Loading...
HomeMy WebLinkAboutAGENDA REPORT 1999 0818 CC REG ITEM 11KTO: FROM: DATE: CITY OF MOORPARK AGENDA REPORT The Honorable City Council ITEM CITY OF MOORPARK, CALIFORNIA City Council Meeting ACTION: )BY: ze'e l/ z ' Kenneth C. Gilbert, Director of Public Works August 6, 1999 (Council Meeting 8- 18 -99) �(�9r SUBJECT: CONSIDER APPROVAL OF THE PLANS AND SPECIFICATIONS FOR THE 1999 MISCELLANEOUS CURB, GUTTER & SIDEWALK REPAIR PROJECT AND AUTHORIZATION TO ADVERTISE FOR RECEIPT OF BIDS FOR THE SAID WORK DISCUSSION A. Project Scope The location of each concrete repair or construction site is identified on the map attached as Exhibit 1. A general description of the scope of work to be performed at each of those sites is attached as Exhibit 2. B. Design The list of concrete construction and /or repair projects was developed by the Public Works staff. The plans and specifications were prepared by the City Engineering Division. The project design has been completed. C. Additional Work Since the preparation of the plans two other locations have been identified as requiring concrete re- construction. Those two areas are generally identified as follows: • Reconstruction of a subsided driveway apron (within the street right -of -way) on Sosna Court; and • Reconstruction of the curb at the southwest corner of Collins Drive and Hearon Drive. 0 0045 . Poindexter Avenue Widening Project August 6, 1999 Page 2 It is recommended below that the plans and specifications be revised to include this work prior to advertising the project. Please note that the fiscal data set forth in Section D of this report does not include this work. The cost of this work (estimated to be approximately $10,000) will be added to those items funded by the Gas Tax fund. D. Fiscal ImiDact 1. Construction Cost Estimate: The estimated cost of construction is summarized as follows: Element Total ($) Construction 70,000 Contingency (10 %) 7,000 Total 77,000 2. Total Project Cost Estimate: The estimated total project costs are summarized as follows: Element Total ($) Construction (& Cont.) 77,000 Design 10,128 Admin & Inspection 8,872 Total 96,000 A breakdown of the total Project cost by recommended funding source is as follows: Location * ** Fund 1000 Fund 2602 Fund 2605 Fund 2903 Total Code: Street Gen. Fund SB -821 ($) Gas Tax ($) MRA ($) A: Dorothy B: McFadden C: Poppy Glen 0 0 39,875 0 39,875 D: Spring Road E: Vista del Valle F: Tierra Rejada 0 * 14,625 17,875 0 32,500 G: City Hall 1,625 0 0 0 1,625 H: Public Works Yard 0 0 8,500 8,500 17,000 I: Poindexter Outlet 0 0 0 5,000 5,000 Total 1,625 14,625 66,250 13,500 96,000 Percent of Total 2% 15% 69% 14% 100% * SB -821 Grant is 45% of Total * ** Refer to Exhibit 2 for exact location and limits of the work r- r7o Conc 99 ad 0004"i.0 Poindexter Avenue Widening Project August 6, 1999 Page 3 3. Project Funding : Information pertaining to funding sources and the application of those sources to elements, is summarized as follows: E. Caltrans Permit In that Spring Road has not yet been relinquished to the City, it will be necessary to obtain a Caltrans Permit for the work to be done on Spring Road near the Railroad crossing. F. Schedule The bid / award schedule for the subject project is as follows: • 08/23/99: advertise for bids; • 09/28/99: open bids; • 10/06/99: award contract • 10/25/99: Notice to Proceed • 01 /01 /00: Construction complete G. Plans and Specifications A copy of the plans and specs have been provided to the City Council under separate cover. 00045, ,3 Conc_99_ad Estimated Current Estimated Revised Fund Budget ($) Change ($) Total ($) 1000: Gen. Fund 1,600 1,600 2602: SB- 821 18,000 (3,400) 14,600 2605: Gas Tax 27,000 39,300 66,300 Total City 45,000 37,500 82,500 2903: MRA 50,000 (36,500) 13,500 Total 95,000 1,000 96,000 4. Budget Amendment: It is recommended that adjustments to the amounts of the appropriations, and the amount of the budget, be deferred until the opening of bids and award of contract. E. Caltrans Permit In that Spring Road has not yet been relinquished to the City, it will be necessary to obtain a Caltrans Permit for the work to be done on Spring Road near the Railroad crossing. F. Schedule The bid / award schedule for the subject project is as follows: • 08/23/99: advertise for bids; • 09/28/99: open bids; • 10/06/99: award contract • 10/25/99: Notice to Proceed • 01 /01 /00: Construction complete G. Plans and Specifications A copy of the plans and specs have been provided to the City Council under separate cover. 00045, ,3 Conc_99_ad Poindexter Avenue widening Project August 6, 1999 Page 4 RECOMMENDATIONS Staff recommends that the City Council take the following actions: 1. Direct staff to revise the plans to include the areas described in Section C of this report; 2. Approve the plans and specifications for the subject project, with the above referenced change; 3. Authorize staff to advertise for receipt of bids upon receipt of the authorization to proceed from Caltrans. Attachments: Exhibit 1: Location Map Exhibit 2: Project Description Conc 99 ad 0004 .5,1 Ci�� CITY OF MOORPARK 0 0 0 c� Exhibit 2: Project Description Page 1 A general description of the scope of work for the subject project is as follows: A. Dorothy Avenue: Removal and reconstruction of the curb and gutter (northwest side of the street) at the "knuckle" at the intersection of Dorothy Avenue and Millard Street to correct a poor drainage condition at this location. B. McFadden Avenue: Removal and reconstruction of the curb and gutter at the south end of McFadden Avenue to improve drainage. The work will include the construction of a ribbon gutter connecting the gutter on the street to a grate inlet in the alley just west of McFadden Avenue. C. Ponpycrlen Court: Re- construction of a portion of a driveway apron on the south side of the street near the end of Poppyglen Court. This work is being done to replace temporary asphalt installed when the subsided driveway was recently removed by City crews. D. Spring Road (South of Railroad): Replacement of asphalt sidewalk and driveways with concrete improvements on the west side of Spring Road just south of the railroad. [Note: As a future project, it is the intent of staff to pursue a project to construct concrete sidewalks on both sides of Spring Road across the railroad crossing.] E. Vista Del Valle: Reconstruction of the curb and gutter on the west side of Vista Del Valle from a point just north of Vista Lavana Drive northerly to a point just north of Bonita Heights Street (approximately 3301), to correct drainage problems in this area. F. Tierra Rejada Road: Construction of a new curb, gutter and sidewalk on the south side of Tierra Rejada Road from Spring Road westerly to join with an existing sidewalk approximately five hundred feet (5001) to the west. This work is partially funded by an TDA Article 3 (SB -821) grant. G. City Hall: Construction of a handicap ramp at the walkway leading to the City Council Conference Room. This work is being done to improve handicap accessibility. H. Public Works Yard: Re- construction of the concrete driveway and parking area in front of the Public Works Maintenance Yard. This work will include concrete surface along the south side of the building to improve the drainage and maintenance of this barricade and sign storage area. Conc 99 ad 0 004JJ Exhibit 2: Project Description Page 2 I• Poindexter outlet: The construction of a secondary outlet at the Catch basin on the south side of Poindexter Avenue just east of the rail spur crossing. The purpose of this work is to prevent flooding in the street when the "private" drain serving this catch basin does not function properly. The City possesses a flowage easement to allow water from the street to be conveyed to the adjacent industrial property. 0004,'7 Conc_99_ad