Loading...
HomeMy WebLinkAboutAGENDA REPORT 2003 0305 CC REG ITEM 09CMr . _ c. of Moorpark City Council ... c� Agenda Report To: The Honorable City Council From: Kenneth C. Gilbert, Director of Public Works Date: February 24, 2003 (Council Meeting 3- 05 -03) Subject: Approval of Plans and Specifications and Authorization to Advertise for Receipt of Bids for the 2003 Slurry Seal Project BACKGROUND One of the elements of the City's pavement maintenance program is the periodic application of a protective slurry seal to the pavement surface of all of the streets in the City. The program objective is to maintain a bi- annual program (construct a project every other year) in which each project addresses approximately one -third of the residential streets in the City. In this way, every residential street in the City should be slurry sealed once every six (6) years. DISCUSSION A. Proposed Scope of Work The streets included in the 2003 Slurry Seal Project are shown on the maps attached as Exhibit 1. A summary of the scope of the project is as follows: Quantity of Slurry: . . . . . . . . . . . . . 1,820 Tons Total Length of Streets in linear feet: . . 91,500 l.f. Total Length of Street in miles: . . . . . . . 17.3 mi. The project will include the application of Type II Slurry on all designated streets. It is anticipated that this year's project will not require any removal and replacement of asphalt pavement, or the construction of any "leveling" courses, prior to the application of slurry seal. The project will include the installation of crack filler material as required, and re- striping subsequent to the application of slurry seal. Slry2003_ad Slurry Seal 2003: Advertise February 24, 2003 Page 2 B. Asphalt Overlay Project By separate action, the City Council is also being asked to approve the 2003 Asphalt Overlay Project. Attached as Exhibit 2 is a map showing the streets to be resurfaced by both Slurry Seal and AC Overlay. C. Fiscal Impact 1. Cost Estimate: A preliminary estimate of project costs is as follows: Element Amount Design 14,000 Construction 177,000 Constr Contingency (10 %) 17,700 Inspection ** 14,300 Total 223,000 ........................................................................................................................................................................._.............................................................................................................._.......... ............................. -: ** Note: Inspection services provided by the consultant City Engineer will be augmented by in -house inspection efforts. 2. Budget: The FY 2002/03 Budget provides funding for this project [Project 8002] from the TDA Article 8 Fund [Fund 2603] (Local Transportation Fund [LTF] ) . A summary of the present status of the budget for this project is as follows: Description Design: Fund 2603 Design: Fund 2610 Design Total Construction Inspection Prior Year ($) 3,162 9,239 12,401 I Total 12,401 ........ ........--...... ....................... ......... ... . .. . ..... . ............. --- .......................... - ..................................... _ ........................ . .... ....... ..... ..... ** Note: A portion of prior year expe FY2002/03 ($) 10,838 10,838 400,000 24,000 434,838 - - . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . nses for design Fund 2610: Congestion Relief Grant funds. Total 14,000 9,239 23,239 400,000 24,000 447,239 . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ................................ : were charged to 2. Projected Actual Budget Requirements: The final budget requirements for the project are summarized as follows: Description FY 02 03 Budget Design, Printing, Etc Construction Inspection Total Plus Prior Year Design Project Total Slry2003 ad FY 02/03 Bud-get 10,838 400,000 24,000 434,838 12,401 447,239 ..... ......... Projected Actual 2,000 194,700 14,300 211,000 12,401 223,401 ................. Surplus ($) (Deficit [$1 ) 8,838 205,300 9,700 223,838 12,401 236,239 .......................... Slurry Seal 2003: Advertise February 24, 2003 Page 3 D. Plans and Specifications A review copy of the Plans and Specifications for the subject project has been placed on top of the file cabinets in the City Council Conference Room. E. Project Inspection As mentioned in the Note in Section C -11 contract administration and inspection services will be provided by both the City Engineer's Office and by the Public Works Supervisor. In past years we have found that one inspector at the stockpile site and one inspector in the field, is the best way to assure a quality job with adequate cost control. F. Project Approval -- Design Immunity It is recommended below that the City Council approve the project plans and specifications in order to document City Council approval of the scope and design of the project. Such approval is also required for the purpose of establishing design immunity pursuant to Section 830.6 of the Government Code of the State of California. G. Schedule It is anticipated that bids for the subject project will be opened and presented to the City Council in May, with construction to start in July. STAFF RECOMMENDATION It is recommended that the City Council approve the plans and specifications for the subject project and authorize staff to advertise for receipt of bids for construction of the project. Attachments: Exhibit 1: Exhibit 2: Slry2003 ad Slurry Seal Maps Map [Slurry Seal & AC Overlay] \T1 r' f-'. JI, l� CITY OF MOORPARK c. �[J I i LCS ANCE- pl YI ¢I ?i Aul- U, lkk '6)7 1 fl_2 `,e\ II ,a S V ° RD. CTY UMI'S 3 ? i > 50+00. _.I '`SHE?+1 ♦N AVE. U, lkk '6)7 1 fl_2 `,e\ II ,a S V ° RD. CTY UMI'S ��� SilNi1 'kI13 '13 AOOV3N 3SIaNns C 13 ADaW N 33vab31 r '1S MOV3N a13 3C I✓ a ff�T ^Z, a 3 I< n 3S w" f� IU a D, �o J i I J.Rl i A 3 31 �aO 3�Iwa: as QIA ONVw —, > < I 1 I L1 I O � i i LIMITS ` St u�p� ITE C, CITY LIMITS 00 VC., ,C% �C.,i;= ti. jli eJ . v.. I. � s F