HomeMy WebLinkAboutAGENDA REPORT 2000 0920 CC REG ITEM 11EITEM I/ - t -
C1 Y OF ri00gP;kPK CAUVORNIA
CEiV Council Nineting
of q- aO --SOOo
ACT -TON: A ffp 2O VGA STftF�
R Ed-of" M EN l:>A7 -I o N
Agenda Report
City of Moorpark
To: The Honorable City Council
ti
From: Kenneth C. Gilbert, Director of Public Works
Date: September 8, 2000 (Council Meeting 9- 20 -00)
Subject: Authorize Reimbursement of
Road AOC Fees to Albertson's
on Behalf of the City, of
Traffic Signal and Strei
Intersection of Los Angeles
Road.
DISCUSSION
Spring Road /Tierra Rejada
Inc. for the Construction,
Certain Modifications the
E!t Improvements at the
Avenue and Tierra Rejada
1. Certain conditions of approval of the Commercial Center at
the corner of Tierra Rejada Road and Mountain Trail Street
required the developer of the property (now Albertson's,
Inc.) to construct a double left -turn lane for westbound
traffic at the intersection of Los Angeles Avenue and Tierra
Rejada Road.
2. The developer and their engineering consultant have been
working with City staff on the development of the design for
the construction of this modification to the subject
intersection. The final design calls for a new double left
turn lane approximately three hundred feet (3001) long.
3. At the request of the City, Albertson's added to the plans
for their project, the construction of certain modifications
to the north and south legs of the intersection. These
modifications are needed to improve traffic flow and safety
and to add Bike Lanes at certain locations where none now
exist. Said work will include a) removal and reconstruction
[to the east] of the raised center median in the south leg of
the intersection, b) restriping and c) the relocation of
traffic loop detectors.
4. The design for all of the needed improvements to the subject
intersection are almost completed. It is anticipated that the
project plans will be submitted to Caltrans within the next
few weeks for review and approval, and for the issuance of an
Encroachment Permit.
Tr_la_lft3 WOW 10 3
Double Left -Turn: Los Angeles Avenue and Tierra Rejada Road
September 8, 2000
Page 2
5. When the Caltrans Permit is issued, the developer will retain
a contractor to construct the required improvements. It is
anticipated that said construction will be completed within
three to four months.
6. The estimated cost for the requested modifications to the
north and south legs of the intersection is approximately
$10,000. The final cost will be known when construction bids
are received by the developer.
7. It is recommended below that an amount not to exceed $15,000
be authorized to be reimbursed to the developer for the cost
of the modifications to the north and south legs of the
intersection, said payment to be made upon completion of the
work. Said reimbursement would be in the form of a
reimbursement of previously paid Spring Road / Tierra Rejada
Road AOC fees.
STAFF RECOMMENDATION
Authorize reimbursement to Albertson's Inc., of Spring Road /
Tierra Rejada Road AOC fees previously paid by the developer of
the Carlsberg Specific Plan area (PC -3), in an amount not to
exceed $15,000, for the constructions of improvements to the
intersection of Los Angeles Avenue and Tierra Rejada Road.
Tr la lft3 0:104