HomeMy WebLinkAboutAGENDA REPORT 2003 0305 CC REG ITEM 09BTo: From Date: ITEM 9• as (JTV OF'b OnRPARK, CAT,TFORNTA City Cnnncil Nfeefing of 3 - 5 -a CIO 3 ACTION' L412,QY-OL :L1 J12-+_F R��cmm Moorpark City Council Agenda Report The Honorable City Council Kenneth C. Gilbert, Director of Public Works February 24, 2002 (Council Meeting 3 -5 -03) Subject: Consider Resolution Amending FY 2002/2003 Budget, and Approve Plans and Specifications and Authorize Advertisement for Receipt of Bids for the Flinn Avenue Realignment Project [Project 8037] BACKGROUND In November of 2001, the City Council approved the conceptual design for the subject project. The project plans have been completed and the project is ready to construct. It is the goal of staff to proceed with construction of these improvements at this time, so that the off -site improvements for the proposed new Police Station can be completed prior to the start of construction of that facility. DISCUSSION A. Scope of Work The subject project calls for: • the construction of a new Flinn Avenue to intersect Spring Road at Second Street (see Exhibit 1, Pages 1 and 2); • the widening of the east side of Spring Road from Flinn Avenue northerly to the rail crossing (see Ex. 1, Page 3); • the construction of a raised center median in Spring Road from Flinn Avenue to the rail crossing; and Note: The installation of landscaping in that median will be undertaken at a later date. A separate consultant has been retained to prepare the design for that and other landscaping in the area. • the construction of a traffic signal at the new intersection of Spring Road, Flinn Avenue and Second Street. Flinn Avenue Realignment: Advertise February 24, 2003 Page 2 B. Spring Road Widening Project Design efforts are proceeding on a project to widen Spring Road south of Flinn Avenue. That project will require acquisition of additional street right -of -way. It is anticipated that the design will be completed within three months and that the required rights -of -way will be acquired by the end of 2003. C. Construction Details Some of the components of the subject project include the following: • Gas, water, sewer, telephone and storm drain utilities will remain in the "old" Flinn Avenue right -of -way. • The existing overhead electrical lines along the "old" Flinn Avenue, will be placed underground in the new Flinn Avenue. This "undergrounding" effort will also include a portion of Minor Street. • The installation of several new street lights. • A water meter will be installed for the future median irrigation system and will be "stubbed -out" to the median, in order to avoid a future street cut. • Irrigation sleeves will be installed from the median to a point south of Flinn Avenue, where future medians will be constructed. • New curbs and gutters will be constructed at their ultimate location, along the Spring Road and Flinn Avenue frontage of the future Police facility. • A sidewalk will be constructed on the south side of the new Flinn Avenue, and on the east side of Spring Road, south of the new Flinn Avenue. • No sidewalks will be constructed on the north side of the new Flinn Avenue or on the east side Spring Road north of the new Flinn Avenue. That work will be constructed as a part of the new Police facility. • The old Flinn Avenue will be left in -place at this time. A barricade will be placed at the west end of the street to prevent vehicular access to and from Spring Road. • A driveway will be constructed at the east end of the old Flinn Avenue, to allow vehicular access to the properties on the south side of the old Flinn Avenue. D. Right -of -Way No right -of -way acquisition will be required to construct this project. The new Flinn Avenue and the added street width for Spring Road, will be created via recordation of a Parcel Map for the Police facility property. flinn_ad - ,,k)74 Flinn Avenue Realignment: Advertise February 24, 2003 Page 3 E. Environmental Clearance The subject project has been determined to be Categorically Exempt. F. Street Vacation It is the intent of staff to prepare and process, at a later date, documents necessary to vacate the old Flinn Avenue. That vacation will include action to retain utility easements for the existing utilities to remain in place. G. Ultimate Access to Properties south of Flinn Avenue As mentioned above, the project calls for the construction of a barricade at the west end of the old Flinn Avenue and the construction of a driveway at the east end of the old Flinn Avenue, to allow access for the businesses on the south side of the street. The pavement improvements for old Flinn Avenue will remain in place until the street vacation efforts have been completed. The business and /or property owners affected by these changes have been contacted and notified of these changes. Staff will be meeting with the affected business and property owners in the future to discuss a number of issues, including: • the subject project; • the future widening of Spring Road (and the right -of -way acquisition related thereto); • the planned vacation of the old Flinn Avenue; [Note:Upon vacation of the street, the south one -half of old Flinn Avenue can be conveyed to the properties fronting the south side of the street.] • the ultimate use of the remnant parcel to be created when the street is relocated; • the design for the future ultimate access from the affected properties to the new Flinn Avenue; and • the removal of the street improvements within the old Flinn Avenue right -of -way to be vacated. flinn ad Flinn Avenue Realignment: Advertise February 24, 2003 Page 4 H. Fiscal Impact 1. Construction Cost Estimate: A preliminary estimate of project construction and construction related costs is as follows: . ... ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Element Amount Construction Contract 532,458 Edison Undergrounding ** 100,000 Contingency (10 %) 63,246 Total 695,704 ............................................ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Notes: * Includes conduits for electrical undergrounding and for new street lights. ** This is only an estimate. Full costs will be known prior to the review of the bids for the project. 2. Total Project Cost Estimate: A preliminary estimate of project costs is as follows: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .................. _ . . . . . . . . . . . . . . . . . . . , Element Amount Design 60,000 Right -of -way 2,000 Construction 695,704 Inspection * ** 70,000 Total 827,704 .........................................._..................................................................................................._.._........................................................................................._........................................................... ......................._....... Note: * ** This cost is only an estimate. Staff is in the process of negotiating a contract with a qualified civil engineering firm to provide construction management services for this project. 3. Budget: The FY 2002/03 Budget provides funding for this project [Project 8037] from the Los Angeles Avenue AOC Fund [Fund 2501] and the Moorpark Redevelopment Agency [Fund 2902]. A summary of the present status of the budget for this project is as follows: Description Fund 2501 fL A AOCI Design Right -of -Way Construction Inspection Sub -Total Fund 2902 WRAI Design Right -of -Way Construction Inspection Sub -Total Total ...................... . Prior Year ($) 18,805 1,000 0 0 19,805 FY2002 /03 ($) Total 11,195 30,000 10,000 11,000 174,000 174,000 15,000 15,000 210,195 230,000 18,805 11,195 1,000 10,000 174,000 0 15,000 19,805 210,195 30,000 11,000 174,000 15,000 230,000 flinn ad ►`" Flinn Avenue Realignment: Advertise February 24, 2003 Page 5 4. Projected Actual Budget Requirements: The estimated revised budget requirements for future project costs are summarized as follows: Description Design, Printing, Etc Right -of -Way Construction Inspection Total FY 02/03 Plus Prior Costs Project Total MRA Fund 2902 ($) 11,195 0 347,852 35,000 394,047 19,805 413,852 .............................. .... ............................... L A Ave AOC Fund 2501 ($) 11,195 0 347,852 35,000 394,047 19,805 413,852 ..................................................... . . . . ......................................... Total 22,390 0' 695,704 70,000 788,094 39,610 827,704 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5. Budget Amendment: The attached Resolution provides for the amendment of the Budget to fully fund the project cost estimates noted above. That recommended action is summarized as follows: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ............................................................ Description Fund 2501 Design Right -of -Way Construction Inspection Sub -Total Fund 2902 Design Right -of -Way Construction Inspection Sub -Total Total FY 02/03 Plus Prior Year Costs Total Project Budget Current Budget ($) 11,195 10,000 174,000 15,000 210,195 11,195 10,000 174,000 15,000 210,195 420,390 39,610 460,000 Change Revised Budget ($) 0 (10,000) 173,852 20,000 183,852 (10,000) 173,852 20,000 183,852 367,704 367,70 11,195 0 347,852 35,000 394,047 11,195 0 347,852 35,000 394,047 - 39,610 4 827,704 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Note: The main reasons for this budget increase are the addition of the Spring Road improvements to the scope of work and the addition of electrical undergrounding costs. Prior cost estimates for the Flinn Avenue project did not include this work. flinn ad vary Flinn Avenue Realignment: Advertise February 24, 2003 Page 6 I. Plans and Specifications A review copy of the Plans and Specifications for the subject project has been placed on top of the file cabinets in the City Council Conference Room. J. Project Approval -- Design Immunity It is recommended below that the City Council approve the project plans and specifications in order to document City Council approval of the scope and design of the project. Such approval is also required for the purpose of establishing design immunity pursuant to Section 830.6 of the Government Code of the State of California. K. Schedule It is anticipated that bids for the subject project will be opened and presented to the City Council in May, with construction to start soon thereafter. STAFF RECOMMENDATION 1. Adopt Resolution NO. 2003- 2. Approve the plans and specifications for the subject project. 3. Authorize staff to advertise for receipt of bids for construction of the project. Attachments: Exhibit l: Exhibit 2: flinn ad Diagram of Street Realignment Resolution V old V ,U- 13- 2001(TUE) 12:24 HAWKS AND ASSOCIATES FLINN IGNMENT 80 0 80 160 SCALE OF FEET PC , Z NORTH Ff 60' SOUTH If 7' 23' 23' 7' Q 2 tq0 RADE 2 . 2Z 2 FLINN AVENUE 5 Curb & Gutter 7 Sidewalk ®80 .� tf► J7' i a4 I Cpl WEST If In I I I I I 7' 7' VARIES II • � I I II 6 I I 74 Q6 Curb 8Q Curb & Gutter Q9 Median �— i4' — 37 R -v _ Q 7' AC OVERLA Y 12��I� 11, WIDENING 4" AC i VAR! =S lq, 8" PUB f__MIN. �29 EAST F� I VARIES GRADE TO 127 MAX. i I I I I I SPRING ROAD GRIND EDGE AND TACK COAT. 3' X 1" TYPICAL STREET SECTIONS GRIND AT JOIN LINE NOT TO SCALE Exhibit 2 RESOLUTION NO. 2003- A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MOORPARK, CALIFORNIA, AMENDING THE FY 02/03 BUDGET TO REVISE THE AMOUNTS OF THE APPROPRIATIONS AND BUDGET FOR PROJECT 8037: FLINN AVENUE REALIGNMENT [L. A. AVE. AOC FUND (FUND 2501) AND MRA AREA 1 OPERATIONS FUND (FUND 2902)] WHEREAS, on June 5, 2002, the City Council adopted the Budget for Fiscal Year 2002/03; and WHEREAS, a staff report has been presented to the City Council requesting a budget increase in the aggregate amount of $367,704; and WHEREAS, said staff report discusses certain fund transfers approved last fiscal year and the need to adjust same; and WHEREAS, Exhibit "A ", attached hereto and made a part hereof, describes said budget amendment and its resultant impacts to the budget line item(s). NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF MOORPARK DOES HEREBY RESOLVE AS FOLLOWS: SECTION 1. That a Budget amendment in the aggregate increase of $367,704, as more particularly described in Exhibit "A ", is hereby approved. SECTION 2. The City Clerk shall certify to the adoption of this resolution and shall cause a certified resolution to be-filed in the book of original resolutions. PASSED AND ADOPTED this 5th day of March, 2003. Patrick Hunter, Mayor ATTEST: Deborah S. Traffenstedt, City Clerk Attachment: Exhibit 'A': Appropriation and Budget Detail _. - -1 U62 E Resolution No. 2003 - Exhibit "A" Revised Appropriations & Budget For Project 8037: Flinn Avenue Realignment A. Fund Allocation B. FY 02/03 Budget Re-Cap .... .. .. .... .. . . .. . . . . ....................................................................................................................... .......... ......................................................................... ...... .. ........ . .. . ......... . . . .. . .................... .. .......... ... ; .... . .. . ................. ... Subject' sject� . . .... ....... .............. .. ..... .. . .. ... ... ............. Revised: FY 02/03 Appropriation: FY 02/03: :Account Number Budget! (Reduction) Budget' ....................... ...................... 183,8 ........... $394,047 1 ................ ......................................... . ........... . .. ......... . . . . ............. . .......... . . ... . ...... . ............................................................................... �2902.8310.8037.xxxx ............................................................................. ............................................................. $210,195: . ....... $ ............. . ... . . ..... . . . . ... . . . .. .......... $394,047 ... . . . ...... ......................... ....... ...... ..... ... . .. .. ...... ..................... . . . . . ... ..... . . . .... . .................................... ......... .. .... . ......................... .............................................................................................................................................................................. $420,390 ................................... . ................................ ..................... .. .... ...... ... .. ................ ........................................... . $ 367,704 ... .. ............................ . . ................ . ... .......... .. . . . . . ............................................................ . ... .......... $788,094 ......... .................. . . . . . . ... .... ..... .......... ............. .................................................... ............................... C. Total Appropriations Re-Cap ........................... ........................................................................................................................................................................... ................................................................... . ......................................................................... Revised' ....................... ............................. . ........................ . ................................................................... FY 02/03; Prior Years' Total: 'Account Number Budget; Expenditures' i Appropriations : ................ 01.83 1 0 .8 037. .xxxx ........ .... 7 $ 19,805 $41 3, 8.52 ........ . ...................................... . ... . .... .............. . .. .... I ........... .................................................... 2902.8310.8037.xxxx ...$394,04 ............................................................. ........ .. . $394,047 1 ... .. .............. .. .................. .... ........... $413,852 .......2...5 ............. ..................................................................... . ........ ............... ........................................................... ........... ................................... ...... ................... ................................................. .................................................................................................................................... . . .... . .................................. . ......... $788,094 ................................................... . ..... . .. ............... .... .. .............................................................. ............................................... ....... .. ... .. ...... ............ 1 ............................................................................................ ........................................ $ 39,610 ..... ........... . ...................... ­­ ............................. . . ................. ­­ ....................................................................................................... . $827,7041 . ............. . . ... ... ..................... ...... D. Distribution of Appropriations to Expense Accounts Approved as to form: CQ