Coverage shall be
applicable to City for injury to employees of contractor, subcontractors, or others
involved in the Work. The scope of coverage provided is subject to the approval of city
following receipt of proof of insurance as required herein. Limits are subject to review.
Insurance procured pursuant to these requirements shall be written by insurers
that are admitted carriers in the state of California and with A.M. Best rating of A- or
better and a minimum financial size of VII.
Contractor and City agrees as follows:
1. Contractor agrees to endorse the third party general liability coverage required
herein to include as additional insureds City, its officials, employees, agents,
using standard ISO endorsement No. CG 2010 with an edition date prior to 1992.
Contractor also agrees to require all contractors, subcontractors, and any one
else involved in any way with the project contemplated by this Agreement to do
likewise.
2. Any waiver of subrogation express or implied on the part of the City to any party
involved in this Agreement or related documents applies only to the extent of
insurance proceeds actually paid. City, having required that it be named as an
additional insured to all insurance coverage required herein, expressly retains the
right to subrogate against any party for sums not paid by insurance. For its part,
Contractor agrees to waive subrogation rights against City regardless of the
applicability of any insurance proceeds, and to require all contractors,
subcontractors, or others involved in any way with the project contemplated by
this Agreement to do likewise.
3. All insurance coverage maintained or procured by Contractor or required of
others by Contractor pursuant to this Agreement shall be endorsed to delete the
subrogation condition as to the city, or to specifically allow Contractor or others
providing insurance herein to waive subrogation prior to a loss. This
Pavement Coatings Co. Page 12 of 18
110
endorsement shall be obtained regardless of existing policy wording that may
appear to allow such waivers.
4. It is agreed by Contractor and City that insurance provided pursuant to these
requirements is not intended by any party to be limited to providing coverage for
the vicarious liability of City, or to the supervisory role, if any, of City. All
insurance coverage provided pursuant to this or any other Agreement (express
or implied) in any way relating to City is intended to apply to the full extent of the
policies involved. Nothing referred to here or contained in any agreement
involving City in relation to the project contemplated by this Agreement is
intended to be construed to limit the application of insurance coverage in any
way.
5. None of the coverages required herein will be in compliance with these
requirements if they include any limiting endorsement of any kind that has not
been first submitted to City and approved of in writing.
6. All coverage types and limits required are subject to approval, modification, and
additional requirements by the City, as the need arises. Contractor shall not
make any reductions in scope of coverage (e.g. elimination of contractual liability
or reduction of discover period) that may affect City’s protection without City’s
prior written consent.
7. Proof of compliance with these insurance requirements, consisting of binders of
coverage, or endorsements, or certificates of insurance, shall be delivered to City
at or prior to the execution of this Agreement. In the event such proof of
insurance is not delivered as required, or in the event such insurance is canceled
or reduced at any time and no replacement coverage is provided, City has the
right, but not the duty, to obtain any insurance it deems necessary to protect its
interests under this or any other Agreement and to pay the premium. Any
premium so paid by City shall be charged to and promptly paid by Contractor or
deducted from sums due Contractor, at City option.
8. Contractor agrees to endorse, and to required others to endorse, the insurance
provided pursuant to these requirements, to require 30 days notice to City and
the appropriate tender prior to cancellation or reduction of such liability coverage
and notice of any material alteration or non-renewal of any such coverage, and to
require contractors, subcontractors, and any other party in any way involved with
the project contemplated by this Agreement to do likewise.
9. It is acknowledged by the parties of this Agreement that all insurance coverage
required to be provided by Contractor or any subcontractor, and any other party
involved with the project who is brought onto or involved in the project by
Contractor, is intended to apply first and on a primary non-contributing basis in
relation to any other insurance or self insurance available to the City.
10. Contractor agrees to ensure that subcontractors, and any other party involved
with the project who is brought onto or involved in the project by Contractor,
Pavement Coatings Co. Page 13 of 18
111
provide the same minimum insurance coverage required of Contractor.
Contractor agrees to monitor and review all such coverage and assumes all
responsibility for ensuring that such coverage is provided in conformity with the
requirements of this Agreement. Contractor agrees that upon request, all
agreements with subcontractors and others engaged in this project will be
submitted to City for review.
11. Contractor agrees not to self-insure or to use any self-insured retentions or
deductibles on any portion of the insurance required herein and further agrees
that it will not allow any contractor, subcontractor, architect, engineer, or other
entity or person in any way involved in the performance of Work on the project
contemplated by this Agreement to self-insure its obligations to City. If
Contractor’s existing coverage includes a deductible or self-insured retention, the
deductible or self-insured retention must be declared to the City. At that time the
City shall review options with the Contractor, which may include reduction or
elimination of the deductible or self-insured retention, substitution of other
coverage, or other solutions.
12. The City reserves the right at any time during the term of this Agreement to
change the amounts and types of insurance required by giving the Contractor 90
days advance written notice of such change. If such change results in substantial
additional cost to the Contractor, the City will negotiate additional compensation
proportional to the increased benefit to City.
13. For purposes of applying insurance coverage only, all contracts pertaining to the
project will be deemed to be executed when finalized and any activity
commences in furtherance of performance under this Agreement.
14. Contractor acknowledges and agrees that any actual or alleged failure on the
part of City to inform Contractor of non-compliance with any insurance
requirement in no way imposes any additional obligations on City nor does it
waive any rights hereunder in this or any other regard.
15. Contractor will renew the required coverage annually as long as City, or its
employees or agents face an exposure from operations of any type pursuance to
this Agreement. This obligation applies whether or not the Agreement is canceled
or terminated for any reason. The insurance shall include but not be limited to
products and completed operations and discontinued operations, where
applicable. Termination of this obligation is not effective until City executes a
written statement to that effect.
16. Contractor agrees to waive its statutory immunity under any workers’
compensation statute or similar statute, in relation to the City, and to require all
subcontractors and any other person or entity involved in the project
contemplated by this Agreement to do likewise.
17. Requirements of specific coverage features are not intended as limitations on
other requirements or as a waiver of any coverage normally provided by any
Pavement Coatings Co. Page 14 of 18
112
given policy. Specific reference to a given coverage feature is for purposes of
clarification only as it pertains to a given issue, and is not intended by any party
or insured to be all-inclusive.
18. Any provision in any of the construction documents dealing with the insurance
coverage provided pursuant to these requirements, is subordinate to and
superseded by the requirements contained herein. These insurance
requirements are intended to be separate and distinct from any other provision in
this Agreement and are intended by the parties to be interpreted as such.
19. All liability coverage provided according to these requirements must be endorsed
to provide a separate aggregate limit for the project that is the subject of this
Agreement and evidencing products and completed operations coverage for not
less than two years after issuance of a final certificate of occupancy by all
appropriate government agencies or acceptance of the completed work by City.
20. Contractor agrees to be responsible for ensuring that no contract used by any
party involved in any way with the project reserves the right to charge City or
Contractor for the cost of additional insurance coverage required by this
Agreement. Any such provisions are to be deleted with reference to City. It is not
the intent of City to reimburse any third party for the cost of complying with these
requirements. There shall be no recourse against City for payment of premiums
or other amounts with respect thereto.
21. Contractor agrees to obtain and provide to City a copy of Professional Liability
coverage for Architects or Engineers on this project, when required by City. City
shall determine the liability limit.
Pavement Coatings Co. Page 15 of 18
113
EXHIBIT B
PUBLIC CONTRACT CODE SECTION 9204
9204. (a) The Legislature finds and declares that it is in the best interests of the state
and its citizens to ensure that all construction business performed on a public works
project in the state that is complete and not in dispute is paid in full and in a timely
manner.
(b) Notwithstanding any other law, including, but not limited to, Article 7.1 (commencing
with Section 10240) of Chapter 1 of Part 2, Chapter 10 (commencing with Section
19100) of Part 2, and Article 1.5 (commencing with Section 20104) of Chapter 1 of Part
3, this section shall apply to any claim by a contractor in connection with a public works
project.
(c) For purposes of this section:
(1) “Claim” means a separate demand by a contractor sent by registered mail or
certified mail with return receipt requested, for one or more of the following:
(A) A time extension, including, without limitation, for relief from damages or penalties
for delay assessed by a public entity under a contract for a public works project.
(B) Payment by the public entity of money or damages arising from work done by, or on
behalf of, the contractor pursuant to the contract for a public works project and payment
for which is not otherwise expressly provided or to which the claimant is not otherwise
entitled.
(C) Payment of an amount that is disputed by the public entity.
(2) “Contractor” means any type of contractor within the meaning of Chapter 9
(commencing with Section 7000) of Division 3 of the Business and Professions Code
who has entered into a direct contract with a public entity for a public works project.
(3) (A) “Public entity” means, without limitation, except as provided in subparagraph (B),
a state agency, department, office, division, bureau, board, or commission, the
California State University, the University of California, a city, including a charter city,
county, including a charter county, city and county, including a charter city and county,
district, special district, public authority, political subdivision, public corporation, or
nonprofit transit corporation wholly owned by a public agency and formed to carry out
the purposes of the public agency.
(B) “Public entity” shall not include the following:
(i) The Department of Water Resources as to any project under the jurisdiction of that
department.
(ii) The Department of Transportation as to any project under the jurisdiction of that
department.
(iii) The Department of Parks and Recreation as to any project under the jurisdiction of
that department.
(iv) The Department of Corrections and Rehabilitation with respect to any project under
its jurisdiction pursuant to Chapter 11 (commencing with Section 7000) of Title 7 of Part
3 of the Penal Code.
(v) The Military Department as to any project under the jurisdiction of that department.
(vi) The Department of General Services as to all other projects.
(vii) The High-Speed Rail Authority.
Pavement Coatings Co. Page 16 of 18
114
(4) “Public works project” means the erection, construction, alteration, repair, or
improvement of any public structure, building, road, or other public improvement of any
kind.
(5) “Subcontractor” means any type of contractor within the meaning of Chapter 9
(commencing with Section 7000) of Division 3 of the Business and Professions Code
who either is in direct contract with a contractor or is a lower tier subcontractor.
(d) (1) (A) Upon receipt of a claim pursuant to this section, the public entity to which the
claim applies shall conduct a reasonable review of the claim and, within a period not to
exceed 45 days, shall provide the claimant a written statement identifying what portion
of the claim is disputed and what portion is undisputed. Upon receipt of a claim, a public
entity and a contractor may, by mutual agreement, extend the time period provided in
this subdivision.
(B) The claimant shall furnish reasonable documentation to support the claim.
(C) If the public entity needs approval from its governing body to provide the claimant a
written statement identifying the disputed portion and the undisputed portion of the
claim, and the governing body does not meet within the 45 days or within the mutually
agreed to extension of time following receipt of a claim sent by registered mail or
certified mail, return receipt requested, the public entity shall have up to three days
following the next duly publicly noticed meeting of the governing body after the 45-day
period, or extension, expires to provide the claimant a written statement identifying the
disputed portion and the undisputed portion.
(D) Any payment due on an undisputed portion of the claim shall be processed and
made within 60 days after the public entity issues its written statement. If the public
entity fails to issue a written statement, paragraph (3) shall apply.
(2) (A) If the claimant disputes the public entity’s written response, or if the public entity
fails to respond to a claim issued pursuant to this section within the time prescribed, the
claimant may demand in writing an informal conference to meet and confer for
settlement of the issues in dispute. Upon receipt of a demand in writing sent by
registered mail or certified mail, return receipt requested, the public entity shall schedule
a meet and confer conference within 30 days for settlement of the dispute.
(B) Within 10 business days following the conclusion of the meet and confer
conference, if the claim or any portion of the claim remains in dispute, the public entity
shall provide the claimant a written statement identifying the portion of the claim that
remains in dispute and the portion that is undisputed. Any payment due on an
undisputed portion of the claim shall be processed and made within 60 days after the
public entity issues its written statement. Any disputed portion of the claim, as identified
by the contractor in writing, shall be submitted to nonbinding mediation, with the public
entity and the claimant sharing the associated costs equally. The public entity and
claimant shall mutually agree to a mediator within 10 business days after the disputed
portion of the claim has been identified in writing. If the parties cannot agree upon a
mediator, each party shall select a mediator and those mediators shall select a qualified
neutral third party to mediate with regard to the disputed portion of the claim. Each party
shall bear the fees and costs charged by its respective mediator in connection with the
selection of the neutral mediator. If mediation is unsuccessful, the parts of the claim
remaining in dispute shall be subject to applicable procedures outside this section.
(C) For purposes of this section, mediation includes any nonbinding process, including,
but not limited to, neutral evaluation or a dispute review board, in which an independent
third party or board assists the parties in dispute resolution through negotiation or by
Pavement Coatings Co. Page 17 of 18
115
issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this
section.
(D) Unless otherwise agreed to by the public entity and the contractor in writing, the
mediation conducted pursuant to this section shall excuse any further obligation under
Section 20104.4 to mediate after litigation has been commenced.
(E) This section does not preclude a public entity from requiring arbitration of disputes
under private arbitration or the Public Works Contract Arbitration Program, if mediation
under this section does not resolve the parties’ dispute.
(3) Failure by the public entity to respond to a claim from a contractor within the time
periods described in this subdivision or to otherwise meet the time requirements of this
section shall result in the claim being deemed rejected in its entirety. A claim that is
denied by reason of the public entity’s failure to have responded to a claim, or its failure
to otherwise meet the time requirements of this section, shall not constitute an adverse
finding with regard to the merits of the claim or the responsibility or qualifications of the
claimant.
(4) Amounts not paid in a timely manner as required by this section shall bear interest at
7 percent per annum.
(5) If a subcontractor or a lower tier subcontractor lacks legal standing to assert a claim
against a public entity because privity of contract does not exist, the contractor may
present to the public entity a claim on behalf of a subcontractor or lower tier
subcontractor. A subcontractor may request in writing, either on his or her own behalf or
on behalf of a lower tier subcontractor, that the contractor present a claim for work
which was performed by the subcontractor or by a lower tier subcontractor on behalf of
the subcontractor. The subcontractor requesting that the claim be presented to the
public entity shall furnish reasonable documentation to support the claim. Within 45
days of receipt of this written request, the contractor shall notify the subcontractor in
writing as to whether the contractor presented the claim to the public entity and, if the
original contractor did not present the claim, provide the subcontractor with a statement
of the reasons for not having done so.
(e) The text of this section or a summary of it shall be set forth in the plans or
specifications for any public works project that may give rise to a claim under this
section.
(f) A waiver of the rights granted by this section is void and contrary to public policy,
provided, however, that (1) upon receipt of a claim, the parties may mutually agree to
waive, in writing, mediation and proceed directly to the commencement of a civil action
or binding arbitration, as applicable; and (2) a public entity may prescribe reasonable
change order, claim, and dispute resolution procedures and requirements in addition to
the provisions of this section, so long as the contractual provisions do not conflict with or
otherwise impair the timeframes and procedures set forth in this section.
(g) This section applies to contracts entered into on or after January 1, 2017.
(h) Nothing in this section shall impose liability upon a public entity that makes loans or
grants available through a competitive application process, for the failure of an awardee
to meet its contractual obligations.
(i) This section shall remain in effect only until January 1, 2020, and as of that date is
repealed, unless a later enacted statute, that is enacted before January 1, 2020, deletes
or extends that date.
(Added by Stats. 2016, Ch. 810, Sec. 1. (AB 626) Effective January 1, 2017. Repealed
as of January 1, 2020, by its own provisions.)
Pavement Coatings Co. Page 18 of 18
116
EXHIBIT C
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151