FROM: Mary K. Lindley, Director of Community Services
DATE: June 26, 2002 (CC Meeting of July 17, 2002)
SUBJECT: Consider FY 2002/03 Budget Amendment for Repairs
to the Community Center
BACKGROUND
In November 2001, the Apricot Room roof collapsed and the
City Council authorized repairs. All but $5,000 of the
final cost of $149,076, will be covered by insurance. The
City's insurance representative required that the repairs
only include work directly related to the damaged roof and
that the scope of work include no enhancements. As a
result, the roof drains were placed in the general location
as the original design called for; on the north side of the
Apricot Room along the walkway, outside the City Hall
Conference Room.
Staff believes with moderate rains, the walkway will be
unusable. In the event of a heavy down -pour, the City could
experience water intrusion in the Conference Room and
Apricot Room if water collects along the walkway adjacent
to the respective doors for these rooms.
In addition to repair work to the Apricot Room, staff
recently discovered that seven lateral support beams to the
Community Center Breezeway, just outside the Community
Center Lobby, have significant termite and fungus damage.
These beams are in an opening in the breezeway, over the
outdoor planter box. They are not covered by roof tiles and
are exposed to the sun and rain.
Honorable City Council
July 17, 2002
Page 2
The problem was discovered when
were attempted. The contract work
Building and Safety Department was
and a building contractor was
solution.
DISCUSSION
enhancements to the area
was stopped, the City's
called for consultation,
consulted to identify a
With respect to the Apricot Room roof drains, staff
proposes installing drainpipes that will channel the water
under the walkway and towards the large drain located at
the back side of the City Hall Conference Room. The initial
sawcutting and installation of drainpipe would be performed
by a contractor. In -house staff would repair the sawcut
work and make necessary repairs to the exterior building
stucco finish.
It is estimated that the project would cost $4,500 ($3,700
for work performed by the contractor and $800 for in -house
repairs and contingency). Staff proposes amending the
City's existing Agreement with Allen Bornstein Construction
Inc. (the contractor who repaired the Apricot Room roof) to
perform this work.
With respect to the Breezeway repairs, it appears that the
problem is isolated to the beams that are exposed to the
weather, those beams that are not under roof tiles. Staff
has received a proposal from a qualified building
contractor who has identified a scope of work that includes
replacing the seven impacted beams and performing necessary
patchwork. Because the beams support the Breezeway roof,
the impacted area needs to be supported by shoring while
under repair. Additionally, in an attempt to ensure that
this damage is not repeated, it is recommended that the
existing design of the open roof be altered. It is proposed
that the open roof be enclosed using roof tiles to match
the existing roof.
The estimated cost to perform the scope of work identified
above is $20,000. It is staff's intent to solicit bid
proposals for this project and present a recommendation on
the award of an agreement to the Council at a later date.
M: \MLindley \Facilities \Comm Center repairs 2002 ccagda.doc
Honorable City Council
July 17, 2002
Page 3
The total appropriation needed for the repairs identified
above is $24,500. Staff proposes transferring funds from
the General Fund Reserve Balance to the appropriate
expenditure account.
STAFF RECOMMNDATION (Roll Call Vote)
1) Adopt Resolution No. 2002 -_, amending the FY 2002/03
Budget by appropriating $24,500 from the General Fund
Reserve Balance for repairs to the Apricot Room roof drains
($4,500) and Community Center Breezeway ($20,000), and 2)
authorize the City Manager to amend the Agreement with
Allen Bornstein Construction Inc. to perform the roof drain
work at a cost not to exceed $3,700.
M: \MLindley \Facilities \Comm Center repairs 2002 ccagda.doc
V V -" - Y
Honorable City Council
July 17, 2002
Page 4
ATTACHMENT A
RESOLUTION NO. 2002-
A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF MOORPARK, CALIFORNIA, AMENDING
THE FY 2002/03 BUDGET BY TRANSFERRING
$24,500 FROM THE GENERAL FUND RESERVE
BALANCE (1000.5500) TO THE FACILITIES
BUDGET (1000.7620) FOR REPAIRS TO THE
COMMUNITY CENTER
WHEREAS, on June 5, 2002, the City Council adopted the
budget for Fiscal Year 2002/03; and
WHEREAS, a staff report has been presented to said
Council requesting a budget amendment by transferring
$24,500 from the General Fund Reserve balance for repairs
to the Community Center; and
WHEREAS, Exhibit "A" hereof describes said budget
amendment and its resultant impacts to the budget line
item(s).
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF
MOORPARK DOES HEREBY RESOLVE AS FOLLOWS:
SECTION 1. A budget amendment allocating $24,500
from the General Fund Reserve as more particularly
described in Exhibit ` %A" attached hereto is hereby
approved.
SECTION 2. The City Clerk shall certify to the
adoption of the resolution and shall cause a certified
resolution to be filed in the book of original Resolutions.
PASSED AND ADOPTED this 17th day of July, 2002.
Patrick Hunter, Mayor
ATTEST:
Deborah S. Traffenstedt, City Clerk
Attachment: Exhibit A
M: \MLindley \Facilities \Comm Center repairs 2002 ccagda.doc
Honorable City Council
July 17, 2002
Page 5
Resolution No. 2002-
EXHIBIT A
Budget Revision
A. Fund Allocation:
Fund No.
Fund Name
Amount
1000.5500
General Fund - Community Services
Department
$24,500
$24,500
$24,500
B. Budget Appropriation:
BUDGET NUMBER
BUDGETED
REVISION
NEW BUDGET
1000.7620.7632.9621
$0
$24,500
$24,500