DISCUSSION
A. Background
On January 19, 2000, the City Council reviewed, revised and
approved a new set of policies and standards pertaining to
grading. The City Council then directed staff to bring a
Resolution back to the City Council formalizing those changes
in the form of a comprehensive set of Engineering Policies
and Standards.
On September 20, 2000, this matter was considered by the City
Council and then continued to October 4 to allow staff to
revise the recommended language pertaining to the
administration of stockpile sites.
On October 4, 2000, this matter was discussed by the City
Council and then continued to October 18 to allow staff to
develop a response to certain additional questions regarding
the initial review the proposed grading of slope areas.
B. Prior Resolution 96 -1229
The Engineering Polices and Standards in effect prior to the
January 19, 2000, City Council action, are set forth in
Section 4 of Resolution No. 96 -1229. The subject Resolution
(Exhibit 2) rescinds Resolution No. 96 -1229 and adopt new
and /or revised Engineering Policies and Standards. The
subject Resolution also restates the rescinding of certain
Engineering Policies in existence prior to 1996.
Eng_std_00_01_d v� V14201L�. y
Engineering Standards
October 9, 2000
Page 2
C. Final Gradinct Plans
Section C -7 Final Grading Plan states that, in approving
final grading plans, the City Engineer and Director of
Community Development may approve minor changes to the
approved conceptual grading plans, provided those changes are
within certain specified guidelines. At the October 4 City
Council meeting it was requested that staff be granted more
latitude in the approval of minor changes, by revising the
maximum elevation change which can be approved by staff from
three feet (3') to five feet (5'). That change has been made
to the final draft Resolution. It should be noted that other
stated guidelines require that any such change could not have
an adverse impact on aesthetics or viewsheds.
D. Conceptual Grading Plans
At the October 4 City Council meeting, there was also
discussion of the need for certain changes to the application
requirements for projects proposing to grade slope areas. The
City Council is advised that, although no new language has
been added to the subject Engineering Policies and Standards,
it is the intent of Community Development Department to
revise the application requirements for land development
entitlements to require a model of the slope areas to be
graded.
The revised application requirements will be based on the
following "draft" language:
"For each project requiring consideration by the Planning Commission, the
applicant for any such project having an average slope greater than ten
percent, or a proposed area of slope to be graded that is or will be steeper
than twenty percent (20 %) and having an area greater than one (1) acre,
shall prepare a model of the project site. The model shall be such as to
provide a realistic representation of the topography of the areas proposed
to be graded, both before and after grading, and shall have color
differentiation between graded and natural slopes, watercourses, streets,
building pads and open space. The positional accuracy of the contours
and other physical elements shall meet National Map Accuracy standards.
The model to be provided by the applicant shall conform to one of the
following criteria:
a. The applicant shall provide a three dimensional relief model having a
scale of 1' = 40' or such other scale as the City Engineer may approve.
The model shall have a smoothed surface with contour lines applied at
2 -foot intervals. Pseudo - planar (stepped) presentation is not
Eng_std_00_01_d
Engineering Standards
October 9, 2000
Page 3
acceptable. The model shall be mounted on rigid bases and, if
segmented for ease of transport, shall have indexing pins for easy and
reliable assembly.
b. The applicant shall provide a three dimensional computer simulated
model having an equivalent or more detailed resolution than required
by Section a above. Software and hardware needed to display and
manipulate the computer - modeled displays shall be compatible with
software and hardware that may be possessed by the City. The
software and hardware shall be capable of providing a visualization of
the before and after graded appearance using a real -time 'fly -by' of the
project at varying scales. The display shall provide a resolution of one
foot (1') when projected on a six feet (6') by eight feet (8') projection
screen. Should the applicant elect to use software and hardware that
is not compatible with software and hardware that may be possessed
by the City, the applicant shall provide to the City a fully licensed and
capable copy of the software and suitable hardware necessary to
generate and view the model. Provision of such software and hardware
shall be considered as a part of the submittal package for the project
and no compensation shall accrue to the applicant as consequence of
providing said software and /or hardware.
The method of modeling to be used (a or b above) shall be subject to the
approval of Director of Community Development."
The City Council is further advised that it is the intent of
the Interim Director of Community Development to require
models for a number of pending project, including West
Pointe, SP -1 (Hitch Ranch) and Sun -Cal.
STAFF RECOMMENDATION
Adopt Resolution No 2000-
Attachments:
Exhibit 1: Final Draft Resolution
Eng_std_00_01_d
L � 0.0
Exhibit 1
RESOLUTION NO. 2000 -
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF MOORPARK, CALIFORNIA, RESCINDING
RESOLUTION NO. 96 -1229 AND ADOPTING NEW
AND /OR REVISED POLICIES AND STANDARDS
PERTAINING TO ENGINEERING MATTERS
WHEREAS, the City Council adopted Resolution No. 96 -1229,
rescinding certain prior City Council policies pertaining to
Engineering matters and establishing a then new set of
Engineering policies and standards set forth as Section 4 of said
Resolution; and
WHEREAS, the City Council now wishes to amend the Engineering
Polices and Standards of the City.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF MOORPARK DOES
HEREBY RESOLVE, DETERMINE AND ORDER AS FOLLOWS:
SECTION 1. Resolution No. 96 -1229 is hereby rescinded.
SECTION 2. The Engineering Policies and Standards rescinded
by Sections 1, 2 and 3 of Resolution No. 96 -1229 shall remain
rescinded and deleted.
SECTION 3. A new set of Engineering Policies and Standards
are hereby approved and adopted, said Policies and Standards
being set forth in Exhibit 'A' attached hereto and made a part
hereof.
SECTION 4. The City Clerk shall certify to the adoption of
this resolution and shall cause a certified resolution to be filed
in the book of original resolutions.
PASSED AND ADOPTED this day of , 2000.
ATTEST:
Patrick Hunter, Mayor
Deborah S. Traffenstedt, City Clerk
Attachments:
Exhibit 'A': Engineering Policies and Standards
C ^02'ifi:.ii
Resolution No. 2000 -
Exhibit 'A' [Page 1]
October 18, 2000
Engineering Policies and Standards
A. PLACEMENT OF ABOVE GROUND STRUCTURES IN THE SIDEWALK:
The following guidelines shall be followed in determining the location of above
ground structures in the sidewalk. Such structures include, but are not limited
to, facilities owned by the City, any utility company or district, and the U.S.
Postal Service. The location of such structures should be consistent with
these guidelines unless unique circumstances require other action. In any
case, the placement of such structures shall be consistent with minimum
requirements for handicap access.
Whenever possible, traffic control signs should be placed on street light
poles instead of separate sign poles.
2. Sidewalks having widths greater than five feet (6) and sidewalks with
parkways:
a. All signs, poles, mailboxes, etc. should be placed behind the curb with
the minimum setback.
b. Fire hydrants shall be placed five feet (5) from the curb face.
3. Sidewalks having a width of five feet (5') or less:
a. All stop signs, yield signs, turn prohibition signs, large guide signs,
traffic signal poles and similar traffic signs shall be placed behind the
curb with the minimum setback.
b. Except as noted in Item #1 above, all other traffic control and traffic
warning signs shall be placed behind the sidewalk, provided adequate
visibility is maintained. Parking restriction signs placed behind the
sidewalk may require placement at shorter intervals.
c. Mailboxes may be placed behind the curb with the minimum setback,
provided additional sidewalk width is constructed sufficient to provide a
sidewalk width consistent with the width of the sidewalk adjacent to the
mailbox.
d. All other facilities shall be placed behind the sidewalk.
B. PUBLIC NOTIFICATION OF STREET PROJECTS: When deemed
necessary and appropriate, City staff shall provide those affected with written
notice of the City's intent to construct a street improvement project. Such
notice shall only be given when and if the City Engineer and /or Public Works
Director determine that a given project could adversely impact certain
properties. When given, such notice shall be mailed to the owners and /or
residents of properties which could be adversely affected by the project. Any
C�0��I
Resolution No. 2000 -
Exhibit 'A' [Page 21
October 18, 2000
such notice shall be mailed at least ten (10) days prior to the date the City
Council is scheduled to consider the approval of the plans and specifications
for such project and /or authorization to advertise for receipt of bids for the
construction of such project.
C. GRADING: The following guidelines shall be followed by the City Engineering
Department in the review and approval of grading plans and the
administration of grading operations:
1. Conceptual Grading Plans: On all tentative tract maps, parcel maps, and
applications for land development where grading quantities will be equal to
or greater than fifty cubic yards (50 cu. yds.), obstruct a drainage course
or impact another property owner's property, a conceptual grading plan
shall be a part of the submittal to the City. The conceptual grading plan
shall show pad elevations, tops and toes of slopes and walls, borrow and
fill quantities, and the general drainage pattern. The location of any
anticipated siltation, retention or debris basins shall be shown. As a
condition of approval, surety shall be provided for the full cost of the
grading operations.
On projects where the grading quantities do not exceed twenty thousand
cubic yards (20,000 cu. yds.) and where all grading is in an isolated self
contained area (such as agricultural land) and where the actual limits of
proposed grading will have a significant buffer from and have no drainage
impact to adjacent properties, and the grading creates no adverse
aesthetic impacts to views or hillsides, the City Engineer in consultation
with the Director of Community Development after review of a plot plan
and supporting information concerning drainage and buffer areas, may
determine that a grading plan is unnecessary.
2. Contour Grading:
a. Findings: The Council hereby finds that the terrain of certain areas of
the City provides a unique and substantial character to the area and
forms an integral part of the City's total environment. Due to their
physical dominance on the City's landscape, development of the
hillside areas will definitely affect the visual and environmental
character of the community. The City's primary objective regarding
hillside development is to preserve the natural terrain and aesthetic
character of the City while encouraging creative, innovative, and safe
residential development with a variety of housing types. Such
characteristics will only be achieved when special consideration is
given to those developments, subdivisions, and lot splits within hillside
areas, on an individual basis and proper consideration of the variations
C' � 40 2
Resolution No. 2000 -
Exhibit 'A' [Page 3]
October 18, 2000
in conditions, design criteria, and other factors. All contour grading
shall be in conformance with the requirements of Chapter 17.38
Hillside Management of the Moorpark Municipal Code.
b. Slope Design Standards: Where the creation of cut and fill slopes is
approved, they shall be rounded at the edges and contoured as
necessary to blend with existing topography. All cut and fill slopes shall
conform to the following standards:
1) All cut and fill slopes in excess of five feet (5') vertical height shall
be rounded with vertical curves from the crest of the slope and from
any surface drains constructed on the face or top of the slope and
must keep concentrated water from roofs, drives or pads from
going over slopes or onto adjacent properties;
2) Where cut or fill slopes intersect the ends of each graded slope, the
slope shall be horizontally rounded and blended with a minimum
radius of twenty -five feet (25'). A smaller radius may be permissible
for short slope lengths;
3) Where a cut or fill slope intersects a natural slope, the horizontal
contours of the slope shall be curved so as to blend with the natural
slope;
4) Where any cut or fill slope exceeds seventy feet (27') in horizontal
length, the horizontal contours of the slope shall be curved in a
continuous undulating fashion with radii no greater than three
hundred feet (300') nor less than twenty feet (20');
5) Slope rounding shall be designed in proportion to the total height of
the slope. The top and toe of each slope in excess of ten feet (10')
height, excepting the toe of any slope within twenty -five feet (25') of
a dwelling, shall be vertically rounded with radii equal to one -fifth of
the height of the slope and no less than five feet (5'). This shall not
apply to the toe of any cut slope that is supported by a retaining
wall;
6) All engineered slopes shall be contour graded to achieve a natural
appearance. Borders of cut slopes and fills are to be rounded to
blend with the existing terrain;
7) Road and utility construction will not be approved until improvement
plans have been approved for the area in accordance with
discretionary approvals and City standards; and
8) Slope height shall be measured to the intersection of the slant of
the slope with existing ground before rounding.
c. Architectural Treatment: Architectural innovation shall be utilized rather
than extensive grading so that the natural landform is disturbed to the
least extent possible.
d. Development Area Interfaces: Where approved by the Planning
Commission or City Council, the slope grading requirements may be
C
0. -13 ��' ic:'
Resolution No. 2000 -
Exhibit 'A' [Page 4]
October 18, 2000
applied to limited portions of an adjacent zone to permit the extension
or transition of a logical design concept. These requirements do not
preclude satisfying requirements for slope benching, drainage facilities,
and maintenance access or fire apparatus access roads.
e. Development Guidelines for Natural Slopes: Areas within the following
ranges of natural (pre - development) slope percentages shall be
developed in accordance with the following criteria:
1) The "Percent Natural Slope" on a site will be calculated as the
average gradient of the entire site as determined by the elevation
differentials measured orthographically between each node of a
north -south and east -west one hundred foot interval grid extending
over the entire developed portion of the project site.
2) Areas having an average slope of less than ten percent (10 %) [10'
horizontal to 1' vertical) are not a hillside condition. Mass grading
with conventional fully padded lots and terracing are acceptable.
3) Areas having an average slope of between ten percent (10 %) [10'
horizontal to 1' vertical] and nineteen and nine -tenth percent
(19.9 %) [5' horizontal to 1' vertical]: Mass grading may occur in
this slope zone. Existing landforms must retain their natural
character. Padded building sites are permitted on these slopes, but
split -level architectural structures with stacking and clustering are
preferred. A cut and fill map is required to verify maximum heights
of cut and fill.
4) Areas having an average slope of between twenty percent (20 %)
[5' horizontal to 1' vertical] and thirty -three percent (33 %)
[3' horizontal to 1' vertical]: Special hillside architectural and design
techniques are required within this slope zone. Architectural
designs are to conform to the natural landform. Mass grading is
discouraged except on a case -by -case basis as permitted by the
Planning Commission. Mass grading is particularly discouraged
where development is proposed within a high -risk landslide area.
This does not preclude grading necessary to mitigate slide hazards.
A cut and fill map is required to verify maximum heights of cut and
fill.
5) A Conditional Use permit is required for grading on areas having an
average slope of thirty -four percent (34 %) or more [greater than 3'
horizontal to 1' vertical). Approval of any Conditional Use permit for
development within this slope zone is contingent that the Planning
Commission make findings that such grading and development:
a) Has been clearly demonstrated to minimize safety,
environmental and aesthetic impacts.
b) Includes the minimum amount of grading.
c) Includes the grading necessary to mitigate slope instability or
slide hazards that may exist on the site.
Resolution No. 2000 -
Exhibit 'A' [Page S]
October 18, 2000
d) Has had thorough geotechnical investigation.
e) Has had a detailed grading plan prepared as well as a cut and
fill exhibit that shows maximum heights of cut and fill.
f) Will require no import or export of soils.
3. Import/Export: On all required conceptual grading plans where the total
on -site borrow and fill yardages differ by one thousand cubic yards (1,000
cu. yds.) or more, plans for handling the import/export shall be part of the
conceptual grading plan.
a. The import/export plan shall show quantity of import/export, location of
borrow /stockpile sites, temporary and final grading of the site, height of
fill /depth of cut, visibility of the site from public roads and lands,
vegetation and screening for sites located within the City of Moorpark.
b. Unanticipated off -site import/export operations requiring an excess of
one thousand (1,000) total truck loads or ten thousand cubic yards
(10,000 cu. yds.), whichever is less, shall require Council approval
prior to the commencement of hauling or staged grading operations. A
haul route shall be submitted to the City Council for review and
approval.
c. If the borrow /fill site(s) are within the City limits, a grading plan for such
sites, showing the before and after condition, shall also be shown.
4. Stockpiles: The temporary placement of soil on any property prior to its
placement as imported certified fill (herein "Stockpile "), shall comply with
the following requirements:
a. Design: All Stockpile shall:
1) not exceed five feet (6) in height;
2) have side slopes which do not exceed 3:1
b. Approval:
1) Development Entitlement: For any property having an approved
development entitlement (CPD, IPD, RPD), requests for placement
of a Stockpile are to be reviewed and conditionally approved, or
denied, by the City Engineer and the Director of Community
Development as a discretionary action. The conditions and
requirements for any approval of a Stockpile shall be consistent
with an approved grading plan for the property and the conditions of
approval for the development entitlement. Such approval shall also
require the deposit of adequate and appropriate bonds to
guarantee the removal of the Stockpile within the prescribed time
limits of subsection 4c. In addition, the City Engineer and the
Director of Community Development shall require appropriate
(i,� " t
„ �'A0 .�
Resolution No. 2000 -
Exhibit 'A' [Page 6]
October 18, 2000
conditions relative to the placement and maintenance of the
Stockpile, including but not limited to:
a) distance and screening from public rights -of -way and adjacent
properties, with fencing or landscaping as determined
necessary;
b) erosion control;
c) weed abatement;
d) construction of public improvements as required by the
conditions of approval of the development entitlement, if said
public improvements are determined to be needed at the time
the Stockpile approval is requested; and,
e) payment of applicable fees for processing of the request for the
placement of the Stockpile(s).
The quantity of soil for any approved Stockpile(s) being placed
upon any such approved property or project, shall not exceed 5,000
cubic yards per acre, unless prior approval of a greater amount is
granted by the City Council.
2) All Other Properties: For any property which has not been granted
a development entitlement (including any property located within
any One Hundred (100) Year Flood Boundary as shown on the
current Flood Insurance Rate Map [FIRM]), requests for a Stockpile
shall require approval by the City Council. Any application for such
approval shall be accompanied by an adequate and appropriate
Environmental Document assessing and addressing any potential
environmental impacts associated with the placement and removal
of the Stockpile. Such application shall be accompanied by
appropriate conditions of approval as recommended by the City
Engineer, including a requirement for the deposit of bonds to
guarantee the removal of the Stockpile site(s) if deemed necessary.
c. Duration: The duration of the placement of a Stockpile shall not
exceed the following time limits:
1) Development Entitlements: For any property having an approved
development entitlement, the duration of the placement of any
Stockpile shall not exceed the time limits specified in said
entitlement or two years whichever is less.
2) All Other Properties: For any other Stockpile approved by the City
Council [see subsection 4.b.2], the duration of the placement of any
Stockpile shall not exceed the time limits set forth in the conditions
of approval as determined by the City Council.
5. Haul Routes: On all required conceptual grading plans that require
import/export of more than one hundred (100) truckloads or one thousand
cubic yards (1,000 cu. yds.), whichever is less, the following information
shall be made a part of the conceptual grading plan: haul routes, hours of
C° flD* 0 ti1 7G
Resolution No. 2000 -
Exhibit 'A' [Page 71
October 18, 2000
hauling, numbers and frequency of trucks and other information necessary
to define hauling impacts. Additional surety for the cleaning and/or repair
of streets used as haul routes may be required as determined by the City
Engineer.
6. Director of Community Development Review: On all grading plans, the
Director of Community Development shall provide comment to the City
Engineer concerning: contour grading, aesthetics, viewshed and
consistency with the Hillside Management Ordinance where applicable
and Moorpark General Plan. With said comments, the City Engineer shall
develop and provide to the Director of Community Development,
appropriate recommendations relative to those matters plus slope stability,
drainage, erosion protection and related issues, before approval of any
conceptual or final grading plan.
7. Final Grading Plan: The final grading plan shall be in substantial
compliance with the approved conceptual grading plan. The City Engineer
and the Director of Community Development shall make the determination
as to substantial compliance with the approved conceptual grading plan.
The City Engineer may administratively approve minor changes from the
conceptual grading plan. Minor changes are defined as:
a. changes in elevation of five (5) feet or less from the conceptual plan;
b. changes in total borrow /fill quantities which do not exceed one
thousand cubic yards (1,000 yd3);
c. additional import/export quantities not exceeding one thousand cubic
yards (1,000 yd3);
d. changes which cause no adverse impacts to slope stability, drainage,
and erosion control; and,
e. changes which, in the view of the Director of Community Development,
do not result in any adverse impact on aesthetics or viewshed.
If the City Engineer finds that the final grading plan is not in substantial
conformance with the approved conceptual grading plan, the City
Engineer shall submit a report with recommendations to the City Council.
The City Engineer shall not issue a grading permit for those final grading
plans that are not in substantial conformance with the conceptual grading
plan without approval of the City Council.
8. Erosion Control: Concurrent with submittal of the final grading plan, an
erosion control plan shall be submitted for review and approval by the City
Engineer. The design shall include measures for erosion control to be
implemented on all graded areas. These measures shall apply to
temporary grading activity that remains or is anticipated to remain
unfinished or undisturbed in its altered condition for a period of time
C "'J Jrc.7'%
Resolution No. 2000 -
Exhibit 'A' [Page 8]
October 18, 2000
greater than thirty (30) days or for a period of time which extends into the
wet season defined as that period between October 15th of a given year
and April 15th of the following year.
9. National Pollution Discharge Elimination System ( NPDES): As part of
each final grading plan, NPDES regulations shall be addressed to the
satisfaction of the City Engineer. As a minimum the following shall be
included:
a. A Stormwater Pollution Control Plan (SWPCP) shall be developed and
implemented in accordance with requirements of the Ventura
Countywide Stormwater Quality Management Program, NPDES Permit
No. CAS063339.
b. The project construction plans shall incorporate Best Management
Practices (BMPs) applicable to the development for the review and
approval of the City Engineer.
If the site is 5 acres or more in size, the following items shall also be
included:
c. A permit shall be obtained from the State Water Resources Control
Board. A Notice of Intent (NOI) shall be submitted to the City Engineer
and to the California State Water Resources Control Board, Storm
Water Permit Unit in accordance with the NPDES Construction
General Permit No. CASQ00002.
d. A Stormwater Pollution Prevention Plan (SWPPP) shall be prepared
and approved by the City Engineer consistent with the requirements of
the City's Stormwater Quality standards and regulations.
10. Dust Control: Dust control measures shall be identified to the satisfaction
of the City Engineer. These measures shall include, but not be limited to,
minimization of ground disturbance, application of water /chemicals,
temporary/permanent ground cover /seeding, street sweeping, and
covering loads of dirt.
All clearing, grading, earth moving, or excavation operations shall cease
during periods of high winds (greater than 15 mph averaged over one
hour).
11. Field Changes: During grading operations, changes to the approved final
grading plan may be authorized by the City Engineer, when such changes
are in conformance with the approved Final Grading Plan and result in an
"equal to" or "improved" final graded condition, provided the Director of
Community Development concurs that the changes do not result in any
adverse impact to aesthetics or viewshed within or adjacent to the graded
area.
�r T Q
8
L � 1 L) Az
Resolution No. 2000 -
Exhibit 'A' [Page 9]
October 18, 2000
D. UTILITY TRENCH BACKFILL REQUIREMENTS: The following guidelines
shall be followed by the City Engineering Department in the review and
approval of plans and the inspection of work related to the backfill and
compaction of utility trenches:
1. Except as noted below, all utility trenches within any street right -of -way or
easement shall be backfilled from the top of the pipe zone to the bottom
of the pavement structural section with a one sack cement and sand slurry
mix. A maximum of one percent (1 %) of calcium chloride may be added
when a faster cure is required.
2. All utility trenches within a parkway, median or sidewalk area shall be
backfilled from the top of the pipe zone to a point one foot (1') below the
finished grade.
3. Upon written request to the City Engineer this requirement may be waived
for specific special conditions such as excessively wide or deep (in excess
of eight feet) trenches.
E. SIZE OF SPEED LIMIT SIGNS: The following guidelines shall be followed in
determining the size of Speed Limit signs:
Less than 45 MPH: 24" x 36 ";
45 MPH or more: 36" x 45 ".
The City Engineer or Director of Public Works may determine that a different
size of speed limit sign may be warranted or may be more suitable at certain
locations.
F. TRAFFIC CONTROL PLAN: Where streets are to be dedicated to the City in
conjunction with the recordation of a final map, a regulatory traffic signing and
striping plan shall be submitted to, and approved by the City Council, along
with City Council review and approval of the final map. The traffic signing and
striping plan shall show, as a minimum, all proposed regulatory signing and
striping, such as stop signs, speed limit signs and parking restriction signs.
G. STREET IMPROVEMENTS ON A STATE HIGHWAY: The construction of
street improvements on a State Highway by a private developer, may require
the City to act in the role of facilitator. To that end the City Engineer and/or
the Public Works Director are authorized to take certain actions as follows:
1. Sign Caltrans Encroachment Permit Applications, if required, provided the
developer provides the City with appropriate hold harmless
indemnification.
2. Take all steps necessary and appropriate to provide for City acceptance of
additional street right -of -way and /or easements within and /or adjacent to a
State Highway.
Resolution No. 2000 -
Exhibit ' A' [Page 10]
October 18, 2000
3. Take all steps necessary and appropriate to convey such additional street
right -of -way, easements and improvements to Caltrans upon completion
and acceptance of said improvements.
H. REPAIR OF DAMAGED SIDEWALKS, CURBS AND GUTTERS: The
responsibility for undertaking the repair of damaged sidewalks, curbs and
gutters, shall be as follows:
Damage Caused by: Responsible Party
1 Street trees or other landscaping located within City
a parkway maintained by the City.
2 Street trees or other landscaping located within HOA
a parkway maintained by a Home Owners'
Association.
3 Street trees or other landscaping within a City
Parkway located within the street right -of -way or
a City-owned landscape easement adjacent
thereto.
4 Trees or other landscaping located on private
property:
First Repair: City
Subsequent Repairs: Owner of the
property fronting
the damage
5 Any activity of the owner of the property fronting Owner of the
the damage, including an agent of the owner property fronting
(e.g. renter, contractor, etc.) the damage
I. REAR YARD ACCESS THROUGH BLOCK WALLS: In order to maintain and
preserve the structural integrity and the aesthetic quality of Perimeter Walls
throughout the City, such walls shall not be altered or removed and
reconstructed to provide temporary access to a work site, unless a Wall
Access Permit is issued in accordance with the requirements set forth herein.
1. Building Permits: Identification of Work Access: The plot plan attached to
any building permit issued for the construction of improvements or
modifications to any property, shall identify, on the plot plan, the method or
location of the access to the work site.
cn OL"(3 J
v
Resolution No. 2000 -
Exhibit 'A' [Page 11 ]
October 18, 2000
2. Prohibited Access: Any requested access which requires the removal and
reconstruction of a wall located along a rear of side property line shared
with any street, SHALL NOT BE APPROVED.
3. Exceptions: Wall Access Permit: A Perimeter Wall Access Permit may be
issued by the City Engineer, when and if the contractor or property owner
can adequately demonstrate that it is not possible to construct the desired
improvements or modifications without the removal and reconstruction of
the Perimeter Wall in order to gain rear access to the property.
Exemptions (Wall Access Permit) shall not be granted for the purpose of
facilitating the work (i.e. avoid damage to existing landscaping, make the
project easier, reduce the cost of the project, etc.). Exemptions may only
be granted when there is no way to construct the project without access
through the wall. Prior to the approval of any Wall Access Permit, a
representative of the City Engineer shall visit the site to confirm that
access to the work site is not possible without the removal and
reconstruction of a perimeter wall.
4. Conditions of Approval: Any Wall Access Permit issued by the City
Engineer shall include Conditions of Approval designed to assure that the
wall is restored to its "pre- project" condition. Such Conditions may include
any of the following:
a) a block wall restoration plan shall be provided;
b) block samples shall be provided to the City prior to the approval of the
Permit, to assure that the "match" between the existing block wall and
the new block is adequate;
c) all approved block shall be procured and delivered to the site prior to
the issuance of the final permit and the commencement of
construction, in order to assure that the final block material "matches"
the approved sample [Note: a conditional permit may be issued setting
forth all requirements and advising of the City's intent to issue a Wall
Access Permit upon delivery and approval of the block material].
d) [if new block does not adequately match the existing wall] the
restoration plan shall provide for the removal and reconstruction of the
block wall for an entire wall section (pilaster to pilaster).
J. STREET IMPROVEMENT PLANS: U- TURNS: During the review and
approval of the Tentative Tract Map and /or the review and plan checking of
street improvements plans for the development of proposed new arterial
streets, consideration shall be given to the geometirc design for proposed
new intersections; and, unless conditions preclude such installation, the final
design shall adequately provide for "U- Turn" traffic movements at such
intersections. In the event the City Engineer finds that conditions exist which
preclude the need or necessity to provide for "U- Turn" traffic movements, the
City Engineer shall prepare a report to the City Manager setting forth the
Resolution No. 2000 -
Exhibit 'A' [Page 121
October 18, 2000
reasons why such provisions should not be included in the final design, prior
to making a final determination.
K. SECOND DRIVEWAYS: Street Encroachment Permits for the
construction of a second driveway on a residential lot, shall not be
approved unless and until the applicant has obtained a Zone Clearance
approved by the Director of Community Development. Such approval shall
be consistent with the requirements of the Moorpark Municipal Code
[Section 17.32.011 ].