AGENDA REPORT
TO: The Honorable City Council
FROM: John Brand, Senior Management Analyst
DATE: February 26, 2003 (CC meeting of March 5, 2003)
SUBJECT: Consider Approval of Plans and Specifications for the
Procurement and Installation of Transit Bus Shelters.
SUMMARY
The City Council is being asked to approve plans and specifications
for the procurement and installation of Transit Bus Shelters. The
attached specifications represent the recommendation of the
previous Transportation and Streets Committee (Councilmembers Mikos
and Millhouse) . Following the Council's approval, bid proposals
will be solicited for an initial order of eight (8) shelters with
benches. Five of the benches will be paid for with a countywide
88.5% CMAQ grant coordinated by VCTC, with a match of city TDA
funds and the remainder coming from the City's TDA funds
appropriated in the Fiscal year 2002/03 budget for the bus stop
amenities program. The bids will ask for a three -year price
guarantee so that the City could order additional shelters at the
same cost if it chooses to do so in the future. The goal is to
complete the initial installation of the eight shelters by June 1,
2003.
DISCUSSION
Among the City Council Fiscal Year 2002/03 Goals and Objectives is
one to enhance bus stops with amenities such as signs, route maps,
benches and shelters. The previous City Council Transportation and
Streets Committee considered the many options available for bus
shelters. The Committee considered various construction materials,
design styles and colors. The Committee also looked into
commissioning custom architectural design of a shelter, but found
that it was cost prohibitive. The challenge facing the Committee
was to find a design that was attractive and would fit in all areas
of town. The Committee hoped that a common design would help
U134
Transit bus shelters
CC Meeting of March 5, 2003
Page 2
establish a unifying look in the diverse areas of the City.
The Committee also had to consider the space constraints that exist
at bus stops. It is necessary to provide adequate sidewalk
clearance around the shelter. The Committee also had to weigh
security issues, weather protection, cost, and maintenance concerns
in addition to the aesthetic considerations.
The final design, as shown in the Attachment "A ", is a dusty gray
three -sided metal design with a simulated mission clay tile metal
roof. The walls are perforated metal, providing good weather
protection without creating security concerns. The benches will be
matching metal, backless with "nerf bars" dividing the bench into
three seating spaces. The nerf bars provide comfort to people as
they sit by defining their space and providing a grip for getting
up from the bench. They also inhibit people from lying across the
bench and preventing others from taking a seat. The shelters will
be thirteen feet in length and the benches are six feet. This will
allow a wheel chair to fit within the shelter in compliance with
Americans with Disabilities Act (ADA) requirements.
In 2001, the City secured a CMAQ grant of an unspecified amount,
through VCTC for five bus shelters. This was part of a regional bus
shelter /bike locker program coordinated by VCTC and it planned to
install shelters of its own design. The City's Transportation and
Streets Committee did not like the VCTC design. It was planned to
place the shelters at the Moorpark Metrolink Station since they did
not have the right look for the City streets. Three cement pads
were poured last year at the Station using a 100% minor capital
grant from the Caltrans rail program. The original plan called for
the remaining two shelters to replace existing wooden benches at
the station. However, on February 12, staff met with VCTC staff and
it was agreed that Moorpark and the other recipient agencies could
bid their own shelter designs. As a result, staff recommends that
only three CMAQ shelters be placed at the station and that the
other two shelters be placed at Moorpark City Transit bus stops in
addition to three City- funded shelters. The CMAQ (Congestion
Management /Air Quality) grant will pay for 88.50 of five shelters.
If the City procures an additional three (3) shelters as
recommended, the cost to the City is estimated to be $4,900.19 per
unit for eight (8) bus shelters, for a total outlay of City TDA
funds of $39,201.52, including a loo contingency. The 88.5% CMAQ
grant would be $44,111.06, for a total project cost of $79,748.60.
This is based on estimates from vendors and the actual bid results
Transit bus shelters
CC Meeting of March 5, 2003
Page 3
experienced by the City of San Buenaventura for a very similar bus
shelter project recently bid by that city. It is quite possible
that the City's actual costs may be somewhat lower than the
estimate. With the grant funding, the unit cost to the City's is
estimated to be reduced from almost $10,000 per unit to $4,900.19
per unit for eight (8) installed bus shelters. The funds for this
project were included in the adopted Fiscal Year 2002/03 budget.
On the attached sheets there is a front elevation of the shelter
design, side elevations, a layout plan (showing future trash
receptacles), a bench elevation, and cost estimates.
To expedite this project, staff requests that the City Council
approve the plans and specifications for the procurement and
installation for transit bus shelters and the Council is asked to
authorize staff to proceed with the bid process for this project at
this time. The final determination for shelter locations will be
made by staff based on ridership and site compatibility. To assist
in finalizing the siting decisions, staff will review a report from
VCTC showing boardings and alightings by bus stop.
STAFF RECOMMENDATION
Approve the plans and specifications for the procurement and
installation of transit bus shelters, and authorize staff to
proceed with the bid process for this project.
Attachment A
LINCustom Manufacturing
Bus Shelter Programs
12536 Chadron Ave Hawthorne CA 90250 Phone 310- 978 -2000 Fax 310- 9784000
City of Moorpark
Shelter Systems Spec Sheets
1. Bids are required for the entire work described herein, the contractor shall possess
a Class D -34 Prefabricated Equipment license at the time the award of contract.
2. Structural Materials:
Aluminum shall conform to 6063 T6 or better. Structural steel shall conform to
ASTM A -36, minimum yield strength 36,000 psi. Structural tubing shall have
rounded edges and conform to ASTM A501 or A53 Grad B. Shelters shall be
constructed of modular interchangeable extruded aluminum and steel tubes. All
materials must be coated before attachment where disimilar materials join.
Shelters shall be rated to withstand wind loads of 75 MPH
3. Shelter structures will be non - advertising and without lighting. Shelters shall be
manufactured by LNI Custom Manufacturing Inc. (12536 Chadron Ave,
Hawthorne CA 90250) Model SS -HP -13 Custom with Met -Tile color Mission
Clay Roof with steel perforated back and sides to be primed and painted dusty
Gray Matthews MP 34938. Shelters shall have an overall length of 13' -8" x 5' -8"
width x 9' -10" Height with ceiling. Shelters shall be secured to the existing
sidewalk with 4 shoe base surface mounts that telescope up and down for
leveling, with two 1/2" diameter 4" long expansion bolts per shoe. Recommended
paint Manufacture Mathews two stage Epoxy Primer and Paint urethane. And or
approved equal.
4. Benches: Benches shall be fabricated with 1 %2" round steel pipe and formed 10
gauge 1/4" diameter holes Perforated Steel Material without a back. Two 1 %2"
diameter 1' -8" width anti- vagrant bars welded to 1/4" thick plates. 6' -0" in length
and be manufactured by LNI Custom Manufacturing Inc. (12536 Chadron Ave,
Hawthorne CA 90250) Model SS- 1020 -6 painted Dusty Gray or Black by
recommended paint Manufacture Mathews two stage Epoxy Primer and urethane
paint and or approved equal.
��()137
13'-8 " Overall Length Of Bus Shelter
21-011 9'-8 " Ridge 2'-0 11
10 ' j 3'-8 3'-8 31-811 110
upening(Typ.)' Opening (Typ. )
311 3 "-l'i -3 3
CL
I
= I
7 91,
10
10
Welded—Z
.l5 (Typical)
Q)
0
a) P
C�
U')
C
01 D
Zo
—41
Cn
611
SS -HP -13 Custom Shelter Front Elevation
Scale: 1/2 " =1' -0" QTY= 10 UNITS
"Met Tile" Mission Clay Roof
2"x 4"x 1/8" Thick Aluminum Rectangular
Tube Frame (Typical).
Yx Yx 3/16" Horizontal Steel Square
Tube Bracing.
,060" thick X 114" did. Hole X 3/8" stg Ctrs.
Finish: Point Dusty Gray
Matthews MP 34938
6-0" Long Bench
Part No. 1020-6
3"x Yx 3/16" Vertical Steel Square Tube
Insert Support ( 4 Places ),
NOTE:
Entire Structure ( Except Decra Stone
Coated Steel Tile Roof ) To be painte
Dusty Gray Matthews IMP 3493J8
PROTECT NAME City Of Moorpark Bus Shelters I ;,Wk #, 02072635 APPROVAL DATE I .... .... DATE By I
REVISION
ADDRESS park Ave. isalf. As Noted ......
21 IEII� Dbw#sr PL/AC ... . . pay
STATE MT, ark, HN
HONE ID[SISNa4y. 12.12,02
JUMBERS
ISAIISPfMN Orlando
C;
FZ
CIO
on
PROJECT NAME City Of Moorpark Bus Shelters M-01a N. 02072635 APPROVAL DATE DATE By RNSION 99 Norlh Moor rk Ave. KAU. As Noted _T"
MTATI Moorpark, CA PRMNB?' PUAC
wrrvy I EN
9j.f/j;#&rF, 12.12,02
MIT
leiIS41ESPaSow Orlando Vargasj
5'-8 " O.A.
5'-8 " O.A.
Width
Width
711
4'-0 11
711
7
4'-0 7
3
inside Opening
3
3
inside Opening
"MetT IIe'MMon Clay Roof
CL
CL
--------
2"x 4"x 1/8" Thick Aluminum Rectangular
-
Tube Frame (Typical).
A
3"x 3"x 3/16" Horizontal Steel
'77
Tube Bracing.
Q
10
C14
10
060" thick X 114" dia. Hole X 3/8" sfg
Finish: Point Dusty Gray
Matthews MP 34938
Q
Yx 3"x 3/16" Vertical Steel Square Tube-
C �
Insert Support ( 4 Places
0
C?
6-0" Long Bench
60
Part No, 1020-6
2-1/2"x 2-1/2"x 1/4" Thick Steel Tube Sleeve,
Welded To 3/8" Thick Steel Mounting Base
C?
Plate.
A
NOTE:
Entire Structure ( Except Decro Stone
Left Side Elevation
Coated Steel Tile Roof ) To be paint e
Right Side Elevation
Dusty Gray Matthews MP 34938
Scale: 1/2 " =1' -0"
Scale: 1/2"=1' -0"
PROJECT NAME City Of Moorpark Bus Shelters M-01a N. 02072635 APPROVAL DATE DATE By RNSION 99 Norlh Moor rk Ave. KAU. As Noted _T"
MTATI Moorpark, CA PRMNB?' PUAC
wrrvy I EN
9j.f/j;#&rF, 12.12,02
MIT
leiIS41ESPaSow Orlando Vargasj
Bus Stop
Sign
+/- 3' -5 " t.b.d.
1N- IMPROVE SITE ONLY 4
- oncrete Pad 4" Deep x 4I -0"
Vide (Varie Depth).
5' -0" Long Bench
'art No. 1020 -6
_ ________ _______________________
2 30 ,SS Trash
�urb R"ICeptacle
N
Back of Curb.
13' -8 rr Overall Length of Bus Shelter (SS -HP -13 Custom) +/- 3' -5 " t.b.d.
Street Name
BUS SHELTER, BENCH & TRASH RECEPTACLE LAYOUT PLAN
SCALE: 1/2" =1 ' -0"
CNy Of Moorpark, CA Scope Of Work:
Plan Elevation
Pg. 2
Bus Shelter, Bench and Trash Receptacle
SS -HP-13 Custom Shelter
Pg. 3
Front elevation
SS -HP-13 Custom Sheller
Pg. 4
Side elevation
SS -HP-13 Custom Shelter
Pg. 5
Roof Plan
SS -HP -13 Custom Sheller
Pg. 6
Roof Frame Details
SS -HP-13 Custom Shelter
Pg. 7
Roof Section Details
SS -HP•13 Custom Sheller
Pa 8-9
Partial Left /Front Elevation Details (Attachment)
6 FT BENCH PART #1020.6
Pa. 10-11
2630SS Me Mesh Trash Receptacle Pg, 12
L Details
F
PROTECT NAME Ci Of Moor ark Bus Shelters oxaxrxc xo. 02072635 APPROVAL DATE ��� DATE BY REVISION SHEET
ADDRESS 99 North Moor ark Ave. SCALE Rs Noted QY��y_ - - - „
SM /STATE Moorpark, CA ORAWNBY PL/AC _ - xf 2 or IZ
'TUIPHONE OfS /6NA4fE 12.12.02
�,]. NUMBERS S&FSPfBSOK, Orlando Vargas °_ ^^ - ^ ^•� "` '
I" h
A
1" 1 1 /4" 1 1 /2" Dia. X 1/8" Thick Steel
L CL Pipe Frame.
/ -1 /4" Thick Steel Mounting
N A Plate At Base.
Plan View
Rolled 10 Gauge
Perforated Metal
Bench.
NOTE:
Y-0 3/8"
Scale: 1 1/2" =1 ' -0"
led 1 1/2" Dia. X 1/8"
L-k Steel Pipe Hand
il, Welded As Required.
Gauge x 114" Round
les Steel Perforated
9tal Screen, Welded
Bottom Edges of
/2" Dia. Steel Pipe.
/2" Dia. Steel Pipe
ont & Back),
flded to Steel
le Frame.
1" thick Steel Plate
Base With (2) -3/8"
i. X 4" Long Steel
3s & Shields.
Scale: 1 1/2"=1'-O" QTY= 10 UNITS
PROTECT NAME: Cq 01 Moor ark Bus Shelters uuiwMC Ha 02072635 rnovnL ogre Q DATE By REVISION SHEET
wr
DRESS 99 Narlh Moor ark Ave. SfA26 As Noted
CITY / STATE. Moo( park, CA ORAMNBY 'VAC NNY
EtEPHONE: 10 OF 12
NUMBER: SIUMISBN Odaedo Var as
a
rt
n
x
E5
N
0
rt
a
0
a
7
Note: Please be advised the pricing below are reasonable estimates for the shelters specified.
Descri tp ion OW Unit Price Tax Install &Delivery Sub total Total
SS- SS- HR -13' 8 $7,255.00 $598.54 $1,555.00 $9,408.54 $75,268.30
Spanish Tile Roof Shelter
Aluminum / Steel construction w/ acrylic poly painted surface
All welded construction w/ modular field set -up
Perforated screen back panels
Shoebase mount
LNI 6' V Bench 8 $425.00 $35.06 $100.00 $560.06 $4,480.50
Bench w/ standard nerf bars
Perforated Back Matez unit subtotal: $9,968.60
All Steel Construction
Shoebase mount
total estimate: $79,748.80
5 88.5% CMAQ Grant for five she] $44,111.06
11.5% local match $5,731.95
3 City funded shelters $29,905.80
Contingency $3,563.77
Total City expenditure $39,201.52