Subject: CONSIDER BIDS FOR THE CONSTRUCTION OF MISCELLANEOUS
CURB, GUTTER AND SIDEWALK CONSTRUCTION
EXECUTIVE SUMMARY
On August 18, 1999, the City Council authorized staff to advertise
for receipt of bids for the subject project. This presents the
results of the bid opening held on September 29, 1999, and
recommends the award of a contract for the construction of the
project.
DISCUSSION
A. Project Scope
The location of each concrete repair or construction site is
identified on the map attached as Exhibit 1. A general
description of the scope of work to be performed at each of
those sites is attached as Exhibit 2.
B. Bid Results:
Bids for the subject project were received and opened on
September 29, 1999. The apparent low bidder is Channel Islands
Paving, Inc., with a bid of $61,830.75. A summary of the bid
results is attached as Exhibit 3. It has been determined that
the apparent low bidder is qualified to perform the work. Said
bidder has confirmed that their bid is valid and that they are
prepared to proceed with the construction of the project.
000409
Miscellaneous Concrete Project
September 30, 1999
Page 2
C. Fiscal Impact
1.
Construction Cost Estimate: The estimated cost
of
14,900
construction is summarized as follows:
53,000
11,700
Element
Total ($)
3,400
12,300
Construction Bid Amount
61,831
Contingency (100)
6,183
Total
68,014
2.
Total Project Cost Estimate: The
estimated total project
costs are summarized as follows:
Element
Total ($)
Construction (& Cont.)
68,014
Design
12,066
Admin & Inspection (est.)
10,000
Total
90,080
3.
Funding Source Breakdown: A summary of the funding sources
for the various elements of the
subject contract, is
as
follows:
Fund 1000 Fund 2602
Fund 2605 Fund 2903
Total
Code / Street Gen. Fund SB -821 ($)
Gas Tax ($) MRA
($)
A
Dorothy
B
McFadden
C
Poppy Glen
100%
100%
D
Spring Road
E
Vista del Valle
J
Sosna Ct.
K
Collins /Hearon
F
Tierra Rejada 45%
55%
100%
G
City Hall 100%
100°%
H
Public Wks Yard 50%
50%
100%
I
Poindexter
100%
100%
Outlet
4. Recommended Funding Source Amounts: A breakdown of the
recommended funding sources is shown on the chart attached
as Exhibit 4. A summary of that breakdown is as follows:
Funding Source
1000 General Fund
2602 TDA Article 3
2605 Gas Tax
Sub -Total City
2903 MRA
Total
Design Constr.
#9601 ($) #9640 ($)
900
5,000
1,700
14,900
9,300
53,000
11,700
74,100
600
3,400
12,300
77,300
Inspection Total
#9650 ($) ($)
800 6,700
1,400 18,000
7,700 70,000
500 4,500
Conc_99_awd 0004 ��
Miscellaneous Concrete Project
September 30, 1999
Page 3
5. TDA Article 3 (SB -821): The total estimated costs to be
funded by TDA Article 3 funds shown on Exhibit 4 is
approximately $10,000 -- $8,000 less than the amount of the
grant [$18,000]. It is recommended, however, that the budget
for this funding source remain at the amount [$18,000] of
the grant. The net result is that the above total project
budget includes that additional $8,000 in grant funds which
may or may not be utilized.
6. Adjusted
Estimated Total
Project Cost
/ Funding:
The revised
total
estimated project
costs are as
follows:
Estimated
Current
Revised
Fund
Budget
Adjustment
Project
Amount ($)
($)
Total ($)
1000:
Gen.
Fund
0
6,700
6,700
2602:
SB-
821
18,000
0
18,000
2605:
Gas
Tax
27,000
43,000
70,000
Total City 45,000 49,700 94,700
2903: MRA (Project 8008)
50,000 (45,500) 4,500
Total 95,000 4,600 99,200
7. Budget Amendment: If adopted, the attached Resolution
(Exhibit 5) will revised the City of Moorpark Budget for FY
1999/2000 to fund the City- funded portion of the project in
the amounts and from the sources identified in Section C -4
above. As noted in Section C -6 above, it is anticipated that
there will be a surplus in the MRA funds [Project 80081
appropriated for this project. When the project is complete,
any surplus MRA funds will revert to the MRA Reserve Fund.
No MRA Budget amendment is required.
A summary of the recommended budget adjustments is as
follows:
Fund
1000: Gen. Fund
2602: SB- 821
2605: Gas Tax
Total City
Current Estimated
Budget ($) Change ($)
0 6,700
18,000 0
27,000 43,000
Estimated
Revised
Total ($)
6,700
18,000
70,000
45,000 49,700 94,700
Conc_99_awd
0 004_1
Miscellaneous Concrete Project
September 30, 1999
Page 4
D. Schedule
Construction should start before the end of October and be
completed within one month.
RECOMMENDATIONS (Roll Call Vote)
Staff recommends that the City Council take the following actions:
1. ROLL CALL VOTE: Adopt Resolution No. 99 - approving an
amendment to the FY 1999/2000 Budget for the subject
project revising the current year appropriation and budget
for the subject project (Fund 2605 - Gas Tax: $39,700
increase; Fund 1000 - General Fund: $10,800 increase).
2. Award a contract to Channel Islands Paving, Inc. in the
amount of $61,830.75 for the construction of the subject
project.
3. Approve a construction contingency in the amount of $6,183
and authorize the City Manager to approve additional work,
if required, for a cost not to exceed said contingency.
4. Authorize the City Manager to sign necessary contract
documents.
Attachment
Exhibit 1:
Exhibit 2:
Exhibit 3:
Exhibit 4:
Exhibit 5:
s
Map
Project Description
Bid Results
Project Funding Detail
Resolution
D U
Conc 99 awd L -'
�Q CITY OF MOORPARK
0
0
c
cw
Kn
Exhibit 2: Project Description
Page 1 of 2
A general description of the scope of work for the subject project
is as follows:
A. Dorothy Avenue: Removal and reconstruction of the curb and
gutter (northwest side of the street) at the "knuckle" at the
intersection of Dorothy Avenue and Millard Street to correct a
poor drainage condition at this location.
B. McFadden Avenue: Removal and reconstruction of the curb and
gutter at the south end of McFadden Avenue to improve drainage.
The work will include the construction of a ribbon gutter
connecting the gutter on the street to a grate inlet in the
alley just west of McFadden Avenue.
C. Poppyglen Court: Re- construction of a portion of a driveway
apron on the south side of the street near the end of Poppyglen
Court. This work is being done to replace temporary asphalt
installed when the subsided driveway was recently removed by
City crews.
D. Spring Road (South of Railroad): Replacement of asphalt
sidewalk and driveways with concrete improvements on the west
side of Spring Road just south of the railroad. [Note: As a
future project, it is the intent of staff to pursue a project
to construct concrete sidewalks on both sides of Spring Road
across the railroad crossing.]
E. Vista Del Valle: Reconstruction of the curb and gutter on the
west side of Vista Del Valle from a point just north of Vista
Lavana Drive northerly to a point just north of Bonita Heights
Street (approximately 3301), to correct drainage problems in
this area.
F. Tierra Rejada Road: Construction of a new curb, gutter and
sidewalk on the south side of Tierra Rejada Road from Spring
Road westerly to join with an existing sidewalk approximately
five hundred feet (5001) to the west. This work is partially
funded by an TDA Article 3 (SB -821) grant.
G. City Hall: Construction of a handicap ramp at the walkway
leading to the City Council Conference Room. This work is being
done to improve handicap accessibility.
H. Public Works Yard: Re- construction of the concrete driveway and
parking area in front of the Public Works Maintenance Yard.
This work will include concrete surface along the south side of
the building to improve the drainage and maintenance of this
barricade and sign storage area.
®00.11'1
Exhibit 2: Project Description
Page 2 of 2
I. Poindexter Outlet: The construction of a secondary outlet at
the Catch basin on the south side of Poindexter Avenue just
east of the rail spur crossing. The purpose of this work is to
prevent flooding in the street when the "private" drain serving
this catch basin does not function properly. The City possesses
a flowage easement to allow water from the street to be
conveyed to the adjacent industrial property.
J. Driveway Apron on Sosna Court: Re- construction of the subsided
driveway apron at 15286 Sosna Court.
K. Curb at the Southwest Corner of Collins Drive and Hearon Drive:
Reconstruct the curb (curb only - spandrel to remain) at the
southwest corner of the intersection.
®004'1
City of Moorpark
Exhibit 3
Bid Results
Miscellaneous Concrete Project
Page 1 of 3
Vendor 1
Vendor 2
Bid Opening Date:
Name:
Engineer's Estimate
Channel Islands
Paving
CNM Paving
29- Sep -99
Address:
355 N Lantana
St #685
2510 -G Las Posas
Rd #449
Cit, State:
Camarillo, CA 93010
Camarillo, CA
93010
Tel. No.:
(805) 388 -0112
(805) 389.1475
Contact Person:
Jerome Contreras
Matt Ludlow
Item Description
-Qty Units
Unit Cost
Total Bid
Unit Cost
Total Bid
Unit Cost
Total Bid
1 LS
1,012 LF
500.00
2.00
500.00
2,024.00
1,000.00
0.50
1,000.00
506.00
4,100.00
1.50
4,100.00
1,518.00
1 Trafflc Control
2 Saw Cutting
3 Remove A/C 81 Base
51 CY
25.00
1,275.00
20.00
1,020.00
38.50
1,963.50
4 Earthwork
1 LS
250.00
250.00
1,500.00
1,500.00
1,390.00
1,390.00
5 Adj Meter Box
4 EA
100.00
400.00
200.00
800.00
210.00
840.00
6 A/C Pavement
60 Ton
34.00
2,040.00
80.00
4,800.00
118.00
7,080.00
7 Base
16 CY
15.00
240.00
75.00
1,200.00
36.00
576.00
8 Curb 8t Gutter
1,070 LF
12.00
12,840.00
13.00
13,910.00
14.50
15,515.00
9 Curb Only
62 LF
8.00
496.00
20.00
1,240.00
16.00
992.00
10 Sidewalk
3,326 SF
4.00
13,304.00
2.25
7,483.50
2.80
9,312.80
11 Drive Approach
1,496 SF
6.00
8,976.00
5.25
7,854.00
3.45
5,161.20
12 3" Curb Drain
3 EA
50.00
150.00
80.00
240.00
210.00
630.00
13 Alley Gutter
171 SF
5.00
855.00
6.75
1,154.25
14.00
2,394.00
14 Parkwau Drain
38 LF
70.00
2,660.00
75.00
2,850.00
125.00
4,750.00
15 4" PCC Slab
400 SF
4.00
1,600.00
3.00
1,200.00
2.80
1,120.00
16 6" PCC Slab
1,140 SF
6.00
6,840.00
3.50
3,990.00
3.45
3,933.00
17 Remove Curb 81 Gutter
1,171 LF
5.00
5,855.00
5.00
5,855.00
4.00
4,684.00
18 Remove Sidealk, Drive
3,167 SF
2.50
7,917.50
1.00
3,167.00
1.18
3,737.06
Approach 8t Concrete Slab
19 Access Ramp
128 SF
9.00
1,152.00
10.00
1,280.00
9.00
1,152.00
20 Saw Cut Concrete (Collins)
39 LF
2.50
97.50
10.00
390.00
3.00
117.00
21 Curb / Gutter Collins
39 LF
9.00
351.00
10.00
390.00
15.00
585.00
22 Release
i LS
1.00
1.00
1.00
1.00
1.00
1.00
Total
69,824.00
61,830.75
71,55136
s.b
0®04
City of Moorpark
Exhibit 3
Bid Results
Page 2 of 3
Miscellaneous Concrete Project
Vendor 3
Vendor 4
Vendor 5
Bid Opening Date:
Name:
T A Staben
Medez Concrete
Berry General
29- Sep -99
Address:
5560 -B Tech Clr
1210 E. Santa
Paula St
P O Box 7178
Clt, State:
Moorpark, CA 93021
Santa Paula, CA
93060
Oxhard, CA 93031
Tel. No.:
(805) 523.7995
(805) 525 -8043
(805) 485 -9826
Contact Person:
Tom Staben
Manuel Mendez
Rob Stainsberry
Item Description
Qty Units
Unit Cost
Total Bid
Unit Cost
Total Bid
Unit Cost
Total Bid
1 LS
2,500.00
2,500.00
3,130.00
3,130.00
2,200.00
2,200.00
1 Traffic Control
2 Saw Cutting
1,012 LF
0.90
910.80
0.98
991.76
2.75
2,783.00
3 Remove A/C 8> Base
51 CY
100.00
5,100.00
87.45
4,459.95
31.70
1,616.70
4 Earthwork
1 LS
2,500.00
2,500.00
2,880.00
2,880.00
9,200.00
9,200.00
5 Adj Meter Box
4 EA
100.00
400.00
150.00
600.00
58.00
232.00
6 A/C Pavement
60 Ton
80.00
4,800.00
151.21
9,072.60
110.00
6,600.00
7 Base
16 CY
67.50
1,080.00
105.13
1,682.08
160.00
2,560.00
8 Curb 8t Gutter
1,070 LF
19.00
20,330.00
18.00
19,260.00
20.00
21,400.00
9 Curb Only
62 LF
17.00
1,054.00
16.00
992.00
13.00
806.00
10 Sidewalk
3,326 SF
4.00
13,304.00
4.00
13,304.00
2.80
9,312.80
11 Drive Approach
1,496 SF
6.00
8,976.00
6.50
9,724.00
4.00
5,984.00
12 3" Curb Drain
3 EA
100.00
300.00
143.33
429.99
12.60
37.80
13 Alley Gutter
171 SF
4.00
684.00
9.33
1,595.43
6.40
1,094.40
14 Parkwau Drain
38 LF
90.00
3,420.00
80.53
3,060.14
180.00
6,840.00
15 4" PCC Slab
400 SF
4.00
1,600.00
5.85
2,340.00
2.35
940.00
16 6 "PCC Slab
1,140 SF
5.00
5,700.00
6.29
7,170.60
3.50
3,990.00
17 Remove Curb at Gutter
1,171 LF
5.50
6,440.50
6.60
7,728.60
6.75
7,904.25
18 Remove Sidealk, Drive
3,167 SF
1.50
4,750.50
1.40
4,433.80
4.70
14,884.90
Approach ax Concrete Slab
19 Access Ramp
128 SF
9.00
1,152.00
20.00
2,560.00
14.00
1,792.00
20 Saw Cut Concrete (Collins)
39 LF
4.90
191.10
5.26
205.14
2.90
113.10
21 Curb / Gutter Collins
39 LF
40.00
1,560.00
22.00
858.00
20.00
780.00
22 Release
I LS
1.00
1.00
1.00
1.00
1.00
1.00
Total
86,753.90
96,479.09
101,071.95
0004.l.Ii"s
City of Moorpark
Exhibit 3
Bid Results
Miscellaneous Concrete Project
Page 2 of 3
Vendor 6
Vendor 7
Bid Opening Date:
Name:
E&M Constructors
A82R Construction
29- Sep -99
Address:
14581 Tyler St
11655 Sheffield
Way
Cit, State:
Sylmar, CA 91342
Northridge, CA
91326
Tel. No.:
(818) 362 -9811
(818) 366 -5626
Contact Person:
Elfred Padilla
Artin Thomas
Item Description
Qty Units
Unit Cost
Total Bid
Unit Cost
Total Bid
Unit Cost
Total Bid
1 LS
9,000.00
9,000.00
5,000.00
5,000.00
1 Traffic Control
2 Saw Cutting
1,012 LF
3.00
3,036.00
1.00
1,012.00
3 Remove A/C 8t Base
51 CY
1.50
76.50
40.00
2,040.00
4 Earthwork
1 LS
10,000.00
10,000.00
6,000.00
6,000.00
5 Atli Meter Box
4 EA
100.00
400.00
100.00
400.00
6 A/C Pavement
60 Ton
125.00
7,500.00
80.00
4,800.00
7 Base
16 CY
150.00
2,400.00
50.00
800.00
8 Curb 8t Gutter
1,070 LF
25.00
26,750.00
30.00
32,100.00
9 Curb Only
62 LF
20.00
1,240.00
25.00
1,550.00
10 Sidewalk
3,326 SF
3.00
9,978.00
5.00
16,630.00
11 Drive Approach
1,496 SF
5.00
7,480.00
6.00
8,976.00
12 3" Curb Drain
3 EA
100.00
300.00
400.00
1,200.00
13 Alley Gutter
171 SF
8.00
1,368.00
25.00
4,275.00
14 Parkwau Drain
38 LF
120.00
4,560.00
100.00
3,800.00
15 4" PCC Slab
400 SF
3.00
1,200.00
5.00
2,000.00
16 6" PCC Slab
1,140 SF
5.00
5,700.00
6.00
6,840.00
17 Remove Curb at Gutter
1,171 LF
4.00
4,684.00
5.00
5,855.00
18 Remove Sidealk, Drive
3,167 SF
3.00
9,501.00
2.00
6,334.00
Approach 8t Concrete Slab
19 Access Ramp
128 SF
8.00
1,024.00
15.00
1,920.00
20 Saw Cut Concrete (Collins)
39 LF
10.00
390.00
4.00
156.00
21 Curb / Gutter Collins
39 LF
20.00
780.00
30.00
1,170.00
22 Release
I LS
1.00
1.00
1.00
1.00
Total
107,368.50
112,859.00
0.00
000413
City of Moorpark
Exhibit 4
Bid Results
Miscellaneous Concrete
Project
Bid Opening Date:
Current
Change
New Budget
Remarks
Budget
Fund
Actual Estimate Based on Bids Received
1000 General Fund
Design
1000.8310.8001.9601
0
866
866
Construction
1000.8310.8001.9640
0
4,881
4,881
Inspection
1000.8310.8001.9650
0
718
718
Sub -Total
0
6,465
6,465
2602 TDA Article 3
Grant Amount
Adl to:
Design
2602.8310.8001.9601
0
1,343
1,343
2,200
1,700
Construction
2602.8310.8001.9640
18,000
(10,431)
7,569
14,800
14,900
Inspection
2602.8310.8001.9650
0
1,113
1,113
1,000
1,400
Sub -Total
18,000
(7,975)
10,025
18,000
18,000
2605 Gas Tax
Design
2605.8310.8001.9601
0
9,271
9,271
Construction
2605.8310.8001.9640
27,000
25,261
52,261
Inspection
2605.8310.8001.9650
0
7,684
7,684
Sub -Total
27,000
42,216
69,216
City Total
45,000
40,706
85,706
2903 MRA
Design
2903.8310.8008.9601
0
586
586
Construction
2903.8310.8008.9640
50,000
(46,697)
3,303
Inspection
2903.8310.8008.9650
0
486
486
Sub -Total
50,000
(45,626)
4,374
Project Total
95,000
(4,920)
90,080
Adjusted to Requested Amount
1000 General Fund
Design
1000.8310.8001.9601
0
900
900
Construction
1000.8310.8001.9640
0
5,000
5,000
Inspection
1000.8310.8001.9650
0
800
800
Sub -Total
0 6,700 6,700
2602 TDA Article 3
Design
2602.8310.8001.9601
0
1,700
1,700
Construction
2602.8310.8001.9640
18,000
(3,100)
14,900
Inspection
2602.8310.8001.9650
0
1,400
1400
Sub -Total
I $�6�
- 00
2605 Gas Tax
Design
2605.8310.8001.9601
0
9,300
9,300
Construction
2605.8310.8001.9640
27,000
26,000
53,000
Inspection
2605.8310.8001.9650
0
7,700
7,700
Sub -Total
27,000
43,000
70,000
Sub -total City
45,000
49,700
94,700
2903 MRA
Design
1000.8310.8008.9601
0
600
600
Construction
1000.8310.8008.9640
50,000
(46,600)
3,400
Inspection
1000.8310.8008.9650
0
S00
500
Sub -Total
50,000
(45,500)
4,500
Total
95,000
4,200
99,200
Summary
0
12,500
12,500
Design xxxx.8310.800x.9601
Construction
xxxx.8310.800x.9640
95,000
(18,700)
76,300
Inspection
xxxx.8310.800x.9650
0
10,400
10,400
Total��
Summary: City Only
0
11,900
11,900
Design xxxx.8310.800x.9601
Construction
xxxx.8310.800x.9640
45,000
27,900
72,900
Inspection
xxxx.8310.800x.9650
0
9,900
9,900
Total6bb-
000419
\� ` \,I,.
RESOLUTION NO. 99 -
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
MOORPARK, CALIFORNIA, AMENDING THE FY 1999/2000
BUDGET BY REVISING THE FUNDING SOURCES AND AMOUNTS
FOR PROJECT 8001 - CONCRETE CONSTRUCTION AND REPAIRS
[ FUND 2605: GAS TAX; FUND 2602: TDA ARTICLE 3; FUND
1000: GENERAL FUND]
WHEREAS, on June 23, 1999, the City Council adopted the
Budget for Fiscal Year 1999/00; and
WHEREAS, a staff report has been presented to the City
Council requesting a budget increase in the aggregate amount of
$49,700; and
WHEREAS, Exhibit "A," attached hereto and made a part hereof,
describes said budget amendment and its resultant impacts to the
budget line item(s).
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF MOORPARK,
DOES HEREBY RESOLVE AS FOLLOWS:
SECTION 1. That a Budget amendment in the aggregate increase
of $49,700, as more particularly described in Exhibit "A," is
hereby approved.
SECTION 2. The City Clerk shall certify to the adoption of
this resolution and shall cause a certified resolution to be filed
in the book of original resolutions.
PASSED AND ADOPTED this
ATTEST:
day of , 1999.
Patrick Hunter, Mayor
Deborah S. Traffenstedt, City Clerk
Attachment"
Exhibit 'A': Appropriation and Budget Detail
0 004,
Resolution No. 99-
Exhibit A
Budget Revision
Page 1
A. Fund Allocation:
Fund No.
Fund Name
Amount
1000
General Fund Reserve
$6,700
2605
Gas Tax Reserve
$43,000
TOTALS:
$900
$49,700
B. Budget Appropriation
Budget Number
Budget
Revision
New Budget
General Fund
1000.8310.8001.9601: Design
$0
$900
$900
1000.8310.8001.9640: Construction
$0
$5,000
$5,000
1000.8310.8001.9650: Inspection
$0
$800
$800
TDA Article 3
2602.8310.8001.9601: Design
$0
$1,700
$1,700
2602.8310.8001.9640: Construction
$18,000
$(3,100)
$14, 900
2602.8310.8001.9650: Inspection
$0
$1,400
$1,400
Gas Tax
2605.8310.8001.9601: Design
$0
$9,300
$9,300
2605.8310.8001.9640: Construction
$27,000
$26,000
$53,000
2605.8310.8001.9650: Inspection
$0
$7,700
$7,700
Approved to Form: