Loading...
HomeMy WebLinkAboutAGENDA REPORT 2000 0405 CC REG ITEM 11JITEM ` CITY OF MOORPARK AGENDA REPORT TO: The Honorable City Council FROM: Kenneth C. Gilbert, Director of Publ: CM1V OF MOORPARK, CALIFORNTA of DATE: March 24, 2000 (Council Meeting 4 -5 -00) SUBJECT: Consider Approval of an Increase to the Amount of the Fee for Construction Engineering Services for the Spring Road Bridge Reconstruction Project DISCUSSION A. Background On February 3, 1999, the City Council awarded the construction contract for the subject project. The amount of the construction contract was $2,352,424.60. The bridge was opened to traffic on March 15, 2000. Construction continues on additional work being done within the channel. It is anticipated that the total project will be completed in May. On December 1, 1999, the City Council increased the project contingency from $235,242 to $588,105, to cover certain anticipated construction cost increases. B. Construction Engineering Services The City retained the services of VCE Civil Engineering and Surveying to provide Construction Engineering Services (Contract Administration and Construction Inspection) for this project. The negotiated fee for those services was $140,000, an amount equal to less than 6% of the construction bid cost. Typically Construction Engineering fees range from 10% to 150 of construction costs. C. Construction Delays As you know, the construction contract is expected to take five to six months longer than originally expected. The causes of the delays to the construction contract are the subject of on -going disputes between the City and the contractor. Spg_brg_ce_fee_0004 000211 Spring Road Bridge: C. E. Fee Adjustment March 24, 2000 Page 2 D. Request for a Fee Increase 1. Reason: In the attached letter from VCE, it is requested that the amount of the fee for Construction Engineering services be increased to cover certain additional unforeseen costs. Those additional costs are related to a number of factors including: • the additional Contract Time resulting from the above mentioned delays; • additional work required by a number of Contract Change Orders and /or Extra Work Orders ( "Force Account "); • additional time required to review, evaluate and manage additional extra work being performed under "Force Account "; • input, review and approval of revised falsework plans; • additional time related to the review of numerous requests for additional information and /or claims for additional compensation; and • additional work related to the inordinate number of Requests for Information (RFIs) and letters requesting additional information and /or disputing administrative actions taken. 2. Time: The total amount of the requested fee increase is $92,540. [If approved, the total revised fee would be $232,540.1 The amount of the requested fee increase is approximately 56% of the original fee. It should be noted that the amount of time that construction is now expected to exceed the original Contract Time is approximately five (5) months - coincidentally an increase of about 56 %. Although it is not anticipated that all of this added time will be approved as an adjustment to the Contract Time, it has been and will continue to be necessary for the VCE to provide Construction Engineering Services to the City throughout the duration of the administration of the project. 3. Percent of Construction Costs: There are a number of outstanding unresolved requests for, and potential claims for, additional compensation. Accordingly, it is not possible to yet determine the final estimated construction cost for the project. However, based upon the approved "extras" to date, plus certain additional "extras" anticipated to be approved in the near future, the current "known" cost of construction is approximately $2,802,424 [$2,352,425 (bid) + $450,000 (extras) ] . Using that figure the requested revised fee for Construction Engineering is approximately 8.3% of total construction costs. As stated earlier, Construction Engineering costs normally run about 10% to 15% of construction costs. Spgbrg— ce_fee_0004 _ 0002- Spring Road Bridge: C. E. Fee Adjustment March 24, 2000 Page 3 D. Budget Impact The requested additional Construction Engineering costs, if approved, will be authorized by way of a staff - approved line item transfer from the construction contingency. Based upon the current level of appropriations and approved costs to date, there is no need to amend the budget at this time. RECOMMENDED ACTION Approve an increase to the fee amount for Construction Engineering services for the Spring Road Bridge Replacement Project, in the amount of $92,540, and authorize the City Manager to sign an Amendment to the Agreement for said services to effect said increase. Spgbrg_ce_fee_0004 0 0 0 2.11 March 16, 2000 CIVIL ENGINEERING SURVEYING Mr. Ken Gilbert City of Moorpark 799 Moorpark Avenue Moorpark, CA 93021 Re: Job. #1207 - Spring Road Bridge Replacement Request for fee increase to our contract Inspection Contract and Administration Purchase Order #980505 Dear Mr. Gilbert: Attached is an itemized. breakdown of the increase in fees and the work for which we believe justifies said increase. In general the contract has run over -a total of three months thus far and we expect it to go until at least April 19, 2000, which will be a total of four months increase in length of contract. We had based our contract on the number of hours of inspection and office time that we needed to provide given the nine calendar months allowed the contractor for this project. As you know most of the delay was caused and created by the extremely slow pile driving. We had estimated he should have driven ten piles a day minimum. He wound up driving an average of slightly over three. Yet, when reviewed in the totality, he drove easily ten and twelve piles a day the last days of the contract. • Extra days for one man for the contract will amount to an extra added 83 days through April 19, 2000 for 8 hours a day @ $65.00 an hour for a total of $43,160.00. • Office Support is 10% or $4,316.00 • Car allowance is 4 months @ $650.00 per month for a total of $2,600.00 • Extra man power required during the pile driving was 1 man for 53 days 8 hours a day @ $65.00 an hour for a total of $27,560.00' • We also were authorized and did a falsework design for a total of $4,900.00. We checked two extra Falsework submittals caused by the delay for a total $3,800.00. ® Our original contract estimated 10% of the field time as office support. With the contractor generating 50 R.F.I.'s, 98 letters (many of which were for claims), numerous other letters averaging better than two letters a day, the total contract for the office support time ballooned. • On Change Order #5, alone, I spent a grand total of 55 plus hours. We estimate from the hours shown on our office records that the increase in office time was well in excess of 50% of our original estimate which would be $6,204.00 for the life of the 397 Mobil Ave., Suite 5 - Camarillo, California ® 93010 ® Phone (805) 388 -6460 . FAX (805) 388 -6456 nine month contract. 49CEMM. Sincerely, John Dickerson JD:db 1207 — request for fee increase -T.D-k-,N I ; 03/16/00 17:26 a 8053886456 UCE SERUICES P.04 EXTRAS FOR JOB #1207 A. For 4 months Extra contract time through April 15, 2000 1 Inspection 83 days x 8 hrslday x $65.00 $4 ,160.00 'Office support @ 10% of above 4,316.00 Car --4 months x $650 -00 /month 2,600.00 2 Extra for additional inspection 53 days x 8 hrslday x $65 00lhr. 27,560.00 During pile driving 3) Falsework Design - 4,900.00 4) Two extra Falsework submittals _ 3,800.60 checked 5) Additional office work 21 EWO's to date - __._._. 51 RFI's 92 Letters (complaints and_for claims) _ Extra for documentation of EWO #5 & other force account EWO's. An additional 50% of original' Allocation for office support __ :...._. total MAR 16 '00 16:40 6053886456 I 0''x''1 6 PAGE. 04