HomeMy WebLinkAboutAGENDA REPORT 2019 0206 REG CCSA ITEM 10DCITY OF MOORPARK, CALIFORNIA City Council Meeting of 2.6.2019 ACTION Approved staff recommendation. Adopted Reso No. 2019-3790 BY M. Benson D. Consider an Amendment No. 2 to Agreement with Pavement Coatings Co. for the 2018 Slurry Seal and Pavement Rehabilitation Project (M0042), Specification No. MPK 18-01 and Resolution Amending the Fiscal Year 2018/2019 Budget to Fund the Project. Staff Recommendation: 1) Adopt Resolution No. 2019-3790 amending the Fiscal Year 2018/2019 Budget to appropriate $30,000 from the Road Maintenance and Rehabilitation Fund (2416) to Account No. 2416 -311- M0042-55200; 2) Amend the existing Agreement with Pavement Coatings Co. in the amount of $29,415.32 to Schedule A for adjust ing to grade City and County- owned surface facilities; 3) Amend the existing Agreement with Pavement Coatings Co. for project contingencies in an amount not exceed $27,102 (10%), if and when the need arises for extra work and services for Schedule A; and 4 ) Upon completion of the construction contract, direct staff to seek reimbursement from the Ventura County Waterworks District for construction costs associated with the adjustment and improvements to County-owned surface facilities. . ROLL CALL VOTE REQUIRED Item: 10.D. MOORPARK CITY COUNCIL AGENDA REPORT TO: Honorable City Council FROM: Sean Corrigan, City Engineer/Public Works Director DATE: 02/06/2019 Regular Meeting SUBJECT: Consider Amendment No. 2 to Agreement with Pavement Coatings Co. for the 2018 Slurry Seal and Pavement Rehabilitation Project (M0042), Specification No. MPK 18-01 and Resolution Amending the Fiscal Year 2018/2019 Budget to Fund the Project SUMMARY The City and the Ventura County Waterworks District have a current Agreement in place, dated December 9, 2009, for adjusting to grade surface facilities affected by pavement rehabilitation projects. City and County staff performed field inspections of existing surface facilities along the residential streets within Campus Canyon Drive and University Drive and determined that two storm drain manholes, 10 sanitary sewer manholes, and 24 water valve covers should be adjusted to the finish grade. Per the existing Agreement between the City and the County Waterworks District, the County will reimburse to the City the construction cost to adjust the surface facilities, plus 15% to cover all design, inspection, and administrative costs incurred by the City. Staff is seeking approval from City Council to amend the existing Agreement with Pavement Coatings Co. to adjust City and County-owned surface facilities and to direct staff to seek reimbursement from the County after construction completion. BACKGROUND On October 17, 2018, the City Council awarded a construction contract to Pavement Coatings Co. for the 2018 Slurry Seal and Pavement Rehabilitation Project (M0042). The project scope of work is to place approximately 625,000 square feet of Type 2 slurry seal on local residential streets in the Campus Canyon Drive – University Drive area and to repair asphalt pavement potholes along Princeton Avenue. The current contract amount is $299,817. At the time of the construction contract award, City Council authorized the City Manager to amend the contract for project contingencies in an amount not to exceed $27,102 for the slurry sealing of residential streets and $21,200 in additional asphalt pavement pothole repair. At this time, there is a need to amend the current Contract Agreement with Pavement Coatings Co. to adjust both City and County-owned surface facilities to the finish street grade. Item: 10.D. 293 Honorable City Council 02/06/2019 Regular Meeting Page 2 DISCUSSION The City and the Ventura County Waterworks District have a current Agreement in place for adjusting to grade surface facilities affected by pavement rehabilitation projects. Surface facilities typically include manhole lids, valve covers, vault lids, and grated storm water inlets that are within the paved street section. Typically, the adjustment of surface facilities is needed on asphalt overlay or street reconstruction projects where the finish street surface grade and profile is modified. However, City and County Waterworks District staff performed field inspections of existing surface facilities along the residential streets within Campus Canyon Drive and University Drive and determined that many of these should be adjusted as part of this project. The following table is a list and location of surface facilities that are being recommended for adjustment as part of this construction contract. The County Waterworks District owns, operates, and maintains the sanitary sewer and water utility infrastructure within the City. The City owns and maintains the storm drainage infrastructure. Manhole/Lid Location SDMH SSMH Water Valve Campus Canyon Drive/Mallory Court 0 1 4 University Drive/Freshman Court 0 1 0 University Drive/Sophomore Court 0 1 0 University Drive/Griffith Lane 0 0 3 7304 University Drive 0 0 1 University Drive/Miline Circle 1 0 3 Shakespeare Place/Doris Court 0 1 4 Shakespeare Place cul-de-sac 1 0 1 Doris Court cul-de-sac 0 1 1 15549 Doris Court 0 1 0 15597 Borges Court 0 0 1 15736 Miline Circle 0 0 1 15790 Swift Place 0 0 1 15691 Borges Court 0 0 1 15205 Monroe Avenue 0 0 1 15295 Monroe Avenue 0 0 1 15217 Monroe Avenue 0 1 0 Griffith Lane/Graduate Circle 0 1 0 Griffith Lane cul-de-sac 0 1 0 7193 Shakespeare Place 0 1 0 Total 2 10 24 294 Honorable City Council 02/06/2019 Regular Meeting Page 3 Based on field inspections, there are two (2) city-owned storm drain manholes that are recommended for adjustment. The 10 sanitary sewer manhole and 24 water valve covers are County District-owned surface facilities and are recommended for adjustment. The following is a cost proposal from Pavement Coatings Co. to perform the surface facility improvements. Description Unit Cost Quantity Extended Cost Storm Drain Manholes $715 2 $1,430.00 Sanitary Sewer Manholes $715 10 $7,150.00 Water Valve Covers $682 24 $16,368.00 Additional Traffic Control $4,467.32 1 $4,467.32 Total Contract Amount $29,415.32 Per the current Agreement between the City and County Waterworks District, the County has agreed to these surface facility adjustments and will reimburse to the City the actual construction cost, plus 15%, to cover all design, inspection, and administrative costs incurred. Based on the unit costs submitted by Pavement Coatings Co., the County will reimburse the City $27,045.70 for the adjustment of the sanitary sewer and water surface facilities. Final construction costs and reimbursements may vary based on actual field conditions. FISCAL IMPACT The current contract with Pavement Coatings Co. is funded as follows: Project Description Account Number Amount Schedule A – Slurry Seal 2416-311-M0042-55200 $271,017.00 Schedule B – Pavement Rehabilitation 2014-311-C0020-55200 $28,800.00 Total Contract Amount $299,817.00 In addition to the construction contract award, the City Council authorized the City Manager to amend the contract for project contingencies as follows: Total Project Budget Amount Schedule A (2416-311-M0042-55200) $271,017.00 Schedule A – Contingency (2416-311-M0042-55200) $27,102.00 Schedule B (2014-311-C0020-55200) $28,800.00 Schedule B – Contingency (2014-311-C0020-55200) $21,200.00 Total $348,119.00 295 Honorable City Council 02/06/2019 Regular Meeting Page 4 Staff is requesting City Council amend the existing Agreement with Pavement Coatings Co. in the amount of $29,415.32, for Schedule A, to adjust two storm drain manholes, 10 sanitary sewer manholes, and 24 water valve covers. Project Account number 2416- 311-M0042-55200 is funded by the Road Maintenance and Rehabilitation Fund (2416). A new appropriation, in the amount of $30,000, from Fund 2416 to Account No. 2416- 311-M0042-55200 is requested. The County will reimburse the City to adjust their facilities as follows: Description Amount Sanitary Sewer Manholes $7,150.00 Water Valve Covers $16,368.00 Sub-Total Reimbursement Amount $23,518.00 15% Administrative Fee (per Agreement) $3,527.70 Total Reimbursement Amount $27,045.70 STAFF RECOMMENDATION 1. Adopt Resolution No. 2019-____ amending the Fiscal Year 2018/2019 Budget to appropriate $30,000 from the Road Maintenance and Rehabilitation Fund (2416) to Account No. 2416-311-M0042-55200; and 2. Amend the existing Agreement with Pavement Coatings Co. in the amount of $29,415.32 to Schedule A for adjusting to grade City and County-owned surface facilities ; and 3. Amend the existing Agreement with Pavement Coatings Co. for project contingencies in an amount not exceed $27,102 (10%), if and when the need arises for extra work and services for Schedule A; and 4. Upon completion of the construction contract, direct staff to seek reimbursement from the Ventura County Waterworks District for construction costs associated with the adjustment and improvements to County-owned surface facilities. Attachments 1. Resolution No. 2019-____ 2. Amendment No. 2 to Agreement Between the City of Moorpark and Pavement Coatings Co., for the 2018 Slurry Seal and Pavement Rehabilitation Project (M0042) 3. Agreement for Adjusting to Grade Surface Facilities Affected by City of Moorpark Pavement Rehabilitation Projects 296 ATTACHMENT 1 RESOLUTION NO. 2019-____ A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MOORPARK, CALIFORNIA, AMENDING THE FISCAL YEAR 2018/19 BUDGET BY APPROPRIATING $30,000 FROM THE ROAD MAINTENANCE AND REHABILITATION FUND (2416) TO PROJECT M0042 INFRASTRUCUTRES (2416.311.M0042.55200) FOR THE 2018 SLURRY SEAL AND PAVEMENT REHABILITATION PROJECT (M0042) WHEREAS, on June 20, 2018 the City Council adopted the Operating and Capital Improvement Projects budget for Fiscal Year (FY) 2018/19 which includes a total budget of $250,000 for Infrastructures (2416.311.M0042.55200) and $50,000 for Capital Professional Services (2416.311.M0042.55300); and WHEREAS, a staff report has been presented to the City Council recommending approval of Amendment No. 2 to an existing Agreement with Pavement Coatings Co. and to appropriate $30,000 from the Road Maintenance and Rehabilitation Fund (2416) to Account No. 2416-311-M0042-55200; and WHEREAS, Exhibit “A”, attached hereto and made a part hereof, describes said budget amendment and the resultant impact to the budget line items. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF MOORPARK DOES HEREBY RESOLVE AS FOLLOWS: SECTION 1. A budget appropriation in the amount of $30,000 from the Road Maintenance and Rehabilitation Fund (2416) to Infrastructures Account No. (2416.311.M0042.55200), as more particularly described in Exhibit “A”, attached hereto, is hereby approved. SECTION 2. The City Clerk shall certify to the adoption of this resolution and shall cause a certified resolution to be filed in the book of original resolutions. PASSED AND ADOPTED this 6th day of February 6, 2019. _____________________________ Janice S. Parvin, Mayor ATTEST: ____________________________________ Maureen Benson, City Clerk Exhibit A – Budget Amendment 297 Resolution No. 2019-_____ Page 2 FUND BALANCE ALLOCATION: Fund-Account Number Amount 2416-33990 30,000.00$ -$ -$ Total 30,000.00$ EXPENDITURE APPROPRIATION: Account Number Current Budget Revision Amended Budget 2416.311.M0042.55200 300,000.00$ 30,000.00$ 330,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Total 300,000.00$ 30,000.00$ 330,000.00$ Fund Title Road Maintenance and Rehabilitation EXHIBIT A BUDGET AMENDMENT FOR CAPITAL IMPROVEMENTS FY 2018/19 PUBLIC WORKS DEPARTMENT 2018 SLURRY SEAL AND PAVEMENT REHABILITATION PROJECT (M0042) 298 ATTACHMENT 2 AMENDMENT NO. 2 AGREEMENT BETWEEN THE CITY OF MOORPARK AND PAVEMENT COATINGS CO., FOR 2018 SLURRY SEAL AND PAVEMENT REHABILITATION PROJECT (M0042), SPECIFICATION NO. MPK 18-01 This Amendment No. 2 to the Agreement between the City of Moorpark, a municipal corporation (“City”), and Pavement Coatings Co., a private corporation (“Contractor”), for construction services related to pavement preservation and rehabilitation (“Agreement”), is made and entered into on this , 2019. RECITALS day of WHEREAS, on November 2, 2018 the City and Contractor entered into an Agreement to have the Contractor provide construction services related to pavement preservation and rehabilitation; and WHEREAS, on February __, 2019, Amendment No. 1 to the Agreement was executed for additional asphalt pavement rehabilitation on Princeton Avenue in the amount of Twenty-One Thousand One Hundred Ninety-Four dollars and Forty cents ($21,194.40) for a total contract value of Three Hundred Twenty-One Thousand Eleven dollars and Forty cents ($321,011.40); and WHEREAS, there is a need to adjust existing surface facilities to grade; and WHEREAS, the City and Ventura County Waterworks District have an existing Agreement for adjusting to grade surface utilities affected by pavement rehabilitation projects; and WHEREAS, the Contractor provided a cost proposal, dated January 21, 2019, to provide the adjustment of existing surface facilities grade, attached as Exhibit E, in the amount of Twenty-Nine Thousand Four Hundred Fifteen dollars and Thirty-Two cents ($29,415.32); and WHEREAS, the City desires to include project contingency to the Agreement in the amount of Twenty-Seven Thousand One Hundred Two dollars ($27,102.00); and WHEREAS, the City and Contractor now desire to amend the Agreement for an additional period; and WHEREAS, the City and Contractor now desire to amend the Agreement to increase the compensation for services to be performed by Contractor from Three Hundred Twenty-One Thousand Eleven dollars and Forty cents ($321,011.40) by a value of Fifty-Six Thousand Five Hundred Seventeen dollars and Thirty-Two cents ($56,517.32) for a total contract value of Three Hundred Seventy-Seven Thousand Five Hundred Twenty-Eight dollars and Seventy-Two cents ($377,528.72), and document said agreement to amend by jointly approving Amendment No. 2 to the Agreement. 299 NOW, THEREFORE, it is mutually agreed by and between the parties to the Agreement as follows: I. Section 1, TERM, is amended by replacing this section in its entirety as follows: “The term of the Agreement shall be from the date of execution until completion of the work identified in the Scope of Services and in conformance with Exhibit C, Exhibit D and Exhibit E, unless this Agreement is terminated or suspended consistent with Section 6 of this Agreement.” II. Section 2, SCOPE OF SERVICES, is amended by replacing paragraph 2 and paragraph 3 in this section in its entirety as follows: “Contractor shall perform the tasks described and set forth in Exhibit C, Exhibit D, and Exhibit E. Contractor shall complete the tasks according to the schedule of performance which is also set forth in Exhibit C, Exhibit D, and Exhibit E. Compensation for the services to be performed by Contractor shall be in accordance with Exhibit C, Exhibit D, and Exhibit E. Compensation shall not exceed the rates or total value of Three Hundred Seventy-Seven Thousand Five Hundred Twenty-Eight dollars and Seventy-Two cents ($377,528.72) as stated in Exhibit C, Exhibit D, and Exhibit E, without a written amendment to the agreement executed by both parties. Payment by City to Contractor shall be as referred to in this Agreement.” III. Section 5, PAYMENT, is amended by replacing paragraph 1 in this section in its entirety as follows: “The City agrees to pay Contractor monthly, in accordance with the terms and the schedule of payment as set forth in Exhibit C, Exhibit D, and Exhibit E, attached hereto and incorporated herein by this reference as though set forth in full, based upon actual time spent on the above tasks. This amount shall not exceed Three Hundred Seventy-Seven Thousand Five Hundred Twenty-Eight dollars and Seventy-Two cents ($377,528.72) for the total term of the Agreement unless additional payment is approved as provided in this Agreement.” Amendment No. 2 to Agreement between City of Moorpark and Pavement Coatings Co. Page 2 300 IV. Remaining Provisions: Except as revised by this Amendment No. 1, all of the provisions of the Agreement shall remain in full force and effect. In Witness Whereof, the parties hereto have caused this Amendment to be executed the day and year first above written. CITY OF MOORPARK PAVEMENT COATINGS CO. Troy Brown City Manager Doug Ford President Attest: Maureen Benson, City Clerk Amendment No. 2 to Agreement between City of Moorpark and Pavement Coatings Co. Page 3 301 EXHIBIT E CITY OF MOORPARK PUBLIC WORKS DEPARTMENT | 799 Moorpark Avenue, Moorpark, California 93021 Main City Phone Number (805) 517-6200 | Fax (805) 532-2555 | moorpark@moorparkca.gov CHANGE ORDER NO.: 2 CONTRACTOR: Pavement Coatings Co. PROJECT TITLE: 2018 Slurry Seal and Pavement Rehabilitation Project, Spec. No. MPK 18-01 CIP NO.: M0042 SUBJECT: Schedule A – Project Contingency Schedule A – Adjust Existing Surface Facilities to Grade All work involved in this Change Order shall conform with Public Works Standard Specifications, Plans, General Provisions, and Special Provisions. The following changes are hereby made to the Contract Documents: The City has determined the need to add a 10% project contingency to the budget for Schedule A scope of work. Any work performed as part of the project contingency line item shall be approved by the City prior to commencement. Additionally, the City has determined the need to adjust existing surface facilities to grade. This determination is based on field observations of existing roadway and traffic conditions. The surface facilities include two storm drain manholes (City), 10 sanitary sewer manholes (County Waterworks), and 24 water valve covers (County Waterworks). The prices for the additional Schedule A scope of work are as follows: Item No. Item Description Unit Quantity Unit Price Amount 1 Traffic Control (ADD) LS 1 $4,467.32 $4,467.32 16 Project Contingency N/A N/A N/A $27,102.00 17 Adjust 24” SD and SS Manhole (ADD) EA 12 $715.00 $8,580.00 18 Adjust Water Valve Cover (ADD) EA 24 $682.00 $16,368.00 The net total cost for this contract change order is $56,517.32. All final quantities will be based on field measurements, within the approved project limits. All work shall conform to the latest edition of Standard Plans for Public Works Construction and Standard Specifications for Public Works Construction (Greenbook). END OF CHANGES JANICE S. PARVIN Mayor CHRIS ENEGREN Councilmember ROSEANN MIKOS, Ph.D. Councilmember DAVID POLLOCK Councilmember KEN SIMONS Councilmember 302 Specification No. MPK 18-01 Contract Change Order No. 1 Page 2 CHANGE TO CONTRACT PRICE Amount Original Contract Price Plus approved quantity adjustments $ 299,817.00 $ - Subtotal $ 299,817.00 Plus Change Orders to Date $ 21,194.40 Subtotal $ 321,011.40 This Change Order $ 56,517.32 Revised Contract Price $ 377,528.72 CHANGE TO CONTRACT TIME By reason of this change order, documented weather delays, and modifications to the schedule at the City’s request, the time for contract completion will be adjusted by 28 consecutive calendar days. The project completion date is now March 8, 2019. GENERAL PROVISIONS Both Contractor and City agree and acknowledge that execution of this Change Order constitutes a mutual accord and satisfaction as to the work and/or time extension covered herein and Contractor specifically waives and releases any and all claims, rights or interest, including but not limited to those for impact disruptions, loss of efficiency, ripple, or other extraordinary or consequential costs arising directly or indirectly out of the work or time extension described in this Change Order except as specifically included herein. The contract is amended with respect to the above only and all other terms and conditions of the original contract remain unchanged. APPROVALS REQUIRED Proposed by/ Concurrence by: Doug Ford, President Date Pavement Coatings Co. Reviewed by: Daniel Kim, P.E., Project Manager Date Recommended by: Sean Corrigan, P.E. Date City Engineer/Public Works Director Approved by: Troy Brown, City Manager Date 303 ATTACHMENT 3 304 305 306 307 308 309 310