Loading...
HomeMy WebLinkAboutAGENDA REPORT 2003 0507 CC REG ITEM 10FMoorpark City Council Agenda Report I' mm 1 fl To: The Honorable City Council From: Kenneth C. Gilbert, Director of Public Works, Date: April 25, 2003 (Council Meeting 5 -7 -03) Subject: Consider Award of Contract for the Construction of the Flinn Avenue Realignment Project [Project 8037] and Adoption of a Resolution Amending FY 2002/2003 Budget to Revise the Funding for Said Project BACKGROUND In November of 2001, the City Council approved the conceptual design for the subject project. In February of 2003 the City Council approved the project plans and authorized staff to advertise for bids. DISCUSSION A. Scope of Work The subject project calls for: • the construction of a new Flinn Avenue to intersect Spring Road at Second Street (see Exhibit 1, Pages 1 and 2); • the widening of the east side of Spring Road from Flinn Avenue northerly to the rail crossing (see Ex. 1, Page 3); • the construction of a raised center median in Spring Road from Flinn Avenue to the rail crossing; and Note: The installation of landscaping in that median will be undertaken at a later date. A separate consultant has been retained to prepare the design for that and other landscaping in the area. • the construction of a traffic signal at the new intersection of Spring Road, Flinn Avenue and Second Street. flinn_awd 000:132 Flinn Avenue Realignment: Award Contract April 25, 2003 Page 2 B. Spring Road Widening Project Design efforts are proceeding on a project to widen Spring Road south of Flinn Avenue. That project will require acquisition of additional street right -of -way. It is anticipated that the design will be completed within three months and that the required rights -of -way will be acquired by June of 2004. C. Construction Details Some of the components of the subject project include the following: • Gas, water, sewer, telephone and storm drain utilities will remain in the "old" Flinn Avenue right -of -way. • The existing overhead electrical lines along the "old" Flinn Avenue, will be placed underground in the new Flinn Avenue. This "undergrounding" effort will also include a portion of Minor Street. • The installation of several new street lights. • A water meter will be installed for the future median irrigation system and will be "stubbed -out" to the median, in order to avoid a future street cut. • Irrigation sleeves will be installed from the median to a point south of Flinn Avenue, where future medians will be constructed. • New curbs and gutters will be constructed at their ultimate location, along the Spring Road and Flinn Avenue frontage of the future Police facility. • A sidewalk will be constructed on the south side of the new Flinn Avenue, and on the east side of Spring Road, south of the new Flinn Avenue. • No sidewalks will be constructed on the north side of the new Flinn Avenue or on the east side Spring Road north of the new Flinn Avenue. That work will be constructed as a part of the new Police facility. • The old Flinn Avenue will be left in -place at this time. A barricade will be placed at the west end of the street to prevent vehicular access to and from Spring Road. • A driveway will be constructed at the east end of the old Flinn Avenue, to allow vehicular access to the properties on the south side of the old Flinn Avenue. D. Campus Park Drive Median Improvements In March of 2003 the City Tax Fund] for the placement Park Drive Median. A design work to the subject project. flinn awd Council appropriated $22,000 [Gas of stamped concrete in the Campus Addendum was prepared adding this Mr t Flinn Avenue Realignment: Award Contract April 25, 2003 Page 3 E. Right -of -Way No right -of -way acquisition will be required to construct this project. The new Flinn Avenue and the added street width for Spring Road, will be created via recordation of a Parcel Map for the Police facility property. F. Environmental Clearance The subject project has been determined to be Categorically Exempt. G. Street Vacation It is the intent of staff to prepare and process, at a later date, documents necessary to vacate the old Flinn Avenue. That vacation will include action to retain utility easements for the existing utilities to remain in place. H. Ultimate Access to Properties south of Flinn Avenue As mentioned above, the project calls for the construction of a barricade at the west end of the old Flinn Avenue and the construction of a driveway at the east end of the old Flinn Avenue, to allow access for the businesses on the south side of the street. The pavement improvements for old Flinn Avenue will remain in place until the street vacation efforts have been completed. The business and /or property owners affected by these changes have been contacted and notified of these changes. Staff invited the affected business and property owners along the south side of "old" Flinn Avenue to meet and discuss a number of issues, including: • the subject project; • the future widening of Spring Road (and the right -of -way acquisition related thereto); • the planned vacation of the old Flinn Avenue; [Note:Upon vacation of the street, the south one -half of old Flinn Avenue can be conveyed to the properties fronting the south side of the street.] • the ultimate use of the remnant parcel to be created when the street is relocated; • the design for the future ultimate access from the affected properties to the new Flinn Avenue; and • the removal of the street improvements within the old Flinn Avenue right -of -way to be vacated. flinn_awd 000134 Flinn Avenue Realignment: Award Contract April 25, 2003 Page 4 The owner of the most westerly property on the south side of "old" Flinn Avenue met with staff to discuss the project. Staff explained the scope of the project, the impacts to adjacent properties and the future plans related to the disposition of "old" Flinn Avenue. There were no objections noted. I. Bid Results Bids for the subject project were received and opened on April 22. The apparent low bidder is Nativ Engineering, with a bid of $539,865.00. A summary of the bid results is attached as Exhibit 2. It has been determined that the apparent low bidder is qualified to perform the work. Said bidder has confirmed that their bid is valid and that they are prepared to proceed with the construction of the project. J. Sub - Contractors Nativ Engineering listed two sub - contractors for concrete work. They failed to state in the bid documents that the two "subs" were to perform different components of the work. The firm subsequently provided a letter to the City clarifying this matter. It has been determined that this clerical error in the bid did not render the bid "non- responsive." K. Fiscal Impact 1. Construction Contract Costs: Based on the bid results, the estimated construction cost is as follows: .................----...............................--........_.........____._ ..........................._._......_----._...._........._........................._._.._--._._.. ......I...............--- ._...: Description Amount ($) Construction Contract 539,865.00 Contingency (10 %) 53.986.50 Total 593,851.50 2. Contract Breakdown: A breakdown of the Contract Costs into certain project components is as follows: Bid Amount Contingency (10 %) Total Less Campus Park Median (Bid Item #613) Less Electrical Conduit for Undergrounding (Bid Item #13) Less Spring Road Widening Costs Less Traffic Signal Costs (Bid Item #15) Flinn Avenue Realignment Costs flinn awd Amount ($) 539,865.00 53.986.00 593,851.00 (16,000.00) (139,236.00) (62,236.00) (90,000.00) 286,379.00 Flinn Avenue Realignment: Award Contract April 25, 2003 Page 5 3. Spring Road Widening Costs: The project includes the painting of Class 2 Bike Lanes along that portion of Spring Road between "old" Flinn Avenue and the rail crossing. The project will be able to install these Bike Lanes because this segment of Spring Road is to be widened eleven feet (11'). Identified in the above chart is the approximate cost [$62,236] of that portion of the work related to this street widening. As stated below, a portion of these street widening costs [$30,230] is to be funded from TDA Article 3 (SB -821) bicycle / pedestrian grant funds carried over from prior year projects. This recommended funding will bring the unappropriated Fund balance for this Fund [Fund 2602] to zero. 4. Electrical Undergrounding Costs: As authorized by the City Council, the project includes the undergrounding of existing overhead electrical distribution facilities in the general vicinity of the project. The placement of the conduits for that effort is included in the construction contract. Certain other equipment and energizing costs were paid directly to the Southern California Edison Company (SCE). A summary of these costs is as follows: --- ............... ---- .............. ___ ............... --- ...................... __.__ ........................... ....... _------._._ .......................................... . ---- ....................... _ Description Amount ($) Direct Costs to SCE 56,698 Conduit Costs (Bid Item #13) 139.236 ...--- ........Total.. ..._ ... -- ................__._. 195,934 _ 5. Total Project Costs: A current estimate of total project costs is as follows: Descri Design Design Support Right -of -Way Construction Contract ( +10 %) SCE Undergrounding Direct Costs Inspection / Contract Admin. Total Amount ($) 60,000 500 2,000 593,851 56,698 70.000 783,049 flinn_awd 0001,36 Flinn Avenue Realignment: Award Contract April 25, 2003 Page 6 6. Budget Amendment: The attached Resolution provides for an amendment to the Budget to reflect the revised funding sources and requirements discussed above. That Resolution is summarized as follows: Description Fund Current Budget ($) Chan a ($) Revised Budget ($ Design 2501 L A AOC 11,195 1750 12,945 2902 MRA 11,195 1750 12,945 22,390 3500 25,890 Construction 2501 L A AOC 347,852 (45,692) 302,160 ** > 2605 Gas Tax 0 16,000 16,000 * ** > 2602 TDA Art. 3 0 30,230 30,230 2902 MRA 347,852 (45,692) 302,160 695,704 (45,154) 650,550 Inspection 2501 L A AOC 35,000 0 35,000 2902 MRA 35,000 0 35,000 70,000 - 70,000 Total FY 02103 788,094 (41,654) 746,440 Plus Prior Year Costs 39,610 0 39,610 Total Project Budget 827,704 (41,654) 786,050 ** Campus Park Medians * ** Portion of Spring Rd. Widening L. Schedule It is anticipated that construction of the project will commence in June and be completed by September. M. Administrative Actions If the recommended action is taken by the City Council, certain administrative actions will be undertaken by staff, including the following: • A contract agreement will be forwarded to Nativ Engineering, Inc., for the construction of the subject project, for the contract price of $539,865.00. • When all of the contract documents are in order, the agreement will be executed by the City Manager. • A construction contingency of $53,987 (10 %) will be set aside for the project. f1inn_awd 000137 Flinn Avenue Realignment: Award Contract April 25, 2003 Page 7 STAFF RECOMMENDATION (Roll Call Vote) 1. Approve the award of a contract to Nativ Engineering, Inc. for the construction of the subject project. 2. Adopt Resolution NO. 2003- Attachments: Exhibit 1: Exhibit 2: Exhibit 3: flinn awd Design Diagrams Bid Results Resolution U- 13- 2001(TUE) 12:24 HAWKS AND ASSOCIATES FLINN AVENUE REALIGNMENT 000139 80 - _ 0 80 160 SCALE OF FEET NOR TH f? 7' 23' 1 PC3 Z 60' SOUTH !� 23' I 7' I ( i m WI I v : Q Q a Z Z tqRA D E --0-2 ..2--7° FLINN AVENUE 5 Curb & Gutter 7 Sidewalk 000140 ri Q Curb Curb & Gutter Q9 Median a� q4/ 37' 37' T ki< 15- WEST I 7' AC EAST R 111 I OVERLA Y I I I 7' 7' 12' 11, VARIES - II W1DENlNG II 6 II 6 I VARIES VA'Q /ES n AC 01 19 8" PMB GRADE TO —''^ .,_._ ._.;.... .....MIN. !. ---� 2Z MAX. -- 12'f E i I I I 8 I SPRING ROAD i GRIND EDGE AND TACK COAT. 3' X 1" TYPICAL STREET SECTIONS GRIND AT JOIN LINE NOT TO SCALE Flinn Avenue Realignment and Spring Road Widening Project Bid Opening: 04/22/03 Engineer's Estimate marks an allowance Flinn Avnue Realignment Item # Item Code Item Description Quantity Unit of Measure Unit Price Item Total 1 1001 -8 TRAFFIC CONTROL & CONSTRUCTION 1 LS $25,000.00 $25,000.00 2 1003 -3 CLEARING & GRUBBING 1 LS $15,000.00 $15,000.00 31004-3 UNCLASSIFIED EXCAVATION 1521 CY $15.00 $22,815.00 41005-3 UNCLASSIFIED FILL 246 CY $10.00 $2,460.00 5A 1006 -3 6" PCC CURB & 18" GUTTER 980 LF $12.00 $11,760.00 5B 1006 -3 8" PCC CURB & 24" GUTTER 702 LF $16.00 $11,232.00 61007-3 PCC MEDIAN CURB & STAMPED 1131 LF $15.00 $16,965.00 71008-3 PCC SAN & CROSS GUTTER, H/C RAMPS 12026 SF $6.00 $72,156.00 8 1009 -3 ROAD BASE (PMB) 665 CY $55.00 $36,575.00 91010-3 ASPHALT CONCRETE 700 TON $65.00 $45,500.00 101011-3 CATCH BASIN 3 EA $4,000.00 $12,000.00 11 1012 -3 18" DRAIN RCP (3000 D -LOAD) 75 LF $60.00 $4,500.00 12 1013 -3 24" DRAIN RCP (2000 D -LOAD) 22 LF $120.00 $2,640.00 13(A) 1014 -3 1 1/2" STREET LIGHT CONDUIT 1212 LF $8.00 $9,696.00 13(B) 1014 -3 2" CONDUITS 20 LF $10.00 $200.00 13(C) 1014 -3 3" CONDUITS 759 LF $13.00 $9,867.00 13(D) 1014 -3 4" CONDUITS 1641 LF $15.00 $24,615.00 13(E) 1014 -3 5" CONDUITS 145 LF $20.00 $2,900.00 141015-3 MISC. FACILITIES 1 LS $44,000.00 $44,000.00 151016-3 TRAFFIC SIGNAL 1 LS $160,000.00 $160,000.00 16 1017 -3 SIGNING & STRIPING 1 LS $10,000.00 $10,000.00 17 RELEASE 1 LS $1.00 $1.00 181018-3 6" PVC 135 LF $30.00 $4,050.00 191019-3 BUS TURNOUT 32 CY $400.00 $12,800.00 6b Addendum N STAMPED CONCRETE CAMPUS PARK 3200 SF $0.00 $0.00 Bid List Total $556,732.00 Total Bid Amount $556,732.00 I TI) x 9 Nativ Engineering, Inc. SULLY- MILLER C.A. Rasmussen, Inc. 7003 Owensmouth Avenue 3555 E Vineyard Ave 2360 Shasta Way Canoga Park, CA 91304 Oxnard, CA 93036 -1091 Simi Valley, CA 93065 -1800 US US US Unit Price Item Total Unit Price Item Total Unit Price Item Total $2,000.00 $2,000.00 $15,000.00 $15,000.00 $20,000.00 $20,000.00 $40,000.00 $40,000.00 $46,000.00 $46,000.00 $20,000.00 $20,000.00 $28.00 $42,588.00 $21.00 $31,941.00 $15.00 $22,815.00 $20.00 $4,920.00 $11.50 $2,829.00 $20.00 1 $4,920.00 $10.00 $9,800.00 $19.00 $18,620.00 $8.00 $7,840.00 $12.00 $8,424.00 $17.00 $11,934.00 $9.00 $6,318.00 $18.00 $20,358.00 $26.00 $29,406.00 $17.00 $19,227.00 $3.00 $36,078.00 $3.50 $42,091.00 $4.00 $48,104.00 $30.00 $19,950.00 $27.50 $18,287.50 $33.00 $21,945.00 $67.00 $46,900.00 $46.25 $32,375.00 $60.00 $42,000.00 $4,000.00 $12,000.00 $6,425.00 $19,275.00 $5,800.00 $17,400.00 $200.00 $15,000.00 $61.00 $4,575.00 $50.00 $3,750.00 $220.00 $4,840.00 $117.00 $2,574.00 $75.00 $1,650.00 $35.00 $42,420.00 $6.25 $7,575.00 $6.00 $7,272.00 $36.00 $720.00 $7.15 $143.00 $7.00 $140.00 $37.00 $28,083.00 $11.20 $8,500.80 $11.00 $8,349.00 $38.00 $62,358.00 $34.30 $56,286.30 $40.00 $65,640.00 $39.00 $5,655.00 $58.40 $8,468.00 $65.00 $9,425.00 $2,000.00 $2,000.00 $44,200.00 $44,200.00 $79,000.00 $79,000.00 $90,000.00 $90,000.00 $105,000.00 $105,000.00 $96,600.00 $96,600.00 $10,000.00 $10,000.00 $7,550.00 $7,550.00 $7,000.00 $7,000.00 $1.00 $1.00 $1.00 $1.00 $1.00 $1.00 $118.00 $15,930.00 $55.00 $7,425.00 $50.00 $6,750.00 $120.001 $3,840.00 $250.00 $8,000.00 $250.00 $8,00.00 $5.00 $16,000.00 $5.90 $18,880.00 $8.00 $25,6600.00 $539,865.00 $546,936.60 $549,746.00 $539,865.00 $546,936.60 $549,746.00 Mendez Concrete Berry General Engineering Nye & Nelson 1210 E Santa Paula St Santa Paula, CA 93060 -2237 us PO Box 1457 Ventura, CA 93002 us 1860 Eastman Ave #108 Ventura, CA 94004 us Unit Price Item Total Unit Price Item Total Unit Price Item Total $9,500.00 $9,500.00 $16,925.00 $16,925.00 $13,320.00 $13,320.00 $6,749.00 $6,749.00 $41,002.00 $41,002.00 $63,118.00 $63,118.00 $12.00 $18,252.00 $18.95 $28,822.95 $14.53 $22,100.13 $10.70 $2,632.20 $34.10 $8,388.60 $12.00 $2,952.00 $13.20 $12,936.00 $11.30 $11,074.00 $15.13 $14,827.40 $14.10 $9,898.20 $14.80 $10,389.60 $20.01 $14,047.02 $18.80 $21,262.80 $17.60 $19,905.60 $15.66 $17,711.46 $6.60 $79,371.60 $4.10 $49,306.60 $4.57 $54,958.82 $45.40 $30,191.00 $30.55 $20,315.75 $51.91 $34,520.15 $72.50 $50,750.00 $51.95 $36,365.00 $73.74 $51,618.00 $3,986.00 $11,958.00 $5,440.00 $16,320.00 $6,427.30 $19,281.90 $71.20 $5,340.00 $98.10 $7,357.50 $50.60 $3,795.00 $80.70 $1,775.40 $110.00 $2,420.00 $81.40 $1,790.80 $6.70 $8,120.40 $6.20 $7,514.40 $26.95 $32,663.40 $7.70 $154.00 $7.10 $142.00 $27.23 $544.60 $12.00 $9,108.00 $11.10 $8,424.90 $27.50 $20,872.50 $36.80 $60,388.80 $34.00 $55,794.00 $28.60 $46,932.60 $62.70 $9,091.50 $57.90 $8,395.50 $29.70 $4,306.50 $51,861.00 $51,861.00 $68,721.00 $68,721.00 $58,359.60 $58,359.60 $97,900.00 $97,900.00 $105,275.00 $105,275.00 $71,940.00 $71,940.00 $10,620.00 $10,620.00 $7,205.00 $7,205.00 $7,548.20 $7,548.20 $1.001 $1.00 $1.00 $1.00 $1.00 $1.00 $66.40 $8,964.00 $92.65 $12,507.75 $55.00 $7,425.00 $305.70 $9,782.40 $204.00 $6,528.00 $272.15 $8,708.80 $9.40 $30,080.00 $6.00 $19,200.00 $5.351 $17,120.00 $556,687.30 $568,3011.151 1 $590,462.88 $556,687.301 $568,301.15 $590,462.88 A Silvia Construction Co. Olivas Valdez Inc. Lee Construction Company 9007 Center Ave Rancho Cucamonga, CA 91730 -5311 us 846 N Charter Dr Covina, CA 91724 -2620 US PO Box 940909 Simi Valley, CA 93094 -0909 us Unit Price Item Total Unit Price Item Total Unit Price Item Total $69,000.00 $69,000.00 $9,000.00 $9,000.00 $50,000.00 $50,000.00 $39,000.00 $39,000.00 $35,000.00 $35,000.00 $50,000.00 $50,000.00 $19.30 $29,355.30 $45.00 $68,445.00 $50.00 $76,050.00 $24.00 $5,904.00 $48.00 $11,808.00 $50.00 $12,300.00 $13.00 $12,740.00 $21.00 $20,580.00 $12.50 $12,250.00 $14.50 $10,179.00 $25.00 $17,550.00 $15.00 $10,530.00 $42.40 $47,954.40 $24.00 $27,144.00 $11.00 $12,441.00 $4.04 $48,585.04 $5.40 $64,940.40 $4.25 $51,110.50 $29.30 $19,484.50 $42.00 $27,930.00 $50.00 $33,250.00 $54.00 $37,800.00 $66.00 $46,200.00 $60.00 $42,000.00 $5,500.00 $16,500.00 $6,000.00 $18,000.00 $7,000.00 $21,000.00 $149.00 $11,175.00 $125.00 $9,375.00 $125.00 $9,375.00 $198.00 $4,356.00 $140.00 $3,080.00 $400.00 $8,800.00 $8.80 $10,665.60 $8.65 $10,483.80 $9.00 $10,908.00 $22.00 $440.00 $21.60 $432.00 $23.00 $460.00 $22.00 $16,698.00 $21.60 $16,394.40 $23.00 $17,457.00 $27.50 $45,127.50 $27.00 $44,307.00 $28.75 $47,178.75 $36.30 $5,263.50 $35.65 $5,169.25 $38.00 $5,510.00 $28,000.00 $28,000.00 $70,000.00 $70,000.00 $82,655.00 $82,655.00 $112,000.00 $112,000.00 $110,000.00 $110,000.00 $116,957.00 $116,957.00 $9,900.00 $9,900.00 $9,700.00 $9,700.00 $10,235.00 $10,235.00 $1.00 $1.00 $1.00 $1.00 $1.00 $1.00 $105.00 $14,175.00 $120.00 $16,200.00 $100.00 $13,500.00 $232.00 $7,424.00 $330.00 $10,560.00 $240.00 $7,680.00 $8.70 $27,840.001 $6.00 $19,200.00 $6.25 $20,000.00 $629,567.841 $671,499.85 $721,648.25 $629,567.841 $671,499.85 $721,648.25 Exhibit 3 RESOLUTION NO. 2003- A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MOORPARK, CALIFORNIA, AMENDING THE FY 02/03 BUDGET TO REVISE THE AMOUNTS OF THE APPROPRIATIONS AND BUDGET FOR PROJECT 8037: FLINN AVENUE REALIGNMENT [L. A. AVE. AOC FUND (FUND 2501); MRA AREA 1 OPERATIONS FUND (FUND 2902); GAS TAX FUND (FUND 2605) AND TDA ARTICLE 3 FUND (FUND 2602)] WHEREAS, on June 5, 2002, the City Council adopted the Budget for Fiscal Year 2002/03; and WHEREAS, a staff report has been presented to the City Council requesting a budget decrease in the aggregate amount of $ (41, 654) ; and WHEREAS, said staff report discusses certain fund transfers approved last fiscal year and the need to adjust same; and WHEREAS, Exhibit "A ", attached hereto and made a part hereof, describes said budget amendment and its resultant impacts to the budget line item(s). NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF MOORPARK DOES HEREBY RESOLVE AS FOLLOWS: SECTION 1. That a Budget amendment in the aggregate decrease of $(41,654), as more particularly described in Exhibit "A ", is hereby approved. SECTION 2. The City Clerk shall certify to the adoption of this resolution and shall cause a certified resolution to be filed in the book of original resolutions. PASSED AND ADOPTED this 7th day of May, 2003. Patrick Hunter, Mayor ATTEST: Deborah S. Traffenstedt, City Clerk Attachment: Exhibit 'A': Appropriation and Budget Detail ,. m: l* `,1: Resolution No. 2003 - Exhibit "A" Revised Appropriations & Budget For Project 8037: Flinn Avenue Realignment A_ Fund Allocation B. FY 02/03 Budget Re -Cap ......... ---- ......................... --...................._....................__............._..--_....................__... ....................._......_.. - ...... ,.................................................. _1...___ .......... ..... Current; Subject: Revise FY 02/031 Appropriation! FY 02/03 Account Number Budget! / (Reduction); Budget 2501.8310.8037.xxxx - .........�...... ;...._....;. $ 394 047; $ (43,942); .........,. $ --- ........................ 350,105 - - -- _._....... -- ..................... --..............._..__..............---..................---._....................----...._....... 2602.8310.8037.xxxx ............................... -------._....................................... _._;.----- $ 0 ..............._...-- _........ - ............__............ -- $ 30,230: $ ---.__................. 30,230 ............................... ---- ........................ ---... ..............--- ._............ ............... --..._............. .---- 2605.8310.8037.xxxx ...................._..... _.. ...................... $ 0 --_-........... ._._..............--- .......... --.. ..........__.r._............... $ 16,000'::• $ 16,000 ............................... . . .....................---._..............---........._....----............ ......_._..._.................. 2902.8310.8037.xxxx ..._............ ...................:......_.... --- - - - - -- ............................ ...,...---- $ 394,047; ._._................ _..._..........__._........... ---....;.........---.................................... $ 43,942); $ 350,105 - -- ...................--.---.................---...............---................._.__.....................---._.... _ ..............................---_-.._............_...__.................__..................---......................---................. ............................... -- ....._.------- ..._............. ;- _., .............................._ ..............._.__................._._.. $........_7 8 8, 0 94 . . __ $ (.4..1 ....6 5 4...)._._............ _ _$........7.4._6_ - .._4._4._0... C. Total Appropriations Re-Cap --..... ........__..................... -----..............................._...._.- ......... -----._ ........................__...._ ............. ---..............--- ................ __........................---_.... ......................_......- --.........._............................... _........._.. ----...........................__._........... Revised' ._.__.......................... FY 02/03: Years: Total Account Number Budget! Expenditures; A ro riations 2501.8310.8037.xxxx _$ 350,105' $ 19,805; ............... $ --- ._........................... 369,910 -- ...._................ ... ....................__. __....................__.... .............--- ............... __.................... _._ .... _.................. 2602.8310.8037.xxxx _. -__ -.......................... $ ..................-- ..... - - - - -- ._..... ........................... 30,230 - - -- ............. .....-- _...........__._...,.... -- ........... $ 30,230 - -. - -- ....... 260.5.8310 .8037 .xxxx ................ y- $ _ ..................... ...............................---_....._................-_-_...............---......._.__... 16, 000 ........... __ ................ -- ............ _ ................. ........ $ - -- - 16, 000 ........................... ............................... .............. ...... .......... ---._..............---................._ .......... ..._..._.__................. - 2902.8310.8037.xxxx -- ........................;..------._........................................................-----._...._.......................----..................__.............. $ 350,105; __............._............... $ 19,805 $ 369,910 ..__ ............................----......................__._................._.- ................. _._.........................._...........................---v.............._......... $......... 7. 4_ 6_ r...._ 4._ 4._ 0 .. ........................__._._. ....._..............._.__...... $ 3 9 , 610 $.._.__7._8._6_r_... 5 D. Distribution of Appropriations to Expense Accounts .. .... _ ...........................__ ... _ ............... _.._._ .................. __ ................. ..._ .......................... _ .............................. _.__ ........ ................ ............................... .. ..... _ ........................................ Current; :.........._._......................._...................__..............._ ............... _._.....,..........._._................................... Subject: ..... ........................... Revised FY 02/03: Appropriation; FY 02/03 Account Number Budget....;._ / (Reduction) Bind et 2501.8310.8037.9601: __........_........_.........._ Design $ 11,195; $ 1,750 $ 12,945 - -- -- - - - -- -- ................... ............._---................ 2902.8310.8037.9601: .._.--- ........................ Design ----- $ 11,195 r- .................. --- ..........._.. --......... ..__............__............. $ 1,750 -- ............... $ --- - - - 12,945 ---------._ ......................----- ............---- ............ - -- ................----................ ..--- ._._...................._. _ $ 22,390: - -- .............� .:................ $ 3,500: $ 25,890 - ---- .................... - . .. ........ .......... ---............... . - . . . ............. ..-- . .... .................---._._........ 2602.8310.8037.9640: ........................._..... Const -----...._.................. ........................ ____- $ 0_ -.. . ............... . ... -- ............ _. . ... ..... . .... -- ..... ..... .-- . ........... $ 30,230: .._- .. .......... $ ------- - - - - --- 30,230 - - - -- ................... -- . _............--- ............... - ................ 2605.8310.8037.9640: - - - -.. .................... - - - Const - -- ._................... ............................... ----._...._...._....................---................---..........._._..............__...............__...................._.----.._......_.. $ 0 $ 16,000: $ ............_......._.......... 16,000 .. . 2501. 8310...8 - 037... 9640 - _ Const - --..._..._ ............................. $ 347, 852 ......._.__._.................. ................__...........__._............__......,......._.__._................................. $ (45, 692) $ ............................... 302, 160 - - - -- ..................... ................ -- ............... .................----..........._......---._......... 2902.8310.8037.9650: ............................_.. Const ----....__................................. ...._._.__�._.................. ; $ 347,852 _._......... -- ............ $ (45,692) _....................... $ - -- ... - -- 302,160 - ---._ .......................---.._..............---..............---._...............---.......................---._.... ................_.._----- .;_.__ $ 695,704: __. ;_............. $ (45,154); $ 650,550 2501.8310.8037.9650: Ins A $ 35,000: $ 0 $ 35,000 2902.8310.8037.9650: Ins p. $ 35,0001 $ 0 $ 35,000 ................ ----- ............... - -- ............. ._...........__.... .._.........---- ............... ---- ....................... _ .... ---- - .. - - - -- .......................---- .................. --- .............. ----...........__................._...__................----. _._....................... - - - -- .. $ 70,195 $ 0 $ 70, 000 Total Project $ 788, 094: $ (41, 654) $ 746, 440 .............. .. .-----.......................---...............--- ................ __................---...................._ _.......................... - - -- --........ ............................... ------. ..........................;.... .................. - ._........._.__............_...._..........._..._. ....._...__._.................. - -- -- ...__..................: Approved as to form: