HomeMy WebLinkAboutAGENDA REPORT 2000 0419 CC REG ITEM 11FITEM /1. F-
TO: The Honorable City Council
FROM: Kenneth C. Gilbert, Director of Public Works
DATE: April 7, 2000 (Council Meeting 4- 19 -00)
SUBJECT: Consider Bids for the New Los Angeles Avenue Bridge
Widening. Project
nTC(1TTCCTnWT
A. Project Scope and Other Background Information
Attached s Exhibit 1 is a summary of the.project scope, as well
as other background information.
B. Construction Engineering
It will be necessary for the City to retain the services of a
consultant civil engineering firm to provide Construction
Engineering services [contract administration, surveying and
inspection] for this project. The selection of that consultant
is the subject of a separate report to the City Council.
C. Bid Results:
Bids for the subject project were received and opened on April
4, 2000. The apparent low bidder is Security Paving, Inc. A
summary of the bid results is attached as Exhibit 2. The bid
from Security Paving is summarized as follows:
Base Bid Amount $1,389,921.10
Bid Alternate #[1 25,000.00
$1,414,921.10
It has been determined that the apparent low bidder is
qualified to perform the work. Said bidder has confirmed that
their bid is valid and that they are prepared to proceed with
the construction of the project.
Mew L A Brg_awd 0 011
New Los Angeles Avenue Bridge Widening: Award Contract
April 7, 2000
Page 2
D. Bid Alternate No. 1: Defined
1. Traffic Impact: As described in more detail in Item #12 of
Exhibit 1, a portion of the work will require the
restriction of traffic to one lane in each direction. The
Contract Documents state that the traffic control plan for
this portion of the work [Stage Construction SC2] shall not
be in place more than fifteen (15) working days (21 Calendar
days) .
2. Liquidated Damages: The contract documents provide for the
assessment of $500 per day Liquidated Damages for each day
the contract extends beyond the specified contract time.
The contract documents also provide that $2,500 per day
Liquidated Damages shall be assessed for each day traffic
control plan SC2 is in place longer than fifteen (15)
working days (21 calendar days).
3. Accelerated Schedule: If approved, Bid Alternate No. 1
authorizes the Contractor to work twenty -four (24) hours
per day seven (7) days per week during the period when
Traffic Stage SC2 is in place. The bid documents ask for an
additional lump sum bid for the added costs associated with
this accelerated schedule. The bid documents also require
the bidder to state the number of days Traffic Control
Stage SC2 will be in place if the accelerated schedule is
utilized.
4. Liquidated Damages for the Accelerated Schedule: As stated
above, should Bid Alternate No. 1 be approved and the
accelerated schedule for Stage SC2 be authorized, $2,500
per day will be assessed for each day Stage SC2 remains in
place in excess of the number of days stated in the bid for
the accelerated work.
E. Recommended Scope of Contract: Bid Alternate
1. Bid Amount: The amount bid for Bid Alternate No. 1 by the
apparent low bidder is $25,000.
2. Number of Days (Accelerated Schedule): The apparent low
bidder stated in his bid that Construction Stage SC2 will
be completed in 11 calendar days utilizing the accelerated
schedule.
3. Analysis: Approving the Bid Alternate will, theoretically,
reduce the number of days that traffic will be restricted to
one lane in each direction, from 21 calendar days to 11
calendar days. This is a reduction of 10 calendar days. The
cost to the City for Bid Alternate #1 is $25,000; or (using
New L A Brg_awd 000117
New Los Angeles Avenue Bridge Widening: Award Contract
April 7, 2000
Page 3
the aforementioned assumptions) $2,500 per day [$25,000 / 10
_ $2,5001. As stated above, if the two -lane traffic control
plan remains in place for more than 11 calendar days, the
Contractor will be assessed $2,500 per day Liquidated
Damages.
4• Recommended Scope: It is recommended that the scope of work
include Bid Alternate No. 1 and that the contract price
include the bid price for same [$1,389,921.10 + $25,000.00
_ $1,414,921.10].
F. Fiscal Impact
1. Construction Cost Estimate: The estimated cost of
construction is summarized as follows:
Element Total ($)
Bid Amount 1,414,921.10
Contingency (100 +) 141,492.90
Total 1,556,414.00
2. Design: A summary of the total
design phase is as follows:
Element
Miscellaneous [printing, etc.]
EDAW [Environmental & Permits]
CAA [Basic design Efforts]
CAA [Final Modifications]
CAA [Alternate Pile Design]
CAA [Construction Support]
Total
costs incurred during the
Total ($)
2,000
17,200
141,200
12,600
5,880
6,750
185,630
3. Construction Engineering: As mentioned above, the selection
of a consultant to provide Construction Engineering services
is the topic of a separate report. The estimated cost of
these services is $185,500.
4• Total Project Cost Estimate: The
costs are summarized as follows:
Element Prior Year
Construction & Contingency 0
Design 112,100
Inspection 0
Total 112,100
estimated total project
FY 99/00
Total
1,556,414
1,556,414
73,530
185,630
185,500
185,500
1,815,444
1,927,544
5. Funding Sources : The subject project is totally funded by
the Los Angeles Avenue AOC Fund.
New L A Brg_awd r
New Los Angeles Avenue Bridge Widening: Award Contract
April 7, 2000
Page 4
6. Budget ,Amendment: The
attached resolution provides for the
amendment of the budget
to fully fund
the project.
A summary
of the recommended budget change is as
follows:
Element
Current Amount
Revised
Design
($)
Change ($)
Total ($)
36,000
372,530
73,530
Construction
943,115
613,299
1,556,414
Inspection
80,000
105,500
185,500
Revised Budget
1,059,115
756,329
1,815,444
G. Schedule
It is anticipated that construction should start in May and be
completed by March of 2001.
STAFF RECOMMENDATIONS (ROLL CALL VOTE)
1. Adopt Resolution No. 2000 - approving an amendment to
the FY 1999/00 Budget by increasing the appropriation and
budget for the subject project from $1,059,115 to $1,815,444
($756,329 increase).
2. Approve the addition of construction requirements and costs
[additional $25,000] called for by Bid Alternate No. 1 which
requires an accelerated schedule for the work requiring
traffic to be restricted to two lanes.
3. Award a contract to Security Paving, Inc. in the amount of
$1,414,921.10 for the construction of the subject project.
4. Approve a contingency for the project in the amount of
$141,942.90 [100 +] and authorize the City Manager to approve
additional work, if required, for a cost not to exceed said
contingency.
5. Authorize the City Manager to sign necessary contract
documents.
New L A Brg_awd 000119
Exhibit 1
Project Scope & Background
April 7, 2000
Page 1
A. Project Scope: The proposed project provides for the widening
of the New Los Angeles Avenue bridge across the Arroyo Simi,
generally described as follows:
1. South Side Widening only: The primary purpose of the project
is to widen the bridge structure on the south side of the
street - or the downstream side of the bridge. When
completed the center line of New Los Angeles Avenue will be
shifted southerly.
2. Bridge Width (outside dimension): The current width of the
bridge is 821. The new bridge will be 117' wide.
3. Curb -to -Curb Width at Bridge: Presently there are no curbs.
Curbs and sidewalks are to be added. When the project is
completed the curb -to -curb dimension will be 1021.
4. Eastbound Bridge Approach: The plans include an eastbound
bridge approach approximately 120' long. This will result
in a minimum curb -to -curb width of 102' between Spring Road
and the bridge (existing improvements may exceed 102' curb -
to -curb due to provisions for acceleration or deceleration
lanes) .
5. Eastbound Bridge Departure: Project improvements will be
compatible with the street widening on the south side of the
street, which was recently constructed by the developer of
the Carlsberg Specific Plan area.
6. North Side Improvements: Project improvements include the
addition of a sidewalk on the north side of the bridge. This
new sidewalk will be extended westerly to connect to an
existing sidewalk west of the bridge, and will be extended
easterly to Science Drive.
7. Sidewalks: When the project is completed there will be
continuous sidewalks on both sides of the street between
Spring Road and Science Drive. Please note that there is an
existing sidewalk on the south side of the street continuing
from Science Drive easterly to and past the freeway.
8. Emergency Lane (Bicycles) : When the project is completed
there will be an eight feet (81) wide (minimum) emergency
lane on each side of the street. The existing NO STOPPING
ANYTIME prohibition on this street segment will remain in
place. Although there will be no painted bike lanes, there
will be painted "sidelines" and additional pavement width
for emergency lanes, which will be more "user- friendly" for
bicyclists.
00014110
Exhibit 1
Project Scope & Background
April 7, 2000
Page 2
9. Median: When the project is completed, there will be a 141
wide (minimum) painted median between the freeway and Spring
Road, with left turn lanes in the painted median where
required.
10.Striping: The project plans will include the re- striping of
the street to provide three travel lanes in each direction
between the freeway and Spring Road, plus left -turn lanes
where required. There will be an additional right -turn lane
for both eastbound and westbound traffic at Science Drive.
The number three westbound lane will convert to a "Right -
Turn Only" lane as it approaches Spring Road. When future
planned widening occurs west of Spring Road, the westbound
approach to Spring Road will have three lanes plus a right -
turn lane and a left -turn lane.
11-Temporary Provisions for Pedestrians / Bicycle: The plans
include the installation of fencing and K -Rail concrete
barriers along the south side of the street during
construction, to provide a protected area for both the
construction work area and pedestrian / bicycle traffic.
12-Construction Phasing:
• Stage 1: Temporary striping will be installed shifting
the existing four (4) lanes of traffic (two lanes in each
direction) to the north to allow for the construction of
the bridge widening on the south side of the street.
• Stage 2: Certain excavation work in the travel lanes will
require traffic to be restricted to one lane in each
direction along the north side of the bridge. It is
anticipated that this work, and restricted traffic flow,
will last approximately three (3) weeks. At the end of
this work, traffic control will revert back to the Stage
1 plan.
• A Bid Alternate provides for an accelerated work schedule
to reduce the number of days traffic will be restricted
to one lane in each direction.
• Stage 3: Temporary striping will be installed shifting
the four lanes of traffic (two lanes in each direction)
to the south to allow for the construction of the
sidewalk on the north side of the street.
• Traffic Management: If necessary, the traffic signal
controllers will be adjusted to better accommodate
traffic flow for each stage of construction
• Post Construction: Again at the end of the construction
project the street will be re- striped to provide three
(3) lanes of traffic in each direction, plus turning
lanes where required.
Exhibit 1
Project Scope & Background
April 7, 2000
Page 3
B. Right -of -Way: No additional street right -of -way is required in
order to construct the project.
C. Environmental Document: The project has been found to be
Categorically Exempt.
D. Permits and Approvals
1. U. S. Army Corp of Engineers: An Environmental Consultant
retained by the City has obtained a permit from this agency.
2. California Fish & Game Department: An Environmental
Consultant retained by the City has obtained a permit from
this agency.
3. Regional Water Quality Control Board: An Environmental
Consultant retained by the City has obtained a permit from
this agency.
4. VCFCD: A permit has been obtained from the Ventura County
Flood Control District (VCFCD).
S. Caltrans: The Caltrans Encroachment Permit is expected to be
issued in January. The final permit and permit requirements
will be included in the plans and specifications.
E. Cooperative Agreement: Cooperative Agreements between the City
and Caltrans were executed for both the design and the
construction phases of the project.
City of Moorpark
Bid Results
Exhibit 2
New Los Angeles Avnue
Pagel of 2
Bridge Widening
Vendor 1
Vendor 2
Name:
Engineer's Estimate
Security Paving
C A Rasmussen
Address:
P 0 Box 1489
2360 Shasta Way
Bid Opening:
Cit, State:
Sun Valley, CA 91353
Simi Valley, CA 93065
4- Apr -00
Tel. No.:
(818) 767.8418
(805) 426.2579
Contact Person:
Albert Mattivi
C Dean Rasmussen
Item Description
Qty
Units
Unit Cost
Total Bid
Unit Cost
Total Bid
Unit Cost
Total Bid
1 Construction Signs
1
LS
500.00
500.00
3,400.00
3,400.00
15,000.00
15,000.00
2 Traffic Control
1
LS
28,860.00
28,860.00
22,700.00
22,700.00
20,000.00
20,000.00
3 Temporary Fencing
229
M
22.00
5,038.00
12.00
2,748.00
25.00
5,725.00
4 Temp Railiing (Type K)
377
M
30.00
11,310.00
45.00
16,965.00
40.00
15,080.00
5 Temp Crash Cushion
16
EA
250.00
4,000.00
500.00
8,000.00
300.00
4,800.00
6 Remove Stripe
1,140
M
2.50�u2,850.00W
1.50
1,710.00
1.40
1,596.00
7 Remove Markings
24
M2
5.50
132.00
19.75
474.00
20.00
480.00
8 Remove A/C Dyke
57
M
9.00
513.00
12.00
684.00
25.00
1,425.00
9 Cap Inlet
1
EA
200.00
200.00
1,000.00
1,000.00
150.00
150.00
10 Remove Handrailing
75
~M
M
_ .__ 30.00
_ 2,250.00
35.00
2,625.00
1.00
75.00_
11 Remove Fence
23
28.00
644.00
_tea 15.00 W
345.00
15.00
345.00
12 Remove K- Railing
90
M
15.00
1,350.00
6.00
540.00
1.00
90.00
13 Relocate Sign
3
EA
500.00
1,500.00
250.00
750.00
250.00
750.00
14 Remove Concrete
20
M3
280.00
5,600.00
120.00
2,400.00
150.00
3,000.00
15 Class 4 Base
_ 85
_ M3
_40.00
3,400.00
91.00
7,735.00
70.00
5,950.00
16 Class 2 Base
101
M3
48.00
4,848.00
91.00
9,19110
70.00 _
7,070.00
17 A/C (Type B)
145
T
45.00
6,525.00
70.00
10,150.00
100.00
14,500.00
18 A/C Dyke (Type A)
63
M
10.00
630.00
27.00
1,701.00
10.00
630.00
19 Minor Concrete
34
M3
430.00
14,620.00
430.00
14,620.00
310.00
10,540.00
20 100 mm Thermo Stripe _
2,168
M
4.00
8,672.00_
2.00_
4,336.00
2.00
4,336.00
21 200 mm Thermo Stripe
138
M
5.00
690.00
��_ -2.90
__ 400_
.20
3.00
_
414.00
22 300 mm Thermo Stripe
211
M
6.50
1,371.50
7.60
1,603.60
7.00
1,477.00
23 Pavement Markings
12
M2
10.00
120.00
50.75
609.00
50.00
600.00
24 Reflect Pavment Markers
146
EA
4.00
584.00
2.85
416.10
3.00
438.00
25 Drainage Inlet
2
EA_
2,500.00
5,000.00
250.00
500.00
26 Import I Borrow
450
M3
13.50
6,0750 .0
----750.00-
25.00
11,250.00
25.00
11,250.00
27 Bridge Removal (portion)
1
LS
50,000.00
50,000.00
26,800.00
26,800.00
63,500.00
63,500.00
28 Struc Excavate (Type 0)
805
M3
80.00
64,400.00
24.00
19,320.00
100.00
80,500.00
29 Struc Excavate (Ret Wall)
383
M3
60.00
22,980.00
22.00
8,426.00
100.00
38,300.00
_3_0 Struc Backfill (bridge)
1,110
M3
55.00
m 61,050.00
41.00
45,510.00
40_.00
44,400.00
31 Struc Backfill (ret. wall)
367 r
M3
50.00
18,350.00
_ p 41.00
15,047.00
30.00
11,010.00
32 Furnish Piling
1,676
M
40.00
67,040.00
71.00
118,996.00
67.00
112,292.00
33 Drive Piling
130
EA
1,200.00
156,000.00
955.00
124,150.00
720.00
93,600.00
34 Prepressing CIPC
1
LS
45,000.00
45,000.00
31,600.00
31,600.00
28,000.00
28,000.00
35 Prepressing
1
_LS_
6,000.00
_6,000.00
20,000.00
20,000.00
5,000.00
5,000.00
36 Struc, Conc Brdg Footing
179
M3
450.00
80,550.00
210.00
37,590.00
550.00
98,450.00
37 Struc, Conc Brdg
572
M3
600.00
343,200.00
610.00
348,920.00
550.00
314,600.00
38 Struc, Conc Rot Wall
113
M3
450.00
50,850.00
405.00
45,765.00
350.00
39,550.00
39 Drill & Bond Dowel
114
M
40.00
4,560.00
38.00
4,332.00
55.00
6,270.00
40 Neoprene Strip _ __
27
M_
35.00
_ 945.00
70.00
1,890.00
50.00
1,350.00
41 Bridge Reinforcing Steel
112,543
KG
1.10
123,797.30
i 1 20 _.. _
_
135,051.60
_
1.00
112,543.00
42 Ret Wall Reinforcing Steel
11,583
KG
1.10
12,741.30
1.20
13,899.60
1.00
11,583.00
43 Misc Metal (bridge)
1,774
KG
3.50
6,209.00
4.00
7,096.00
20.00
35,480.00
44 Conc (Rock Slope)
45 Rock Slope (114 Ton)
36
203
M3
M3
196.00
7,056.00
175.00
6,300.00
140.00
5,040.00
46 Handrailing �'
112.._
M
70.00
- 80.00
14,210.00 _v�
66.00
13,398.00
'Y
100.00
20,300.00
47 Conc Barrier
112
M
165.00
8,960.00
18,480.00
98.00
375.00
10,976.00
75.0 0 TT
8,400.00
48 Mobilization
1
LS
125,000.00
125,000.00
185,000
42,000.00
185,000.00
375.00
13Q000
42,000.00
130,000.00
49 Release
1
EA
1.00
1.00
1.00
1.00
1.00
1.00
Add Alternate .w�o,avu.uu
50,611.00 25,000.00 20,000.00
Total with Add Alternate 11455,273.10 1,414,921.10 1,448,390.00
001
City of Moorpark
Qty
Units
Unit Cost
Bid Results
Total Bid
Exhibit 2
New Los Angeles Avnue
Unit Cost
Unit Cost
Page 2 of 2
Bridge Widening
Vendor 3
Vendor 4
Name:
T M Engineering
Reyes Construction
Address:
19301 Ventura Blvd [112001
1295 S. East End Avenue
Bid Opening:
Cit, State:
Tarzana, CA 91356
Pomona, CA 91766
4- Apr -00
Tel. No.:
(818) 343.8844
(909)622.2259
0.00
Contact Person:
Matt Moetazedi
Joe Reyes
Item Description
Qty
Units
Unit Cost
Total Bid
Total Bid
Unit Cost
Unit Cost
Total Bid
1 Construction Signs
1
LS
8,000.00
8,000.00
5,000.00
5,000.00
0.00
2 Traffic Control
1
LS
5,000.00
5,000.00
30,000.00
30,000.00
0.00
3 Temporary Fencing
229
M
15.00
3,435.00
13.00
2,977.00
0.00
4 Temp Railiing (Type K)
377
M
60.00
22,620.00
75.00
28,275.00
0.00
5 Temp Crash Cushion
16
~ EA
300.00
_.
--
4,800.00
325.00
5,200.00
0.00
6 Remove Stripe
1,140
M
3.00
3,420.00
10.00
11,400.00
0.00
7 Remove Markings
24
M2
50.00
1,200.00
85.00
2,040.00
0.00
8 Remove A/C Dyke
57
M
10.00
570.00
24.00
1,368.00
0.00
9 Cap Inlet
1
EA
500.00
500.00
1,000.00
1,000.00
0.00
10 Remove Handrailing
75
---2-3---M-
_M
10.00
----
750.00
16.00
1,200.00
0.00
11 Remove Fence
10.00
230.00
----
25.00575.00
0.00
12 Remove K- Railing
90
M
5.00
450.00
30.00
2,700.00
0.00
13 Relocate Sign
3
EA
500.00
1,500.00
227.00
681.00
0.00
14 Remove Concrete
20
M3
350.00
7,000.00
126.00
2,520.00
0.00
15 Class 4 Base
85
"
M3
70.00_
5,950.00
76.00
6,460.00
0.00
16 Class 2 Base
101
M3
60.00
6,060.00
76.00
7,676.00
0.00
17 A/C (Type B)
145
T
150.00
21,750.00
92.00
13,340.00
0.00
18 A/C Dyke (Type A)
63
M
40.00
2,520.00
33.00
2,079.00
0.00
19 Miner Concrete
34
M3
800.00
27,200.00
450.00
15,300.00
0.00
20 100_mm_Thermo Stripe
--2i
2,168_
M
�mmM
"__ "_ _5.00
"
" -
10,840.00
2.00
4,336.00
0.00
200 mm Thermo Stripe
138
10.00"
-l- "1,380.00
W 3.00 -_
-.- - _414.00 -T
T
^� 0.00
22 300 mm Thermo Stripe
211
M
15.00
3,165.00
9.00
1,899.00
0.00
23 Pavement Markings
12
M2
50.00
600.00
50.00
600.00
0.00
24 Reflect Pavment Markers
146
EA
12.00
1,752.00
3.00
438.00
0.00
25 Drainage Inlet _
2
EA _
1,500.00
3,000.00
1,400.00
2,800.00
0.00
26 Import I Borrow
450
M3
30.00
13,500.00
- 13.00 _
5,850.00
0.00
27 Bridge Removal (portion)
1
LS
10,000.00
10,000.00
50,000.00
50,000.00
0.00
28 Struc Excavate (Type D)
805
M3
150.00
120,750.00
150.00
120,750.00
0.00
29 Struc Excavate (Rot Wall)
383
M3
25.00
9,575.00
17.00
6,511.00
0.00
30 Struc Backfill (bridge)
1,110
M3
45.00
u35.00P
49,950.00
17.00
18,870.00_
0.00
31 Struc Backfill (rot. wall)
367
M3
12,845.00
22.00
a 8,074.00
_
0.00
32 Furnish Piling
1,676
M
70.00
117,320.00
100.00
167,600.00
0.00
33 Drive Piling
130
EA
1,000.00
130,000.00
1,000.00
130,000.00
0.00
34 Prepressing CIPC
1
LS
25,000.00
25,000.00
30,000.00
30,000.00
0.00
35 Prepressing
1 T
LS_
mM3
_ 10,000.00
10,000.00
10,000.00
10,000.00
0.00
36 Struc, Conc Brdg Footing
179
300.00
53,700.00
300.00
53,700.00
0.00
37 Struc, Conc Brdg
572
M3
600.00
343,200.00
800.00
457,600.00
0.00
38 Struc, Conc Rot Wall
113
M3
450.00
50,850.00
550.00
62,150.00
0.00
39 Drill & Bond Dowel
114
M
100.00
11,400.00
60.00
6,840.00
0.00
40 Neoprene Strip
27
--R-c
_M Y
300.00
8,100.00
100.00_
0.00
41 Bridge Reinforcing Steel
112,543
1.30
X146,305.90
1.50
__2,700.00 _
168,814.50 _
__ _ _ "_
0.00
42 Rat Wall Reinforcing Steel
11,583
KG
1.40
16,216.20
1.50
17,374.50
0.00
43 Misc Metal (bridge)
1,774
KG
5.00
8,870.00
4.00
7,096.00
0.00
44 Conc (Rock Slope)
36
M3
150.00
5,400.00
350.00
12,600.00
0.00
45 Rock Slope (114 Ton)
----fl
203
-2----V
M3
130.00
26,390.00
120.00
24,360.00
0.00
00
46 Handrailing� �
"" 120.00
13,440.00 _
100.00 _
11 200 00 i�
"® TM� 4v�
47 Conc Barrier 112 M 500.00 56,000.00 150.00 16,800.00
48 Mobilization 1 LS 140,000.00 140,000.00 160,000 160,000.00
49 Release 1 EA 1.00 1.00 1.00 1.00
Add Alternate I I 00,000.00 V 30,000.00
Total with Add Alternate 1,622,505.10 1,729,169.00
0.00
0.00
1.00 1.00
1.00
RESOLUTION NO. 2000 -
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF MOORPARK, CALIFORNIA, REVISING THE AMOUNT
OF THE APPROPRIATIONS AND BUDGET FOR PROJECT
8014: NEW LOS ANGELES AVENUE BRIDGE WIDENING
PROJECT [FUND 2501: LOS ANGELES AVENUE AOC
FUND]
WHEREAS, on June 23, 1999, the City Council adopted the
Budget for Fiscal Year 1999/00; and
WHEREAS, a staff report has been presented to the City
Council requesting a budget increase in the aggregate amount of
$756,329; and
WHEREAS, Exhibit "A ", attached hereto and made a part hereof,
describes said budget amendment and its resultant impacts to the
budget line item(s).
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF MOORPARK DOES
HEREBY RESOLVE AS FOLLOWS:
SECTION 1. That a Budget amendment in the aggregate increase
of $756,329 as more particularly described in Exhibit "A ", is
hereby approved.
SECTION 2. The City Clerk shall certify to the adoption of
this resolution and shall cause a certified resolution to be filed
in the book of original resolutions.
PASSED AND ADOPTED this
ATTEST:
day of , 2000.
Patrick Hunter, Mayor
Deborah S. Traffenstedt, City Clerk
Attachment"
Exhibit 'A': Appropriation and Budget Detail
oo
Resolution No. 2000 -
Exhibit "A"
ADDITIONAL APPROPRIATIONS FOR
Project 8014 (New Los Angeles Avenue Bridge Widening Project)
FUND
ACCOUNT NUMBER
APPROPRIATION REQUEST
Los Angeles Avenue AOC
2501.0000.0000.5500
$756,329
TOTALS:
$ 73,530
2501.8310.8014.9640: Const
$ 943,115
$ 613,299
$756,329
DISTRIBUTION OF APPROPRIATIONS TO EXPENSE ACCOUNT NUMBERS
ACCOUNT NUMBER
CURRENT
APPROPRIATION
SUBJECT
APPROPRIATION
/ (REDUCTION)
REVISED
APPROPRIATION
2501.8310.8014.9601: Design
$ 36,000
$ 37,530
$ 73,530
2501.8310.8014.9640: Const
$ 943,115
$ 613,299
$ 1,556,414
9650: Inspection
$ 80,000
$ 105,500
$ 185,500
TOTALS:
$1,059,115
$756,329
$1,815,444
Approved as to form: f