Loading...
HomeMy WebLinkAboutAGENDA REPORT 2002 1106 CC REG ITEM 10FMoorpark City Council — Agenda Report TO: The Honorable City Council. f FROM: Kenneth C. Gilbert, Director of Public Works DATE: October 24, 2002 (Council Meeting 11 -6 -02) SUBJECT: Notice of Completion for the Miller Parkway Widening Project [Project 80321 D T r' Vrl-D nT TTTT ) In May of this year the City Council awarded a contract for the construction of a project to widen Miller Parkway at the northeast corner of that street and Peach Hill Road, in order to facilitate south -to -north "U- Turn" traffic movements at that intersection. MT C(IT TC C Tr)NT A. Project Description An excerpt of the project plan, showing the required street widening, is attached as Exhibit 1. The Scope of Work is generally described as follows: • Relocate and /or replace traffic signal poles; • Relocate traffic signal pull boxes; • Relocate a storm drain catch basin; • Remove and replace curb & gutter; • Remove and replace sidewalk; • Construct asphalt pavement; • Transplant tree; • Replace irrigation system; • Replant ground cover and shrubs; and • Regrading at back of sidewalk. B. Right -of -Way As shown on Exhibit 1, additional street right -of -way was required for the construction of the project. This property was deeded to the City by the Serenata HOA. Miller_mod_cmp Miller Parkway Modification U -Turn Traffic Movement October 24, 2002 Page 2 C. Fiscal Impact 1. Contract Cost: A summary of the final contract cost is as follows: Description Total Bid Amount 101,476.75 Quantity Adjustment a 1,119.75 Change Orders b 3,676.62 Total 106,273.12 Notes: a) The actual quantities required were slightly more than the engineer's estimate. b)There was one Change Order to modify the base material for the new sidewalk. 2. Total Project Costs: A summary of the total project costs is as follows: Description Description Total $ Design 15,000.00 Right -of -way 0.00 Costruction Plus Prior Design Costs Pole Procurement a 5,078.00 Contract Amount 106,273.12 Additional Slope Landscaping b 1,425.00 Inspection 2,000.00 Total 129,776.12 Notes: a) In that the delivery time for the procurement of new poles and mast arms is approximately fourteen (14) weeks, the City initiated those procurement efforts prior to the opening of the bids. Those materials were delivered within a timeframe which did not cause a delay in the construction of the project. b) additional slope landscaping was ordered from a separate vendor at a lower cost. 3. Budget Summary: This project is funded by the Traffic Mitigation Fund [Fund 2002]. A summary of the project budget is as follows: Surplus Description Current Budget Design 14,000.00 Right -of -Way 500.00 Construction 117,000.00 Plus Prior Design Costs 3,000.00 Total Project 134,500.00 Miller mod cmp Actual Cost Surplus 15,000.00 (1,000.00) 0.00 500.00 112,776.12 4,223.88 2,000.00 1,000.00 129,776.12 4,723.88 Miller Parkway Modification U -Turn Traffic Movement October 24, 2002 Page 3 D. Final Inspection, Acceptance, Landscape Maintenance Phase Staff has completed a final inspection of the project and has found the work to be acceptable. The project specifications require the contractor to provide for the maintenance of landscaping in the project area for a period of six (6) months from the date the landscape improvements have been found to be substantially complete. These maintenance efforts do not include utility costs (the existing irrigation systems are under the control of the HOA and /or the City), but do require the contractor to replace any dead plants during the maintenance period. At this time it would be appropriate for the City Council to accept the project as complete and direct the City Clerk to record a Notice of Completion to start the final lien period. E. Release of Retention Although the lien period will terminate thirty -five (35) days subsequent to the recordation of the Notice of Completion, it is the intent of staff to retain all or a significant portion of the ten percent (100) retention until satisfactory completion of the six (6) month maintenance period. STAFF RECOMMENDATIONS Accept the work as complete and direct the City Clerk to record the Notice of Completion. Attachments: Exhibit 1: Plan Miller mod cmp IT cl O co 1,3 o, 1 c / _ W 3 V lYw J3 16 \ \ \ \\ T - �_ 1j� �: `•.qhy {� �;% ! rte'` ? +: 19 ,I CO UA -� 12 � _- ` N �✓ 18 � �ExrSTiN _ � ExiSTI ON RA J G' s 1A _ IRIPINC Ao w 7�2j - 'X/STING CURB GUTTER I =E-X /S TING SIDE W 4 K _ EXISTiN G R /w M 1 L L E R PARKWAY CURVE TABLE LE - -- , CRV DEL TA L EN RAD TAN 1 14'03'52" 22 n4' on nn, 11 , ,.