HomeMy WebLinkAboutAGENDA REPORT 2000 1206 CC REG ITEM 10GTE
CITY 01F *,i0(- )RPARK, C,AL1TrQ -NL1
City Council fleeting
of 121101800t)
ACTIf)'-,,: A S Q 1NC��1Din1c? ��
Ago?ripN OF RESo a000- 1'141
BY:
CITY OF MOORPARK
AGENDA REPORT
3
TO: The Honorable City Council
FROM: Kenneth C. Gilbert, Director of Public Works
PREPARED BY: Robert P. Morgenstern, Public Works
Supervisor
DATE: November 27, 2000 (Council Meeting 12 -6 -00)
SUBJECT: Consider Approval of Plans and
Specifications and Authorization to
Advertise for Receipt of Bids for the Light
Emitting Diode Traffic Signal Conversion
Project.
618015F -1XV6
There exists energy saving performance enhancement to the
incandescent signal light bulbs currently in use in the
City's traffic signals. "Light Emitting Diode" (LED)
replacement bulbs for signal vehicle heads and pedestrian
heads are available. The advantages of LED over
incandescent are reduced energy costs, longer bulb life,
reduced maintenance and increased safety.
LED technology is relatively new and therefore expensive.
However, Southern California Edison (SCE) has a Cash Rebate
Program for their customers who retrofit incandescent
traffic signals with qualifying LED lamps. The City has
confirmed reservations with SCE for $55,295.00. This rebate
reservation is to convert all City owned red and green
lamps, all red and green arrows and all pedestrian heads
(Upraised Hand /Walking Person combinations).
��213
DISCUSSION:
A. Proposed Scope of Work
All lights except amber at fifteen (15) City owned
signalized intersections would be converted from
incandescent to (LED's). The project includes
providing the necessary bulbs and converting the
signal and pedestrian heads to a Type 1 hard wired
installation as opposed to in the existing screw in
type.
B. Plans and Specifications
A review copy of the Plans and Specifications for the
subject project has been placed on top of the file
cabinets in the City Council Conference Room.
C. Schedule
It is anticipated that bids for the subject project
will be opened in early January and presented to the
City Council for consideration later that month.
Construction should begin by February 2001 and be
completed by March 2001.
D. Fiscal Impact
1. LED LIFE
LED's are typically warranted for 4 -6 years and
can last up to 10 years without replacement.
2. MAINTENANCE COSTS
Signal Maintenance, Inc., the City's current
signal maintenance contractor has estimated that
the City would realize a monthly saving of $ 4.22
per intersection. The City currently owns 15
signalized intersections that would result in
annual cost savings of $ 759.60.
3. INCREASED SAFETY
LED's provide increased safety for the following
reasons:
❖ LED's burn brighter than incandescent.
C'C"V114
❖ LED's last up to ten years
❖ When LED's expire, they do slowly diode by
diode, not all at once like incandescent.
4. UTILITY REBATES
SCE is has confirmed approval of the City's
request for a rebate of a portion of the costs
for the subject project. Under this program the
City will recover $65.00 for each red light
(including arrows), $175.00 for each green light
(including arrows) and $70.00 for each
combination Ped Head.
This program is effective for units installed by
June 1, 2001. After that date the incentive will
be reduced by 50`?. The program completion date is
December 31, 2001.
5. ESTIMATED ECONOMICS
PROJECT CONVERSION COSTS
HEAD
TYPE
QTY
MATERIAL
LABOR
COST **
TOTAL COSTS
$88,390.00
COST*
12"
RED
148
$19,980
$5,180
$25,160
12"
RED ARROW
39
$3,900
$1,365
$5,265
8"
RED
10
$1,000
$ 350
$1,250
12"
GREEN
145
$25,375
$5,075
$30,450
12"
GREEN ARROW
51
$5,610
$1,785
$7,395
8"
GREEN
10
$1,400
$ 350
$1,750
PED
HEAD
92
$13,800
$3,220
$17,020
TOTAL CONVERSION COSTS $71,065 $17,325 $88,390
* MATERIAL COST PROVIDED BY CALIFORNIA ENERGY COMMISSION BASED ON
ACTUAL PROJECTS COSTS.
** LABOR COST PROVIDED BY CALIFORNIA ENERGY COMMISSION
BASED ON CONTRACTUAL INSTALLATIONS.
ENERGY SAVINGS & PAYBACKS WITHOUT SCE REBATES
Conversion
Annual
Savings
Project
Cost
*Payback
(years)
Convert all except ambers
$16,624.00
$88,390.00
5.3
* Payback estimates based on California Energy Commission spreadsheet
program. Each conversion spreadsheet is attached in Appendix A.
C i� 5
PROJECT CONVERSION SAVINGS
HEAD
TYPE
QTY
ENERGY*
MAINT.
SCE
REBATE
TOTAL
SAVINGS
PROJ. CONVERSION
COSTS
SAVINGS
SAVING
0
S
12"
RED
148
$6,472
$380
$9,620
$16,472
12"
RED ARROW
39
$2,456
$16, 624
$2,535
$4,991
8"
RED
10
$ 192
$ 760
$650
$ 842
12"
GREEN
145
$4,227
$380
$25,375
$29,982
12"
GREEN ARROW
51
$ 651
$8,925
$9,576
8"
GREEN
10
$ 128
$1,750
$1,878
PED
HEAD
120
$2,498
$6,440
$8,938
TOTAL CONVERSION SAVINGS: $16,624 $ 760 $55,295 $72,679
* Energy Savings Based on California Energy Commission Projections.
Based on the estimates provided, the City would
experience an initial capital outlay of $88,390 and
would receive $72,679 in savings and incentives the
first year leaving a net expense of $15,711.
Realizing a combined energy and maintenance saving of
$17,384 annually the City would receive a project
payback in an estimated 21 months.
Extended the project over 5 years the City would save
an estimated $53,825 ($86,920 less $33,095) in
combined energy and maintenance costs as shown below:
FIVE YEAR SAVINGS ESTIMATE FOR RED LIGHT, GREEN LIGHT & PED
CONVERSIONS
FUNCTION
YEAR 1
YEAR 2
YEAR 3
YEAR 4
YEAR 5
TOTAL
PROJ. CONVERSION
COSTS
($88,390)
0
0
0
0
($88,390)
SCE INCENTIVES
$55,295
0
0
0
0
$55,295
ENERGY SAVINGS
$16, 624
$16, 624
$16,624
$16, 624
$16, 624
$83,120
MAINTENANCE
SAVINGS
$ 760
$ 760
$ 760
$ 760
$ 760
$ 3800
TOTALS
($15,711)
$17,384
$17,384
$17,384
$17,384
$53,825
6. COST ESTIMATE AND FUNDING
Funds for this project have not been budgeted for
2000 -01 and a Budget Adjustment is necessary. The
project's construction cost is estimated at
$88,390. Southern California Edison rebates will
C 0116
amount to $55,295.00 and when received will be
accounted for as a negative project expense (not
a revenue). The total estimated cost outlay for
construction therefore is $33,095.
A Resolution (attached) has been prepared for the
proposed budget amendment. Said Resolution
includes the above mentioned funding from the
General Fund for the conversion of City owned
Traffic Signals to Light Emitting Diodes. A
summary of the proposed budget amendment is as
follows:
Account Number
Current Budget
Amendment
Revised Budget
2605.8310.0000.9253
$32,1201
$33,095
$65,215
Total
$32,1201
$33,095
$65,215
RECOMMENDATION:
It is recommended that the City Council adopt Resolution
2000- revising the amount of the appropriations and
budget for the Traffic Signal Maintenance account, approve
Plans and Specifications for the Traffic Signal LED
Conversion Project and authorize staff to advertise for
receipt of bids for said project.
RESOLUTION NO. 2000 -
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
MOORPARK, CALIFORNIA, REVISING THE AMOUNT OF THE
APPROPRIATION AND BUDGET FOR TRAFFIC SIGNAL
MAINTENANCE [GAS TAX FUND 2605, DIVISION # 8310,
OBJECT # 92531
WHEREAS, on June 21, 2000, the City Council adopted
the Budget for Fiscal Year 2000/01; and
WHEREAS, a staff report has been presented to the City
Council requesting a budget increase in the aggregate
amount of $33,095.00; and
WHEREAS, Exhibit `A', attached hereto and made a part
hereof, describes said Budget amendment and its resultant
impacts to the budget line item(s).
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF
MOORPARK DOES HEREBY RESOLVE AS FOLLOWS:
SECTION 1. That a Budget amendment in the aggregate
increase of $33,095 as more particularly described in
attached Exhibit A, is hereby approved.
SECTION 2. The City Clerk shall certify to the
adoption of this resolution and shall cause a certified
resolution to be filed in the book of original resolutions.
PASSED AND ADOPTED this day of , 2000.
Patrick Hunter, Mayor
ATTEST:
Deborah S. Traffenstedt, City Clerk
Attachment:
Exhibit `A': Appropriation and Budget Detail
C�UTA -8
Resolution No. -
Exhibit `A'
APPROPRIATIONS FOR
LED TRAFFIC SIGNAL CONVERSION PROJECT
Account Number
Current
Budget ($)
Amendment ($)
Revised
Budget ($)
2605.8310.0000.9253
32,120
33,095
65,215
Total
32,120
33,095
65,215
DISTRIBUTION OF APPROPRIATION
TO ACCOUNT 2605- 8310 - 000 -9253
* Revised Budget tot
Approved as to form:
C Ul1y
Individual Descriptions
AMOUNT
(1)
Routine Maintenance
$
17,880
(2)
Extraordinary Maintenance (based on history)
$
4,240
(3)
Paint existing signal poles (one time expense)
$
10,000
(4)
LED Traffic Signal Conversion (City owned)
$
88,390
(5)
Southern California Edison Reimbursement
$
(55,295)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13)
TOTAL FY 2000/2001 EXPENDITURE REQUEST
$
65,215
* Revised Budget tot
Approved as to form:
C Ul1y