Loading...
HomeMy WebLinkAboutAGENDA REPORT 2000 0405 CC REG ITEM 11IY OF140ORPARX, CALTUC)RNIA a --nd-1 17kif"'ea"l-I of CITY OF MOORPARK ACTION: AGENDA REPORT TO: The Honorable City Council BY: FROM: Kenneth C. Gilbert, Director of Public Works DATE: March 24, 2000 (Council Meeting 4-5-00) SUBJECT: Consider Approval of an Increase to the Amount of the Construction Contingency for the Poindexter Sidewalk Project DISCUSSION A. Background On November 17, 1999, the City Council awarded the construction contract for the subject project. The amount of the contract was $271,682. Construction of the project has been delayed due to inclement weather. Construction efforts are now proceeding. B. Changes Four Change Orders have been approved or are being processed, summarized as follows: No. ----------- - - - ------- ------------------------------------------------------------------------------------------ - - ------- Description - - --------------- Amount . . . ........... Block Wall: Modifications to the design for the' 1,500.00; block wall on the south side of Poindexter :Avenue to meet the requirements of the Right-of- !way Acquisition Agreement. ....... . ---- ....... . . . . - ............. .. ... . . ............... . .. .......... . . . ...... .. . . ....... . ........ ....... . ...... . ....... . . . ........ 2 Driveway Modification: Modifications to the 1,357.29 design for the driveway to be constructed on the' south side of Poindexter Avenue west of Sierra ......... . 'Avenue, to improve traffic safety. ............... . . . .......... . . . ..... . . . ..... - - ----- .. . ............... . . ... .................. . . . . ............. . .... . .... 3 Drainage Design Change: When the design was 500.00 prepared it was known that the existing pipe conveying surface drainage under the Gabbert Poindexter intersection was substandard. In' to control costs the design did not": ... . ... .......... this problem but merely provided for the' ...................... ..... . . . ............ . . . . ........................................ . . Pndx— increase —0004 000208 Poindexter Sidewalk Project: Increase March 24, 1999 Page 2 ........... ..---._. ......... ..-__- ................... _._.._._. .................. .. .... ---._..........................._._...._----- ............................. --- .................. .- __............._ ............. _. .......... _.......... ..... ._..._............ No. ;Description Amount ($) construction of an extension to that sub- standard pipe. It has been subsequently: determined that the best design would be the removal of the pipe and the construction of a :cross- gutter. The net construction cost increase: is under $500. 4 Intersection Reconstruction; The pavement: 21,000.00: :within the intersection of Gabbert Road and: est. :Poindexter Avenue is in poor condition. This condition was not the focus of the design for; the subject project - thus the problem was not addressed. It has now been determined that it :would be cost effective to remove and: reconstruct the asphalt pavement at this intersection as a part of the construction of the cross gutter described above. Total; 24,357.29: C. Contribution from A -B Properties Pursuant to the Conditions of Approval for TT -5147, the developer [A -B Properties] will reimburse the City for the drainage improvements being constructed by the subject property at the intersection of Gabbert Road and Poindexter Avenue. The estimated cost of those drainage improvements is approximately $5,000. D. Contingency When the contract was awarded, the City Council approved a construction contingency of $28,318. The above described changes use up the majority of that contingency. The unforeseen intersection reconstruction comprises the majority of those extra costs. The amount of the remaining contingency is only $4,000. Future unforeseen conditions or events could give rise to other added costs. In order to be in the position of responding to any such potential problems, it is recommended that the contingency be increased by an amount equal to the estimated cost of the intersection reconstruction. If approved, the revised contingency will be $49,318 [$28,318 + $21,000]. Such an action would result in a remaining contingency of approximately $25,000. Pndx increase 0004 000209 Poindexter Sidewalk Project: Increase March 24, 1999 Page 3 E. Budget Amendment It is still possible that the final project costs may be less than the amount of the current budget. It is recommended, therefore, that any amendment to the Budget to cover the subject or any other additional costs be deferred until the City Council takes action on the approval of the Notice of Completion for the project. RECOMMENDATION Staff recommends that the City Council approve an increase to the contingency for the Poindexter Sidewalk Project to $49,318. 000210 Pndx increase 0004