Loading...
HomeMy WebLinkAboutAGENDA REPORT 2002 0306 CC REG ITEM 11F_PT //• �. CITY OF MOORPAIRK, CALIFORNIA Citv Council :Meeting of ACTION: Moorpark City Counci Agenda Report To: The Honorable City Council From: Kenneth C. Gilbert, Director of Public Works YA�_ Date: February 22, 2002 (Council Meeting 3 -6 -02) Subject: Notice of Completion for the Construction of a Double Left -Turn Lane [West -to- South] and Other Improvements in the Vicinity of the Intersection of Los Angles Avenue and Tierra Rejada Road [ Albertson's] DISCUSSION A. Backaround 1. Certain conditions of approval for the Commercial Center at the corner of Tierra Rejada Road and Mountain Trail Street required the developer of the property (now Albertson's, Inc.) to construct a double left -turn lane for westbound traffic at the intersection of Los Angeles Avenue and Tierra Rejada Road. 2. The developer and their engineering consultant developed the design for this project. 3. At the request of the City, Albertson's added to the plans for their project, the construction of certain modifications to the north and south legs of the intersection, which were needed to improve traffic flow and safety and to add Bike Lanes where none now exist. 4. The City also retained the services of a separate civil engineering consultant to prepare plans for the removal and reconstruction of the raised center median at the south leg of the intersection. The easterly relocation of this median was required to improve traffic flow and safety. S. The project plans included the re- striping on the State Highway [ Albertson's] and the work on the north and south legs of the intersection [City]. These plans were reviewed and approved by Caltrans and a Caltrans Encroachment Permit was issued. �n ra .01 t.-J" .X � _- • 040 LA TR Double Left_cmp L. A. Ave. / Tierra Rejada Rd. Double Left -Turn: Completion February 22, 2002 Page 2 6. The City and Albertson's entered into an Agreement relative to the City acting as the lead party for the construction phase of the project. 7. On October 3, 2001, the City Council awarded a contract to Nye and Nelson, Inc. for the construction of the project. B. Project Scope 1. General: As mentioned above, the work on the highway was required to provide a double left -turn lane for west -to south turning traffic. The work on Tierra Rejada Road and Gabbert Road was required to improve traffic flow and to allow for the placement of Bike Lanes. 2. Joint Project: The project plans include both the highway improvements and the modifications and improvements to the City streets. The work was done as a joint project. 3. State Highway: Albertson's fully funded the construction of modifications to the highway to make provisions for a double left -turn lane. The elements of this portion of the work is summarized as follows: • the re- stripping of the street to provide for a three hundred feet (3001) long double left -turn lane for west -to -south traffic; • the relocation of traffic loop detectors as required; and • the modification of signing as required. Notes: 1 No modifications were required to be made to the existing street improvements. 2 At one time the ultimate design for Los Angeles Avenue east of Tierra Rejada Road, called for three lanes in each direction. In order to accommodate the subject project, the City Council revised this standard to call for the third eastbound lane to start at a point east of the double left -turn lane. 4. Tierra Rejada Road / Gabbert Road: The City funded certain improvements and modifications to the north and south legs of the intersection. That scope of work included: • Removal and reconstruction of the center median in the south leg of the intersection. The raised median was moved approximately five feet (51) to the east to improve north -south lane alignment and to accommodate the two lanes of west -to -south left -turn traffic. • Restriping as required. J"A F, M ►-� LA TR Double Left_cmp L. A. Ave. / Tierra Rejada Rd. Double Left -Turn: Completion February 22, 2002 Page 3 • Relocation of traffic loop detectors. • The addition of Bike Lane lines where none now exist. C. Change Orders Four (4) Change Orders were authorized for this project, generally described as follows: Change Order Description 1 Princeton Median Modification of median [Project 80251 nose and construction of stamped concrete. 2 Tierra Rejada Rd median stamped concrete 3 Loop Detectors 4 Revise striping Removal and replacement of additional area Change Loop Stub -outs Cost ($) Note 19,520.00 a/b 911.80 977.70 Change striping at south 855.31 leg of intersection Total 22,264.81 Notes: a) This work was not a part of the Double Left -Turn Lane Project. Although this work was performed under a Change Order to this construction contract, the costs for this work will be charged to the Los Angeles Avenue Median Landscaping Project [Project 80251. b) Nye and Nelson was selected to do this work because they submitted a lower price than the contractor constructing the Los Angeles Avenue Median Landscaping Project. D. Quantity Adjustment There were no quantity adjustments required for this project. E. Fiscal Impact 1. Final Project Construction Cost: The final construction cost for the subject project [Project 80071 is summarized Q- -:I fnl l nWP - . . . . . . . . . . . . . . . . . . . . .................... . ................................................. . ............ . . . . . . . . . . . . . . . . . . ........................... ..... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ............... Description . .............................................................. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .................. . . . . . . . . . . . . . . . . . . Amount ($) Bid Amount 67,510.35 Change Orders 2, 3 & 4 2,744.81 Quantity Adjustments - Total .........................................................................._........................................................................................................................................................................................._............................................... 70,255.16 ............................... LA TR Double Left_cmp L. A. Ave. / Tierra Rejada Rd. Double Left -Turn: Completion February 22, 2002 Page 4 2. Total Construction Contract Costs: As stated above, this contractor also performed some work on the Los Angeles Avenue Median Landscaping Project. The total construction contract costs, including that work, is summarized as follows: Description Amount Proct 8007: Double Left -Turn Project 70,255.16 Proct 8025: L. A. Ave. Median Project (CCO #1) 19,520.00 Total 89,775.16 Note: The fiscal information below does not include the above mentioned costs to Project 8025. 3. Total Project Costs: The total cost for Project 8007 (nn„ble T.eft -Turn Lane) is summarized as follows: ..._.............. ---............_ .............._..... .......... ........................ ..................... Description ....... .................. ........ _.__. _..._...._..............._...._.........._........... _.............................. Left -Turn Project ($) Added City Work ($) Total Design a 9,248.49 9,248.49 Design Support 302.30 422.36 724.66 Construction 29,307.70 40,947.46 70,255.16 Inspection 500.59 699.41 1,200.00 Total 30, 110. 59 ................................ ............................51, 317. 72......................... ............................... ........._81,428.•.3.1.......; Note a: Plus design costs incurred by Albertson's. 4. Funding Source: The funding source for this project is the Los Angeles Avenue AOC Fund. All costs reimbursed by Albertson's (discussed below) were deposited into this Fund. 5. FY2001102 Costs: A portion of the design costs for Project 8007 were incurred last Fiscal Year. A summary of wv ,)nnl /n? r -n .qt-.q is as follows: - - - - -, Description Total Cost ($) Less Prior Year ($) Total FY 01/02 ($) Design 9,973.15 (3,026.02) 6,947.13 Construction 70,255.16 0.00 70,255.16 Inspection 1,200.00 0.00 1,200.00 Total .......... ....................... ....._...... .... ......................................................................... 81,428.31 ...._......................._. ................................ ................... .................... ..................................................................................................__................................................................................. (3,026.02) 78,402.29 ............................... 6. Budget Sununary: A re -cap of the the subject project is as follows: .. ............................... Account Number Current Budget ($) :9601: Design 9,223 : 9640: Construction 81,012 :9650: Insp. [In- House] 20,253 Total 110,488 FY 2000/2001 Budget for Actual Cost ($) Sur lus 6,947 2,276 70,255 10,757 1,200 19,053 78,402 32,086 Note: Surplus Appropriations will be released back to the L. A. Avenue AOC Fund Reserve when the project is completely closed -out. lJ v v .-. • �„ LA TR Double Left_cmp L. A. Ave. / Tierra Rejada Rd. Double Left -Turn: Completion February 22, 2002 Page 5 7. Funding Source: The funding source fo [Project 2501 - 8310 - 8007 -xxxx] is the Los AOC Fund [Fund 25011. That portion of the the Los Angeles Avenue modifications Albertson's pursuant to the terms of the Agreement. r this project Angeles Avenue cost related to is funded by above mentioned 8. Albertson's Reimbursement: Pursuant to the Agreement between the City and Albertson's, Albertson's has deposited with the City an advance payment for their share of the project costs. Costs incurred for the Albertson's portion of the work, were less than the amount of their deposit. A re -cap of the reimbursement due to Albertson's is as follows: ........................................................................_................._................._............................._...................._..._......................................__......................................._-- Description Advance ($) Less Actual Cost ($) Refund Amount ($) Construction 28,330.00 (29,307.70) (977.70) Inspection [15 %] 4,249.50 (4,396.16) (146.66)', Administration [10 %] 2,833.00 (2,930.77) (97.77)', Sub -Total 35,412.50 (36,634.63) (1,222.13)' Plus Contingency ** 11,483.78 11,483.78 Total ..................................................................._........................_....................__........................_..................................................................._....................._................................................... 46,896.28 (36, 634. 63 .......... ............................... .........._1.0.,26.1..._6.5.... ** $17,706.25 less $6,222.47 in City design costs It is the intent of staff to issue a check for this refund. F. Final Inspection and Acceptance The City has completed has found the work to be appropriate for the completed and direct Completion to start th e G. Bond Exoneration a final inspection of the project and be acceptable. At this time it would City Council to accept the project as the City Clerk to file a Notice of final lien period. In that the required improvements have been constructed, it is recommended that the Bond for such work be exonerated. H. Release of Retention If the recommended action is taken, the Notice of Completion will be forwarded to the County Recorder for recordation. Absent the receipt of any Stop Notices from subcontractors or suppliers, thirty -five (35) days after the date of the recordation of the Notice of Completion, the ten percent (10 %) retention could be paid. LA TR Double Left_cmp L. A. Ave. / Tierra Rejada Rd. Double Left -Turn: Completion February 22, 2002 Page 6 RECOMMENDATION Accept the work as completed and authorize exoneration of the bond on file for the construction of these improvements. C LA_TR Double Left_cmp