MOORPARK CITY COUNCIL
AGENDA REPORT
TO: Honorable Mayor and City Council
From: Hugh R. Riley, Interim Deputy City Manager`
DATE: May 3, 2000 (Meeting of 5/17/00)
SUBJECT: Submittal and approval of final report for the
Civic Facilities Space Needs Study. (Continued
from April 19, 2000)
BACKGROUND: At the regular meeting of April 19, 2000 the
City Council received the final report for the Civic
Facilities Space Needs Study. The Council decided to
continue the matter to the meeting of May 17 to allow
additional time for the Council to review the report. The
Council also requested staff to fully evaluate if leasing
space for the city offices might be a feasible option. An
informal evaluation of the leasing option had already been
done but the option was not pursued due to the probable
high cost and because it would not meet the goal of staying
in the downtown area. Staff was also asked to determine
reuse opportunities for the modular office units being
proposed and other possible alternatives available to the
City.
DISCUSSION:
LEASING A BUILDING - Listings of all commercial and
industrial property currently available in the City were
obtained and a number of properties that could be converted
to provide the necessary space were visited. A five -year
lease period was used for the evaluation. Staff examined
000012
Space Needs Study
Meeting of May 17, 2000
Page 2
area, parking and tenant improvement costs. Conservative
cost factors and typical moving costs were used.
1. AREA
To centralize the city's facilities and accommodate all of
the offices, services and functions including the police
department, a minimum of 15,000 square feet would be
required. The minimum area needed to accommodate present
functions without the police department would be 12,000
square feet. There are no commercial office properties
available in the City that provide sufficient space for the
city's combined needs. Most of the industrial buildings
examined were either small units in multiple -unit complexes
or very large buildings with a significant portion of space
devoted to open, non -HVAC served, warehouse -type space.
Several of these buildings offer the opportunity to lease
smaller segments. Buildings in the Poindexter Road
(Commerce and Tech Dr.) , Condor Road and Freeway Business
Park (Science Dr.) were visited. Suitable space could be
leased for between $.50 and $.60 per square foot.
2. PARKING
To provide the required parking for employees and visitors
to combined city offices staff estimates that between 110
and 130 spaces including handicapped reserved spaces would
be required for a short term. None of the available
buildings provide that quantity of adjacent parking. The
suitable industrial properties are not required to provide
this number of parking spaces. While parking agreements
with neighboring properties are a possibility, non - adjacent
parking for the city's use would be a problem.
3. TENANT IMPROVEMENTS
The cost to convert any of the available buildings to
office use for the city's needs is relatively expensive.
Even using conservative estimates of $ 20.00 to $30.00 per
square foot for basic offices and modular work stations the
cost for such improvements would be in excess of $375,000
(@ $25 /Sq. Ft.) In addition, none of these buildings are
suitably equipped with electrical, plumbing, heating and
000010—
Space Needs Study
Meeting of May 17, 2000
Page 3
air conditioning facilities for such use. It is estimated
that providing these facilities would cost an additional
$20.00 per square foot or an additional $ 300,000. A
summary of the leasing costs compared to the Short Term,
Option B provided in the previous report is as follows:
SHORT TERM OPTION B as presented (Adds 6,000 Sq. ft to
existing space)
Modular units and Office Reconfiguration - $ 540,538
Contingencies (5 %) - $ 7,026
General Fund Savings /Earnings (5- year)* ($ 90,000)
FIVE -YEAR COST ($79.60/ sq. ft. -new space) $ 477,564
COST PER YEAR $ 95,512
*Building Safety & Engineering lease revenue now going
to the Redevelopment Agency
The concern for the appearance of the modular units would
need to be addressed at an additional cost.
TYPICAL LEASE OF PROPERTY /MOVING & TENANT IMPROVEMENT COSTS
WITH ALL FUNCTIONS CONSOLIDATED (15,000 sq. ft.):
Annual Lease cost for building @ $.55 /Ft.
Lease cost for five -year period -
Tenant Improvements - @ $25.00 /Ft.
Electrical,Plumbing, HVAC
Moving costs -
SUBTOTAL
Contingencies - (5%)
SUBTOTAL
General Fund Savings /Earnings -*
FIVE -YEAR COST ($139.80/ sq. ft.- new space)
COST PER YEAR
$ 99,000
$ 495,000
$ 375,000
$ 300,000
$ 25,000
$1,195,000
$ 59,750
$1,254,750
($ 101,800)
$1,093,200
218,640
*Combined savings /earnings by consolidating all
functions including Building Safety & Engineering
and Police Department. (Not including CHP)
000®1.4
Space Needs Study
Meeting of May 17, 2000
Page 4
WITHOUT THE POLICE DEPARTMENT (CITY HALL ONLY- 12,000 sq.
ft.) .
Annual Lease cost for building @ $.55 /Ft.
Lease cost for five -year period -
Tenant Improvements - @ $25.00 /Ft.
Electrical,Plumbing, HVAC
Moving costs -
SUBTOTAL
Contingencies - (5 %)
SUBTOTAL
General Fund Savings /Earnings -*
FIVE -YEAR COST ($191.33/sq. ft. -new space)
COST PER YEAR
$ 79,200
$ 396,000
$ 300,000
$ 250,000
$ 18,000
$ 964,000
$ 48,200
$1,012,200
($ 90,000)
$ 922,200
$ 184,440
*Savings /earnings by consolidating Building Safety &
Engineering without the Police Department.
If a period longer than five years is utilized, the
amortized construction cost per square foot improves as a
function of time. However with leasing, there is less
advantage because the lease expense continues and
escalates. For example, the cost of leasing 12,000 square
feet for a ten -year period would be approximately $792,000
and a ten -year cost of $1,270,000 or a cost per year of
$127,000. Amortizing the cost of the new modular units
for a ten -year period results in a cost per year of
$47,756.
RECAP:
TOTAL COST PER YEAR
ACTION FIVE -YEAR TEN -YEAR
Modular Expansion
Option B $ 95,512 $ 47,756
All City Functions
Including Police Dept.
(15,000 sq. ft.) 218,640 109,320
City Functions
Excluding Police Dept.
(12,000 sq. ft.) 184,440 127,000
00001's
Space Needs Study
Meeting of May 17, 2000
Page 5
CONCLUSION: The lease option is not financially feasible
given what is available even with an extended lease term.
The costs are almost twice the cost to implement Option B.
A lack of sufficient parking combined with the high costs
rules out the option of leasing property. The location of
city offices in a business park setting, away from the
downtown area does not conform to this objective.
The opportunity for salvage /and or reuse value of the
modular units is minimal. Generally, these units are
prepared (wired, plumbed and fitted) for specific uses.
Relocation and remodeling costs usually come close to or
exceed resale values. The use of the suggested modular
units at the same site for alternate functions after the
occupancy of a new city hall complex is an option.
An additional option that could be examined is the phased
new construction of the city facilities on the existing
Civic Center Site with multi -level parking. However, this
would not address the current and critical shortage of
space. Staff has discussed this possibility only on a
conceptual basis. To explore this option a comprehensive
site survey of the existing property would be needed.
Although not examined, another option would be to further
decentralize city functions by combining the community
development function with building, safety and engineering
at another location. This would require approximately 8,500
square feet of space and the costs for leasing space
provided in this report would also apply. While this
alternative would bring the community development,
building, safety and engineering functions together under
one roof, the cost for leasing additional space would still
be high relative to the modular expansion.
SUMMARY: The leasing of space for all or a part the
functions currently provided at the city hall complex is
relatively expensive compared to the on -site, modular
expansion option (Short -term Option B) and would move city
hall away from the downtown area at a critical time. The
adding of additional modular units, while not the most
aesthetically appealing prospect, offers the least
expensive and most timely solution to the pressing need for
additional space. It also gives the City Council time to
000®"9 G
Space Needs Study
Meeting of May 17, 2000
Page 6
explore alternative sites and related options (ie.
Combining City Hall and Police or separate locations) and
adequate time to explore financing options, design and
construct a permanent facility.
STAFF RECOMMENDATION: Based on current conditions and
needs, staff recommends the City Council:
1. Direct staff to implement the Short Term Plan, Option
B as provided in the report, without the existing building
expansion, to accommodate moving the building, safety and
engineering functions to the city hall complex and modify
lease arrangements with Abbott for this space accordingly.
2. Direct staff to begin the identification of suitable
alternative sites for a new city hall complex.
ATTACHMENT: April 19, 2000 Council Staff Report
0000:1'i
TO:
From:
DATE:
SUBJECT:
MOORPARK CITY COUNCIL
AGENDA REPORT
Honorable Mayor and City Council
ITEM-10- L Of
CITY OF MOORPARK, CALIFORNIA
A City Council Meeting
CITY 0-I 'MOORPARK, CALIFORNIA
C- Coundl''rlee� rg
of T rt 1 1�1 LV )
AC T1'0';'-4: 1A_/i'n 4 !r ,t .Er
a u ri CA . f "Fi ! f� J
000
BY:
Hugh R. Riley, Interim Deputy City Manager
April 12, 2000 (Meeting of 4/19/00)
Submittal and approval of final report for the
Civic Facilities Space Needs Study.
BACKGROUND: In March 1998 the City awarded a contract to
Leach Mounce Architects to conduct a short and long -term
space needs study for city hall. It was intended to examine
the current and future space requirements based on
projections for staffing requirements in the various city
departments and service functions.
DISCUSSION: In March 1998 the City Council approved a
contract with Leach Mounce Architects to conduct a short
and long -term space needs study for the City. The original
contract was for $43,620 to be paid from the City Hall
Improvement Fund. In October 1999 a budget amendment for an
additional $16,600 was requested and authorized for
additional work on the study made necessary because of
changes in the original scope of work as follows:
1. . Added ten (10) staff to long -term projections.
2. Added five (5) positions to short -term projections
(City Clerk, Community Development, Community Services,
Public Works Departments)
3. Added restroom and employee lounge to new annex
structure.
000018
Space Needs Study
Meeting of April 19, 2000
Page 02
4. Added employee restrooms and small kitchenette area to
existing city hall building to short term option.
5. Added provision for CHP office with police facility.
6. Added option for stand -alone Police %CHP facility.
7. Added staffing areas to police services - clerical and
volunteers.
8. Revised all work - stations to include computer work
area, short and long -term.
9. Revised maintenance area to include vector control
operations for long -term.
The short -term plan covers a five to ten year period and
includes three options. Option A provides for new modular
units for Community Development and some breathing room for
existing staff. This option would only partially correct
crowded conditions created by the current use of corridor
space for file cabinets for community development, public
works and community services. However, this option would
provide no real expansion opportunity and would not
accommodate moving the Building and Safety division to the
main City Hall Complex. The estimated design and
construction cost to implement Option A is $512,272.
However the expansion to the existing building is not
needed producing a savings of $100,000 making the est' _
cost for this option $412,272 providing a total ,
square feet of space. Occupancy under this option wil
approximately nine months from the date of Council approval /o,
to proceed with design plans. The time -line includes 30 to gy`'`p
45 days to prepare plans; 30 to 45 days for bidding and 60
to 90 days for construction.
Option B would fulfill the desire to bring all services to
one location however, with that move, the plan would not
accommodate the expansion needs identified for all
departments. With the prospect of a proposed new or
expanded permanent city hall facility within five years, a
decision is needed as to whether the additional cost of
option B can be justified. The design and construction cost
for Option B less the cost for existing building expansion
000019
Space Needs Study
Meeting of April 19, 2000 l3�I$ 0
Page 03
is $540,538 providing a total of square feet of
space. While this option costs $128, e than Option A,
it also provides flexibility for the inclusion of City
Council Office space as well as the necessary space for the
Building and Safety functions. The City currently leases
2,000 square feet of space for these services to Charles
Abbott Associates in Redevelopment Agency -owned property on
High Street. The lease generates $1,500 per month or
$18,000 per year. If space at City Hall is provided at a
rate that would generate the same revenue, the income would
accrue to the city instead of the agency and recover a
portion of the additional cost for Option B over a five -
year period ($90,000). The remaining difference of $38,266
can be considered the cost of the added convenience to the
public for the consolidated service functions.
An Option C as presented, although the least expensive
option, is not considered feasible because it provides
insufficient file space for the Community Development
Department.
The long -term plan concludes that a suitable site to
accommodate new facilities for city hall, police and
highway patrol and the city yard should contain 7.78 acres
allocated as follows:
City Hall
3.62
Police
1.98
CHP
0.54
SUBTOTAL
2.52 2.52
City Yard
1.64
TOTAL
7.78 Acres
All work on the Space Needs Study has now been completed.
The Council has received a copy of the final report
document and Howard Leach, Leach Monuce Architects will be
present at the City Council Meeting to provide a brief
presentation on the findings.
Some important factors to consider are:
1) The use of site space for modular units which would
interfere with an alternative of expanding the existing
city hall building to this area of the current site.
O000�()
Space Needs Study
Meeting of April 19, 2000
Page 04
2) The projected costs do not include adding parking and
two spaces would be lost.
3) The cost estimates for Options A and B do not include
possible modifications to sanitary sewer service to the
site. These costs, if any, will need to be considered.
4) Following completion of new facilities, the modular
units and the existing main building may be used for other
city purposes. In the new modular units, only the corner
offices, restroom and lounge will be hard - walled by the
manufacturer. All other walls would be of modular
(moveable) design providing a highly flexible floor plan.
5) The current balance in the City Hall Improvement Fund of
$ 420,000 will be fully depleted for the short -term option.
RECOMMENDATION: Based on current conditions and needs,
staff recommends the City Council:
1. Direct staff to implement the Short Term Plan, Option
B as provided in the report, without the existing building
expansion, to accommodate moving the building, safety and
engineering functions to the city hall complex and modify
lease arrangements with Abbott for this space accordingly.
2. Direct staff to begin the identification of suitable
alternative sites for a new or expanded city hall complex.