Loading...
HomeMy WebLinkAboutAGENDA REPORT 2003 0402 CC REG ITEM 09Aof� MOORPARK CITY COUNC IY:�, AGENDA REPORT TO: The Honorable City Council FROM: Kenneth C. Gilbert, Director of Public Works c DATE: March 25, 2003 (Council Meeting 4 -2 -03) SUBJECT: Approval of the Selection of a Consultant to Provide Design and Environmental Review Services Required for the Construction of the Moorpark Avenue Widening Project [Project 80401, and Adoption of a Resolution Revising the Amount of the Funding for Project 8040 DISCUSSION A. Protect Description The subject project consists of the acquisition of street right -of -way, the preparation of design documents and the construction of a project to widen the west side of Moorpark Avenue between Casey Road and Third Street (see Exhibit 1). The purpose of the project is to provide a second southbound travel lane for this segment of State Route 23. Upon completion of the project there would be one northbound lane and two southbound lanes - plus emergency lanes, center median, sidewalks, etc. B. Consultant Selection In an effort to improve timely delivery of designs for the City's more important capital improvement projects, staff developed a "short list" of firms with a reputation of providing quality civil engineering services in a timely manner. A Request for Proposals (RFP) for the subject project was prepared and forwarded to that list of firms. One Proposal was received from the firm of Tetra Tech, Inc. (Irvine). Staff and the Consultant discussed and clarified some of the components of that initial Proposal and a final draft Proposal and fees was then provided to the City. A copy of the final draft Proposal is attached as Exhibit 2. Mpk_Ave_0304 000149 Moorpark Avenue Widening Project March 25, 2003 Page 2 C. Scope of Services The scope of the required services generally consists of the following: Task l: Conceptual Design • Geometric Analysis • Surveying • Research / Data Gathering • Utility Impact Analysis / Coordination • Right -of -way Impact Analysis • Traffic Analysis • Preliminary Cost Estimating • Drainage Analysis • Assistance with Public Participation Workshops • PSR /PR Preparation [for Caltrans] Task 2: Final Draft Design • Street Improvement Plans • Drainage Plans • Utility Plans • Striping / Signing Plans • Street Lighting Plans • Traffic Signal Modification Plans • Traffic Control Plans • Structure Modification Plans for Impacted Properties • Final Draft Cost Estimate Task 3: Final Plans • Final Plans /Specifications • Final Right -of -Way Documents • Geotechnical Analysis • Utility Coordination • Traffic Management Plan • Permits D. Fees A breakdown of the total fee quoted is as follows: Description Amount ($) Task 1 106,738 Task 2 114,964 Task 3 103,207 Administration 30,091 Total 355,000 Mpk_Ave_0304 000150 Moorpark Avenue Widening Project March 25, 2003 Page 3 A summary of those fees related specifically to project design is as follows: Fee Description Task 2 Task 3 Total Amount ($) 114,964 103,207 218,171 Percent of Construction Description Amount' Construction Cost Estimate $1,750,000 Design Fee $218,171 Percent of Construction Cost 12.5% It should be noted that the fees quoted are preliminary in nature and may be adjusted slightly as a function of final contract negotiations. E. Additional Design Services It is also the intent of staff to negotiate the scope of work and fee for certain additional design services required for the development of the design for the following two projects: • Project 8038: Moorpark Avenue Rail Crossing Improvements • Project 8039: Spring Road Rail Crossing Improvements F. Other Services and Costs Other required professional services and costs not included in the above scope of work include the following: • Preparation of an Environmental Document • Right -of -Way Acquisition Services • Railway Coordination • Bidding Services • Construction Engineering Services (Contract Administration and Inspection) • Right -of -way Acquisition Costs • Right -of -way severance damages • Required "On- site" Property Modifications Mpk_Ave_0304 ® 001S I Moorpark Avenue Widening Project March 25, 2003 Page 4 G. Fiscal Impact 1. Total Project Cost Estimate: A preliminary project cost estimate is as follows: Description Design Design Support Environmental Document Contingencies Sub -Total Right -of -Way Costs Right -of -Way related Costs Sub -Total Construction Construction Engineering Total Estimate 355,000 15,000 60,000 70,000 500,000 200,000 Cost Estimate ($) 500,000 700,000 1,750,000 250,000 3,200,000 2. Budget Amendment: Attached as Exhibit 3 is a Resolution amending the FY 02/03 Budget to provide additional funding for the subject services. A summary of that requested budget change is as follows: Description Fund 2902 - MRA Current Revised Budget M Change Bud et Design 70,000 180,000 250,000 R -O -W 50,000 50,000 Construction - - Inspection - - - Sub -Total 120,000 180,000 300,000 2002 - Traffic Mitigation - Design 70,000 180,000 250,000 R -O -W 50,000 50,000 Construction - - Inspection - - Sub -Total 120,000 180,000 300,000 Total Current Budget 240,000 360,000 600,000 Plus Prior Years Costs Fund 2501 - L A Ave AOC R -O -W 156,708 156,708 Total Project To Date 396,708 756,708 Mpk_Ave_0304 000152 Moorpark Avenue Widening Project March 25, 2003 Page 5 3. Project Funding: The current approved funding for this project is fifty percent (50 %) from the Traffic Mitigation Fund [Fund 2002] and fifty percent (50 %) from the Moorpark Redevelopment Agency [Fund 2902]. No changes are proposed to that funding strategy. 4. Moorpark Redevelopment Agency Action: By separate action, the Moorpark redevelopment Agency will be asked to approve a Budget amendment for the MRA portion of this requested funding increase. STAFF RECOMMENDATION (ROLL CALL VOTE) Approve the selection of Tetra Tech to provide design and environmental clearance services for the subject project, authorize the City Manager to negotiate and execute a contract for said services and adopt Resolution No. 2003- amending the FY 02/03 Budget to revise the amount of the funding for Project 8040. Attachments: Exhibit l: Exhibit 2: Exhibit 3: Map Proposal Resolution Mpk Ave_0304 ® 001 S 3 1 4 f - �c �.r.• t f Akt �Y E� �y �3i ��� R3$v� '*ti.' 4� ':' �_ ^,��i'# it �' pa � �(g��a�m$a .T"'°".- ; dd �:.r37'�da.,..- .,.:." ,L�t ` $§ . yam 2?,Y x !ti '[c-•' g($ .. 71 `'... y,.._•q -.- r . I.p.Iiii An fr fm .. `^^.. ,� �� r sz y F � b `�. 1� r� � � p• t P . s lie . , ^ � t 5,� t�.1��'�.�� { �P � .tr���'N;"".°i � � �'w� � <�1ri`>w $ — c ���.�'��.•t -��1d � >��, f if �, a... 4,:J � y !�' J .: �? _�} "-_' i � W r, it .►� "b'.�.{,�!* .t. Y�Y � r�S �''- � °C. ' f ' =+� rgq•.�+.✓ '° �..� {. , �J.i, � f K � � � � "" l - -.m�S ,3.gt�`s uf, 4 d.a, ;,,:.. ! i ..3n Gg s ,� '�. "�s d"'� -3. . ''.� -, � -•�,_ � - ,-- .i,..r� :, ra � �` .,•t { „t w I ,, ,,,t x3"�r(y � r - ` ' s3:: � � ,yL 5 � sa . �j 7�:. fi �}. �k. SJ ; f �•dT "`�'� `7"' t7"S i� 13' is = x � ��'��"t '��°,�`` '�' 1 ?y �1 �•� 1 .; �,,,[ ,>�'�s.1 ��,t „��-r 3�. -yi.'1 k �ft � rw„ � �r ka: i z le' ..., s>^'.�i°' -•rv- .a^=,r ' ®'^ „�� � ` { "f•. t eY �.6 {�.��7.'d� -:,xs r�-�' ��. '-•• .� �. f B • ��a- atl,.iw.= ..r.. :�rai '� -. i R .:� � ,��1 �^y -..aw ....�, �-.y; ./” x,,,, t- IM't id l _�. 9- �f!�*�[.+''y'.. �t'�°'yY >�'� I� -.�• P Me..narb+.r wee .v+.y , {. lJ..4e.D+ .:r , > � i ! \.• • S. �� )( fi r •x . SECTION IV: REVISED SCOPE OF WORK PRELIMINARY ENGINEERING /PS &E SCOPE OF WORK We propose to complete the scope of work outlined in the RFP dated November 26, 2002, and provide the following detailed tasks as requested to further define the methodology and various elements of work required to complete the Moorpark Avenue Widening Project. Task 0 -A: Administration /Coordination/ Meetings This task includes project management and administration; meetings; quality assurance /quality control; scheduling; budgeting; progress reporting; and invoicing. Progress meetings will be held at monthly intervals or as needed between the City and the Tetra Tech Project Team. To supplement these meetings, we will maintain on -going communication with the City and Caltrans. The purpose of these meetings will be to review the project status to ensure that the contract objectives and milestones are being achieved. A detailed schedule will be developed, maintained, and updated for control of the project. We will establish a Project Development Team (PDT), which will be comprised of the assigned Caltrans Project Manager and representatives of the City and Tetra Tech. PHASE 1 — CONCEPTUAL PLAN Task 1 -A Geometric Approval Drawings (GAD) In order to help expedite project delivery and properly scope the project requirements, GAD approval will be obtained to determine the geometric requirements. Development, review, and final approval of the GAD are described in the following scope of work. City of Moorpark Ex V% k -4 Z Tetra Tech will include drawings of both the existing conditions and proposed improvements. We will submit the GAD, in accordance with City and Caltrans standards, for the City's, Caltrans' and Union Pacific Railroad's (UPRR) review and approval. The City and other agencies will review the plans after the submittal and transmit review comments to Tetra Tech. A comments review meeting may be scheduled between the City, Caltrans, UPRR, Metrolink, utility companies, and Tetra Tech to present and resolve review comments. Task 1 -B Survey Services /Mapping/ Base Sheets We propose to develop base sheets using aerial topographic mapping, supplemented by field survey and field site visits, as -built plans, and other existing information that is available from previous studies and investigations in the area as a basis to begin our project study work. We will perform a field survey in conformance with the Professional Land Surveyors Act of the Business and Professions Code. Said survey will establish the centerline of Moorpark Avenue, the existing rights -of -way and adjoiner lot lines (where said lines are coincident with the right -of- way). We will perform field cross sections at 50 -foot intervals, with additional field shots taken at grade breaks and proposed improvement tie -in points and all surface evidence of underground utilities in the project area. We will prepare monument tie notes for found monuments within the proposed limits of construction. Pursuant to state law, Corner Records will be filed in the office of the County Surveyor and a copy supplied to the City. TETRA TECH, INC. Moorpark Avenue Widening Project -1- Ilisgi crfsOl! wpmisclprop031p001kalSectionlY .Amended.doc 000155 Task 1 -C Research /Data Collection Existing reports, studies, proposed and as -built plans, mapping, or other information will be obtained from the City and reviewed by the Tetra Tech Team. Data to be obtained and reviewed includes: • Design information from the City for adjacent street improvement projects and from developers who may be planning or currently working on development projects in the vicinity. Traffic data (existing and forecasted traffic, level of service, capacity adequacy, operational analysis, etc.). • Right -of -way and utility plans. • Local planning (land use). Task 1 -D Utility Impacts /Coordination We will review existing utility information available from the City and contact utility owners to determine major facilities located in the project area. This information will be shown on the utility sheets and used to determine significant impacts to facilities and the cost estimates resulting from the impacts. We will send copies of the preliminary plans to the utility owners, showing known utilities and requesting verification of existing facilities. The request for information will also include proposed future improvements planned by the utility owners in the project area. Information received from the utility owners will be used to update the utility plan sheets and cost estimates for utility relocations/adjustments paid for by the City and required to construct the project. This scope of work includes the coordination and field location of potholed utilities, but it is assumed that each impacted utility owner will pothole their respective facilities. This scope of work does not include design and preparation of PS &E for any utility relocations required for the project. Task 1 -E Right -of -Way Identification/ Impact Existing right -of -way information, including parcel boundaries, will be obtained from record information at the City and County. Those areas where right -of -way is restricted will be identified. Tetra Tech will identify the existing right -of -way, including property ownership, easements, assessor parcel numbers, and access control, to facilitate construction for the Moorpark Avenue Widening Project. This information will be shown on the GAD and used to determine the preliminary right - of -way requirements that may be required to construct the project. Task 1 -F Preliminary Construction Cost Estimates We will develop preliminary cost estimates, with appropriate contingencies (typically 25% for the 30% plans), by summarizing: 1) design; 2) utility relocation /adjustment costs; and 3) construction engineering costs. Task 1 -G Traffic Report The following is a detailed approach and tasks that will be performed by our traffic engineering staff to complete the analysis of traffic operations and prepare the traffic analysis report for the PSR/PR. Obtain data defining existing conditions in the study area for key intersections and arterials, including information such as land use, number of lanes, intersection geometrics, traffic volumes, turning movement counts, accident data, type of traffic control, speed, and other traffic- related data. This collected data will be the basis for forming an "existing conditions" database. Traffic counts and traffic modeling studies will be provided by the City. Existing and forecasted traffic volumes will be developed (post - processed) and coordinated with Caltrans using information provided by the City. Using the City of Moorpark TETRA TECH, INC. lµ ° Moorpark Avenue Widening Project -2- llisgt crfs-011wpmisclprop031p001kalSection IV.Amended.doc O®0VE6 traffic information developed by Tetra Tech and approved by the City and Caltrans, the following intersections will be analyzed: • Moorpark Avenue at Third Street • Moorpark Avenue at Second Street • Moorpark Avenue at First Street/ Poindexter Avenue • Moorpark Avenue at High Street • Moorpark Avenue at Charles Street • Moorpark Avenue at Everett Street • Moorpark Avenue at Wicks Road • Moorpark Avenue at Casey Road • Moorpark Avenue at New Los Angeles Avenue (SR -118) 2. Using traffic forecast information developed in Item 1, conduct level of service (LOS) analysis for the following three years: 1) Current Year; 2) Implementation or Design Year; and 3) Target or Horizon Year. LOS analysis will be conducted at the intersections listed in Item I above for peak hour conditions. 3. Conduct LOS analysis for the proposed widening geometric, for each of the three years listed in Item 2 above. 4. Queuing on local streets will be evaluated, especially queuing at all left -turn movements. 5. Propose mitigation based on identified impacts for the proposed geometrics and provide a conceptual plan to illustrate the mitigation recommended. Prepare a summary matrix showing traffic scenarios, mitigation, and costs. Cost estimates of recommended mitigation will be included in the PSR/PR. 6. Prepare a Traffic Analysis Report summarizing the overall project work, including complete documentation of analysis procedures and results. The report will meet ' City of Moorpark Moorpark Avenue Widening Project Caltrans, FHWA (NEPA) and CEQA guidelines. Task 1 -H Preliminary Drainage Retort Tetra Tech will review the existing hydrology and any new development hydrology, and prepare a new hydrologic analysis to design the proposed storm drain facilities for the Moorpark Avenue Widening project. We will prepare hydrologic and hydraulic capacity calculations utilizing the Ventura County Hydrology Manual and the Ventura County Flood Control District Design Manual. We will meet early in the project to coordinate any drainage issues, including commercial building roof drains and other nuisance flows. • Obtain existing hydrology and hydraulics studies. • Verify existing watershed boundary. • Meet with the City regarding downstream storm drain connections. • Prepare hydrologic analysis. • Compare peak storm runoff vs. allowable capacity. • Check street capacity and velocity. • Determine catch basin locations. • Prepare preliminary pipe sizes and hydraulics. Task 1 -1 Public Participation (Public Meeting/Workshop) Since this project will have a significant impact to the public traveling along Moorpark Avenue and adjacent property owners along the west side of the project, we will assist the City in providing graphic exhibits, and technical assistance necessary to keep the public informed of the project design and progress. This will be accomplished through workshops and meetings the City may desire to conduct during the development of the Environmental Assessment. We anticipate one (1) public workshop /meeting will be held for the project. TETRA TECH, INC. -3- Ilisgl crfs011wpmisclprop031p001kalSection IV.Amended.doc 000:1512 Task 1 -J Draft Project Study Report/ Project Report (PSR /PRl Note: This scope is based on the assumption that a combined PSRIPR will be used for the project. We will prepare a combined Project Study Report/Project Report (PSR/PR) using the GAD prepared in Task 1 -A. The following are to be included in the PSR/PR as well: 1. Right -of -Way Identification /Impact from Task 1 -E. Traffic and Accident Data: Traffic and accident data will be provided by the City and Caltrans to include current and year 2030, forecasts for the average annual daily traffic, peak hours, and peak hour directional split. Caltrans will provide the most recent three - year accident history. 3. Environmental Assessments and Documentation from Task 1 -G. 4. Draft and Final Fact Sheets: We will prepare draft and final Fact Sheets for deviations from Caltrans' Mandatory and Advisory Standards for the proposed improvements as presented in the PSR/PR. 5. Preliminary Construction Cost from Task 1 -F We will provide twenty (20) copies of the Draft PSR/PR, along with copies of the GAD and supporting attachments to the City for review and comment and for transmittal to Caltrans for their review and comment. Task 1 -K Final Proiect Study Report / Proiect Report (.PSR/PRl We will review the Draft PSR/PR comments from the City and Caltrans and incorporate any changes and revisions into the Final PSR/PR. We will provide twenty (20) copies and one (1) original of the Final PSR/PR, along with copies of the preliminary plans and supporting attachments to the City for review and comment and for transmittal to Caltrans for their final review, approval, and signature. - City of Moorpark 1 ~Y Moorpark Avenue Widening Project PHASE 2 — FINAL DRAFT PLAN (65% SUBMITTAL) Task 2 -A Street Plans /Profiles /Details All plans will be prepared in accordance with Standard Plans for Public Works Construction, 2000 Edition, Caltrans Standard Plans, the City of Moorpark, and Ventura County. Five (5) copies of the plans will be submitted for each plan check review. We will prepare V = 40', 24" x 36" plan and profile street widening plans, including geometric information for reconstruction, rehabilitation, overlay pavement, and other related street improvements required for the project. Note: Plans for relocation of the Civic Center entry are not included in this scope. Negotiations of scope and fee to provide construction documents for the relocation of the entrance will take place after the City determines to relocate the entry during the development of the conceptual plans. Task 2 -B Drainage Plans /Profiles Tetra Tech will develop a modification strategy and prepare the plans and details necessary to construct the drainage facilities required to modify the street. Existing drainage basin locations will be reviewed to maximize the drainage system efficiency. Changes in the on -site drainage patterns that will occur as a result of the proposed street improvements will be reviewed and addressed in developing the drainage design. Based on design flows determined from the hydrologic analysis, we will prepare hydraulic calculations necessary to determine the sizing of laterals, catch basin connection pipes and elevations, and locations of proposed curb inlets. The drainage analysis will also address the runoff from the existing and proposed street and provide for its disposal into a new or existing storm drain system. TETRA TECH, INC. -4- Ilisglcrfs01 ',wpmisclprop03'p00 /kalSection /V.Amended.doc 0 0 0:1�8 The plans will provide for on -site improvements, such as location of new and relocated catch basins, laterals, mainline storm drain requirements, and other storm drainage facilities that may be required to collect storm water runoff. A drainage report will be submitted with the PSR/PR submittal. This scope of work does not include hydrological or hydraulic analysis of regional off -site drainage facilities or preparation of a Runoff Management Plan. Task 2 -C Utility Plans We will prepare separate 1" = 40' scale utility plans using base layout sheets, showing the location of existing utilities, delineating those that will require relocation/adjustment, and designating who will be responsible for any required adjustment/relocation. Plans will be sent to utility companies to confirm that all facilities and relocation limits are clearly shown. Task 2 -1) Striping /Signing We will revise signing and striping plans, per the GAD, showing the locations of signs to remain, be removed or relocated; new sign installations; and special sign details. Striping plans will show all striping details, pavement markings and markers. Signing and striping plans will be prepared in accordance with the City of Moorpark and Caltrans standards and design criteria. Task 2 -E Street Lighting Plans We will prepare street lighting plans to install new street lighting and relocate or remove existing street lighting within project limits. The lighting plans will include proposed poles, pull boxes, conduits, service locations and wiring diagrams. The lighting plans will be prepared at a 1" = 40' scale. Task 2 -F Traffic Signal Modification Plans We will prepare two (2) traffic signal modification plans for the following intersections: City of Moorpark • Moorpark Avenue at First Street/Poindexter Avenue Moorpark Avenue at High Street Traffic signal plans will include locations of traffic signal appurtenances, schedules, warrants, signal phasing, and structural or foundation requirements in accordance with City and Caltrans standards and design criteria. Requirements for electrical service will be coordinated with the local electric utility owner. The traffic signal plans will be prepared at a I" = 20' scale. Traffic Signal on Moorpark Avenue at First Street /Poindexter Avenue Task 2 -G Construction Staging and Traffic Control Plans Construction staging and traffic control plans will be critical to the success of the project during construction. Attention to detail, awareness of the daily access requirements along the project, and maintaining traffic flow at acceptable levels of service through the project during construction will be essential to develop a workable traffic control plan. We are sensitive to the concerns of the existing businesses and property owners and the necessity to provide access for customers and emergency vehicles. We have prepared numerous traffic control plans for projects of this nature and are confident that we can offer this service to assist TETRA TECH, INC. Moorpark Avenue Widening Project -5- 1lisg1crt .011wpmirc1propU3 1pUUlka&ction II.Amended.doc U001OIS9 the City in developing concept plans that will provide the staging and traffic control necessary to provide an adequate level of service during construction, maintain safe vehicular traffic, and provide a safe work area for the construction workers. Traffic control plans will be prepared in accordance with the City and Caltrans' Traffic Manual and will be prepared at a 1" = 40' scale. Task 2 -H Structure Modification Conceptual Plans It is our understanding of the RFP that this item of work is to provide preliminary design and preliminary estimates of the probable construction costs of the necessary modifications to buildings affected by partial right -of -way takes in the widening of Moorpark Avenue. We have reviewed the site and have prepared our proposal assuming the widening of Moorpark Avenue is on the west side of the street, affecting two business and properties: Vanessa's Bakery (Panaderia Vanessa), and Kahoots Feed, Pet and Saddlery. To provide the additional right -of -way and building setback, these businesses may be structurally modified by removing a portion of the structure. The preliminary right-of-way analysis will investigate the zoning requirements and identify the building setback and impacted structures. Tetra Tech will work with the City to identify the structures that will be considered for full takes, partial takes, or partial takes with structural modifications. Preliminary structural investigation will involve field measurements and verification of the existing structures to identify the existing conditions and locations of structural, electrical, plumbing, and HVAC systems that would be affected by the proposed modifications. Tetra Tech will provide a report of our findings, including schematic plans, with items of proposed work. The preliminary estimate of probable construction costs will include areas of work, estimated crews, and equipment necessary to complete the work, as well as back up information used in the estimates. �f City of Moorpark Moorpark Avenue Widening Project Proposed structural modifications include the following: foundations and shear wall analysis and additional reinforcement; architectural modifications, roofing, windows, and exits; plumbing; HVAC; electrical; ADA access compliance (to be investigated and determined); and driveway and site modifications. We will provide five (5) copies of the preliminary reports for the two properties. Task 2 -1 Final Draft Special Provisions Specifications for this project will conform to the requirements of Standard Specifications for Public Works Construction, 2000 Edition, and City, County and Caltrans Standard Specifications, The City will furnish specific front -end documents, and we will prepare final special provisions for items, details, materials, procedures, and other conditions not adequately covered by City, County, Caltrans, or Public Works Standard Specifications. A listing and copy of all standard plans required for the project will be provided in the Appendix, and copies of any plans used that are not standard will also be included. Five (5) copies of the specifications will be submitted with the design drawings for each plan check review. Task 2 -J Final Draft Cost Estimate We will prepare a draft cost estimate of probable construction costs for the project that will include a proposed bid item list, estimated quantity, and line item cost estimates in accordance with City format. We will coordinate with UPRR, Metrolink, and the Public Utilities Commission for replacement by others of railway crossing protective devices. TETRA TECH, INC. -6- Ilisglcrfs011wpmisclprop0 .31p001kalSection !VV..A�m,�e ed *.tco LE PHASE 3 — FINAL DESIGN (95% AND 100% SUBMITTAL) Task 3 -A -G, I -J : 95% PS &E Submittal We will incorporate review comments from the draft plan check into the 95% PS &E submittal. Ninety-five percent (95 %) submittal tasks (A through G and I through J) will be the same tasks as described in Phase 2, Tasks A through G and I through J, for the 65% submittal. Task 3 -L Final Right- of -Wav When final right -of -way requirements are confirmed, we will prepare legal descriptions and sketches for property acquisition of necessary right -of -way in fee and/or easement. We estimate the following number and type of descriptions will be required: Fee = 10 Temporary Construction Easements (TCE) = 10 Rail companies tend to own property in fee, including street areas within their right -of -way; therefore, a Permanent Easement will be obtained within the Ventura County Transportation Company right -of -way. We have assumed one review of each description, response to comments and preparation of final descriptions. Note: Legal descriptions for landscape easements are not included in this scope. Negotiations of scope and fee for legal descriptions for landscape easements will take place after the City determines the locations of where landscape easements are required. Task 3 -M 100% PS &E Submittal After incorporating review comments from the 95% plan check for the plans, specifications, and cost estimates for roadway, drainage, utility, signing /striping, street lighting, traffic signal a� City of Moorpark modification, and structure modification plans, we will submit Mylars of the plans; a sealed, original hard copy of the technical specifications; utility response files; and all calculations and notes generated by the project. Task 3 -N Geotechnical Investigation/ Report Our geotechnical subconsultant, Leighton Consulting, Inc. (LCI), will perform the following scope of work that includes field exploration, laboratory testing, engineering analysis, and report preparation. The scope of work is intended to provide geotechnical information for use in the design and recommendations for the construction of the street widening and masonry block soundwalls. • Review of available existing materials reports and available in -house geotechnical reports, aerial photographs, and geology maps pertinent to the project area. • Site reconnaissance to observe the current site conditions and mark boring locations. • Clearance of underground utilities from Underground Service Alert and the City prior to commencement of field exploration. • Coring, logging, and sampling of approximately twenty (20) 8 -inch diameter borings of the subgrade soils at representative locations along the street sections, extended a minimum of five (5) feet below the existing surface. Borings will be backfilled with drill cuttings and patched with cold asphalt at the ground surface. Laboratory testing of representative samples to determine R- value, soluble sulfate content of the subgrade soils, and maximum density and in -situ moisture and density of the subgrade soils. Preparation of a report presenting the findings, conclusions, and recommendations for subgrade preparation and structural pavement sections. TETRA TECH, INC. Moorpark Avenue Widening Project -7- Ilisglcrfs011wpmisclprop031p001kalSection IVAmended.doc 00016 Task 3 -0 Utility Coordination We will send copies of the final plans showing known utilities that are impacted to the utility owners, requesting final verification of the existing facilities. A final meeting will be held with the utility companies to ensure conflicts are addressed and resolution is documented. Our utility procedures include forms, meeting minutes, action item lists, and decision logs clearly identifying the resolution of undergrounding and relocation. Task 3 -P Traffic Management Plan In order to prevent unreasonable traffic delays resulting from construction activities, Tetra Tech will prepare a traffic management plan (TMP) to maintain acceptable levels of service and safety during all work activities in the project area. The TMP will be prepared per the Caltrans TMP Guidelines and will address the concerns and requirements of the City, Caltrans, and local businesses. The TMP will identify traffic impacts for each stage of construction and provide mitigation measures and their associated costs. The TMP for this project will require effective application of traditional and innovative mitigation measures such as: • Public/Business Information Campaign • Motorist Information Strategies • Incident Management • Construction Staging Strategies • Demand Management • Alternate Route Strategies • Contingency Plans Task 3 -Q Permits Tetra Tech will assist the City in obtaining the appropriate permits necessary to construct the proposed improvements. We will meet, as necessary, with the appropriate entities who issue these permits and fill out required forms necessary ti City of Moorpark to obtain these permits. The cost of all permits will be paid for by the City of Moorpark and is not included in our Fee Proposal. The following permits are anticipated: • National Pollutant Discharge Elimination System (NPDES) Permit • UPRR Right -of -Way Entry Permit • CPUC Crossing Application • California Regional Water Quality Control Board Permit • Caltrans Encroachment Permit TETRA TECH, INC. Moorpark Avenue Widening Project -8- llisglcrfs011wpmisclprop031p001kalSection1 V.Amended.doc 000IC2 TETRA TECH, INC. FEE ESTIMATE - MOORPARK AVENUE WIDENING PROJECT CITY OF MOORPARK I ESTIMATED LABOR HOURS PER CLASSIFICATION TASK nESCRIPr10N r2H01Ii1wr1 Rma�l SH PNO3F:IT M MIAGFR PRO.IF.("r F.NC.INE }:R DESIGN ENGINEER CAD )PER WORD PKO(' SURVEY 1'IK)K 2-PER SILKY 1 .REW PRINCIPAL S( IF:NTi57' S( IF'NTISI' ASSOC SCIENTIST TOTAL. LABOR }1011RS TOTAL I LABOR POSTS DIREC'C COSTS TO'1'AI, POST REMARKS 1155 5125 596 585 S56 SI00 5178 $115 $70 S52 d i% A8 40 NO 300 $4.200 514.200 SUHTOI'Al. 96 88 40 0 Nit It B 0 0 0 100 $.14,200 $33-''00 M-C' Phaw 1. IOW MaDN 24 40 40 1;2 $11"38() S11.4A0 56 A 40 40 56 208 526.376 54.700 $11.076 • D .-I foitt Lor Ma m • Rcuurcllbu('i llleaurm 2 N 24 24 8 66 56.102 16.102 1.1) Vuhty Im am /(lr,ttdmabnn 2 4 16 N 4 14 51.250 1 -E R19u .d 14av ldcnuhcablw/hn efts 2 3 16 8 N 16 53 S6.674 1 -F f'tehlmnu ( "m V 2 N 24 4 18 $1.818 S3.918 I -G Tratltc He Ht 2 16 40 32 1 16 M6 59.766 $2.500 $1 2?66 ' "1'14111c Bata ('ullccbun 1 -11 Prchmmary D,-4c Ra• wr1 4 12 48 16 3 _ 108 S11.036 S11,036 1.1 1106c I';vbci r30on (PubhL Mcuun Work >ho 1 4 16 A 16 16 _ 60 $5 (rW SI.000 $6.643 • Rc n ducmm /l)Irw C-t, 1 -3 Orft PSRIPR 16 4X 16 24 _ 168 S17..128 SI', „323 1 -K F-1 PSRAIR N 3'- 16 8 N 72 57 90) 11 58.904 • Ru .luc6nn/D. -I ('om, SLRT'O7'AL 58 2311 34J 208 88 48 72 0 1) 0 1026 $109„198 WNW $118,598 Phw 2 -}9ual Draft Plan - _ - Dnm PS &F Ib5'�: SO -null 5750 $750 • Re m>JucuonlDlr ct t'oets 2•A Roadway I'lan.i/RolilaDcWd> A 60 LOA 120 296 $22108 529.308 2 -0 •)ra.,uc Plain /lholi le 4 40 % 108 _ 248 S24.016 S24016 2 -I' U010 Vim, 2 N 12 24 66 56.32: I 56,422 2 -U 11 •mm; and S•n In •Plans 2 N 12 24 66 5642_ t! %.322 2 -E Stl-L LrutRm • [4.1 _ 1 4 16 10 38 $1.106 I $1.706 2 -F Tr 15c S mn I Mdificawm Vw,,, 2 16 40 40 - 98 $9.550 T $9.550 2 -C. ('nnslrncunn Staeim• anJ'rra(6c lumnd flans 2 8 40 32 _- I 82 57.870 17.870 2 -fi Straaurcs MuJlhcmnms ('once Waal flans 8 qt 112 '76 16 292 528.549 S29.538 2 -1 Final (kilt S -A Pml, ons A •t0 N 24 _ 8U $8.152 58,152 2 -J F-1 DrR (lot Fsumale 2 14 16 A 10 $2.794 S2.794 Sl.'RTUl'AL 40 238 Sql 460 38 0 _ 0 0 0 0 12% $126,988 5750 f127,73A - . Phm3 -Final B ..- D'At Fina1 PS &F. 05'b Suhminal) 5750 S750 ` R11,101. ntUtret ('om, -1-,\ Ros, ay I'Ian,OholilcAkuils 4 I6 56 40 116 511.796 SI 1.196 3 -0 Urmna c Plans/Pmhlc 4 24 49 40 I I6 $11.628 511.62'8 34• Lllda, l'I.In.> 4 16 16 18 51.706 53,706 3 -0 1 Si inn • and Sin mn Plan, I 2 16 N 27 S2.621 S 21,21 3•F: SHm11.i •htin g Plans 1 2 1 8 27 52.621 52.621 3-F Trlfic S, •nal Moddicalion PWn> 2 N 24 16 50 $4,974 54974 3-l; Con >wcl6n SW nn and T,wOL Cont 1 o1 flans 2 2 16 16 36 $3.456 S1•456 3.1 Dr 4l Fm415 't'13I Rnvuums 4 16 1 16 16 52 S5.052 S5.012 3J Draft Final('oet F ".umatc 2 4 16 4 _ 26 52.570 $2.570 H. ht al w- 4 80 24 88 _ 196 521.460 S21.360 34I Fna1 PS&F: 11004, Submmall 8 16 72 16 A _ 80 38.120 $(5(10 59.620 •Rc mduan•n /DlreLl C-is 3-N (,wcchnmel T-ol, anon 2 4 4 LO Sf:04 515.908 $16.942 •Sub - Lct hum and Aim -lca 3 -0 Otda (lxx.hnalion 4 4 8 4 20 52.112 52.112 3-1, T&fic Manaecmcnl Plan 2 L6 30 32 8 98 59.318 $9.118 3•V I'Crmn> N 24 16 12 60 S6.449 56.448 suH,i3O'r.\I. 50 222 320 216 56 88 0 0 0 0 952 S %516 $18,158 $114,674 ES71M, \TF.b'1'OT,U. LABOR ib \SF. HOURS 2.13 81K 1164 884 272 1,16 72 0 0 It 3578 5.167502 f28,11 2 COTAL ESI'1MATPUC'OST ' ` _ ,$395,10 0 O F, Ca p e s.I r TZsk Trsk 3 355, occ ,- Exhibit 3 RESOLUTION NO. 2003- A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MOORPARK, CALIFORNIA, AMENDING THE FY 2002/03 BUDGET TO REVISE THE AMOUNTS OF THE APPROPRIATIONS AND BUDGET FOR PROJECT 8040: MOORPARK AVENUE WIDENING PROJECT [TRAFFIC MITIGATION FUND (FUND 2002) AND MRA AREA 1 OPERATIONS FUND (FUND 2902)] WHEREAS, on June 5, 2002, the City Council adopted the Budget for Fiscal Year 2002/03; and WHEREAS, a staff report has been presented to the City Council requesting a budget increase in the aggregate amount of $360,000; and WHEREAS, Exhibit "A ", attached hereto and made a part hereof, describes said budget amendment and its resultant impacts to the budget line item(s). NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF MOORPARK DOES HEREBY RESOLVE AS FOLLOWS: SECTION 1. That a Budget amendment in the aggregate increase of $360,000, as more particularly described in Exhibit "A ", is hereby approved. SECTION 2. The City Clerk shall certify to the adoption of this resolution and shall cause a certified resolution to be filed in the book of original resolutions. PASSED AND ADOPTED this 2nd day of April, 2003. Patrick Hunter, Mayor ATTEST: Deborah S. Traffenstedt, City Cler Attachment: Exhibit 'A': Appropriation and Budget Detail 0001A Resolution No. 2003 - Exhibit "A" Revised Appropriations & Budget For Project 8040: Moorpark Avenue Widening A. Fund Allocation B. FY 02/03 Budget Re -Cap FY 02/031 Appropriationy FY 02/03, Account Number - Budget ! / (Reduction) BudcLet • - 2902. 8310. 8040. xxxx ,+ $ 120, 000 t- $ 180,0001 - $ 300, 000`1 r----------------- - - - - -- --------- - - - - -� - _ -._ -_- �_ _ - - -- - - -_ -- - _ --- — — 2002.8310.8040.xxxx $ 120,0001 $ 180,000; $ 300,000; 1 240,000 1 $ 360,000 $ 600,000 1 C. Total Appropriations Re -Cap Revised] k FY 02/03; Prior Years; Total Account Number . t Budget': Expenditures; Appropriations) F 2501. 8310. 8040. 9640 i -$ 0 j $ 156,708-1- 56, 708 t_ $ 156, 708 Casey Road Improvements '2902 8310.8040.xxxx j $ 300,000 $ 0 $ 300,000; 2002.8310. 8040-.x- xxx $ 300, 000 $ 0 $ 300, 000 { i $600,000 - $ 156,708 $ 756,708 i D. Distribution of Appropriations to Expense Accounts i Current; Subjecti Revised f FY 02/03 Appropriation, FY 02/03 ;Account Number Budget;/ (Reduction) Bud et • _ rxxxx._8310.8040.9601: Design $ 140,000, $ 360,000; $ 500,0001 �xxxx.8310.8040.9610: R -O -W $ 100,00-1 $ 0! $ 100,00-1 xxxx 8310.8040.9640: Const. $ 0 $ 0 $ i xxxx . 8 310.8 0 4 0. 9 6 5 0 : Insp. i $ - - -- -0 _'$___________ _ o �_ $ 0~ $ 240,000 $ 360,000; $ 600,0001 Approved as to form: ab Q Qo1E S Current' S Subject'! R Revised C. Total Appropriations Re -Cap Revised] k FY 02/03; Prior Years; Total Account Number . t Budget': Expenditures; Appropriations) F 2501. 8310. 8040. 9640 i -$ 0 j $ 156,708-1- 56, 708 t_ $ 156, 708 Casey Road Improvements '2902 8310.8040.xxxx j $ 300,000 $ 0 $ 300,000; 2002.8310. 8040-.x- xxx $ 300, 000 $ 0 $ 300, 000 { i $600,000 - $ 156,708 $ 756,708 i D. Distribution of Appropriations to Expense Accounts i Current; Subjecti Revised f FY 02/03 Appropriation, FY 02/03 ;Account Number Budget;/ (Reduction) Bud et • _ rxxxx._8310.8040.9601: Design $ 140,000, $ 360,000; $ 500,0001 �xxxx.8310.8040.9610: R -O -W $ 100,00-1 $ 0! $ 100,00-1 xxxx 8310.8040.9640: Const. $ 0 $ 0 $ i xxxx . 8 310.8 0 4 0. 9 6 5 0 : Insp. i $ - - -- -0 _'$___________ _ o �_ $ 0~ $ 240,000 $ 360,000; $ 600,0001 Approved as to form: ab Q Qo1E S D. Distribution of Appropriations to Expense Accounts i Current; Subjecti Revised f FY 02/03 Appropriation, FY 02/03 ;Account Number Budget;/ (Reduction) Bud et • _ rxxxx._8310.8040.9601: Design $ 140,000, $ 360,000; $ 500,0001 �xxxx.8310.8040.9610: R -O -W $ 100,00-1 $ 0! $ 100,00-1 xxxx 8310.8040.9640: Const. $ 0 $ 0 $ i xxxx . 8 310.8 0 4 0. 9 6 5 0 : Insp. i $ - - -- -0 _'$___________ _ o �_ $ 0~ $ 240,000 $ 360,000; $ 600,0001 Approved as to form: ab Q Qo1E S Approved as to form: ab Q Qo1E S