Loading...
HomeMy WebLinkAboutAGENDA REPORT 2003 0507 CC REG ITEM 10GITEM_" 1o. G. e- r 3 2c Moorpark City Council Agenda Report To: The Honorable City Council From: Kenneth C. Gilbert, Director of Public Works Date: April 29, 2003 (Council Meeting 5- 07 -03) Subject: Consider Resolution Amending FY2002/2003 Budget for the 2003 Asphalt Overlay Project [Project 80111 and Approval of the Award of a Contract for the Construction of Said Project DISCUSSION A. Project Scope Attached as Exhibit 1, is a set of maps showing the location of the streets included in the subject asphalt overlay project. A list of those streets is attached as Exhibit 2 (Pg. 3) . The project requirements include: • R & R pavement and base in selected areas; • Grinding; • install reinforcing fabric; • construct asphalt overlay; • adjust manholes (etc.) to grade; • restripe as necessary; • replacement of Signal loop detectors; and • crack sealing of certain street segments in lieu of R &R or AC Overlay. B. Tierra Rejada Road As mentioned in the report accompanying City Council approval of the project design, the pavement problems along the "seam lines" on Tierra Rejada Road will be addressed with a combination of crack sealing and pavement ( & Base) removal and replacement. This design approach was selected as a cost control measure. Ac overlay 2003 awd 0 00148 Asphalt Overlay 2003: Advertise April 29, 2003 Page 2 C. Slurry Seal Project It is anticipated that on May 21, 2003, the City Council will consider approval of the award of a contract for the 2003 Slurry Seal Project. Attached as Exhibit 2 are maps and charts showing and listing the streets to be resurfaced by both that Slurry Seal project and the subject AC Overlay project. The contract documents require the Slurry Seal contractor and the AC Overlay contractor to coordinate and cooperate. D. Bid Results Bids for the subject project were received and opened on April 28. The apparent low bidder is Ruiz Engineering Company, with a bid of $1,199,219.69. A summary of the bid results is attached as Exhibit 3. It has been determined that the apparent low bidder is qualified to perform the work. Said bidder has confirmed that their bid is valid and that they are prepared to proceed with the construction of the project. E. Fiscal Impact 1. Total Project Cost: The estimated total project cost is summarized as follows: Element Design Construction Constr Contingency (10 %) Inspection Total -----_._ .............. ........................._... -- --......... .............--- ..._........._. Amount 97,000 1,199,220 119,922 100.000 1,516,142 2. Current Budget Summary: The subject project is currently funded by the Local Transportation Fund {TDA Article 31 [Fund 2603]. A summary of the current budget for the project [2603.8310.8011.xxxx] is as follows: Ac Overlay 2003_awd 000149 Prior Year FY 02/03 Total Description Expenses ($) Budget Budget Fund 2603 - LTF Design 28,698 58,302 87,000 Construction 1,678,600 1,678,600 Inspection - 50.701 50,701 Total 28,698 1,787,603 1,816,301 Ac Overlay 2003_awd 000149 Asphalt Overlay 2003: Advertise April 29, 2003 Page 3 3. Congestion Relief Fund [AB2928] : In an action taken by the City Council last March, the AB2928 funding for this project was deleted. That action was based on an understanding by staff that those funds had been eliminated by recent State Budget cuts. Since that date staff has learned that there is $144,472 (from last fiscal year and the current fiscal year) available for the subject project. Apparently the State Budget cuts only affected future years' revenues. It is recommended, therefore, that the Budget be amended to again reflect partial project funding from this source. 4. Budget Amendment: It is recommended that the Fund 2603 appropriations be reduced to reflect the above grant funding and the actual bid price. A Resolution for this purpose is attached and is summarized as follows: 2610 - Congestion Relief Construction Total Budget Plus Prior Years Design Costs ............... -- _ .................... -- ._....................._Total Project - 144.472 144.472 1,787,603 (200,000) 1,587,603 28,698 1,616,301 Note: ** It is recommended that a portion of the surplus appropriation approved in March 2003, remain allocated to this project. Upon completion of the project, all unexpended appropriations will be returned to Fund 2603. 5. Fund Balances: Based on the above described Budget adjustment, the projected FY 02/03 Year -End Fund Balances for the Gas Tax Fund [Fund 2605] and the Local Transportation Fund {TDA Article 81 [Fund 2603] are summarized as follows: --- ..._- ................................... _..__----- ....................................... _._._-._.- .................. --_ ................ -_ ............. - .............. -- ........... -- ....... ............... _.. -- 2605: Gas Description Tax Fund ($) 2603: LTF ($) Current Unappropriated Fund Balance [6/30/03] 1,022,319 359,661 Plus Above Appropriation Crdit 344,472 Total 1,022,319 704,133 ** Ac Overlay 2003 awd 000150 .._ . .............. Current _._ ......... --- ............. _ ................ -__ ................................. - - -- ._....._.., Revised' 'Description Budget W Change ($) Budget Fund 2603 - LTF Design 58,302 38,698 97,000 Construction + 10% Cont. 1,642,361 (467,691) 1,174,670 Plus Additional Project Contingency ** - 71,461 71,461 Inspection 86.940 13,060 100.000 Sub -Total 1,787,603 (344,472) 1,443,131 2610 - Congestion Relief Construction Total Budget Plus Prior Years Design Costs ............... -- _ .................... -- ._....................._Total Project - 144.472 144.472 1,787,603 (200,000) 1,587,603 28,698 1,616,301 Note: ** It is recommended that a portion of the surplus appropriation approved in March 2003, remain allocated to this project. Upon completion of the project, all unexpended appropriations will be returned to Fund 2603. 5. Fund Balances: Based on the above described Budget adjustment, the projected FY 02/03 Year -End Fund Balances for the Gas Tax Fund [Fund 2605] and the Local Transportation Fund {TDA Article 81 [Fund 2603] are summarized as follows: --- ..._- ................................... _..__----- ....................................... _._._-._.- .................. --_ ................ -_ ............. - .............. -- ........... -- ....... ............... _.. -- 2605: Gas Description Tax Fund ($) 2603: LTF ($) Current Unappropriated Fund Balance [6/30/03] 1,022,319 359,661 Plus Above Appropriation Crdit 344,472 Total 1,022,319 704,133 ** Ac Overlay 2003 awd 000150 Asphalt Overlay 2003: Advertise April 29, 2003 Page 4 Notes: * $1,645,261 less $1,285,600 appropriated in March 2003 for the AC Overlay Project [Project 80111. ** It is anticipated that the 2003 Slurry Seal project will have a surplus of approximately $200,000 which will be released to the Fund 2603 unappropriated Fund Balance at the end of FY03 /04. F. Inspection Contract Administration and Inspection Services will be provided by Engineering Division. G. Schedule It is anticipated that the project will be under construction in June and be completed in September. H. Administrative Actions If the recommended action is taken by the City Council, certain administrative actions will be undertaken by staff, including the following: • A contract agreement will be forwarded to Ruiz Engineering Company, Inc., for the construction of the subject project, for the contract price of $1,199,219.69. • When all of the contract documents are in order, the agreement will be executed by the City Manager. • A construction contingency of $119,922 (100) will be set aside for the project. STAFF RECOMMENDATIONS (Roll Call Vote) Adopt the attached Resolution and approve the award of a construction contract to Ruiz Engineering Company for the construction of the project. Attachments: Exhibit 1: Exhibit 2: Exhibit 3: Exhibit 4: AC Overlay Map Slurry Seal & AC Overlay Maps and Lists Bid Results Resolution Ac Overlay 2003_awd 000:151 i DV CITY OF MOORPARK 1ii r C T. ° u, N �FEn 2AL B R a LLOWaGIf CT. BUTTER� MEAOCW C` a. AV CHAPARRAL NA a MIDDLE 1 w AV `y SCHOOL JAVL_ le Z HEKT. la =II W �L '°Avrti S S E LASS[ N J = a �j a ? W AVE. �raL�r�NrE� r./ - CCNHfPCE' zll ?E S.. 1 �' °�= 'E'ER` _�� A W al E'' zl i < EVEREST = z AVE. AVE LOS ANGELES a I vIGH?7tiGA E��- -1 of z (X �I ni x cv o > i ST. a a a = u N � AVc 2I J J I Z aI~ --- - m . l � a z > : LNN > W AWE. a C `%I a` I0" Z a N – Z Z > U I� lJ =� lu a�C J u Wm TT - - 2EEK ARVES'ER " _ - - - - iii - fcv GLE^+vM 1 COTTONT ; PARK- RD. 2 COURTNEY L.OMMUNI LN. _- - VIST I,CR SENT M A �(,Y� �2 GEDaR MEADOW - W - DR 1 FL RCREEK DR. t� 4 ATHEROALE CT. O MOORPARK 3 CLEARWOOD H.S. 3 MANORVIEV DR. DR. VlE M1 Rey a 1 � C ' WE R –� 1 HAVENR'DGE C C G� �9 (y�J/ MAILER"" CT. n 'o po ; I A \ T1E yrS� `l J ' 1791 !L r.-lfv �_ c S T. — 6 ERRYBR 1 C T. Z qL a. REST :av�N1 3 4 S IEER MEADOW ST. ERRACE MEADOW CT. LNRISE MEADOW CT. I >,.: D9_u I a ST 1 rL ui 00153 Pvr �f_aS — �+__✓'^ Nom« «v evE I��2 t EI'Cti �- -+AVE. Ru'h AVE Z I I C ?r -! —`SSA ,, � AVE �� i f ��`Nh l . ASSEN AVE I iVQ i'�P u, > / AV 3 n R *S AVE Avy; . � RCBE � a I, I . > ELC�a •� , 1, SFc RNAN P a/� t NEW ji <HWY. lib) I `,, AVE. FA _�JJJ777/ �t i (3) 64W S� 4 a 1 YN£ATON CT 2 L13YOLA PL., �E. A I ;rS ( /moo 2 9 R' cF � SPCE E CT /�� 5 J� 6.1 °� 1 MOORPARK COMMUNITY COLLEGE ,2 32D ERAGAN 'CT N 0001.55 N '0- r -4t, w Ln "I Yir IF -04 I„ i l� =� QI �� k I .- +— y _!C'.._ �► " LEGEND Slurry Seal • rk .1 r ....... AC Overlay _,. , � � � `y� �" • ♦ SY 11 c j CITY OF MOORPARK Exhibit 2 [Page 2] List of Slurry Seal Streets Street Name Alderbook St. Amhurst St. Annette St. Arborhill St. Ashtree St. Aspen Tree St. Auburn Ave. Baylor Cir. Bear Valley Rd. Bending Oak Ct. Berkeley Ct. Berkley Cir. Berrybrook Ct. Bitner Pl. Blacksmith Ct. Blossomwood Ct. Borges Ct. Braun Ct. Brookhurst Ct. Bubbling Brook St. Cambridge St. Camden Ct. Canyonlands Rd. Cedar Branch Ct. Chesterfield Dr. Chestnut Ridge St. Clavelle Ave. Clavelle Ct. Clemson St. College Heights Dr. Columbia Ave. Commerce Ave. Condor Dr. Conejo Mesa St. Coralcrest ct. Cornell Cir. Creighton Cir. Dartmouth Cir. Delfen St. Doris Ct. Dracena Ave. Flowerwood Ct. Freshman Ct. Graduate Cir. Grand Isle Rd. Grandsen Ct. Portion o11 •I Street Name Griffith Lane Gunsmoke Rd. Hartford St. Harvard St. Hastings St. Havencrest St. Hearon Dr. Hillshire Ct. Honeybee St. Honeybrook Ct. Huntercrest Ct. Inglewood St. Kernvale Ave. Lafayette Ct. Laurelhurst Rd. Linville Ct. Loyola St. Mahan Ct. Mallory Ct. Maplecrest St. Marquette St. Melray St. Mill Valley Rd. Millerton Dr. Milne Cir. Overly St. Oxford Cir. Painted Sky St. Pepperdine Cir. Pheasant Run St. Pine Ridge Ct. Purdue St. Quailwood St. Rains Ct. Rivergrove Ct. Rivergrove St. Rolling Knoll Rd. Rutger Cir. Seitz Ct. Shakespeare PI. Silver Creek St. Silvercrest St. Skidmore Ct. Skylark Ct. Sleepy Wind St. Sophomore Ct. portion Portion Portion Portion Street Name Sosna Ct. Stanford St. Stanley Ct. Sugar Maple Ct. Swift Pl. Thionet PI. Thomasville Ct. Timerview Ct. Trollope Ct. Tulane Ave. University Dr. Vassar Cir. View Mesa St. Westport St. Westwood St. Wildwest Cir. Winterwood Ct. Yale Ave. Exhibit 2 [Page 3] List of AC Overlay Streets Street Name Adlena PI. Amberwick Lane Avedon Rd. Beragan St. Brookdale Lane Butter Creek Rd. Butterfield Lane Campus Park Dr. Portion Clearcreek Ct. Cloverdale St. Coralberry Ct. Cottontail Rd. Daisy Ct. Deepwell Lane Duke Street Fairbrook Lane Fern Valley Ct. Fireside Lane Gabbert Rd. Portion Havencrest St. Portion Heatherglen Ct. Hollyglen Ct. Hunters Grove Ct. Isle Royale Kernvale Ave. Portion Kimerwick Lane Lantern Lane Laurelhurst Rd. Portion Maplecrest St. Portion McBeth Ct. Meadow Ct. Meadow St. Mesa Verde Dr. Mistygrove St. Portion Mt. Trail St. Portion Pepper Mill St. Poppyglen Ct. Quail Summit Rd. Rand Street Robinwood Lane Rolling Knoll Rd. Talmade Rd. Portion Street Name Tierra Rejada Rd. Vista Del Valle Dr. Vista Lavana Dr. Vistapark Dr. Westgate Rd. Wildflower Ct. Willowwood Ct. Woodglen Dr. �` if 2003 Overlay Bid Opening: 04/28/03 Engineer's Estimate marks an allowance 20030 erla Project Item # Item Code Item Description Quantity Unit of Measure Unit Price Item Total 1 MOBILIZATION 1 LS $15,000.00 $15,000.00 2 TRAFFIC CONTROL 1 LS $37,000.00 $37,000.00 3 PUBLIC NOTICE 1 LS $5,000.00 $5,000.00 4 GRIND EXISITING A.C. 5'X 2" 337480 SF $0.40 $134,992.00 5 IGRIND EXISITING A.C. 2" DEEP PER SEC. 53129 SF $0.40 $21,251.60 6 IGRIND EXISITING A.C. 2" DEEP (CAMPUS 10456 SF $0.45 $4,705.20 7 JADJUST MANHOLE COVER TO GRADE 146 EA $500.00 $73,000.00 8 JADJUST SURVEY MONNUMENT TO 13 LS $385.00 $5,005.00 9 ADJUST VALVE COVER TO GRADE 186 EA $250.00 $46,500.00 10 BLUE HYDRANT MARKER 74 EA $10.00 $740.00 11 PAVEMENT MARKERS TYPE D AND TYPE 40 EA $8.00 $320.00 12 PAVEMENT MARKERS TYPE A AND TYPE 140 EA $3.00 $420.00 13 PAVEMENT FABRIC 147580 SY $1.00 $147,580.00 14 2" AC 16000 TON $57.50 $920,000.00 15 3" AC 230 TON $57.50 $13,225.00 16 5" AC 1209 TON $57.50 $69,517.50 17 10" AC (GABBERT ROAD) 2421 TON $57.50 $13,915.00 18 STOP LEGEND 251 EA $132.00 $3,300.00 19 BIKE LANE, LEGEND, AND ARROW 1869 LF $0.90 $1,682.10 20 CHANNELIZING LINE 796 LF $0.70 $557.20 21 1 CROSSWALK AND LIMIT LINE 1399 LF $1.30 $1,818.70 22 ONE LINE 2603 LF $0.70 $1,822.10 23 LEFT EDGELINE A20B DETAIL 27 95 LF $0.70 $66.50 24 MEDIAN ISLAND 128 LF $0.70 $89.60 25 DOUBLE YELLOW A20A DETAIL 21 477 LF $0.70 $333.90 26 SAWCUT EXISTING AC 6 EA $10.00 $60.00 27 REMOVE EXISTING AC 16621 LF $0.83 $13,795.43 28 J REMOVE EXISTING AC ADDENDUM NO. 1 931 CY $26.00 $24,206.00 29 REMOVE BASE MATERIAL 903 CY $26.00 $23,478.00 30 PLACE 3" CRUSHED AGGREGATE BASE 135 CY $42.00 $5,670.00 31 PLACE 5" CRUSHED AGGREGATE BASE 711 CY $42.00 $29,862.00 32 TYPE IV TURN ARROW 11 EA $90.00 $990.00 33 TYPE I ARROW 1 EA $90.00 $90.00 34 REPLACE TRAFFIC LOOP DETECTOR 60 EA $250.00 $15,000.00 35 CRACK SEALING 29800 LF $0.60 $17,880.00 36 RELEASE 1 LS $1.00 $1.00 Z Bid List Total $1,648,873.83 Total Bid Amount $1,648,873.83 N Ruiz Engineering Company 1344 Temple Ave Long Beach, CA 90804 -2423 US SULLY - MILLER 3555 E Vineyard Ave Oxnard, CA 93036 -1091 US Berry General Engineering PO Box 1457 Ventura, CA 93002 US Unit Price $70,942.00 $13,810.00 $9,950.00 $0.14 $0.16 $0.18 $210.00 $255.00 $175.00 $3.00 $3.00 $1.50 $0.70 $41.90 $46.70 $45.45 $57.95 $29.00 $0.26 $0.50 $1.25 $0.21 $1.00 $1.50 $0.35 $75.00 $0.10 $32.75 $31 .75 $31.50 $36.95 $35.00 > $50.00 $210.00 $0.55 $1.00 � Item Total $70,942.00 $13,810.00 $9,950.00 $47,247.20 $8,500.64 $1,882.08 $30,660.00 $3,315.00 $32,550.00 $222.00 $120.00 $210.00 $103,306.00 $670,400.00 $10,741.00 $54,949.05 $14,023.90 $725.00 $485.94 $398.00 $1,748.75 $546.63 $95.00 $192.00 $166.95 $450.00 $1,662.10 $30,490.25 $28,670.25 $5, 062.50 $26,271.45 $385.00 $50.00 $12,600.00 $16,390.00 $1.00 $1,199,219.69 $1,199,219.69 Unit Price $85,000.00 $32,500.00 $2,400.00 $0.13 $0.30 $0.30 $220.00 $205.00 $225.00 $11.50 $5.75 $3.60 $0.95 $42.95 $88.00 $59.00 $59.00 $90.00 $0.33 $0.58 $1.10 $0.24 $0.42 $1.08 $0.22 $1.52 $0.95 $38.00 $38.00 $117.00 $61.00 $80.00 $64.00 $210.00 $0.28 $1.00 Item Total $85,000.00 $32,500.00 $2,400.00 $43,872.40 $15,938.70 $3,136.80 $32,120.00 $2,665.00 $41,850.00 $851.00 $230.00 $504.00 $140,201.00 $687,200.00 $20,240.00 $71,331.00 $14,278.00 $2,250.00 $616.77 $461.68 $1,538.90 $624.72 $39.90 $138.24 $104.94 $9.12 $15,789.95 $35,378.00 $34,314.00 $15,795.00 $43,371.00 $880.00 $64.00 $12,600.00 $8,344.00 $1.00 $1,366,639.12 $1,366,639.12 Unit Price $12,500.93 $20,300.00 $6,300.00 $0.14 $0.34 $0.46 $255.00 $240.00 $260.00 $12.00 $6.00 $3.75 $0.72 $45.30 $78.00 $80.00 $92.50 $93.50 $0.40 $0.60 $1.20 $0.25 $0.50 $1.20 $0.30 $1.60 $0'80 $58.20 $60.20 $62.00 $65.00 $83.00 $66.00 $215.00 $0.34 $1.00 Item Total $12,500.93 $20,300.00 $6,300.00 $47,247.20 $18,063.86 $4,809.76 $$3,230.00 $3,120.00 $48,360.00 $888.00 $240.00 $525.00 $106,257.60 $724, 800.00 $17,940.00 $96,720.00 $22,385.00 $2,337.50 $747.60 $477.60 $1,678.80 $650.75 $47.50 $153.60 $143.10 $9.60 $13,296.80 $54,184.20 $54, 360.60 $8,370.00 $46,215.00 $913.00 $66.00 $12,900.00 $10,132.00 $1.00 $1,374,372.00 $1,374,372.00 N Nye & Nelson Silvia Construction Co. 1860 Eastman Ave #108 9007 Center Ave Ventura, CA 94004 Rancho Cucamonga, CA 91730 -5311 us us Unit Price Item Total Unit Price Item Total $52,000.00 $52,000.00 $81,000.00 $81,000.00 $36,160.00 $36,160.00 $65,000.00 $65,000.00 $8,729.00 $8,729.00 $7,300.00 $7,300.00 $0.15 $50,622.00 $0.12 $40,497.60 $0.30 $15,938.70 $0.17 $9,031.93 $0.30 $3,136.80 $0.41 $4,286.96 $220.00 $32,120.00 $225.00 $32,850.00 $205.00 $2,665.00 $209.00 $2,717.00 $225.00 $41,850.00 $230.00 $42,780.00, $11.70 $865.80 $11.80 $873.20 $5.75 $230.00 $5.83 $233.20 $3.60 $504.00 $3.66 $512.40 $0.66 $97,402.80 $0.65 $95,927.00 $48.75 $780,000.00 $43.50 $696,000.00 $94.75 $21,792.50 $106.00 $24,380.00 $72.00 $87,048.00 $106.00 $128,154.00 $74.50 $18,029.00 $106.00 $25,652.00 $90.00 $2,250.00 $92.00 $2,300.00 $0.35 $654.15 $0.33 $616.77 $0.60 $477.60 $0.59 $469.64 $1.10 $1,538.90 $1.12 $1,566.88 $0.25 $650.75 $0.24 $624.72 $0.45 $42.75 $0.43 $40.85 $1.10 $140.80 $1.10 $140.80 $0.25 $119.25 $0.23 $109.71 $1.50 $9.00 $1.55 $9.30 $0.70 $11,634.70 $2.80 $46,538.80 $38.00 $35,378.00 $72.00 $67,032.00 $36.00 $32,508.00 $74.00 $66,822.00 $140.00 $18,900.00 $150.00 $20,250.00 $105.00 $74,655.00 $150.00 $106,650.00 $80.00 $880.00 $81.00 $891.00 $64.40 $64.40 $65.00 $65.00 $210.00 $12,600.00 $214.00 $12,840.00 $0.28 $8,344.00 $0.33 $9,834.00 $1.00 $1.00 $1.00 $1.00 $1,449,941.90 $1,593,997.76 $1,449,941.90 $1,593,997.76 w r0. Exhibit 4 RESOLUTION NO. 2003- A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MOORPARK, CALIFORNIA, AMENDING THE FY 2002/03 BUDGET TO REVISE THE AMOUNTS OF THE APPROPRIATIONS AND BUDGET FOR PROJECT 8011: ASPHALT OVERLAY PROJECT [TDA, ARTICLE 8 (LTF) FUND (FUND 2603) AND CONGESTION RELIEF FUND (FUND 2610)] WHEREAS, on June 5, 2002, the City Council adopted the Budget for Fiscal Year 2002/03; and WHEREAS, a staff report has been presented to the City Council requesting a budget decrease in the aggregate amount of $200,000; and WHEREAS, said staff report discusses certain fund transfers approved last fiscal year and the need to adjust same; and WHEREAS, Exhibit "A ", attached hereto and made a part hereof, describes said budget amendment and its resultant impacts to the budget line item(s). NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF MOORPARK DOES HEREBY RESOLVE AS FOLLOWS: SECTION 1. That a Budget amendment in the aggregate decrease of $200,000, as more particularly described in Exhibit "A ", is hereby approved. SECTION 2. The City Clerk shall certify to the adoption of this resolution and shall cause a certified resolution to be filed in the book of original resolutions. PASSED AND ADOPTED this 7th day of May, 2003. ATTEST: Patrick Hunter, Mayor Deborah S. Traffenstedt, City Clerk Attachment: Exhibit 'A': Appropriation and Budget Detail El l �r Resolution No. 2003 - Exhibit "A" Revised Appropriations & Budget For Project 8011: Asphalt Overlay Project A. Fund Allocation B. FY 02/03 Budget Re -Cap C. Total Appropriations Re -Cap current --_-._.........._............------ ................---................---_............---.................._-.-_......_.........._..---.----._...... ........................- ______ ._._... �.................................----....... Revised ............__.............. - -- --._........___............._.__._.................... ......-- ..-- ____.._............ FY 02/03 FY 02/03: Prior Years; Total; :Account Number Budget! E�enditures A ro riations .... , .............. 2 6 0 3. 8 310.8 011. xxxx ............. -- _._..........._$_2_c._4 - ---- ..................... -- ............_.... - -._.. _ ............ _ -- - 4 3 c.._l._3.1.................... 8._c.._6 9 8 _ $_ 1, 4 71, 8 2 9 2610.8310.8011.xxxx :................ - - -- ._._..................... ._.............. ................__._.....................---... .................._--- ._....... $ 144,472: --- ._........_$........2 $ 0 .....__.... $ 144,472: .......................--.-_-.....................-----.................__.................---.....................__........................__.;_..................._ $1 587 603' r......._..........---'---._......... ............................... --- ._..._... $ 28 698: ---- ..._................... __.. r............__. _...........,.__............__. __.......... $ 1,616,301 D. Distribution of Appropriations to Expense Accounts Approved as to form: current subject Revised FY 02/03 ;Appropriation FY 02/03 :Account Number ..........:.............._._... Budget_ / (Reducta.on) Bud et : 2603.8310.8011.9601: _..__ .................. ......._.__._.................. --............._.-.................._..........................._........................__._._..............:......._$..............._........__...._...... Design 58,302 38,698 97,000 ;2603 8310.8011.9640: Const. _.............................. $1,642,361 (396,4230) . $1,246,131 2 610 8 310.8 011.9 6 4._0....:......... :............................----..........................__..... ..............._.........__._.. .. __.. -C o n s t....:...... 0: $ 14 4 '....4.72............__$...... ...........1.4.4..,_..4.7.2_..; 2603.8310.8011.9650: ........................._... -- .....................---...................._._...... ........._.__.................. -- ........................ .....'_.__$...._ Ins p. ............... _._._ ..............:..............._ $ 86 940; $ ..................._................._..............._._. ............._.__.............. 13 060 -- ..................... ................_......._._.__: $ 100 000; , $1, 787, 603 $ (200, 000) $1, 587, 603 Approved as to form: