TO: Honorable City Council
FROM: Hugh R. Riley, Assistant City Manager
DATE: April 3, 2002 (CC Meeting of 4/17/02)
SUBJECT: Consider a Resolution to Amend the City Budget to
Reflect the Total Final Costs for The Construction and
Landscaping of the Rock Fountain Art In Public Places
Project at Tierra Rejada and Mountain Trail.
DISCUSSION
On October 3, 2001 the City Council approved the construction of
a Rock Fountain and Waterscape as an Art In Public Places
Project at the corner of Tierra Rejada Road and Mountain Trail
Street. The approved budget for the project totaled $100,000
from the Art in Public Places Fund. The budget did not include
demolition of the existing planter improvements or the
completion of landscaping at the site. The project is now
nearing completion and the actual cost for the work including
additional deck and walkway improvements and landscape
improvements exceeds the original budget.
The demolition of the existing planter and sidewalk improvements
as well as the rough grading of the project site was completed
by Thomas Construction at a cost of $ 4,285.
During the early phases of the fountain work by Rock Designs,
additional grading and drainage improvements were needed and
electrical facilities had to be installed in the adjacent
commercial building (Change 1). An additional 570 square feet of
sculpted flat rock was added as an option so that the deck
around the fountain had the same appearance as the sculpture.
C.r, .,r„ i\ "
'V , v • fj
Honorable City Council
April 17, 2002
Page 2
Steps in the same flat rock material were also added to provide
pedestrian access to the fountain site from the adjacent
commercial buildings (Change 2). A damaged existing sidewalk
leading from the site to the street sidewalks was removed and
replaced with sculpted flat rock (Change 3).
During the construction of the project, much of the turf and
landscape improvements installed by the original Mountain
Meadows Plaza Center developer, and by the developer of the new
buildings on Pads B and C was damaged or had to be replaced.
Additional landscape improvements were necessary for the
fountain and decking and to relocate some of the original trees
at the site. The City obtained a proposal from ACI Landscaping.
This company had made the original improvements for the
developer and held an inventory of ground cover plantings
originally intended for the site. The costs for the landscape
improvements may be charged to the City's Tree and Landscape
Fund.
On December 7, 2001, the City Council approved the dedication of
the project to the victims and heroes of the September 11
terrorist attacks on the United States. Staff has prepared the
attached recommended wording for a 14" X 20" brass plaque that
will be mounted on a flat rock at the edge of the fountain. The
estimated cost for the plaque including installation is $1,000.
A summary of the project costs is as follows:
Artists Proposal Fee Per RFP $ 1,000
Demolition of Existing Planter and
Improvements (Thomas Construction) $ 4,285
Rock Designs (Original Contract) $ 93,000
Change Orders:
1. Additional Grading, drains,
sidewalk removal and electrical $ 6,520
2. 570 sq. ft. flat sculpted rock
deck including steps; 3 additional
boulders, additional rock for plaque $ 8,740
vv v
Honorable City Council
April 17, 2002
Page 3
3. Remove 300 sq. ft. old (damaged
sidewalk, replace with 240 sq. ft.
flat sculpted rock deck $ 3,780
SUBTOTAL ROCK FOUNTAIN $ 117,325
Landscape Improvements - ACI $ 22,874
Landscape Contingencies $ 2,000
TOTAL LANDSCAPE IMPROVEMENTS $ 24,874
DEDICATION PLAQUE $ 1,000
TOTAL PROJECT COSTS $ 143,199
A budget amendment is needed to cover the additional costs
including $ 18,325 from the Art in Public Places Fund and
$24,874 from the Tree and Landscape Fund.
STAFF RECOMMENDATION
Approve proposed dedication language and budget amendment and
adopt Resolution amending the City budget. (ROLL CALL VOTE
REQUIRED)
Attachment: Proposed Dedication Wording
Resolution No.
e�fN.4- -' or
THE CITIZENS OF MOORPARK DEDICATE THIS
WORK OF ART TO THE VICTIMS AND HEROES OF
THE SEPTEMBER 11, 2001 TERRORIST ATTACKS
ON THE UNITED STATES OF AMERICA
CITY COUNCIL
PATRICK HUNTER, MAYOR
DR. ROSEANN MIKOS, MAYOR PRO TEM
DR. CLINT D. HARPER
KEITH F. MILLHOUSE
JOHN E. WOZNIAK
STEVEN KUENY
City Manager
RESOLUTION 2002-
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF MOORPARK, CALIFORNIA, AUTHORIZING AN
AMENDMENT TO THE 2001/2002 FISCAL YEAR
ADOPTED OPERATING BUDGET FOR THE ARTS IN
PUBLIC PLACES PROGRAM
WHEREAS, on June 20, 2001, the City Council adopted the
operating budget for the 2001/2002 fiscal year; and
WHEREAS, the City Council has approved a project to be
funded by the Arts in Public Places Fund; and
WHEREAS, the City Council now wishes to amend the adopted
budget to reflect all of the final costs for the fountain
project using Arts in Public Places Funds and costs to provide
finished landscaping for the project site using Tree and
Landscape Funds.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF MOORPARK
DOES HEREBY RESOLVE AS FOLLOWS:
SECTION 1. A budget amendment as described in Exhibit "P_"
attached hereto is hereby approved.
SECTION 2. The City Clerk shall certify to the adoption of
this resolution and shall cause a certified resolution to be
filed in the book of original resolutions.
PASSED AND ADOPTED this 17th day of April, 2002.
Patrick Hunter, Mayor
ATTEST:
Deborah S. Traffenstedt, City Clerk
Exhibit A: Budget Amendment Detail
Resolution No. 2002 -
Page 2
EXHIBIT A
BUDGET AMENDMENT DETAIL
Funding Sources
Funding
Source
Account
Amount
Tree and
Arts in
Landscape Fund
Public Places Fund
2150
2151
24,874
18,325
Appropriations
Current New
Budget Budget
Budget Unit Object Amount Change Amount
2150 - 2100 -2002 9632 0 24,874 24,874
2151- 2100 -2002 9632 100,000 18,325 118,325
Approved as to form:
�d►�`nR�r�