HomeMy WebLinkAboutAGENDA REPORT 1999 0915 CC REG ITEM 11EITEM /• � of !! Smmaa-S..L�9� Ac-�1()� : �l�l'�.�t1 ��Jr retvr�lrrlerl�Qlli�r City of Moorpark Agenda Report BY To: The Honorable City Council f From: Kenneth C. Gilbert, Director of Public Works Date: September 3,1999 (Council Meeting 9- 15 -99) Subject: Notice of Completion for Tierra Rejada Road Storm Drain Inlet Project EXECUTIVE SUMMARY On June 2, 1999, the City Council awarded a contract for the construction of the subject project. That work has been completed. This presents the Notice of Completion for the construction contract. DISCUSSION A. Project Description During any moderate rain event flooding occurs at the intersection of Tierra Rejada Road and Mountain Meadow Drive, and the intersection of Tierra Rejada Road and Mountain Trail Street. The purpose of the subject project is to eliminate, or significantly reduce this flooding. This was accomplished by constructing two modifications to the existing storm drain system, generally described as follows: Modification A: Construction of two new catch basins (one on each side of the street) on Mountain Meadow Drive just south of Rivergrove Court. These new catch basins will intercept storm flow which now runs northerly on Mountain Meadow Drive to Tierra Rejada Road, and then to the west. This intercepted storm flow will no longer reach Tierra Rejada Road. It is anticipated that the existing catch basins in and near Tierra Rejada Road will be able to handle the reduced volume. 0003564 Tierra reada Road Inlets - Completion September 3, 1999 Page 2 Modification B: Notwithstanding the above comment regarding the anticipated improved capability of the existing drainage systems in and near Tierra Rejada Road, it is proposed that one additional improvement be constructed near the intersection of Tierra Rejada Road and Mountain Trail Street. The subject project includes construction of additional catch basins on Tierra Rejada Road just east of Mountain Trail Street. These new catch basins will further improve storm water handling capability at this intersection. B. Final Inspection and Acceptance Construction of the project has been completed. Contract administration and inspection services were provided by the Engineering Division. The project administrator/ inspector has found the work to be acceptable. At this time it would be appropriate for the City Council to accept the project as completed, direct the City Clerk to file a Notice of Completion and authorize release of the retention. C. Fiscal Impact 1. Construction Costs: A summary of the final total construction contract costs is as follows: • Bid Amount $ 35,641.00 • Additional Quantities $ 0.00 • Change Orders: $ 5,527.79 $ 41,168.79 Notes: A. Additional Quantities: The bid price was based upon unit prices for certain bid items multiplied by estimated quantities. The actual quantities of items required were the same as the engineer's estimate. B. Change Orders: One Change Order was required for certain additional work generally described as follows: 1) Revise plans to avoid conflicting water main $2,311.87 2) Add concrete collar $450.00 3) Revise Curb & Gutter at median $719.67 4) Additional traffic control $100.00 5) Additional curb $360.00 6) Replace stamped concrete in median $1,586.25 Total $5,527.79 2. Total Project Costs: The final total cost of the project is summarized as follows: • Design: $ 7,000 • Construction $ 41,169 • Inspection: $ 5,000 $ 53,169 Tr inlet cmp 0003 "S ' +' Tierra reada Road Inlets - Completion September 3, 1999 Page 3 3. Funding / Budget: This project is funded by the Gas Tax Fund. A summary of the budget and final costs is as follows: Project Account Number: Description 9601: Design 9640: Construction 9650: Inspection Total 2605.8310.8022.xxxx 3ud et ($) Actual 7,000 58,000 5,000 70,000 6,255 745 41,169 16,831 6,940 (1,940) 54,364 $15,636 The Budget will be adjusted administratively to fully fund inspection costs. In addition, all unexpended encumbrances and surplus appropriations will be reversed administratively. No Budget amendment is required. RECOMMENDATIONS Staff recommends that the City Council take the following actions: 1. Accept the work as completed; 2. Instruct the City Clerk to file the Notice of Completion for the project; and, 3. Authorize the release of the retention upon satisfactory clearance of the thirty five (35) day lien period. Tr— inlet_cmp .ry� UUU�iJ