City of Moorpark
Agenda Report
The Honorable City Council
The Moorpark Redevelopment Agency
ITEM
( )f ,
Kenneth C. Gilbert, Director of Public Works
March 1,1999 (Council Meeting 3- 17 -99)
Subject: Notice of Completion for Alley Improvements Phase 2
BACKGROUND
Last March the City Council approved the Notice of Completion for a
project to construct improvements to Maureen Lane, Bonnie View
Street and the downtown alleys. Included in that report was
information regarding the need to construct additional improvements
along the edges of the alleys reconstructed by that project. That
report stated that efforts to negotiate a Change Order to the
original contract to add this additional work had failed and that
it would be necessary to have this work done under a separate
contract.
On October 21, 1998, the City Council authorized staff to advertise
for receipt of bids for this follow -up project. On November 17,
1998, The City Council awarded a contract for the subject work.
DISCUSSION
A. Scope of Work
The scope of the Phase 2 project consists of the construction
of additional improvements at the edges of the newly
reconstructed alley pavement. The types of improvements to be
constructed are described on the diagram attached as Exhibit 1.
In addition to the above described improvements, the project
also includes the reconstruction of a portion of the existing
driveway located on the west side of the alley just north of
Second Street, serving the property at 432 Moorpark Avenue, and
the construction of modified alley improvements in the area to
improve drainage.
At the request of the contractor,
constructed in gravel where changed
price for gravel and /or asphalt was
foot.
the areas shown to be
to asphalt. The unit bid
the same: $1.00 per square
00.11 4
' -IRNTA
Alleys Phase 2: Completion
March 1, 1999
Page 2
B. Added Allev: Between First St. & Second St., E/0 Bard St:
The project design did not call for any work to be done to
portions of the alley running between First Street and Second
Street, just west of Bard Street. Although the surrounding
alley segments were to receive gravel improvements, the omitted
areas did not seem to be suitable for this type of improvement.
When the type of improvements to other nearby alley segments
changed to asphalt, it became clear that leaving some of the
areas out of the contract was not consistent with the intent of
the project. Accordingly these areas were added to the scope of
work.
The cost of this added work is as follows:
• Change Order (re- mobilization, etc.): $1,559.50
• Added Quantities: $1,250.00
$2,809.50
C. Chanae Orders
There was only one Change order, in the amount of $1,559.50.
This Change Order was for a portion of the added work described
above. The Change Order was for re- mobilization, added traffic
control and removal costs.
D. Quantity Adjustment
Invariably with Public Works projects the final actual quantity
for each of the items required to complete the project will
differ somewhat from the engineer's estimate of quantities set
forth in the bid documents. This means that the final contract
cost will differ somewhat from the bid price, based upon the
actual quantity of items constructed. In this contract more
quantities were required than the amounts set forth in the
engineer's estimate.
A summary of the additional quantities is as follows:
• Total Cost of additional quantities: $3,709.00
• Cost of Added Quantities for Added Area: $1,250.00
Net Additional Quantities $2,509.00
��Out os
Alleys Phase 2: Completion
March 1, 1999
Page 3
A summary of the total project cost is as
• Bid Price:
. Net Added Quantities:
Sub -Total Adjusted Cost
• Added Area
- Change Order $1,559.50
- Quantities $1,250.00
Total
E. Final Inspection and Acceptance
follows:
$39,431.00
$ 2,509.00
$41,940.00
$ 2,809.50
$44,740.50
The City Engineer has completed a final inspection of the
project and has found the work to be acceptable. At this time
it would be appropriate for the City Council to accept the
project as completed, direct the City Clerk to file a Notice of
Completion and authorize release of the retention.
F. Fiscal Impact
1. Prior Project Costs: The total cost for the Alley
improvements already constructed is $196,000.
2. Estimated Cost of Phase 2 Improvements:
• Design $ 3,400.00
• Construction Contract $44,740.50
• Other $ 859.50
• Admin. / Inspection $ 6,000.00
Total $55,000.00
3. Budget Adjustment: This project is funded by the Moorpark
Redevelopment Agency. The attached Resolution amends the MRA
Budget for FY 1998/99 to provide sufficient funds to proceed
with the project. A summary of the actions proposed by that
Resolution is as follows:
• Current Budget
Prior Year Carryover $11,455
FY 98/99 Appropriation $42,545
Total $54,000
• Proposed Increase $ 1,000
• Proposed Amended Budget Amount $55,000
Alleys Phase 2: Completion
March 1, 1999
Page 4
RECObMNDATIONS [Roll Call Vote]
A. Moorpark Redevelopment Agency (MRA) : Staff recommends that the
MRA take the following actions:
1. Adopt Resolution 99 - approving an amendment to the FY
1998/99 Budget by increasing the appropriation and budget
for the subject project from $54,000 to $55,000 ($1,000
increase).
B. City of Moorpark: Staff recommends that the City Council take
the following actions:
1. Accept the work as completed;
2. Instruct the City Clerk to file the Notice of Completion for
the project; and,
3. Authorize the release of the retention upon satisfactory
clearance of the thirty five (35) day lien period.
J l
ti.
... ... ...
.l
SEC
OiVD
TH I RD
=DEE
N0
VEL
Ls i
xxx
Nunn,
I �:) I.
r
CDNCAr \�L
O - Q
j 3
t
ST. HWY. 118 )�1
1
i
I
r
CDNCAr \�L
O - Q
j 3
t
ST. HWY. 118 )�1
1
i
RESOLUTION NO. 98 -
A RESOLUTION OF THE REDEVELOPMENT AGENCY OF
THE CITY OF MOORPARK, CALIFORNIA, AUTHORIZING
A BUDGET AMENDMENT TO THE FISCAL YEAR 1998/99
ADOPTED BUDGET FOR THE MOORPARK REDEVELOPMENT
AGENCY FUND [FUND 4101
WHEREAS, on July 15, 1998, the Moorpark Redevelopment Agency
adopted the MRA Budget for Fiscal Year 1998/99; and
WHEREAS, a staff report has been presented to the MRA
requesting an increase to the amount budgeted for an MRA funded
capital improvement project; and
WHEREAS, Exhibit "A," attached hereto and made a part hereof,
describes said budget amendment and its resultant impacts to the
budget line item(s).
NOW, THEREFORE, THE REDEVELOPMENT AGENCY OF THE CITY OF
MOORPARK, CALIFORNIA, DOES HEREBY RESOLVE AS FOLLOWS:
SECTION 1. That the appropriation and budget amount for the
Alleys Phase 2 project is hereby increased from $54,000 to $55,000
($1,000 increase) as more particularly described in Exhibit "A."
SECTION 2. The City Clerk shall certify to the adoption of
this Resolution and shall cause a certified Resolution to be filed
in the book of original Resolutions.
PASSED AND ADOPTED this 17th day of March, 1999.
Patrick Hunter, Chairman
ATTEST:
Deborah S. Traffenstedt, Secretary
List of attachments: Exhibit 'A'
0001-61?
Resolution No. 99 -
Exhibit "A"
ADDITIONAL APPROPRIATIONS FOR
PROJECT 8001 (Alleys Phase 2)
FUND
ACCOUNT NUMBER
APPROPRIATION
TO ACCOUNT NUMBER
NUMBER
APPROPRIATION
REQUEST
APPROPRIATION
MRA
410.000.0000.000.5100
$1,000
400.801.8001.000.3992
TOTAL TRANSFERS
$3,400
$1,000
$3,400
FROM RESERVES:
DISTRIBUTION OF APPROPRIATIONS TO EXPENSE ACCOUNT NUMBERS
ACCOUNT
CURRENT
SUBJECT
REVISED
NUMBER
APPROPRIATION
APPROPRIATION
APPROPRIATION
/ (REDUCTION)
410.801.8001.802.9102
$3,400
$0
$3,400
Design
410.801.8001.804.9903
$44,600
$1,000
$45,600
Construction
410.801.8001.808.9102
$6,000
$0
$6,000
Inspection
TOTALS:
$54,000
$1,000
$55,000
000168