HomeMy WebLinkAboutAGENDA REPORT 2002 0206 CC REG ITEM 11HGf Moorpark City Council Agenda Re �. Age Report p Y. To: The Honorable City Council From: Kenneth C. Gilbert, Director of Public Works %6 Date: January 18, 2002 (Council Meeting 2 -6 -01) Subject: Notice of Completion for the Widening of Los Angeles Avenue East of Leta Yancy Road DISCUSSION A. Background On March 21, 2001, the City Council awarded a contract to Asphalt Professionals, Inc. for the construction of a project to widen the south side of Los Angeles Avenue along the frontage of the old Caltrans Maintenance Yard just east of Leta Yancy Road. B. Project Scope The scope of the project called for the construction of additional pavement width, curb, gutter, driveway, asphalt sidewalk and related work. C. Right -of -Way Full width right -of -way has not yet been conveyed at this location. It is apparently the intent of Caltrans to retain the street right -of -way when they market this surplus property. L A Ave at Caltrans Yard_cmp 000285 L. A. Ave. Widening [Caltrans Yard]: Completion January 18, 2002 Page 2 Three (3) Change Orders were authorized for this project, generally described as follows: Change Order 1 Pavement Sub- structure 2 Gate 3 Fence Height Notes: Description Over excavate and place extra base and geo- fabric Repair and Modification Increase height of fence Total Cost ($) Note 3,753.91 a/b 577.50 975.74 5,307.15 a) Required by sub - surface conditions and designed and constructed per Caltrans requirements. b) The approved amount of this Change Order has been disputed and, as of the date of this report, has not yet been resolved. A contingency amount has been set aside to pay for any additional costs when and if approved. It should be noted that these Change Orders have not yet been signed by the contractor and no payments on the Change Orders have yet been made. The City has delayed the completion of the project for several months hoping to resolve these matters. It is recommended below that the project be accepted and the Notice of Completion recorded. Funds have been set aside for future payment of these costs when and if the approval paperwork is processed. E. Quantity Adjustment Invariably with Public Works projects the final actual quantity required for each of the bid items will differ somewhat from the engineer's estimate of quantities set forth in the bid documents. Accordingly, the final contract cost will differ from the bid amount, based upon the actual quantity of each item required to complete the project. The cost of significant variances in quantities required to complete the work is summarized as follows: Item Description 1 Roadway excavation 2 Processed Misc. Base 3 A/C Pavement 4 A/C Sidewalk 5 PCC Curb & Gutter Total for Notes: 1) Per Caltrans F. Fiscal Impact Adjusted Quantities field requirements. Cost ($) Note 959.09 1 403.92 1 2,288.88 1 (373.73) 122.09 3,400.25 L A Ave at Caltrans Yard _cmp �y�e !!'00/GrC9J L. A. Ave. Widening [Caltrans Yard]: Completion January 18, 2002 Page 3 1. Final Contact Cost: The final construction contract costs ara viimmari 7Pd as follows: ...............................................................................................................................................----- Description Amount Bid Amount 38,817.09 Change Orders 5,307.15 Quantity Adjustments 3,400.25 Contingency for Added Cost for C.0 #1 1,800.00 Total ......................................_..._...................................................................._............................................................................................___.............. 49,324.49 ............................... 2. Total Construction Costs: In addition to the above described contract costs, certain other construction costs were incurred by the City to facilitate the termination of the water service to the property. The City funded contract traffic control costs [$350.00] to enable the County Waterworks District to terminate the service lateral connection to the water main located on the north side of the street. A summary of all construction costs is ac fnllnw�� Description . . .. . . .. . . . . . . . . . . . . . . . . Amount Contract costs 49,324.49 Added Traffic Control 350.00 Total ........................................................... _ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49,674.49 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3. Total Project Costs: The final project summarized as follows: ...................... _ . . . ................... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ................. . ............. . ................................. Description Amount Design 7,480.00 Design Support 461.63 Soils Analysis 1,800.00 Construction 49,674.49 Contract Admin / Inspection [In- House] 750.00 Total ......................__..............................................................._.._.............................._................................_...................................._....._.......... 60,166.12 ............................... costs are 4. Funding Source: The funding source for this project [Project 2501- 8310 - 8006 -xxxx] is the Los Angeles Avenue AOC Fund [ Fund 2501]. 5. Budget Summary: A re -cap of the FY 2000/2001 Budget for the subject project is as follows: .................... .. ..................... _ ....... .... _._ ..................................................................................................................... Account Number __ .... _ ............................................................... Current Budget ($) .... .............................. _ ................ .... ....................................................... Actual Cost ($) Surplus 9601: Design 10,000 9,742 258 9640: Construction 80,000 49,674 30,326 9650: Inspection 10,000 750 9,250 Total ...................... _.............................................................................._ .............. 100,000 ........ ............................... ......................... _................................................................................................................................................................................................................................. 60,166 39,834 ............................... Note: Surplus Appropriations will be released back to Funds when the project is completely closed -out. L A Ave at Caltrans Yard cmp 000290 L. A. Ave. Widening [Caltrans Yard]: Completion January 18, 2002 Page 4 G. Final Inspection and Acceptance The City has completed a final inspection of the project and has found the work to be acceptable. At this time it would be appropriate for the City Council to accept the project as complete and direct the City Clerk to file a Notice of Completion to start the final lien period. H. Release of Retention If the recommended action is taken, the Notice of Completion will be forwarded to the County Recorder for recordation. Absent the receipt of any Stop Notices from subcontractors or suppliers, thirty -five (35) days after the date of the recordation of the Notice of Completion, the ten percent (10 %) retention could be paid. RECOMMENDATION Accept the work as complete. L A Ave at Caltrans Yard _cmp 000291