Loading...
HomeMy WebLinkAboutAGENDA REPORT 2001 0905 CC REG ITEM 11HITEM I (. 9 . CITY OF 7NIOORP.A.RX, CALIF R"' A of Moorpark City Council�. Agenda Report To: The Honorable City Council From: Kenneth C. Gilbert, Director of Public Works Q1 * Date: August 24, 2001 (Council Meeting 9 -5 -01) Subject: Notice of Completion for the Widening of Los Angeles Avenue East of Leta Yancy Road DISCUSSION A. Background On March 21, 2001, the City Council awarded a contract to Asphalt Professionals, Inc. for the construction of a project to widen the south side of Los Angeles Avenue along the frontage of the old Caltrans Maintenance Yard just east of Leta Yancy Road. B. Project Scope The scope of the project called for the construction of additional pavement width, curb, gutter, driveway, asphalt sidewalk and related work. C. Right -of -Way Full width right -of -way has not yet been conveyed at this location. It is apparently the intent of Caltrans to retain the street right -of -way when they market this surplus property. L A Ave at Caltrnas Yard cmp 000284 L. A. Ave. Widening [Caltrans Yard]: Completion August 24, 2001 Page 2 D. Change Orders Two (2) Change Orders were issued for this project, generally described as follows: Change Order Description Cost ($) Note 1 Pavement Sub- Over excavate and place 3,753.91 a structure extra base and geo- fabric 2 Gate Repair and modification 577.50 Total 4,331.41 Notes: a) Required by sub- surface conditions and designed and constructed per Caltrans requirements. E. Quantity Adjustment Invariably with Public Works projects the final actual quantity required for each of the bid items will differ somewhat from the engineer's estimate of quantities set forth in the bid documents. Accordingly, the final contract cost will differ from the bid amount, based upon the actual quantity of each item required to complete the project. The cost of significant variances in quantities required to complete the work is summarized as follows: Item Description Cost ($) Note 1 Roadway excavation 959.14 1 2 Processed Misc. Base 403.92 1 3 A/C Pavement 2,288.88 1 4 A/C Sidewalk (373.73) 5 PCC Curb & Gutter 122.09 Total for Adjusted Quantities 3,400.30 Notes: 1) Per Caltrans field requirements. F. Fiscal Impact 1. Final Construction Cost: The final construction costs are summarized as follows: ._ ......... - - -- .... --- .............. --- ............ -- ._._.......... - - - -- ._._. _...._......._...._......._._._ Description . - -- --- ............ - ............ -- ........... - Prior Year ($ Bid Amount 38,817.09 :,hange Orders 4,331.41 Duantity Adjustments 3,400.25 Total 46,548.75 L A Ave at Caltrans Yard _cmp L. A. Ave. Widening [Caltrans Yard]: Completion August 24, 2001 Page 3 2. Change Orders & Quantity Adjustments: The scope and cost of Change Orders and Quantity Adjustments is summarized above. 3. Total Construction Costs: In addition to the above described contract costs, certain other construction costs were incurred by the City to facilitate the termination of the water service to the property. The City funded contract traffic control costs [$350.00] to enable the County Waterworks District to terminate the service lateral connection to the water main located on the north side of the street. A summary of all construction costs is as : ....-----.........-----._..........----._._ ...............---._._._............----_-._ ...._._......._................ --_------._. _.... . ............. .. ........ -- .......... ---- ............. _ ... _ ._ ....... ---- ....... _--- ......: Description Prior Year ($)' Contract costs 46,548.75 Added Traffic Control 350.00 Total 46,898.75 _._......._.___ _..._._._._._-_....... _._._.___........._._._.___.__. _ ............. 4. Total Project Costs: The final project costs are summarized as follows: - ._._....... -- ......... - .- .......... - -- .............------._._._......._......._....--------._ ._._............. ............ -- - - Description - - - -- ...(. ._.......... - - ......... _-............._.__......-- Prior Year ($) Design 7,480.00 Construction 46,898.75 Inspection [City Staff - estimate] 1,000.00 Total 55,378.75 5. Funding Source: The funding source for this project [Project 2501 -8310- 8006 -xxxx] is the Los Angeles Avenue AOC Fund [ Fund 25011. 6. Budget Summary: A re -cap of the FY 2000/2001 Budget for the subject project is as follows: Account Number Current Budget ($) -- ... $) .............. ual .. ......._ ._.__.......... Cost .._ _._.......... - ........ .._._.__._............._....... Act ( - -- _......._.............. Sur lus Design 10,000 7,480 2,520 Construction 80,000 46,899 33,101 Inspection 10,000 1,000 9,000 . .. -- Total - ............ - -- ........... ...... - ...... - ------- - - -_._ ._......._ ...................... 100, 000 ........................ 55,379 ._.__ --- .......... _ .............. 44,621 Note: Surplus Appropriations will be released back to Funds when the project is completely closed -out. 7. Outstanding Matters: Staff is still working with the contractor to resolve the final cost for a number of the Change Orders. At the conclusion of those negotiations, the final project costs could be slightly different than the above summary. It is not anticipated that the final costs will exceed the budget amount. L A Ave at Caltrans Yard _cmp L. A. Ave. Widening [Caltrans Yard: Completion August 24, 2001 Page 4 G. Final Inspection and Acceptance The City has completed a final inspection of the project and has found the work to be acceptable. At this time it would be appropriate for the City Council to accept the project as completed and direct the City Clerk to file a Notice of Completion to start the final lean period. H. Release of Retention If the recommended action is taken, the Notice of Completion will be forwarded to the County Recorder for recordation. Absent the receipt of any Stop Notices from subcontractors or suppliers, thirty -five (35) days after the date of the recordation of the Notice of Completion, the ten percent (100) retention could be paid. As mentioned above [Section F -71, staff is still in negotiations with the contractor to determine the final cost of certain Change Orders. It is the intent of staff to not release the retention until after these negotiations are finalized and the Change Orders signed. RECOMMENDATION Accept the work as completed. L A Ave at Caltrans Yard _cmp