Loading...
HomeMy WebLinkAboutAGENDA REPORT 2000 0301 CC REG ITEM 10ETO: FROM ITEM /0. C. CITY OF .• City Council Meefing Irf t/y . irr CITY OF MOORPARK AGENDA REPORT Honorable City Council Wayne Loftus, Director of Community Development�� Prepared by: John Libiez, Principal Planner /Advanced DATE: February 24, 2000 (CC meeting 3/1/2000) SUBJECT: Consider Alternatives To Mitigate Future Traffic and Circulation Impacts Affecting the Downtown and Northwesterly Portions of the Community, Involving The 118 Arterial Bypass SUMMARY: This report discusses historic and current staff efforts related to the implementation of the General Plan Circulation Element identified east -west arterial (SR 118 Bypass) in order to provide mitigation of traffic impacts within Moorpark and the abutting region. BACKGROUND: The Circulation Element of the General Plan includes a concept alignment of an arterial (118 Arterial Bypass)roadway located north of the Union Pacific Railroad tracks, which links the Highway 118/23 corridor near Princeton Avenue to Los Angeles Avenue west of Buttercreek Road. The Circulation Element also incorporates the concept of the 118 Arterial Bypass functioning in the future as a freeway corridor by illustrating the extension of this arterial into unincorporated Ventura County beyond the westerly City limits with a designation as the SR -118 Freeway Corridor. As described by the General Plan the adopted concept for the 118 Arterial involves a roadway section of up to six (6) lanes for the east /west segment (Highway 23 to Gabbert Road) and four (4) lanes for the segment from Gabbert Road to its connection at Los Angeles Avenue. All intersections are at grade and most are signalized and the crossing of the Union Pacific Railroad is noted as grade separated. The crossing of Walnut Canyon Road is shown as a bridge with no connection between these two transportation corridors. \\MOR— PRI— SEMACITY SHARE\Community Development\Everyone \City Council Agenda Reports \City- wideTraMcMitig2.24.00.doc 00003 2 City -wide Traffic Mitigation February 24, 2000 Page 2 Staff has provided the City Council with information regarding the history and activities undertaken to pursue the 118 corridor previously. Copies of the previous staff reports have been attached for Council consideration (Attachments 2 and 3). The incorporation of this transportation corridor into the Circulation Element was the result of concerns over congestion and truck traffic raised by the community to CALTRANS in 1989. A variety of alternatives for the design and function of the 118 Arterial Bypass have been discussed since its incorporation into the General Plan including: 1) as a freeway; 2) "involving a full interchange with Highway 23; and truck traffic from Los Angeles Avenue /Highway 118 to the bypass. Other alternatives, discussed involved limiting its function to serve local traffic needs, not allowing truck traffic, or elimination of the corridor altogether from the Circulation Element. The common theme, however, to all alternatives has been the method for implementation and financing the improvements. This was particularly critical when discussed within the context of freeway type improvements. Currently, the 118 arterial Bypass has become more relevant to the future transportation needs of the community and the management of traffic congestion because of anticipated growth and development north of the Downtown area (potential of approximately 2000 residential units) and the general increase in traffic flow throughout the City. The available options are becoming more focussed and the need for decision more critical because of these projects that are coming forward for processing. DISCUSSION: SR -118: General Plan Alignment The City of Moorpark General Plan Circulation Element depicts an alignment for an arterial roadway, containing up to six lanes, extending from the current SR- 118/SR -23 Freeway westerly through the City to Los Angeles Avenue. A new 4 lane arterial road transitions southerly from the SR -118 corridor to a connection with existing SR -118 (Los Angeles Avenue). History of 118 Arterial ®Q0® ,32.I City -wide Traffic Mitigation February 24, 2000 Page 3 Provision of major north /south and east /west freeway links, and alternative transportation corridors has historically been a portion of the Caltrans transportation considerations for Ventura County and particularly the Simi Valley /Moorpark area. The SR -118 freeway corridor was shown on the County General Plan Circulation Element prior to Moorpark incorporation. In May of 1989 the District 7 Director for Caltrans, based upon community concerns and traffic information, prepared a concept design and preliminary right -of -way lines for both the SR -23 and SR -118 Freeways. The California Transportation Commission adopted the SR -23 alignment on October 28, 1964. In 1989, Caltrans produced preliminary 1 "= 100'scaled plans for both alignments, copies of which are maintained in the Public Works and Community Development Departments. In May,1990, Austin -Foust Associates, Inc.(AFA), at direction of the City Council, prepared a traffic analysis for the pending Moorpark General Plan update, which included a number of alternatives regarding future circulation corridors and connections between corridors to increase circulation efficiency and maintain the City's level of service for traffic flow at Level of Service "C ". Recommendations included: 1)Extend Spring Road to connect with the extension of SR 118; 2)create an arterial roadway from the SR 118 freeway terminus near Princeton Avenue to connect to Los Angeles Avenue at the westerly end of the community; and, 3)grade separate SR 118 at Walnut Canyon Road. The AFA report concluded that: 1) an east -west bypass would be effective in diverting a significant amount of traffic from Los Angeles Avenue (approximately 50K trips) in 2010, thereby achieving desirable system performance standards (LOS -C) for Los Angeles Avenue and other affected corridors; and, 2) that a Bypass configured as a freeway was no more effective than an arterial road in meeting circulation system needs. In 1991, AFA performed traffic analysis related to a potential Circulation Element amendment and concluded that a large percentage of the trips that impacted the City circulation system were pass through trips (28 %), including a significant ratio of truck traffic. AFA noted that the westward extension of the SR -118 Freeway was included within the County Master Plan of Highways. As a result of the traffic analysis related to the city -wide 2010 projections, the extension of SR 118 from SR 23/118 west to Los Angeles Avenue near Buttercreek Road was 000032.2.. City -wide Traffic Mitigation February 24, 2000 Page 4 added to the City's circulation system plan. In the 1992 Circulation Element update adopted by the City, the SR 118 arterial bypass was designated as a six lane arterial from Princeton Avenue to Gabbert Road, and a four lane arterial from Gabbert Road to Los Angeles Avenue. In 1996, Michael Brandman Associates performed additional environmental analysis related to the possible extension of Spring Road in conjunction with the Specific Plan No. 8 considerations. The purpose was to assess the potential connection, other than Broadway, for SP -8 traffic to be distributed to reduce impacts at the Collins /SR -118 interchange and maintain the City's adopted level of service standards. This study concluded there was a need for extension of SR -118 west from the SR- 118/SR -23 connection to Los Angeles Avenue as a four -lane expressway with at grade intersections at Spring Road, Walnut Canyon Road, "C" Street, and Gabbert Road. The Brandman Study concluded this roadway could initially be constructed as a two -lane facility, with the additional lanes added when needed. Current Decisions - 118 Arterial Specific Plan No. 2, as adopted, contains reservations for a 200' right -of -way for the SR -118 and SR -23. Depending on grading, that width is adequate for a six lane facility. Preliminary plans for Specific Plan No.l (Hitch Ranch) also propose a 200' wide reservation for the SR -118. The Moorpark Regency Development (Pre- application 98 -02, Michael Sanders) immediately west of Walnut Canyon Road, and the SunCal project immediately east of Walnut Canyon Road also propose 200' wide reservations for the SR -118 right -of -way as it passes through these projects. The SR -118 highway corridor provided for within these projects is generally consistent with the alignment shown by the Circulation Element and as shown on preliminary Caltrans drawings. City Council action on December 2, 1998, with regard to the A &B Properties /Southern California Edison industrial development application west of Gabbert Road, included a requirement for connection of the SR -118 corridor to Los Angeles Avenue including provision of a Union Pacific railroad underpass to link this corridor to Los Angeles Avenue. The projects located along this corridor represent the potential for ®0003 -:.3 City -wide Traffic Mitigation February 24, 2000 Page 5 reservation /dedication of approximately 98% of the right -of -way needed for this arterial The Freeway Option Past thinking on the General Plan alignment was that it be an extension of the SR -118 Freeway or be developed as a bypass. A benefit of "a bypass could be to divert truck traffic away from L.A. Avenue through the City. The Public Works Director has secured grant funding in the amount of $120,000.00 under the Congestion Management and Air Quality Improvement Program (CMAQ) with which to perform special studies related to the SR -118 alignment. CMAQ projects are those which reduce congestion and reduce air impacts. Up to this time the City has been unable to secure professional engineering services to perform alignment studies and financing recommendations through more than one RFP attempt related to the Freeway /bypass extension. Staff believes this was because the previous RFPs emphasized Caltrans involvement and procedure precedents in the work program. Points for Decision Staff has recently begun to look at different ways to develop this corridor assessing alternatives, with a focus on current and near term solutions to traffic and circulation issues. Some key factors in staff considerations thus .far have been: 1) the cross -town arterial would serve as a major local arterial only, similar to Tierra Rejada, across the north - central portion of the community; 2) the alignment and subsequent street need not act as the extension of the SR -118 Freeway; 3) access to proposed projects abutting the corridor would be allowed, but limited; 4) projects through which the cross -town alignment passes should be responsible for dedication of right -of -way and the construction of the cross -town arterial consistent with the design standards adopted by the City for the roadway; 5) access to Walnut Canyon Road would be limited to secondary or emergency access for projects that can develop direct connection to the corridor /cross -town arterial; 6) Walnut Canyon Road would be crossed via a bridge with no on or off ramps to the corridor; 7) All intersections would be at grade and the major intersections would be signalized; 8) Direct connection to Highway 23, would not occur at this time. 00003 2.4 City -wide Traffic Mitigation February 24, 2000 Page 6 Attachment 1 to this report is a conceptual diagram of the type of cross -town arterial roadway that could be developed. The concept includes a raised landscaped median, turn pockets where appropriate, four travel lanes, and two emergency parking lanes (one in each direction) and parkways that incorporate drainage and bikeway /multi - purpose trail components. This arterial (parkway) would serve as the primary access for projects along its routes as well as provide needed second points of ingress and egress for some adjacent projects, and would create a more aesthetic roadway within the north central area of the City. Mitigation of this new corridor to provide for the future access needs of the remaining portion of the City with growth potential will allow for the dispersal of traffic to the east and west of the Downtown area as opposed to concentrating it on Gabbert Road, Walnut Canyon road or High Street. With the development of the improvements for A -B Properties and Specific Plan No. 1, a major portion of the cross -town corridor could be completed. In discussion with staff, the SP -1 consultants and development team have indicated that there is aesthetic and marketing value this proposed project in considering the development of the cross -town arterial as the prime entry to this future residential community rather than dependence upon the Casey Road, Gabbert Road, or High Street entry. A staged construction of the corridor improvements based upon construction and marketing of units which culminates in the full improvement of the cross -town arterial through SP -1 could result in the eventual reality of the complete cross -town arterial. Three additional projects under preliminary consideration also can develop direct connection to the alignment. These are Westpointe Homes currently proposed for 250 single family dwellings (single family dwellings) project proposed across from the Boy's and Girl's Club on property that straddles Walnut Canyon Road that is not currently within any proposed project, but would be needed for the corridor whether developed as an arterial or ultimately as a freeway. Because of the significant difference in elevation between the 118 corridor and the roadbed elevation of existing Walnut Canyon Road at the point where the two roads would cross Walnut Canyon Road must be bridged. Bridging would address grade and elevation concerns and maintain the alignment of the corridor as shown by the Suncal proposal, 0 0®03 11Z., S� City -wide Traffic Mitigation February 24, 2000 Page 7 which is the third project that may be part of an east /west transportation corridor solution. Right -of -way has been reserved through Specific Plan No. 2 for this corridor. Although not included in the Development Agreement, grading of the corridor may be achievable through the balance of the project review. Although a current engineering study has not been performed, it may be feasible to connect the east end of the 118 Arterial to Old Los Angeles Avenue via the corridor identified as a reservation for Highway 23 within Specific Plan No. 2 (connection with Crawford Canyon) . Thereby providing an opportunity for a continuous roadway connection between Los Angeles Avenue west of Buttercreek Road to Los Angeles Avenue near the SR23/118 overpass bridges west of Princeton Avenue. SR -118 Benefits Staff considers the following to be potential benefits to the community of the implementation of the SR -118 arterial. 1. The proposed routes could remove significant amounts of the traffic from Walnut Canyon Road thereby improving roadway safety and eliminate the need for an expensive widening and straightening project in the future. 2. Development of the 118 corridor could route traffic, in particular truck traffic, to a connection to the Freeway area without the need to traverse the central City or Downtown. Currently two routes are used for the gravel /aggregate haulers that bring trucks through the central core area via either a route that utilizes Walnut Canyon Road, Moorpark Avenue, SR -118, Spring Road to Los Angeles Avenue, or Grimes Canyon Road, SR -118, Spring Road, Los Angeles Avenue. 3. The 118 Arterial can be developed as a limited access roadway resulting in reduced direct traffic flow onto Walnut Canyon Road. This could permit the City to consider design and construction of the Walnut Canyon Road connections for these projects as secondary or emergency access points. 4. This circulation approach would allow the City to establish a specific design plan for the 118 Arterial corridor. The 00®G3�.( City -wide Traffic Mitigation February 24, 2000 Page 8 design of the street sections, intersections, lighting, signalization and construction of improvements would be permitted only in accordance with the plan adopted for the corridors. Actions Needed The following are some of the actions staff contemplates occurring in order to have these corridors become a reality. These involve technical and policy decisions: 1. Acquire professional services to perform vertical and horizontal alignment studies to set the corridor design parameters. This would require a Request for Proposal (RFP) for engineering services. 2. Require developers to offer to dedicate, grade and construct, if it requested, those portions of the corridor within their project site. 3. Continue to require developers to offer to dedicate or acquire additional right of way adjacent to their property adequate to insure a 200 foot ROW width for the total length of the corridor and `allow no encroachments to those corridors. 4. Determine a fair share mitigation fee for those projects developed north of the Union Pacific Railroad tracks that are outside of the corridor, adjacent to the 118 Arterial corridor, or may generate vehicle trips that will use the corridor or a north /south connecting corridor such as Walnut Canyon Road. STAFF RECOMMENDATION: Direct staff as deemed appropriate Attachments: 1. Cross -town Arterial cross section 2. City Council Staff Report 3/31/99 3. City Council Staff Report 4/2/99 4. General Plan Circulation Element (1992) extract. 000032.7 City -wide Traffic Mitigation February 24, 2000 Page 8 4. This circulation approach would allow the City to establish a specific design plan for the 118 Arterial corridor. The design of the street sections, intersections, lighting, signalization and construction of improvements would be permitted only in accordance with the plan adopted for the corridors. Actions Needed The following are some of the actions staff contemplates occurring in order to have these corridors become a reality. These involve technical and policy decisions: 1. Acquire professional services to perform vertical and horizontal alignment studies to set the corridor design parameters. This would require a Request for Proposal (RFP) for engineering services. 2. Require developers to offer to dedicate, grade and construct, if it requested, those portions of the corridor within their project site. 3. Continue to require developers to offer to dedicate or acquire additional right of way adjacent to their property adequate to insure a 200 foot ROW width for the total length of the corridor and allow no encroachments to those corridors. 4. Continue to require developers to pay a mitigation fee consistent with traffic impacts and evaluate the amount that may be needed on a project by project basis related to the specific impacts. STAFF RECOMMENDATION: Direct staff as deemed appropriate Attachments: 1. Cross -town Arterial cross section 2. City Council Staff Report 3/31/99 3. City Council Staff Report 4/2/99 4. General Plan Circulation Element (1992) extract. 000032.g SR -118 ARTERIAL (BOULEVARD CONCEPT) SP -1 SPECIFIC PLAN 200 FT. RIGHT -OF -WAY BIKE LANE MEDIAN BIKE LANE 2:1 SLOPE e' ESCAPE TRAVEL 14' TRAVEL ESCAPE 8' 60' V ETCH LANE ( 14' LANE LANE I V DITCH 2:1 5 , H n 0 x � 100 FT. IMPROVEMENT BIKE LANE BIKE LANE e' TRAVEL TRAVEL MEDIAN e' V DITCH LANE LANE 14' TRAVEL TRAVEL V DITCH I 11' I 12' I 12' LA? E LANE I 11' 2:1 SLOPE 50' INTERIM 2:1 SLOPE 50' FINAL ITEM SAO CITY OF MOORPARK AGENDA REPORT TO: Honorable City Council Planning Commission FROM: Wayne Loftus, Acting Community Development Director Prepared by: John Libiez, Principal Plannerl_�" DATE: March 19, 1999 (For 3/31/99 Joint Meeting) SUBJECT: CONSIDER REPORT RELATED TO SR 118 HISTORY BACKGROUND: During the consideration of circulation options for the Moorpark Highland Specific Plan Project (Specific Plan No. 2), City Council indicated that it would like to discuss the SR118 bypass history as a portion of the joint Council/ Planning Commission meeting on March 31, 1999. DISCUSSION: The provision of major north /south and east /west freeway links, or alternative highways has historically been a portion of the Caltrans transportation considerations for Ventura County and particularly the Simi Valley /Moorpark area. In May of 1989 the District 7 Director for Caltrans indicated that based upon community concerns and traffic information Caltrans would undertake to prepare a basic design and set right -of -way lines for both the SR 23 and SR 118 Freeways. The California Transportation Commission adopted the SR 23 alignment on October 28, 1964. In 1989, Caltrans produced preliminary 1 "= 100'scaled plans, copies of which are maintained in the Public Works and Community Development Departments, to depict a generalr�/,J /� horizontal alignment (location on the ground) , potential right - of -way limits, and potential intersection/ interchange locations. These plans depict a continuous corridor from the Princeton Avenue area to the west end of the City (west of Gabbert Road). In May, 1990, Austin -Foust Associates, Inc.(AFA) was asked by the City Council to prepare a traffic analysis for the pending 00003020. 10 ATTACHMENT 2 Agenda Report SR 118 Joint City Council /Planning Commission Meeting March 31, 1999 Page 2 Moorpark General Plan update, which included a number of alternatives regarding future circulation corridors and connections between corridors to increase circulation efficiency and maintain the City's level of service for traffic flow at Level of Service "C ", a goal of the Circulation Element of the General Plan. Recommendations included in the Austin -Foust traffic analysis were: 1)Extend Spring Road to connect with the extension of SR 118; 2)create an arterial roadway from the SR 118 freeway terminus near Princeton Avenue to connect to Los Angeles Avenue at the westerly end of the community; and, 3)grade separate SR 118 at Walnut Canyon Road. The AFA report included that: 1) an east -west bypass would be effective in diverting a significant amount of traffic from Los Angeles Avenue (approximately 50K trips), thereby achieving desirable system performance standards (LOS -C) for Los Angeles Avenue and other affected corridors; and, 2) that a Bypass configured as a freeway was no more effective than an arterial road in meeting circulation system needs. In 1991, AFA conducted additional traffic analysis related to a potential Circulation Element amendment and concluded that a large percentage of the trips that impacted the City circulation system were pass through trips (280), including a significant ratio of truck traffic. AFA also noted that the westward extension of SR 118 freeway was included within the County Master Plan of Highways. As a result of the traffic analysis related to the city -wide 2010 projections, the extension of SR 118 from SR 23/118 west to Los Angeles Avenue near Buttercreek Road was added to the City's circulation system plan. In the 1992 Circulation Element update adopted by the City, the SR 118 arterial bypass was designated as a six lane arterial from Princeton Avenue to Gabbert Road, and a four lane arterial from Gabbert Road to Los Angeles Avenue. In 1996, Michael Brandman Associates performed additional environmental analysis related to the possible extension of Spring Road in conjunction with the Specific Plan No. 8 considerations. The purpose was to assess the potential connection, other than Broadway, for SP -8 traffic to be distributed to reduce impacts at the Collins /SR -118 interchange and maintain the City's adopted level of service standards. The "no project" traffic scenario contained in the study for the year 2010 determined which City circulation system improvements would be required without Hidden Creek Ranch traffic based on projected General Plan land use build out of 2010(Attachment 5). M: \JLibiez \M \SP2 \SR118history.doc 000032 •II Agenda Report SR 118 Joint City Council /Planning March 31, 1999 Page 3 Commission Meeting One of the conclusions of this study was the need for extension of SR -118 west from the SR- 118/SR -23 connection to Los Angeles Avenue as a four -lane expressway with at grade intersections at Spring Road, Walnut Canyon Road, "C" Street, and Gabbert Road. This roadway as evaluated by the Brandman Study could be initially constructed as a two -lane facility, with the additional lanes added when needed. Because of deficiencies which would exist for the Collins Drive /Campus Drive and Collins Drive /SR -118 intersections as noted by Brandman in the Spring Road Study, City Council placed specific conditions on Specific Plan No. 8 to mitigate the deficiencies that would result to the adopted Level of Service "C standard with the approval of Hidden Creek Ranch (SP -8). Specific Plan No. 2 reflects a 200` right -of -way reservation for the SR 118 Bypass which, depending on grading, can be adequate for a six lane facility. Preliminary plans for Specific Plan No.l (Hitch Ranch) also propose a 200' wide reservation for the SR 118. The Moorpark Regency Development (Pre - application 98- 02, Michael Sanders) immediately west of Walnut Canyon Road, and the SunCal project immediately east of Walnut Canyon Road also propose 200' wide reservations for the SR 118 right -of -way as it passes through these projects. The SR 118 highway corridor illustrated for the referenced projects is generally consistent with the alignment shown by the Circulation Element and as shown on preliminary Caltrans drawings for an arterial bypass route. City Council action on December 2, 1998, with regard to the A &B Properties /Southern California Edison industrial development application west of Gabbert Road included a requirement for connection of the SR 118 corridor to Los Angeles Avenue including provision of a railroad underpass to link this corridor to Los Angeles Avenue. The projects identified in this report which are located along this Bypass corridor represent the potential for reservation /dedication of approximately 98% of the right -of -way needed for the SR 118 Bypass. The City Council in July of 1998, authorized staff to seek professional engineering services related to the potential development of the SR 118 Bypass either as an arterial roadway or freeway. The services sought would provide a study of the SR 118 Bypass corridor which would determine precise horizontal and vertical alignments, improvements and costs for the extension of the SR 118 Bypass from Princeton Avenue to Los Angeles Avenue. The RFP process at that time failed to receive a sufficient number of qualified responses. The Public Works Department M:\JLibiez\M\SP2\SR118history.doc 000032.-0 • I I- Agenda Report SR 118 Joint City Council /Planning Commission Meeting March 31, 1999 Page 4 subsequently obtained a limited grant that will provide partial funding for the long term study once a qualified consultant is found. In mid - January, 1999, staff solicited specialized engineering services that would look at several options for the location of the Walnut Canyon Road /SR 118 interchange including as an at grade and grade separated corridor. Determination of the location of ramps or an interchange at Walnut Canyon Road or another appropriate locations is critical from a timing perspective since the Sun Cal project, currently under analysis for referral to the Community Development Ad Hoc Committee, would be significantly affected by the current Caltrans preliminary bypass plan for SR 118. The Caltrans plan currently identifies Walnut Canyon Road as grade separated with on and off ramps. If this preliminary plan were to represent the preferred access point to the bypass corridor, it would require the Sun Cal project to undergo a significant redesign and additional right -of -way reservation to include ramps at Walnut Canyon Road. Staff issued a work program document to the selected engineering firm in mid - January for response. A response was received as of the end of February from the prospective engineering firm which detailed an expanded work program to complete the study of the Walnut Canyon Road /SR 118 connection. Staff is currently evaluating the proposed work program submitted by the firm. An abbreviated chronology related to the SR -118 is attached to this report for information. CONCLUSIONS: 1. Based upon the commitments and requirements placed upon pending developments along the SR 118 corridor, the City has the ability to reserve land for almost the entire alignment /corridor for the SR 118 arterial. 2. Traffic impact analysis provided by the City's traffic modeling consultant, Austin -Foust Associates, Inc., has consistently indicated a need for the SR 118 arterial as a means to reduce traffic impacts upon the city -wide circulation system, particularly Los Angeles Avenue, in order to permit the system to function within Level of Service "C" standards adopted. M: \JLibiez \M \SP2 \SR118history.doc 000032 - 1'3 Agenda'Report SR 118 Joint .City Council /Planning Commission Meeting March -31, 1999 Page 3. A, professional engineering study to determine location and costs of Walnut Canyon Road /SR 118 interchange potential may be commissioned by the City and is expected to be completed by the selected consultant within twelve weeks after contract approval based upon the work schedule provided by the consultant. ATTACHMENTS: 1. Figure 2. General Plan Circulation Element -1992 Update 2. SR 118 /Walnut Canyon Intersection - CALTRANS proposal 3. Figure 2. General Plan Circulation Element- SP -2 Amendment 4. Brief Chronology of SR 118 History 5. Extract From Spring Road Extension Study, August 1996 M: \JLibiez \M \SP2 \SR118history.doc 0 ®® 0 3 A':'�.1 4 I FQENQ FREEWAY 4 WMCVA14GE SU4LANE ARTERIAL FOUR-LAME ARTERIAL - q RURAL COLLECTOR LOCAL COI.LECTOR SIGNALIZED INTERSECTION AT GRADE RR CROSSING GRADE SEPARATED RR CROSSING .... ..... CITY LIMIT BOUNOARY aalsoma s Sit-III FREEWAY CORRIDOR vUTE X.• WV•M• f- MM• u�Y`•w M�•y tOiYw �.�� iMt c- w #a % MY Ot ygN•M •I1Y LO1YWYA cx_.Wn•M Oe,- �W IJF�•MM �M�v�11•InM 19 FIGURE 2 CTTY OF MOORPARK GENERAL PLAN CIRCULATION ELEMEN7 HIGHWAY NETWORK May 19. 1992 000032. 15 INNER rU/ SIR a PIP PAN to /1/1� i , -7: TI. `.•RS0f 1 . 04 i RV, t � 1. —. —. o �000 .mo ram I _I:rlgm I FREEWAY MITER lPRCIUNCE SIMANE ARTERIAL -R— FUlMAANEARTERIAL RVRALCDLLECroR LOCAL CDLLEMR f1ONMOm OfTERSECTION AT -GRADE RR CROSINO 1'�n�jJ GRADE SEPARATED RR CROSS040 ..... ..•.. CITY LDQ! IOUNDARY • n u m u m e■ SR -113 FREEWAY OORRIDOR . .../-q. Pb— �M�yi Cb, yet Pte. �I�f s�7 Dn�YAea G/rrer FKPJRE 2 CITY OF MOORPARK GENERAL PLAN aRCUTAMON ELEMENT WAHV1Li0f NEIWCR x M&Y IS. 1CO2 000032. SR -118 ABBREVIATED CHRONOLOGY 1964 California Transportation Commission adopts SR23 alignment. Alignment includes interface with SR -118. 1965/69 Ventura County includes the- SR -118 alignment within the County Circulation Element. 1970s County upgrade to Circulation Element reflects potential freeway. 1983 City incorporates and maintains County General Plan as local plan. 1988 County downgrades SR -118 corridor status on County Circulation Element to right -of -way reservation. 1989 City begins discussion on General Plan updating of the Circulation Element. CALTRANS prepares the preliminary' alignment drawings for planning consideration. 1990 Austin -Foust Associates (AFA) prepares traffic analysis at City request and recommends that an SR -118 arterial be included in the City Circulation Element and that there be a grade separation at Walnut Canyon Road. 1991 AFA prepares additional traffic modeling that supports need for SR -118 arterial as a means to ensure adopted traffic level of service standards can be achieved and identifies the most significant component of impact to the City Circulation system as pass through and truck traffic. 28% of the vehicle trips on Los Angeles Avenue identified as pass through trips. City adopts a general alignment for SR -118 into Circulation system. 1992 General Plan Circulation Element adopted with SR -118 alignment, signalized intersections, grade separations and street sections defined. 1992 - current Major development projects within the tentative alignment of the SR -118 advised of need to incorporate the arterial in their planning. 1998 City Council conditions A &B Properties proposal for industrial development to provide SR -118 dedication, transition arterial roadway to Los Angeles Avenue, grade separated underpass at the Union Pacific Railroad as the westerly connection for the SR -118 arterial and first piece of the SR -118 development. M:\ JLibiez \M \SP2 \SR118chronology399.doc 00003-2a J Hidden Creek Ranch Specific Plan: Spring Rord Connection connection between Walnut Canyon Road and Spring Road that would be constructed as part of the proposed Specific Plan No. 2 project. The construction of this roadway link would red-ce the traffic volume at this intersection resulting in an acceptable level of service. Construction of this roadway link would preclude the need for the dual left -turn lanes. In order to determine the traffic impact of the Specific Plan project, a year 2010 No Project cumulative growth baseline traffic scenario was developed to which the Specific Plan project in year 2410 Proposed Project could be compared. The year 2010 No Project traffic scenario assumes buildout of the City of Moorpark General Plan Land Use Element and surrounding cumulative growth, without the proposed project. This scenario was developed by using the MTAM. The findings of the year 2010 analysis are as follows. The following circulation system improvements will be required in addition to the year 2000 No Project scenario minimum circulation system in order to accommodate the year 2010 No Project scenario traffic demands. Intersection levels of service are identified in Table 2.6-4. • Year 2000 minimum circulation system with the improvements at Los Angeles Avenue /Spring Road, Los Angeles Avenue/Tierra Rejada Road and one of the options for the Collins Drive /Campus Park Drive intersections. • The Spring Road extension, C Street, the Casey Road extension, and the completion of Science Drive. • Six -lane roadway section along New Los Angeles Avenue /Los Angeles Avenue with intersection configurations (Exhibit 3.6-15 of the Hidden Creek Ranch Specific Plan EIR). • Extension of SR -118 west from the SR- 118 /SR -23 connection to Los Angeles Avenue as a four -lane expressway with at -grade intersections at Spring Road, Walnut Canyon Road, C Street, and Gabbert Road. (This roadway can be initially constructed as a two - lane facility, with the additional lanes being added when needed.) • Traffic signal installation at the SR -118 /Walnut Canyon Road and SR -118 /Spring Road intersections. The majority of the traffic study area intersections will maintain LOS C or better, with the exception of two of the 22 study intersections, which are projected to exceed the City of Moorpark LOS C or better objective during the a.m. peak hour time period. The Collins Drive /Campus Park Drive intersection is forecast to operate at LOS E in the a.m. peak hour; the Collins Drive /SR -118 westbound ramps are forecast to operate at LOS D in the a.m. peak hour. wJB=6W8B.2.6 2.6-7 000032.11 rrEm 109 CITY OF MOORPARK AGENDA REPORT TO: Honorable City Council Planning Commission FROM: Wayne Loftus, Acting Community Development Directorle., - Prepared by: John Libiez, Principal Planner--W-,-j DATE: April 6, 1999 (For 4/21/99 Meeting) SUBJECT: CONSIDER REPORT RELATED TO SR 118 BACKGROUND: During the consideration of circulation options for the Moorpark Highland Specific Plan Project (Specific Plan No. 2), City Council indicated that it would like to discuss the SR118 bypass history as a portion of the joint Council /Planning Commission meeting on March 31, 1999. Following discussion on the SR -118, City Council requested that this item be placed upon the April 21, 1999 agenda. ' DISCUSSION: The staff report for the March 31, 1999, meeting summarized the history related to decisions that incorporated the SR -118 arterial (bypass) into the General Plan Circulation Element as well as action taken subsequent to request full evaluation of right -of- way and costs. A Request For Proposals was issued in August of 1998 to secure professional engineering studies and fee study for the construction of the SR -118 and SR -23 Bypasses. Only one firm responded. In January of 1999 staff issued a letter to a sole source engineering firm having requisite qualifications to perform the study. A response was received and is under evaluation. Additionally, the Public Works Director has taken action to move the needed study forward. Federal grant monies have been obtained and reserved for the purposes of conducting the study. 000032.20 ATTACHMENT 3 Agenda Report SR 118 City Council Meeting April 21, 1999 Page 2 At the March 31, 1999, meeting City Council and Planning Commission reviewed the staff report and requested response to a number of questions as follows: 1) Status on the extension of SR -118 to Wagon Wheel? 2) Status on the widening and improvements at the SR -118 and Los Posas /SR -34 signal? 3) Method of intersection/ interchange between SR -118 and Walnut Canyon Road? 4) Cost estimates for the SR -118 variations including the freeway option? 5) Do we have cost analysis newer than five years old? 6) What level of lane count will CALTRANS accept for the SR -118 in order to qualify as a State Route? 7) What level of funding or priority list status does the SR -118 have with VCTC? 8) Are we looking at a permanent solution? 9) Is there a need for the SR -118 as an east -west corridor? 10) What will be effects upon agriculture? 11) What will be effects upon the Los Posas Valley? Staff has contacted the Ventura County Transportation Commission, Resource Management Agency, and CALTRANS and has reviewed previous files and studies on`this matter to attempt to provide Council with information on each of the above questions. Staff will provide information received from these agencies upon receipt of the response, however to date only the following information is available: 1) Extension to Wagon Wheel. The master plan for highways of the County does not reflect the extension of the SR -118 to Wagon Wheel Road. Currently the SR -118 turns right at Wells Road and intersects with SR -126. Staff is attempting to obtain alignment maps for the SR -118 from its intersection at Wells Road south to SR -101 and its eventual extension along Rice Road to Port Hueneme. 2) Widening and Improvements SR- 118/34 Intersection. Staff is seeking a definitive response from CALTRANS and VCTC on the status of this intersection. Recently an article was included within the local newspaper which indicated that CALTRANS was studying the potential use of a "round- about" at the SR- 118/34 intersection. It had also been previously indicated that CALTRANS was exploring options for right -of -way 00003 .� f M:\ JLibiez \M \SP2 \SR118history42199rpt.doc Agenda Report SR 118 City Council Meeting April 21, 1999 Page 3 acquisition in order to widen and signalize this critical intersection. 3) Costs and Configuration of SR -118 in Moorpark. Questions 3, 4, 5, 6, 8, and 9 will be addressed by the study effort being solicited and managed by the Public Works Director. Attachment A contains estimated costs for various segments of the SR -118 arterial as of May 27, 1998 as prepared by the Public Works Director. Attachment B contains an excerpt from a staff report to Council issued for the April 5, 1995 agenda and identifies some phasing information and cost estimates. 4) Funding /Priority Status of SR -118. Staff has requested VCTC to provide a report on the funding and priority status for the SR -118 as it may exist currently. We are awaiting a response. 5) Effects of the SR -118. Questions 10 and 11 will be part of the environmental evaluation that CALTRANS will be required to conduct as a process of design and approval for any portion or phase of the SR -118 design and construction project. Discussion of the SR -118 has frequently involved discussion which often seems to focus on provision as a freeway corridor, however, the adopted General Plan Circulation Element (1992) establishes the SR -118 alignment as an Arterial Roadway of up to six lanes. The General Plan also proposes this alignment as a limited access roadway with some at grade intersections, and a grade separated intersection at Walnut Canyon Road. The pending Public Works study will also address these issues. Correspondence has been received from Assemblyman Strickland requesting that the City consider participation and sponsorship of a special meeting on May 6, 1999 in the Apricot Room of the Moorpark Civic Center to discuss truck traffic and safety issues related to SR -118 through Moorpark. This will be considered as a separate agenda item. STAFF RECOMMENDATION: Direct staff as deemed appropriate. Attachments: A. SR -118 Bypass Costs B. Council Staff Report dated March 19, 1999, SR -118 History. M:\ JLibiez \M \SP2 \SR118history42199rpt.doc 0 0 0 0 3r'C..� � 7o,. sfie.. Route 118 Bypass Constructoin Cost Estimate 27- Hay -98 Segment Description - - - - - -- ------ - - - - -- A East of SP -2 B SP -2 C West of SP -2 Approx. Percent Lenth (ft) of Total ---- - - - - -- -- - - - - -- 1,200 0.075 2,500 0.156 400 0.025 D SP -10 700 0.044 E West of Walnut Can 1,900 0.119 Canyon Road F SP -1 6,300 0.394 G West of SP -1 H Anderson I Bugle Boy 800 0.050 1,700 0.106 500 0.031 16,000 1.000 Straight Spread of Total Cost Option 1 Option 2 Option 3 Option 4 Retarks ----- - - - - -- ----- - - - - -- ----- - - - - -- ----- - - - - -- --------------- - - - - -- 2,118,745 2,801,529 2,801,529 5,437,869 4,414,053 5,836,518 5,836,518 11,328,894 706,248 933,843 933,843 1,812,623 1,235,935 1,634,225 1,634,225 3,172,090 3,354,680 4,435,754 4,435,754 8,609,959 11,123,413 14,708,025 14,708,025 28,548,812 1,412,497 1,867,686 1,867,686 3,625,246 3,001,556 3,968,832 3,968,832 7,703,648 882,811 1,167,304 1,167,304 2,265,779 28,249,938 37,353,715 37,353,715 72,504,919 Ziw4e a� ail M, 0000 ? . �3- ..oute 118 Bypass Constructoin Cost Estiaate Option 02, plus Princeton Bridges Length Approx. Percent Segment Description Lenth of Total A East of SP -2 1,200 7.50% i B SP -2 2,500 15.631 C West of SP -2 400 2.501 D SP -10 700 4.381 E West of Walnut 1,900 11.88$ Canyon Road F SP-1 6,300 39.381 I G West of SP -1 800 5.00$ H Anderson 1,700 10.631 I Bugle Boy 500 3.131 16,000 100.001 A Walnut Bridge Over Canyon Railroad Princeton Southbound B Gabbert Crossing -Bridges Frwy Lanes Bridges Bridge Roadway ---- - - - - -- ---- - - - - -- ---- - - - - -- ---- - - - - -- ----- - - - - -- 5,000,000 5,000,000 0 0 1,350,000 0 0 0 0 2,812,500 0 0 0 0 450,000 0 0 3,600,000 A 0 787,500 0 0 3,600,000 A 0 2,137,500 0 0 1,300,000 B 0 7,087,500 0 0 1,300,000 B 0 900,000 0 0 0 2,000,000 1,912,500 0 0 0 2,000,000 562,500 5,000,000 5,000,000 9,800,000 4,000,000 18,000,000 27- Hay -98 Cost Percent j Total of Total 11,350,000 27.15% 2,812,500 6.731 450,000 1.08% 4,387,500 10.50% 5,737,500 13.731 8,387,500 20.071 2,200,000 5.26% 3,912,500 9.36% 2,562,500 6.13% 41,800,000 100.001 00U®3?,aµ y� '� Sf � � � .� � • U man., � •S Q y �A j` y Y �un'n 01` )M g Y O �;i p * inn .s� •fR a V E !s 7 �4 r ' oo ,�+ror }y`` a«a , rr( M lid is o., uvs y xw`O u.�,aa„ " f �E #J ,U= iv;:;' " 6`aC b y w u uao +w p ygnd J y. �� s . � F �• W X b �0 � , a ic,w s.r*.. n..s w mq aidp D � �., �, .. P y, a w � F; � v uaAww v� � a � � �� � � • 7 6 �' )+nn«v'"' S j , �` .. `. qn1�` O 4 R � n � " n i..Mt 1""� W P :m � may' p gA f _"pf• {'�a p w w.n, rn wt��'(l% q 54y 9 py a ws� w v 4 ',,, mo.on « a q �i � ry�..w T b aria � � � A 3 b y� � •' �� u )r7 uwa h„ w ,� 6p A � , 10 ork 12 P-W P-4n AN A DMA fi Alm U0400-8 -9— is 77 r «mqM a Q p ,oa, tuaW vma i W a ar NUJ «o tiyr� 1 �N�dd R o7M Q(GW ... .......... ............... Q n fZ u Su7. .m wwMW am 9 u nmuaw 3 � � � ♦"• tnuw ; � � a � 8 R R u 811 811 :; (; fl )r wwos M..: 3AY S.7T39NV 1 aam ♦r : n Y . >. a • ... o � a � � '� a a � � Q .,w „„, to � �,.,, Al viu . )x.a. u pow M a .� :...... kA a W AO�A� 5.p..� _ �bo"� A R Ri.w n • ..� 4v •.e .n r � it w n M�f vw :::;:.,•• 811 1 7 .1 ••.;.. _ :_�^I �� IC'l� a ^�s�. � _R� �'�. � � J Q a nit " •• � 7 t: "- "Q �'• y 3 � ti �y 'qty O i y C 0 �¢4� L CITY OF MOORPARK AGENDA REPORT TO: Honorable City Council Planning Commission FROM: Wayne Loftus, Acting Community Development Director Prepared by: John Libiez, Principal Planne" DATE: March 19, 1999 (For 3/31/99 Joint Meeting) SUBJECT: CONSIDER REPORT RELATED TO SR 118 HISTORY BACKGROUND: During the consideration of circulation options for the Moorpark Highland Specific Plan Project (Specific Plan No. 2), City Council indicated that it would like to discuss the SR118 bypass history as a portion of the joint Council/ Planning Commission meeting on March 31, 1999. DISCUSSION: The provision of major north /south and east /west freeway links, or alternative highways has historically been a portion of the Caltrans transportation considerations for Ventura County and particularly the Simi Valley /Moorpark area. In May of 1989 the District 7 Director for Caltrans indicated that based upon community concerns and traffic information Caltrans would undertake to prepare a basic design and set right -of -way lines for both the SR 23 and SR 118 Freeways. The California Transportation Commission adopted the SR 23 alignment on October 28, 1964. In 1989, Caltrans produced preliminary 1 "= 100'scaled plans, copies of which are maintained in the Public Works and Community Development Departments, to depict a general horizontal alignment (location on the ground), potential right - of -way limits, and potential intersection/ interchange locations. These plans depict a continuous corridor from the Princeton Avenue area to the west end of the City (west of Gabbert Road). In May,1990, Austin -Foust Associates, Inc.(AFA) was asked by the City Council to prepare a traffic analysis for the pending 00003 b. Z� Agenda Report SR 118 Joint City Council /Planning Commission Meeting March 31, 1999 Page 2 Moorpark General Plan update, which included a number of alternatives regarding future circulation corridors and connections between corridors to increase circulation effit:iency and maintain the City's level of service for traffic flow at Level of Service "C ", a goal of the Circulation Element of the General Plan. Recommendations included in the Austin--Foust traffic analysis were: 1)Extend Spring Road to connect with the extension of SR 118; 2)create an arterial roadway from the SR 118 freeway terminus near Princeton Avenue to connect to Los Angeles Avenue at the westerly end of the community; and, 3)grade separate SR 118 at Walnut Canyon Road. The AFA report included that: 1) an east -west bypass would be effective in diverting a significant amount of traffic from Los Angeles Avenue (approximately 50K trips), thereby achieving desirable system performance standards (LOS -C) for Los Angeles Avenue and other affected corridors; and, 2) that a Bypass configured as a freeway was no more effective than an arterial road in meeting circulation system needs. In 1991, AFA conducted additional traffic analysis related to a potential Circulation Element amendment and concluded that a large percentage of the trips that impacted the City circulation system were pass through trips (28%), including a significant ratio of truck traffic. AFA also noted that the westward extension of SR 118 freeway was included within the County Master Plan of Highways. As a result of the traffic analysis related to the city -wide 2010 projections, the extension of SR 118 from SR 23/118 west to Los Angeles Avenue near Buttercreek Road was added to the City's circulation system plan. In the 1992 Circulation Element update adopted by the City, the SR 118 arterial bypass was designated as a six lane arterial from Princeton Avenue to Gabbert Road, and a four lane arterial from Gabbert Road to Los Angeles Avenue. In 1996, Michael Brandman Associates performed additional environmental analysis related to the possible extension of Spring Road in conjunction with the Specific Plan No. 8 considerations. The purpose was to assess the potential connection, other than Broadway, for SP -8 traffic to be distributed to reduce impacts at the Collins /SR -118 interchange and maintain the City's adopted level of service standards. The "no project" traffic scenario contained in the study for the year 2010 determined which City circulation system improvements would be required without Hidden Creek Ranch traffic based on projected General Plan land use build out of 2010(Attachment 5). M: \JLibiez \M \SP2 \SR118history.doc Agenda Repor-� SR 118 Joint City Council /Planning Commission Meeting March 31, 1999 Page 3 One of the conclusions of this study was the need for extension of SR -118 west from the SR- 118/SR -23 connection to Los Angeles Avenue as a four -lane expressway with at grade intersections at Spring Road, Walnut Canyon Road, "C Street, and Gabbert Road. This roadway as evaluated by the Brandman Study could be initially constructed as a two -lane facility, with the additional lanes added when needed. Because of deficiencies which would exist for the Collins Drive /Campus Drive and Collins Drive /SR -118 intersections as noted by Brandman in the Spring Road Study, City Council placed specific conditions on Specific Plan No. 8 to mitigate the deficiencies that would result to the adopted Level of Service "C standard with the approval of Hidden Creek Ranch (SP -8). Specific Plan No. 2 reflects a 200' right -of -way reservation for the SR 118 Bypass which, depending on grading, can be adequate for a six lane facility. Preliminary plans for Specific Plan No.l (Hitch Ranch) also propose a 200' wide reservation for the SR 118. The Moorpark Regency Development (Pre - application 98- 02, Michael Sanders) immediately west of Walnut Canyon Road, and the SunCal project immediately east of Walnut Canyon Road also propose 200' wide reservations for the SR 118 right -of -way as it passes through these projects. The SR 118 highway corridor illustrated for the referenced projects is generally consistent with the alignment shown by the Circulation Element and as shown on preliminary Caltrans drawings for an arterial bypass route. City Council action on December 2, 1998, with regard to the A &B Properties /Southern California Edison industrial development application west of Gabbert Road included a requirement for connection of the SR 118 corridor to Los Angeles Avenue including provision of a railroad underpass to link this corridor to Los Angeles Avenue. The projects identified in this report which are located along this Bypass corridor represent the potential for reservation /dedication of approximately 98% of the right -of -way needed for the SR 118 Bypass. The City Council in July of 1998, authorized staff to seek professional engineering services related to the potential development of the SR 118 Bypass either as an arterial roadway or freeway. The services sought would provide a study of the SR 118 Bypass corridor which would determine precise horizontal and vertical alignments, improvements and costs for the extension of the SR 118 Bypass from Princeton Avenue to Los Angeles Avenue. The RFP process at that time failed to receive a sufficient number of qualified responses. The Public Works Department M: \JLibiez \M \SP2 \SR118history.doc 00003;,> - �o Agenda Report SR li8 Joint City Council /Planning Commission Meeting March 31, 1999 Page 4 subsequently obtained a limited grant that will provide partial funding for the long term study once a qualified consultant is found. In mid - January, 1999, staff solicited specialized engineering services that would look at several options for the location of the Walnut Canyon Road /SR 118 interchange including as an at grade and grade separated corridor. Determination of the location of ramps or an interchange at Walnut Canyon Road or another appropriate locations is critical from a timing perspective since the Sun Cal project, currently under analysis for referral to the Community Development Ad Hoc Committee, would be significantly affected by the current Caltrans preliminary bypass plan for SR 118. The Caltrans plan currently identifies Walnut Canyon Road as grade separated with on and off ramps. If this preliminary plan were to represent the preferred access point to the bypass corridor, it would require the Sun Cal project to undergo a significant redesign and additional right -of -way reservation to include ramps at Walnut Canyon Road. Staff issued a work program document to the selected engineering firm in mid - January for response. A response was received as of the end of February from the prospective engineering firm which detailed an expanded work program to complete the study of the Walnut Canyon Road /SR 118 connection. Staff is currently evaluating the proposed work program submitted by the firm. An abbreviated chronology related to the SR -118 is attached to this report for information. CONCLUSIONS: 1. Based upon the commitments and requirements placed upon pending developments along the SR 118 corridor, the City has the ability to reserve land for almost the entire alignment /corridor for the SR 118 arterial. 2. Traffic impact analysis provided by the City's traffic modeling consultant, Austin -Foust Associates, Inc., has consistently indicated a need for the SR 118 arterial as a means to reduce traffic impacts upon the city -wide circulation system, particularly Los Angeles Avenue, in order to permit the system to function within Level of Service "C" standards adopted. ®®®®3 . Al M: \JLibiez \M \SP2 \SR118history.doc Agenda Report SR 118 Joint City Council /Planning Commission Meeting March 31, 1999 Page 5 3. A professional engineering study to determine location and costs of Walnut Canyon Road /SR 118 interchange potential may be commissioned by the City and is expected to be completed by the selected consultant within twelve weeks after contract approval based upon the work schedule provided by the consultant. ATTACHMENTS: 1. Figure 2. General Plan Circulation Element -1992 Update 2. SR 118 /Walnut Canyon Intersection - CALTRANS proposal 3. Figure 2. General Plan Circulation Element- SP -2 Amendment 4. Brief Chronology of SR 118 History 5. Extract From Spring Road Extension Study, August 1996 00003112, YO M: \JLibiez \M \SP2 \SR118history.doc .urt IFS FREEWAY PI xcv_4t+GE SIX-LANE MATERIAL FOUR-LAVE ARTERIAL R RURAL COLLECTOR LOCAL COLLECTOR SIGNALIZED INTERSCCTION AT.GRADE RR CROSSING GRADE SEPARATED RR CROSSING - •— • —• —• +• CITY LIMIT 90UN0ARY awsssssll SR•113 FREEWAY CORRIDOR C., rMY Ql\MIYh \IYI 107�WYA D\+f/.YM Q.r�arM 'W W.1�MY Mrw.yv FIGURE Z CITY OF MOOR.PARK GENERAL PLAN CIRCULATION ELE`tEN7 HIGHWAY NETWORK Mar 13. 1992 19 000032. 3f ATTACHMENT: 1 IIPPP- Rw 0\1 \R N ,� lowk 4 OR � OR NOW 'N'� 0 MIN �� �� • � i` � ;;-1 �A�o-. �♦ ♦ .1 INA. All iJi1Y! �► it `Ott .;' • : r 151' �� r ,�;:%��:d' • tf �� � r��' ,r. `t. ,.r. . M /` /�f• if r oi'r s•�� � � wrM I .Prvpl 1D PRELWAY =4AN ART { cttaAra ARTERIAL PCI M4 AHE ARTPJUAL —It— XLMAL COLLE001t LOCAL COLLE it vanAL= vnw=CTION AT-0RADE M OtCUM GRADE S&ARATEO RR CROSS246 _ •— • —• - - -- CSrr LWT Domm RY 88008808 Sltd18 PREZ.WAY CORX=R c =r�wr nrs wr O-rr� r G�rY 0.�� Arrrr PXPJAE s CTI'Y OF MOORPARK GENERAL PUN C3RC[n1►nON ELEMENT wo~ NETWORK may I& Im ATTACHMENT: 3 SR -118 ABBREVIATED CHRONOLOGY 1964 California Transportation Commission adopts SR23 alignment. Alignment includes interface with SR -118. 1965/69 Ventura County includes the SR -118 alignment within the County Circulation Element. 1970s County upgrade to Circulation Element reflects potential freeway. 1983 City incorporates and maintains County General Plan as local plan. 1988 County downgrades SR -118 corridor status on County Circulation Element to right -of -way reservation. 1989 City begins discussion on General Plan updating of the Circulation Element. CALTRANS prepares the preliminary alignment drawings for planning consideration. 1990 Austin -Foust Associates (AFA) prepares traffic analysis at City request and recommends that an SR -118 arterial be included in the City Circulation Element and that there be a grade separation at Walnut Canyon Road. 1991 AFA prepares additional traffic modeling that supports need for SR -118 arterial as a means to ensure adopted traffic level of service standards can be achieved and identifies the most significant component of impact to the City Circulation system as pass through and truck traffic. 28% of the vehicle - ,trips on Los Angeles Avenue identified as pass through trips. City adopts a general alignment for SR -118 into Circulation system.. 1992- General Plan Circulation Element adopted with SR -118 alignment, signalized intersections, grade separations and street sections defined. 1992- current Major development projects within the tentative alignment of the SR -118 advised of need to incorporate the arterial in their planning. 1998 City Council conditions A &B Properties proposal for industrial /development to provide SR -118 dedication, transition arterial roadway to Los Angeles Avenue, grade separated underpass at the Union Pacific Railroad as the westerly connection for the SR -118 arterial and first piece of the SR -118 development. W0032.34 M:\ JLibiez \M \SP2 \SR118chronology399.doc ATTACHMENT:4 Hidden Creek Ranch Specific Plan: Spring Rand Connecnon connection between Walnut Canyon Road and Spring Road that would be constructed as part of the proposed Specific Plan No. 2 project. The construction of this roadway link would red-cc the traffi: volume at this intersection resulting in an acceptable level of service. Construction of this roadway link would preclude the need for the dual left -turn lanes. In order to determine the traffic impact of the Specific Plan project, a year 2010 No Project cumulative growth baseline traffic scenario was developed to which the Specific Plan project in year 2010 Proposed Project could be compared. The year 2010 No Project traffic scenario assumes buildout of the City of Moorpark General Plan Land Use EIement and surrounding cumulative growth, without the proposed project This scenario was developed by using the MTAM. The findings of the year 2010 analysis are as follows. The following circulation system improvements will be required in addition to the year 2000 No Project scenario minimum circulation system in order to accommodate the year 2010 No Project scenario traffic demands. Intersection levels of service are identified in Table 2.6-4. • Year 2000 minimum circulation system with the improvements at Los Angeles Avem e/Spring Road, Los Angeles AvenueMerra Rejada Road and one of the options for the Collins Drive /Campus Park Drive intersections. • The Spring Road extension, C Street, the Casey Road extension, and the completion of Science Drive. • Six-lane roadway section along New Los Angeles Avenue /Las Angeles Avenue with intersection configurations (Exhibit 3.6-15 of the Hidden Creek Ranch Specific Plan EIR). • Extension of SR -1 l8 west from the SR -I 18/SR -23 connection to Los Angeles Avenue as a four -lane expressway with at -grade intersections at Spring Road, Walnut Canyon Road, C Street, and Gabbert Road. (This roadway can be initially constructed as a two - lane facility, with the additional lanes being added when needed.) • Traffic signal installation at the SR -I 18 /Walnut Canyon Road and SR -I 18 /Spring Road intersections. The majority of the traffic study area intersections will maintain LOS C or better, with the exception of two of the 22 study intersections, which are projected to exceed the City of Moorpark LOS C or better objective during the a.m, peak hour time period. The Collins Drive /Campus Park Drive intersection is forecast to operate at LOS E in the a.m. peak hour; the Collins Drive /SR -118 westbound ramps are forecast to operate at LOS D in the a.m. peak hour. 0 U 0 ®? 2.3 wnuozz600ts.2-6 2.6-7 ATTACHMENT: 5 .,�r •� "y!aw. M..... h\ ..., ., �.... .:. n;.;y.....,.. J»:a.rs•. �.., rW:o».;.:..n.... v.:o ..^' ;x.. ..�.+! One of the policies included in this Element states that the City will- attempt to achieve and maintain level of service "C" as a system performance standard for traffic volumes on the roadway system and as a basic design guideline for roadways in the City. CIRCULATION SYSTEM The goals and policies included in the Circulation Element emphasize the need for a circulation system that is capable of serving both existing and future residents while preserving community values and character. The location, design, and constituent modes of the circulation system have major impacts on air quality, noise, community appearance, and other elements of the environment. The highway network designated in the Circulation Element is illustrated in Figure 2, and indicates all of the designated freeways, six -lane arterials, four -lane arterials, and rural collectors. In addition, a selected number of designated local collectors, which carry through traffic, are indicated on the map. Any permanent closure to through traffic or relocation of the designated arterials and collectors will require a General Plan Amendment. Highway facilities are shown within the current City limits as well as for the surrounding planning area that has been defined for the General Plan Update. Existing and potential future traffic signal locations within the City limits are also indicated on the highway network map, as are existing and potential at -grade and grade separated railroad crossing locations. Traffic signal warrants are satisfied for the locations shown here based on current traffic projections. Traffic signalization may be required at minor street and driveway locations not shown on the Circulation Element highway network map. A grade separated railroad crossing is shown only for the future SR -118 bypass arterial crossing. Grade separation is not considered feasible at the four existing railroad crossings (Gabbert Road, Moorpark Avenue, Spring Road, and Los Angeles Avenue). The roadway network in the Circulation Element indicates a number of improvements with regard to the existing roadway system in the Moorpark planning area. The following are the more important improvements that will need to be implemented: • Connection of the SR -118 and SR -23 freeways with new interchanges at Collins Drive and Princeton Avenue. is 00003 > . 3 ATTACHMENT 4 .:.• C�, v .�n:.,v,4}w,wy.v,:u• % ?:i:YYY..1 ... ........•..:.v.: i ?wi Y .. �nJhwiWL.w� ...:: < ^..,.. .. :+Wwv.: : ... ...., .. MiifM�i•1Yw+' �� -. ......� - -...: yirrw'....ri�r.rw......r�ww.irw .�. r..�.. r. l.Jr /i..w �...r.t • Provision of an east /west SR -118 arterial bypass from the SR -23 /SR -118 connector to Los Angeles Avenue west of Butter Creek Road, without a connection to Walnut Canyon Road, and recognition of a potential future SR -118 freeway extension west of the City limits. • Provision of a north /south SR -23 arterial bypass from the SR -23 /SR -118 connector to Broadway Road. • Extension of Spring Road north to the SR -23 arterial bypass. • Provision of a local collector system to serve circulation needs in the northwest portion of the City. Local collectors added to the existing circulation system include an extension of Casey Road to Gabbert Road, "C" Street between Grimes Canyon Road and the SR- 23 arterial bypass, and "D" Street between Princeton Avenue and the SR -23 arterial bypass. • Provision of a roadway system to serve circulation needs in the Carlsberg Specific Plan (Moorpark Highlands) area in the southeast portion of the City. Roadways added to the existing circulation system include an extension of Science Drive from New Los .Angeles Avenue to Tierra Rejada Road, and an extension of Peach Hill Road to Science Drive. s Provision of an eastern extension of Broadway Road potentially connecting with Alamos Canyon Road and the SR -118 freeway to serve circulation needs of potential future development in the portion of the planning area northeast of the City limits. 20