MOORPARK CITY COUNCIL
AGENDA REPORT
TO: The Honorable City Council
FROM: Mary K. Lindley, Director of Community Services J�
DATE: August 12, 2000 (CC Meeting of September 6, 2000)
SUBJECT: Consider Final Approval of the Conceptual Plan for
Arroyo Vista Community Park Phase II
SUMMARY
On April 12, 2000, the City Council met with the Parks and
Recreation Commission to discuss the draft conceptual design for
Arroyo Vista Community Park (AVCP), Phase II (Attachment A).
The draft plans were revised consistent with the input and
consensus of the Council, and it is now being asked to approve
the final conceptual plan (Attachment B).
DISCUSSION
At its joint meeting with the Parks and Recreation Commission on
April 12, 2000, the City Council, by consensus, directed several
changes to the AVCP conceptual plan including:
• Eliminate the proposed BMX tract and skatepark, and
replace the amenities with more passive space, to include
a picnic pavilion;
• Include space for bocce ball and /or shuffleboard if
possible;
• If feasible, include a water feature in the proposed
passive area;
• Plant trees in designed areas throughout the Park;
• Plant shrubbery along the south slope to serve as a noise
buffer;
M: \MLindley \PARKS \AVCP Ph II fianal plan ccagd.doc
AVCP Phase II Final Plan
Page 2
• Relocate or configure the proposed parking lot near the
football field so that it does not extend so far south;
• Construct one or two additional restrooms if feasible;
• Develop a hiking /jogging trail around the perimeter of
the Park; and
• Construct three additional soccer fields in the
undeveloped portion of the Park.
Additionally, staff identified the location of storage
facilities adjacent to some of the parking lots, and formalized
the existing storage facility south of the football field. The
new restroom /concession facility will also contain storage space
as well.
With the Council's final approval, staff will direct the
consulting landscape architect to prepare a large scale color
version of the conceptual plan.
STAFF RECOMMENDATION
Approve the final conceptual plan for Arroyo Vista Community
Park, Phase II.
()()053
Aff,,.hryie(4 A- I+
LO
0
ARROYO VISTA COMMUNITY PARK
J
TOT / THERAPY POOL-- -
COMMUNITY CENTER
EXPANSION
FUTURE TENNIS COURTS
ROLLER HOCKEY
EXISTING RESTROOM
FOOTBALL FIELD
NEW ACCESS ROAD
PAVILION
TOT LOT
-CONCESSION / RESTROOM
SKATEPARK SITE
NEW PARKING LOT (42 CARS)
NON COMPETITIVE
BMXTRACK/
ACTIVITY AREA
BALK /JOGGING TRAIL
City of Moorpark ROAN U ID0, 2.• 3W
--
TA/CATAASSOCIATES
b i4
..D
ARROYO VISTA COMMUNITY PARK
LOCKER
COMMUNITY CENTER
EXPANSION
GYM EXPANSION
TENNIS COURTS
City of Moorpark
rAKATA ASSOCIATES
,,-POOL COMPLEX
NEW PARKING LOT (153 CARS)
/ i /jJ
NEW 1"El
NGT
—EXISTING RESTROOM
----NEW SOFTBALL FIELD
7-NEW PARKING LOT (242 CARS)
- -NEW ACCESS ROAD
ICONCESSION / RESTROC
-.--.-TOT LOT
NEW PAVILION
V
JAPPROX. 20 PICNIC TAELESI
SOCCER (5) NEW
PARKING LOT (42 Ct
S 0) SOCCER (3)
Ii(180'X360'1 .0
(10 3 080'X360
ER(
T.LUL's 7' tt
-J
00, F
S�C�ER I
ISO
Pump Hot
O� E
0S
WATERIEAIUR Z
EXISTING SOFTBALL FIELD I JOGGING TRAIL
BOCCI COURTS (PROPOSED) PRACTICE AREA WALK
\\---RELOCATED PAVILION
(APPROX. 20 PICNIC TABLES)
-----RELOCATED TOT LOT -EXISTING FOOTBALL FIELD
\ SHUFFLE BOARD (PROPOSED)
\---EXISTING ROLLER HOCKEY
NORTH 0 230' 300'
One Acre
B.e