Loading...
HomeMy WebLinkAboutAGENDA REPORT 2001 1205 CC REG ITEM 11Nf, rM, m - - / (. /V - C iincii `,c,"-;, , MOORPARK CITY COUNCIL AGENDA REPORT TO: The Honorable City Council V C FROM: Kenneth C. Gilbert, Director of Public Works DATE: November 15, 2001 (Council Meeting 12 -5 -01) SUBJECT: Conceptual Plan for the Realignment of Flinn Avenue [Project 80371 nT.grTTggTnM A. Police Services Facility The City is working toward the construction of a new Police Services facility, to be constructed on the vacant property northeast of Spring Road and Flinn Avenue. One prerequisite of the site development efforts for that project is the subject road realignment project. B. Budget The FY2001 /02 Budget includes funding for the subject project (Project 8037) . The total budget amount is $460,000, one -half funded by the Los Angeles Avenue AOC Fund and the other half funded by the Moorpark Redevelopment Agency (MRA). C. Project Description The subject project calls for the realignment of Flinn Avenue to intersect Spring Road at Second Street, and the construction of a traffic signal at that new four -way intersection. D. Desiqn Consultant The City has retained the services of Hawks and Associates to provide certain civil engineering services required for the development of the design for the subject project. Flinn concept ai, Flinn Avenue - Conceptual Plan November 15, 2001 Page 2 E. Spring Road Widening Project The City has also retained Hawks and Associates to prepare the design plans for a separate project to widen Spring Road between New Los Angeles Avenue and the rail crossing. That project calls for widening to the east side of the street to allow for two lanes in each direction, a raised center median and bike lanes. F. Phased Construction in order to expedite that work required to complete the street improvements for the Police Services site, it is the intent of staff to construct the Flinn Avenue and Spring Road projects in two phases generally described as foilows: • Phase 1: Flinn Avenue: - Flinn Avenue Realignment; - Spring Road widening north of (new] Flinn Avenue; - Spring Road widening immediately south of the new Flinn Avenue; and - Traffic Signal. • Phase 2: Spring Road - street widening south of Flinn Avenue; - required relocation of the traffic signal poles at the northeast corner of Spring Road and New Los Angeles Avenue; - street restriping; - median construction; and - median (and parkway) landscaping. G. Topographic Survey The topographic survey required for the project will be performed in a manner suitable for use by the architect for the Police Services site. This approach will reduce overall design costs. H. Design Concept Attached as Exhibit 1 is a sketch illustrating the recommended design concept for the realignment of Flinn Avenue. Flinn concept Flinn Avenue - Conceptual Plan November 15, 2001 Page 3 I. Right -of -Way Acquisition 1. Flinn Avenue: The right -of -way for the realigned of Flinn Avenue will be conveyed to the City by the MRA. 2. Spring Road Widening: a. The additional street right -of -way required north of the existing Flinn Avenue, will also be conveyed to the City by the MRA. b. The additional street right -of -way required from the property at the southeast corner of Flinn Avenue and Spring Road, will be acquired from that property. J. Street Vacation The "old" alignment of Flinn Avenue will be vacated. The title work required for that phase of the work has not yet been performed. It is presumed, however, that the north half of that vacated street will revert to the MRA and the south half will revert to the properties on the south side of the existing Flinn Avenue (see Exhibit 2). That relinquishment of property will be a consideration during negotiations for the acquisition of additional street right -of -way along the Spring Road frontage of that property. K. Utilities / Storm Drain It should be noted that it is the design intent to preserve, rather than relocate, any utilities located within the existing Flinn Avenue alignment. This will require the preparation and recordation of easements for each of those existing utilities. one such utility is the existing City storm drain located in Flinn Avenue. L. Property at Southeast Corner As mentioned above, staff will be working with the owner of the property at the southeast corner of Spring Road and Flinn Avenue on the acquisition of street right -of -way along the Spring Road frontage of that property. It is the intent of staff to also work with that owner on the relocation of and /or modification to the access and parking for that property. It should be noted that the final design for the access, parking and landscaping for that project has not been finalized and will be a product of those negotiations. Flinn concept "���? Flinn Avenue - Conceptual Plan November 15, 2001 Page 4 M. Remnant Parcel The project will create a remnant parcel at the southeast corner of the new intersection (see Exhibit 3). This site could be used for the City's "Art -in- Public - Places" program. N. Next Steps Upon City Council approval of the Conceptual Plan, the following steps will be taken: 1. Environmental Report: Staff is currently working to obtain the services of a planning consultant to prepare an environmental document (presumed to be a Negative Declaration) for both the Flinn Avenue Realignment Project and the Spring Road Widening Project. 2. Right -of -Way Acquisition: Staff will proceed with the right -of -way acquisition efforts described in Section I. 3. Final Design: The design consultant will proceed with the preparation of the final plans and specifications. O. Grant Staff is investigating the potential of seeking and obtaining grant funding under the State Hazard Elimination Safety Program [HES], for the partial funding of this project. Progress of those efforts will be reported to the City Council as details become available. STAFF RECOMMENDATION Approve the conceptual design (Exhibit 1) for the realignment of Flinn Avenue. Attachments: Exhibit 1: Exhibit 2: Exhibit 3: Conceptual Plan Vacation Remnant Parcel Flinn— concept '4)Or _4 NOU- 13- 2001(TUE) 12:24 HAWKS AND RSSOCIRTES so 0 80 160 tyEr. SCALE OF FEET • V �i.i'c� F_ � � S�J i !� t 3 , MR f- 1: • V �i.i'c� F_ � � S�J i !� t 3 , MR f- .i A _v p��,cF�