Loading...
HomeMy WebLinkAboutAGENDA REPORT 2000 0621 CC REG ITEM 11GTO: FROM: DATE: CITY OF MOORPARK AGENDA REPORT The Honorable City Council ITEM --ZL. G'- ,( 'F.�L "Pp• FY: Kenneth C. Gilbert, Director of Public Works June 9, 2000 (Council Meeting 6- 21 -00) 1 SUBJECT: Consider Bids for the Construction of a Storm Drain Lateral on Los Angeles Avenue East of High Street DTAC'_TT.gSTnm A. Background 1. About one year ago the City entered into a Cooperative Agreement with Caltrans regarding the relinquishment, to the City, of that portion of Los Angeles Avenue east of High Street. This street segment was finally relinquished to the City on February 28, 2000. 2. The Relinquishment Agreement provided for a Caltrans payment to the City of $1,116,000. That payment has been received. Said amount fully satisfies an obligation by Caltrans to upgrade the street to a ten year life. 3. A portion of the above mentioned in -lieu payment will fund the subject storm drain project. A project scheduled for this summer to construct an asphalt overlay east and west of the future Los Angeles Avenue East Widening Project, will also be funded by a portion of the above mentioned in -lieu payment. The remainder of that in -lieu payment will be applied to the future Los Angeles East Widening Project. 4. The deficiency list developed to comps in -lieu payment, included a drainage side of the street approximately (1,1001) east of Spring Road. The required to correct that drainage constructed by the subject project. ite the above mentioned problem on the south eleven hundred feet remedial improvements problem are to be LA Ave Drain awd 0 G "° Los Angeles Avenue Drain June 9, 2000 Page 2 5. The City retained the services of a consultant to prepare the civil engineering design for the construction of a storm drain lateral to "fix" the problem. That design was undertaken and completed. 6. On May 3, 2000, the City Council approved the plans and specifications for the subject project and authorized staff to advertise for receipt of bids. B. Project Scope The project calls for the construction of a storm drain inlet at the "problem" location, and a 12" storm drain [approximately ninety feet (901) long] from that new inlet to an existing storm drain located on the north side of the street. C. Bid Results Bids for the subject project were received and opened on June 6, 2000. The apparent low bidder is Wear Construction Company, with a bid of $18,901.00. A summary of the bid results is attached as Exhibit 1. D. Bidder Qualifications It has been determined that the apparent low bidder, Wear Construction Company, is qualified to perform the work. Said bidder has confirmed that their bid is valid and that they are prepared to proceed with the construction of the project. E. Fiscal Impact 1. Construction Cost Estimate: The estimated cost of construction is summarized as follows: Bid Amount: $18,901 Contingency (15 %): $ 2,899 $21,800 2. Total Project Cost Estimate: The estimated cost for the total project is summarized as follows: Design: $ 7,050 Construction: $21,800 Inspection: $ 0 $28,850 * Inspection to be provided by City staff. LA Ave Drain_awd `, ,-� �-S .. 3 .V 'oo L Los Angeles Avenue Drain June 9, 2000 Page 3 3. Funding Source: The construction of the subject storm drain is actually Phase 1 of the Los Angeles Avenue Rehab Project [Project 8025]. That project is funded by the Los Angeles Avenue AOC Fund. The above mentioned in -lieu payment from Caltrans was deposited into the L. A. Avenue AOC Fund. 4. Current Budget Amount: A summary of the current total budget amount for Project 8025 is a follows: Description Strom Drain ($) Design 7,050 Constructioon 21,800 Inspection - Unallocated ** 0 Total 28,850 A/C Overlay ($) Total ($) 27,710 43.440 71,150 100,000 ** Year -end balance will be carried over to FY 2000/01. Additional appropriations in FY 2000/01 will be required to fully fund L. A. Avenue Pavement Rehabilitation [Asphalt Overlay] Project. F. Schedule It is anticipated that construction will commence in July and be completed in August. RECOMMENDATIONS 1. Award a contract to Wear Construction Company in the amount of $18,901 for the construction of the subject project. 2. Approve a contingency for the project in the amount of $2,899 [15 % +) and authorize the City Manager to approve additional work, if required, for a cost not to exceed said contingency. 3. Authorize the City Manager to sign necessary contract documents. LA Ave Drain_awd 6 City of Moorpark Exhibit 1 Bid Results: Los Angeles Avenue Storm Drain Latteral Page I of 2 [File # Bids: L A Ave Drain] Bidder » »> Vendor 1 Vendor 2 Bid Opening: Name: Engineer's Estimate Wear Construction Co. Nye & Nelson June 6, 2000 Address: 425 Blanchard Ave 1860 Eastman Ave. #108 Cit, State: Santa Paula, CA 93060 Ventura, CA 93003 Tel. No.: 805- 933 -3835 805 - 6541682 Contact Person: D. Wear Wendy Correl Item Description Est Qty Units Unit Cost Total Bid Unit Cost Total Bid Unit Cost Total Bid 1 Traffic Control 1 LS 3,500.00 3,500.00 3,000.00 3,000.00 4,557.00 4,557.00 2 C/B Inlet Connection 1 EA 1,000.00 1,000.00 3,000.00 3,000.00 1,790.00 1,790.00 3 C/B Construction 1 EA 3,500.00 3,500.00 4,000.00 4,000.00 3,261.00 3,261.00 4 12" RCP 89 LF 125.00 11,125.00 100.00 8,900.00 160.00 14,240.00 5 Release 1 LS 1.00 1.00 1.00 1.00 1.00 1.00 Total 19,126.00 18,901.00 23,849.00 City of Moorpark 18200 Yorba Linda Blvvd, Suite 100 Bid Results: Los Angeles Avenue Storm Drain Latteral [File # Bids: L A Ave Drain] Unit Cost Total Bid Bidder » »> Vendor 3 Bid Opening: Name: Lee Construction June 6, 2000 Address: 3354 Lathrop Ave 2,560.00 Cit, State: Simi V alley, CA 93063 207.00 Tel. No.: 805 -522 -5195 1.00 Contact Person: Ron Smith Item Description Est Qty UniLs Unit Cost Total Bid I Traffic Control I LS 5,000.00 5,000.00 2 C/B Inlet Connection 1 EA 2,500.00 2,500.00 3 CB Construction I EA 2,500.00 2,500.00 4 12" RCP 89 LF 160.00 14,240.00 5 Release I LS 1.00 1.00 Total 24,241.00 Vendor 4 SDR Construction 18200 Yorba Linda Blvvd, Suite 100 Yorba Linda, CA 92886 714 -572 -3660 Scott Denton Unit Cost Total Bid 5,200.00 5,200.00 1,320.00 1,320.00 2,560.00 2,560.00 207.00 18,423.00 1.00 1.00 27,504.00 Exhibit I Page 2 of 2 Unit Cost Total Bid II I