HomeMy WebLinkAboutAGENDA REPORT 2002 0605 CC REG ITEM 11BITEM ILISO Moorpark City Counci'� Agenda Report Y:- --W- -- TO: The Honorable City Council +� FROM: Kenneth C. Gilbert, Director of Public Works DATE: May 24, 2002 (Council Meeting 6 -5 -02) SUBJECT: Consider 1) Bids for the Construction of Modifications at the Intersection of Miller Parkway and Peach Hill Road to Facilitate U -Turn Traffic [Project 80321 2) Adoption of a Resolution Amending the Budget to Fully Fund the Project and 3) Recordation of a Deed for Certain Additional Right -of -Way and Temporary Construction Easements Required by the Project BACKGROUND In April of 2001, the City Council approved a project to widen the northbound barrel of Miller Parkway just north of Peach Hill Road, in order to facilitate south -to -north "U- Turn" traffic movements at that intersection. In March of this year, the City Council approved the plans and authorized staff to advertise for bids. DISCUSSION A. Project Description An excerpt of the project plan, showing the required street widening, is attached as Exhibit 1. The Scope of Work is generally described as follows: • Relocate traffic signal pole at easterly ECR (End Curb Radius); • Replace traffic signal pole and mast arm at westerly BCR (Beginning Curb Radius) [Note: the wider street will require a longer mast arm for the signal heads which, in turn, will require a larger pole]; • Relocate traffic signal pull boxes; • Relocate catch basin east of intersection; • Remove and replace curb & gutter; • Remove and replace sidewalk; Miller mod awd /'-' Miller Parkway Modification U -Turn Traffic Movement May 24, 2002 Page 2 • Construct asphalt pavement; • Transplant tree; • Replace irrigation system; • Replant ground cover and shrubs; and • Regrading at back of sidewalk. B. Right -of -Way As shown on Exhibit 1, additional street right -of -way is required for the construction of the project. A deed conveying this additional right -of -way from the Serenata HOA to the City, has been provided to the City. Also conveyed to the City is a Construction Easement required to facilitate the work. It is recommended that the City Council accept these deeds and direct the City Clerk to have the deeds and Certificates of Acceptance recorded. C. Hardware Procurement The delivery time for the procurement of poles and mast arms is approximately fourteen (14) weeks. In order to expedite this project, the City initiated the procurement of the needed poles and mast arms, immediately after project advertisement was authorized. Accordingly, we believe that these materials will be received in July, at about the time they will be needed. D. Bid Results Bids for the subject project were received and opened on May 21St. The apparent low bidder is Berry General Engineering Contractors, Inc., with a bid of $101,467.75. A summary of the bid results is attached as Exhibit 2. It has been determined that the apparent low bidder is qualified to perform the work. Said bidder has confirmed that their bid is valid and that they are prepared to proceed with the construction of the project. Miller mod awd Miller Parkway Modification U -Turn Traffic Movement May 24, 2002 Page 3 E. Fiscal Impact 1. Construction Cost Estimate costs is as follows: Description Bid Amount Contingency [10 %] Pole Procurement Sub -Total Total An estimate of construction Construction Cost Est. ($) 101,467.75 10,146.78 111,614.53 5,078.00 116,692.53 2. Total Project Cost Estimate: An estimate of the total project construction costs is as follows: Total Project Description Cost Est. ($) Design 14,000.00 R -O -W '' 500.00 Construction 116,692.53 Inspection 3,000.00 Total 134,192.53 ** Cost of Policy of Title Insurance only. There was no compensation made to the Grantor of the right -of -way and Temporary Construction Easement. 3. Budget Amendment: It will be necessary to amend the FY2001 /02 Budget in order to fully fund this project. A Resolution has been attached (Exhibit 3) for this purpose. A summary of the proposed Budget amendment is as follows: Description Current Budget Change Revised Total Design 14,000.00 0.00 14,000.00 Right -of -Way 0.00 500.00 500.00 Construction 85,000.00 32,000.00 117,000.00 Plus Prior Design Costs 1,000.00 2,000.00 3,000.00 Total Project 100,000.00 34,500.00 134,500.00 Note: The funding source for this project [Project 80321 is the Traffic Mitigation Fund [Fund 20021. F. Schedule It is anticipated that construction of the project should start in late June and be completed in August. Mi11er mod awd 4�i.f i l'�4 4 Miller Parkway Modification U -Turn Traffic Movement May 24, 2002 Page 4 G. Administrative Actions If the recommended action is taken by the City Council, certain administrative actions will be undertaken by staff, including the following: • A contract agreement will be forwarded to Berry General Engineering Contractors, for the construction of the subject project, for the contract price of $101,467.75. • When all of the contract documents are in order, the agreement will be executed by the City Manager. • A construction contingency of $10,150 (100) will be set aside for the project. STAFF RECOMMENDATIONS (Roll Call Vote) 1. Approve the selection of Berry Engineering Contractors, Inc. to construct the subject project. 2. Adopt Resolution No. 2002- providing additional funding required for the project. 3. Direct the City Clerk to provide for the recordation of the Deeds and Certificates of Acceptance for the additional right -of -way and temporary construction easement required for the project. Attachments: Exhibit 1: Exhibit 2: Exhibit 3: Miller mod awd Plan Bid Results Resolution ac 41 k PROPOSED LAJ SIDEWALK 13 4 EA SEMEN T AIS -,EXISTING R EXISTING STRIPING TO PEMAIN lk 1, kk EXISTING CURB & GUTTER G SIDEWALK EXIS TIN EXISTING RIW ` CURVE TAN -N RAO Ay 1 14'03'52- 22 P Aitlkvy 2 wl City of Moorpark Exhibit 2 Bid Results: Miller Parkway Widening (at Peach Hill Road) Page 1 of 2 [File # Bids: Miller-mod) Bidder >>>>> Vendor 1 Vendor2 Bid Opening: Name: Engineer's Estimate Berry General Engineering Nye & Nelson May 21, 2002 Address: P. O. Box 7178 1860 Eastman Ave. [ #108] Cit, State: Oxnard, CA 93031 Ventura, CA 93003 Tel. No.: 805 -485 -9826 805 -654 -1682 Contact Person: Dan Berry Ruric Nye Item Description Est Qty Units Unit Cost Total Bid Unit Cost Total Bid Unit Cost Total Bid I Mobilization 1 LS 3,000.00 3,000.00 6,402.00 6,402.00 3,400.00 3,400.00 2 Clearing /Grubbing I LS 1,000.00 1,000.00 3,360.00 3,360.00 5,100.00 5,100.00 3 Unclassified Excavation I LS 1,000.00 1,000.00 11,475.00 1 1,475.00 10,300.00 10,300.00 4 Traffic Control I LS 2,000.00 2,000.00 3,085.00 3,085.00 6,608.00 6,608.00 5 A/C Pavement 47 Ton 120.00 5,640.00 67.15 3,156.05 96.00 4,512.00 6 Signs 2 EA 300.00 600.00 265.00 530.00 285.00 570.00 7 Base 100 CY 100.00 10,000.00 55.40 5,540.00 76.00 7,600.00 8 Curb Ramp I EA 2,500.00 2,500.00 436.00 436.00 800.00 800.00 9 Sidewalk 1,648 SF 4.00 6,59100 2.95 4,861.60 5.00 8,240.00 10 6" Curb & Gutter 206 LF 30.00 6,180.00 17.90 3,687.40 29.00 5,974.00 11 18" RCP 5 LF 500.00 2,500.00 173.00 865.00 220.00 1,100.00 12 Concrete Pipe Collar 1 EA 500.00 500.00 425.00 425.00 340.00 340.00 13 Catch Basin 1 EA 5,000.00 5,000.00 2,445.00 2,445.00 1,700.00 1,700.00 14 Local Depression 1 EA 1,500.00 1,500.00 425.00 425.00 400.00 400.00 15 Striping, Etc. 1 LS 3,000.00 3,000.00 2,908.00 2,908.00 7,000.00 7,000.00 16 Remove Curb & Gutter 222 LF 10.00 2,220.00 4.85 1,076.70 5.70 1,265.40 17 Remove Sidewalk 1,648 SF 2.00 3,296.00 0.85 1,400.80 1.15 1,895.20 18 Remove Curb Ramp 1 EA 1,000.00 1,000.00 72.00 72.00 170.00 170.00 19 Remove Signs 2 EA 100.00 200.00 13.60 27.20 90.00 180.00 20 Remove Catch Basin 1 EA 500.00 500.00 2,295.00 2,295.00 570.00 570.00 21 Relocate Tree I EA 2,000.00 2,000.00 2,325.00 2,325.00 2,500.00 2,500.00 22 Modify Traffic Signal I LS 35,000.00 35,000.00 30,774.00 30,774.00 33,000.00 33,000.00 23 Cap Existing Irrigation I 1 LS 5,000.00 5,000.00 265.00 265.00 570.00 570.00 24 Slope Grading / Landscr 1 LS 7000 7,000.00 13,630.00 13,630.00 15000 15,000.00 25 Release 1 LS 1.00 1.00 1.00 1.00 1.00 1.00 Total 107,229.00 101,467.75 118,795.60 oorpark Exhibit 2 ts: Miller Parkway Widening (at Peach F Hill Road) Page 2 of2 ds: Miller mod] Bidder » »> Vendor 3 Vendor 4 Vendor 5 Bid Opening: Name: J & H Engineering E & M Constructors Sub Zero Excavating May 21, 2002 Address: 79 Daily Drive [ #169] 15981 Yarnell Street [ #198] 67 Erbs Road Cit, State: Camarillo, CA 93010 Sylmar, CA 91342 Thousand Oaks, CA 91362 Tel. No.: 805- 987 -8414 818-362-9811 805- 494 -5013 Contact Person: Howard Janotta Rito Padilla Lisa Fletcher ltem Description Est Qty nits Unit Cost Total Bid Unit Cost Total Bid Unit Cost Total Bid I Mobilization 1 LS 7,500.00 7,500.00 10,000.00 10,000.00 10,000.00 10,000.00 2 Clearing / Grubbing 1 LS 7,500.00 7,500.00 23,471.00 23,471.00 5,800.00 5,800.00 3 Unclassified Excavation 1 LS 4,500.00 4,500.00 7,500.00 7,500.00 1,500.00 1,500.00 4 Traffic Control I LS 4,000.00 4,000.00 5,000.00 5,000.00 19,275.00 19,275.00 5 A/C Pavement 47 Ton 100.00 4,700.00 100.00 4,700.00 95.00 4,465.00 6 Signs 2 EA 225.00 450.00 250.00 500.00 287.50 575.00 7 Base 100 CY 36.00 3,600.00 90.00 9,000.00 33.00 3,300.00 8 Curb Ramp I EA 875.00 875.00 1,000.00 1,000.00 2,800.00 2,800.00 9 Sidewalk 1,648 SF 6.00 9,888.00 4.50 7,416.00 3.40 5,603.20 10 6" Curb & Gutter 206 LF 34.00 7,004.00 18.00 3,708.00 13.10 2,698.60 11 18" RCP 5 LF 300.00 1,500.00 200.00 1,000.00 60.00 300.00 12 Concrete Pipe Collar I EA 350.00 350.00 2,000.0000 2,000.00 500.00 500.00 13 Catch Basin I EA 2,850.00 2,850.00 7,149.00 7,149.00 1,500.00 1,500.00 14 Local Depression 1 EA 250.00 250.00 500.00 500.00 500.00 500.00 15 Striping, Etc. I LS 6,640.00 6,640.00 4,150.00 4,150.00 3,205.00 3,205.00 16 Remove Curb & Gutter 222 LF 7.00 1,554.00 12.00 2,664.00 6.50 1,443.00 17 Remove Sidewalk 1,648 SF 1.00 1,648.00 2.00 3,296.00 1.25 2,060.00 18 Remove Curb Ramp 1 < EA 500.00 500.00 750.00 750.00 690.00 690.00 19 Remove Signs 2 EA 92.00 184.00 100.00 200.00 115.00 230.00 20 Remove Catch Basin 1 EA 750.00 750.00 2,000.00 2,000.00 610.00 610.00 21 Relocate Tree 1 EA 500.00 500.00 300.00 300.00 2,503.50 2,503.50 22 Modify Traffic Signal I LS 33,166.00 33,166.00 25,000.00 25,000.00 39,929.41 39,929.41 23 Cap Existing Irrigation 1 1 LS 500.00 500.00 1,500.00 1,500.00 575.00 575.00 24 Slope Grading 1 LS 28000 28,000.00 12,500.00 12,500.00 30179 30,179.00 25 Release I LS 1.00 1.00 1.00 1.00 1.00 1.00 Total 128,410.00 135,305.00 140,242.71 Exhibit 3 RESOLUTION NO. 2002 - A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MOORPARK, CALIFORNIA, REVISING THE FY 01/02 BUDGET AND APPROPRIATIONS FOR PROJECT 8032 - MILLER PARKWAY WIDENING [FUND 2002 - TRAFFIC MITIGATION FUND] WHEREAS, on June 20, 2001, the City Council adopted the Budget for Fiscal Year 2001/02; and WHEREAS, a staff report has been presented to the City Council requesting a budget increase in the aggregate amount of $34,500; and WHEREAS, Exhibit "A ", attached hereto and made a part hereof, describes said budget amendment and its resultant impacts to the budget line item(s). NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF MOORPARK DOES HEREBY RESOLVE AS FOLLOWS: SECTION 1. That a Budget amendment in the aggregate increase of $34,500, as more particularly described in Exhibit "A ", is hereby approved. SECTION 2. The City Clerk shall certify to the adoption of this resolution and shall cause a certified resolution to be filed in the book of original resolutions. PASSED AND ADOPTED this 5th day of June, 2002. Patrick Hunter, Mayor ATTEST: Deborah S. Traffenstedt, City Clerk Attachment: Exhibit 'A': Appropriation and Budget Detail Resolution No. 2002 - Exhibit "A" REVISED APPROPRIATIONS & BUDGET FOR Miller Parkway Widening Project (Project No. 8032] FUND ACCOUNT NUMBER APPROPRIATION REQUEST L. A. Avenue AOC 2501.0000.0000.5500 $ 34,500 TOTALS: 1 1 $ 34,500 1 FY 01/02 BUDGET RE -CAP ACCOUNT NUMBER CURRENT SUBJECT REVISED SUBJECT APPROPRIATION / (REDUCTION) FY 2001/02 APPROPRIATION FY 2001/02 $ BUDGET / (REDUCTION) BUDGET 2501.8310.8046.xxxx $ 100,000 $ 34,500 $ 134,500 TOTALS: $ 100,0001 $ 34,5001 $ 134,500 DISTRIBUTION OF APPROPRIATIONS TO EXPENSE ACCOUNT NUMBERS ACCOUNT NUMBER CURRENT FY 01/02 BUDGET SUBJECT APPROPRIATION / (REDUCTION) REVISED FY 01/02 BUDGET 2002.8310.8032.9601: Design $ 14,000 $ 0 $ 14,000 2002.8310.8032.9610: R -O -W $ 0 $ 500 $ 500 2002.8310.8032.9640: Const. $ 85,000 $ 32,000 $ 117,000 250028310.8032.9650: Insp. $ 1,000 $ 2,000 $ 3,000 TOTALS: $ 100,0001 $ 34,500 $ 134,500 Approved as to form: