HomeMy WebLinkAboutAGENDA REPORT 2003 0521 CC REG ITEM 09HITEM q • N
J 7- t-20C.3
MOORPARK CITY COUNCILx
AGENDA REPORT
TO: The Honorable City Council
FROM: Steven Kueny, City Manager
DATE: May 15, 2003 (CC Meeting of 5 -21 -2003)
SUBJECT: Consider Mission Statement, Priorities, Goals and
Objectives for Fiscal Year 2003/2004
The City Manager's recommended "Mission Statement, Priorities,
Goals and Objectives" for the City of Moorpark for fiscal year
2003/2004 will be presented to the City Council for its
consideration on May 21, 2003.
It is recommended that the City Council consider the proposed
priorities, goals and objectives at the same time it considers
the City Manager's proposed budgets.
STAFF RECOMMENDATION:
Consider the priorities, goals and objectives on May 28, 2003.
SK:db
S: \City Manager \Everyone \ccagenda \Goals and Obj 2003 -2004 Agenda Rpt 0521 2003.doc 0 00 03 6
ITEM q -
MOORPARK CITY COUNCIL
AGENDA REPORT
TO: The Honorable City Council
FROM: Steven Kueny, City Manager
DATE: May 20, 2003 (CC Meeting of May 21, 2003)
SUBJECT: Consider Mission Statement, Priorities, Goals and
Objectives for Fiscal Year 2003/2004
Attached are the proposed Mission Statement, Priorities, Goals
and Objectives for FY 2003/2004. It shows the proposed changes
from FY 2002/2003 in legislative format. It also includes the
City Council designated "Top Ten (10) Priorities."
It is generally acknowledged that with current staff levels,
there are many more objectives listed than can be reasonably
expected to be accomplished in the year. In fact, many of the
objectives will take several years to fully complete. A written
status report on the various priorities and objectives is not
included as part of this report. The City Council Monthly
Report provides a status on most of these items as well as other
staff work efforts. Staff will respond to specific Council
questions when this matter is considered.
In prior years, the proposed objectives were submitted to the
City Council as part of the annual budget process and usually
reviewed informally as part of the budget deliberations. Formal
consideration of the objectives usually followed adoption of the
budget.
Since 2002, the Council has considered the objectives prior to
preparation of the budget with the purpose of having more
correlation between the Council approved objectives and City
Manager proposed budget. To this end, the Council received a
status report in February 2003. The City Council subsequently
met in separate, joint meetings with the Parks and Recreation
City Council Agenda Report
Re: Mission Statement, Priorities, Goals and Objectives
May 20, 2003 (CC Meeting of May 21, 2003)
Page 2
Commission and Planning Commission and discussed the City's
priorities. Some of the items discussed are included in the
proposed priorities, goals, and objectives.
The report to the Council for the February 5, 2003 meeting
included a list of 47 other potential objectives. Of these,
eleven have been proposed either for deletion from the list or
included on the list of proposed objectives for 2003/2004, as
noted below, and five additional items are proposed to be added
to the list of potential objectives.
Potential Objectives
1. Conduct a community -wide survey to measure the level of
satisfaction residents feel about City services, develop a
program to regularly solicit public input and feedback
regarding service satisfaction, and continue to implement a
system to track customer requests and complaints.
2. Tape a minimum of two (2) special City- sponsored events or
meetings for replay supporting public information and
community promotion efforts and evaluate the feasibility of
taping a video about Moorpark City government.
3. Design and construct electrical system for decorative
lighting on High Street, utilizing recently constructed
underground conduit system.
4. Implement Neighborhood Preservation Program.
diseretien in establishing speed limits that are
enfereeable by - Delete
6. Conduct an Organization and Management Study and prepare an
implementation plan.
7. Analyze potential for franchising of telephone services
providers that provide cable television services.
S: \City Manager\Everyone \ccagenda \Goals & Obj Agenda Rpt to HCC 0521 2003.doc
City Council Agenda Report
Re: Mission Statement, Priorities, Goals and Objectives
May 20, 2003 (CC Meeting of May 21, 2003)
Page 3
8. Taping monthly announcements of upcoming city- sponsored
activities for replay on the City Government Channel.
9. Evaluate feasibility of establishing a teen center.
10. Apply for "Tree City U.S.A." designation after adoption of
Amended Tree Ordinance.
11. Evaluate feasibility of lighting additional parks and
recreation facilities including Arroyo Vista Community Park
(AVCP) multi - purpose court and second softball field, two
basketball courts at Mountain Meadows Park, and proposed
skatepark.
12. Develop inventory of natural open space properties owned by
City and HOA's and other privately owned property
restricted by conservation easement or other development
condition or limitation.
13. Install winter holiday decorations on street light poles at
various locations in the City.
14. Adopt formal traffic policies.
15. Install a compressed natural gas (CNG) pumping station for
City and public use in Moorpark.
16. Conduct an Arbor Day event.
17. Empand Peindexter 7:. Proposed 2003/04 FY Objective
18. Utility undergrounding projects.
19. Canine park. Proposed 2003/04 FY Objective
20.
Proposed 2003/04 FY Objective
S: \City Manager\Everyone \ccagenda \Goals & Obj Agenda Rpt to HCC 0521 2003.doc
City Council Agenda Report
Re: Mission Statement, Priorities, Goals and Objectives
May 20, 2003 (CC Meeting of May 21, 2003)
Page 4
21. -,Gypeeifie Plan fer- area west ef Virginia Celeny en seiith
side —ef Lo:s Angeles Av-eni:te. Proposed 2003/04 FY Objective
22. Rental Inspection Ordinance.
23. Expand Arroyo Vista Recreation Center and gym.
24. Work with property owner to improve west City entry.
25. Develop plan for recreational use of detention basin in
Specific Plan No. 1.
26. Electronic message sign.
27. Install traffic signal at eastbound SR 118 Collins
Drive /Los Angeles Avenue off ramp.
28. Work with Historical Society on finalizing a site for its
proposed facility.
29. Develop policies for Arts in Public Places expenditures.
30. Develop guidelines for fine and cultural arts expenditures.
31. install Tierra Rejada Read median landseaping. Proposed
2003/04 FY Objective
32. Landscaping improvements and signage for Arroyo Vista
Community Park entry.
33. Landscape north side of Poindexter Avenue from Gabbert Road
east to vicinity of Chaparral School.
34. Establish apricot orchard at one or more locations for
community's historical purposes.
35. Evaluate feasibility of establishing a publicly owned,
privately operated equestrian center.
S: \City Manager\Everyone \ccagenda \Goals & Obj Agenda Rpt to HCC 0521 2003.doc
City Council Agenda Report
Re: Mission Statement, Priorities, Goals and Objectives
May 20, 2003 (CC Meeting of May 21, 2003)
Page 5
36. Work with Caltrans to install landscaping and decorative
pavement at Tierra Rejada Road /SR 23 ramps.
37. Develop program to assist City employees as first -time
buyers to purchase housing in the City.
38. e rg reun
118) feet Shasta Avenue - -te Millard Street;- Proposed 2003/04
FY Oblecti.ve
39. Consider feasibility of pedestrian bridge on Los Angeles
Avenue (SR 118) in vicinity of Moorpark Avenue.
40. Consider feasibility of pedestrian bridge over Poindexter
Avenue and Union Pacific Railroad (UPRR) from Specific Plan
No. 1.
41. Gensider- feasibility ef eenverting -. -- e
Fftere natiii=al desi��n freffi 'Gasey "Rlead te the planned - -
Plan - - Delete
42. Prepare .► - - Plan Imand Use Element - - - - -
• - - - HefRes (Williafft Lyen 11emes) DevelepfRent AgreeFaent.
Proposed 00 0I FY Objective
43. Establish Civic Hall of Fame to recognize city enhancement
efforts by individuals and organizations.
44. Upon eemplet -ien of lE A- sueu-dy fer Arreye Sim,iapdute
City's . Proposed 2003/04 FY Objective
45. Upgrade Community Center kitchen facilities.
46.
Proposed
2003/04 FY Objective
S: \City Manager\Everyone \ccagenda \Goals & Obj Agenda Rpt to HCC 0521 2003.doc
City Council Agenda Report
Re: Mission Statement, Priorities, Goals and Objectives
May 20, 2003 (CC Meeting of May 21, 2003)
Page 6
47. Construct a second lighted basketball court at Griffin
College View Park.
48. Develop recommendations for public art at_Arroyo Vista
Recreation Center and College View Park.
49. Evaluate feasibility and cost for modifying traffic signal
..........................................._..........................................._.__.._............ .............................. _.............._.........._..........._......_.........._.................................................__. ._........................... -- ._......................_.....- - - -- - —
pedestrian crossing devices for use by vision impaired and
physically disabled persons as well as upgrading to include
time disulay.
50. Construct restroom at Glenwood Park.
51. Evaluate feasibility of landscaping remaining portion of
Monte Vista Nature Park and adjacent properties with native
vegetation.
52. Evaluate feasibility of relocating the Metrolink layover
facility.
The proposed list of 2003/2004 objectives includes twenty (20)
new objectives, including development of the Moorpark Human
Services Complex, a part of which is the next phase of locating
a permanent site for Catholic Charities (Objective F.14. in
2002/2003). The list also includes thirteen (13) completed
objectives inclusive of F.14. There are 99 proposed objectives
for 2003/2004.
At its February 5, 2003 meeting, the City Council concurred that
the priority to "Construct Arroyo Vista Community Park Phase II
and evaluate feasibility of a second vehicular access" would be
deleted from the list to recognize the imminent construction of
the park improvements. The second part of this priority was to
be retained as an objective with a focus on potential use of the
existing pedestrian bridge for one -way vehicular traffic. Staff
was directed to make a recommendation for a new priority item
for Council consideration.
It is recommended that the construction of the Moorpark Human
Services Complex be added as the new priority for 2003/2004.
S: \City Manager\Everyone \ccagenda \Goals & Obj Agenda Rpt to HCC 0521 2003.doc
City Council Agenda Report
Re: Mission Statement, Priorities, Goals and Objectives
May 20, 2003 (CC Meeting of May 21, 2003)
Page 7
STAFF RECOMMENDATION:
Approve Mission Statement, Priorities, Goals and Objectives for
Fiscal Year 2003/2004.
SK:db
Attachment
S: \City ManagerTveryone \ccagenda \Goals & Obj Agenda Rpt to HCC 0521 2003.doc
CITY OF MOORPARK
Mission Statement, Priorities, Goals, and
Objectives
CITY OF MOORPARK
Mission Statement, Priorities, Goals, and Objectives
For FY 20022003/20032004
CITY MISSION STATEMENT
Striving to preserve and improve the quality of life in Moorpark.
TOP TEN (10) PRIORITIES*
1. Construct new City Hall and Corporate Yard Facility. (F2 &
P29F18 )
2. Construct police station. (F17C10 & F15)
.._._......_.....__.._.. _...._.._ .............._......_
3. Comprehensive update of General Plan Land Use and
Circulation Elements and adopt updated OSCAR Element to
insure internal consistency among all elements of the
General Plan. (G4, & G11 —&-G16)
4. Widen Los Angeles Avenue /New Los Angeles Avenue (SR118) to
six travel lanes from Tierra Rejada Road to SR 23 Freeway
with a raised median and traffic signal interconnect system.
(Cl a) , b) , c) , & d)
5. Truck ban on Los Angeles /New Los Angeles Avenue (SR118) and
permanent truck scale facility west of the City. (C5 & C7)
6. Widening of Moorpark Avenue /Walnut Canyon Road from Los
Angeles Avenue (SR118) to north City limits. (C11 & C12)
7.
feasibility -ef a- seeend vehieulai- aeees —(F3)Construct
Moorpark Human Services Complex. (F13)
8. Increase City's General Fund revenue through enhancement of
existing revenue sources including business attraction and
retention programs and establishment of additional revenue
sources. (D1, D2, D5, D7, D11, D12, D13, D14, D15, D16, D17,
F10,F15, & F2 -4)
9. Enhance open space and greenbelt areas and determine
feasibility of establishing a trail system along the Arroyo
Simi and work with other public agencies to develop a
comprehensive Arroyo Simi Management Plan that incorporates
flood control, habitat preservation /restoration, and
recreation components. (G5 & G15)
10. Develop and implement program to encourage new multi and
single family housing on underutilized sites within the
Downtown Specific Plan area and increase the number of
affordable housing units. (B5, B6, B114, & G8)
* The objectives listed are as shown in legislative format with
this draft.
2
S: \City Manager \Everyone \ccagenda \Objectives 2003 -2004 Draft 0521 2003.doc B.doc
DEPARTMENTAL GOALS AND OBJECTIVES
The abbreviation used after each objective indicates which
department has responsibility for it. If more than one
abbreviation is used, the first one shown has primary
responsibility for that objective. The abbreviations and
corresponding departments used are as follows:
(ACM) Assistant City Manager
(AS) Administrative Services
(CA)
City Attorney
(CC)
City Clerk
(CD)
Community Development
(CE)
City Engineer
(CM)
City Manager
(CS)
Community Services
(MRA)
Moorpark Redevelopment Agency
(PD)
Police Department
(PW)
Public Works
A. Expand and encourage community involvement in establishing
the general policies of the City and increase the public's
understanding of local government operations.
1. Develop a general emergency preparedness manual for
distribution to Moorpark residents. The manual will
outline how to prepare for, and what to do following a
disaster. (ACM)
2. Evaluate the feasibility and legality ef allewing
eleetree -Ftes a. es frem the publie - te be re __ =-' by
the- Mayei= an Geuneilmembers during City ne,,, ei-
Completed
agenda aeket. (CC & AS) Completed
24. Develop an-d- implement an Complete enhanced city web
site that provides the - publie - with a vari _
in€erfRatien abeut eity ser-� -ees ineludiing- separatweb
page for downloadable brochures
of City services and submission of electronic messages
pertaining to City Council, Planning Commission, and
Parks and Recreation Commission meeting agenda items
prior to 1:00 p._m. on day of meeting. (AS & CC)
3
S: \City Manager \Everyone \ccagenda \Objectives 2003 -2004 Draft 0521 2003.doc B.doc
B. Revitalize downtown Moorpark with a focus on High Street and
the surrounding business district and residential
neighborhoods, which includes consideration of public rail
transit, potential for increased residential density, and
governmental and related public uses.
1. Coordinate the City's efforts to resolve concerns with
day laborers. (MRA)
2. Complete project to landscape the railroad frontage
property along Moorpark Avenue, including the vacant
area west of the south Metrolink parking lot. (CS &
MRA)
3. Install landscaping and downtown identification signs
at entrances to High Street. (MRA)
4. Complete the eeneep u design for the Spring Road
. ................... _.._._....._..._._—._.._..._.._....... ......._......_....._........._
Angeles Avenue te deterfaine - the - design -(sidew k,
-travel lanes, bike lanes, medians, parkways,
landseaping, entry signs, et-e. )_-and proceed with
right -of -way acquisition. (PW)
S. Review and consider revisions to the Downtown Specific
Plan including but not limited to the and eensider
zTTe� eat -men to eidrren— vision, policies, land use,
zoning and development standards and uses for
City /Agency owned properties. (CD & MRA-,&-GD)
6. Develop program to encourage new multi and single
family housing projects on underutilized sites within
the Downtown Specific Plan area and consider
feasibility of City /MRA acquisition of selected sites.
(MRA & CD)
7. Install improved street lighting on designated downtown
residential streets. (MRA & PW)
MN
Prepare amendment to Moorpark Redevelopment
related ballot measure to ^•tend reestablish
domain authority and L=elated ballet fneasure .
& CC)
4
S: \City Manager \Everyone \ccagenda \Objectives 2003 -2004 Draft 0521 2003.doc B.doc
Plan and
_eminent
(MRA,
CA
Z"i • a ompleted
ewned a • Completed
3�9. Acquire site and construct mini -park within Downtown
Specific Plan area. (MRA & CS)
10. Acquire property and prepare conceptual development
plan for expansion of Poindexter Park. (CS)
. .................. -. -. ..................................._..._..._...._.-............_..._............._............_.............__.......----- ..__...__......_..._..._.. — -- ......_.__.._........... - - - -- . _._......_..................... - - --
Zoning Code modification for the affordable housing
site as part of the West Pointe Homes / William Lyon
Homes Development Aqreement. (CD)
12. Complete update of Redevelopment Implementation Plan
for 1999 -2004 and prepare draft Implementation Plan for
2004 -2009. (MRA)
13. Prepare report on health and longevity of High Street
pepper trees and related maintenance and replacement
plan for City Council consideration by December 31,
2003. (CS)
C. Improve traffic circulation and mitigate impacts on the
movement of traffic through the City.
1. Work with Caltrans to complete a number of projects
including: (PW)
a)
Obtain Gall ns Caltrans approval
for construction
of a raised median on Los Angeles
Avenue /New Los
Angeles Avenue from west city limits
to SR-23
Freeway.
b)
Installation of a traffic signal
interconnect
system and permissive /restrictive
left turns at
certain intersections to provide
improved signal
coordination and traffic flow on
New Los Angeles
Avenue and Los Angeles Avenue;
c)
re.gi:Ar right of way and widen — Construct
the Los
..._ ....... ...
Angeles Avenue at Beltramo Road widening
_. _. ._..- -- -- -- .............._._..
- .....
project;
d)
Complete design and acquire right
-of -way to widen
Los Angeles Avenue between Spring
Road and
Moorpark Avenue.
5
S: \City Manager \Everyone \ccagenda \Objectives 2003 -2004 Draft 0521 2003.doc B.doc
2. Complete report on the Citywide Traffic Mitigation fee
and develop more precise information on the proposed
east /west route that addresses local issues, including
retention of consultant for an implementation plan
pertaining to the level of improvement required to
serve as an east /west transportation corridor, cost,
funding alternatives, and plan for phased
implementation. (CD & PW -&-GB)
3. Design- Construct traffic signal interconnect system on
Tierra Rejada Road from Los Angeles Avenue Spring Read
to SR 23 Freeway to possibly
-- .._.._...- - ---............_—._..._......_ ............ ...._.......................... - - --
include evaluate - pet^ral use of
permissive /rest-rietive protected left turns at certain
intersections (PW).
4. Acquire right -of -way and improve Los Angeles Avenue
(East) from Condor Drive west to 1,500 feet east of
Spring Road. (PW)
5. Obtain a truck ban on SR 118 (except freeway portion).
(PW)
6. Install bus benches and shelters at selected City bus
stops. (CS)
7. Work with VCTC, CHP, Caltrans, and County of Ventura to
site a permanent truck scale facility west of the City.
(PW & ACM)
8. Monitor Caltrans' efforts to develop improvement plan
for widening of SR 118 west of Moorpark City limits
including proposed improvements at the SR 118 and SR
34 /Donlon Road intersection. (PW)
9. Puxsue -grant fundinJ and D_design fer the modification,
improvement, and widening of the rail crossings at
Spring Road and at Moorpark Avenue. (PW)
10. Preeeed with Complete construction of street
_....._._ - - -- ._............- -
realignment and signalization at the intersection of
Flinn Avenue, Second Street and Spring Road. (PW)
11. Proceed with the development of the design and
acquisition of additional right -of -way necessary to
provide two southbound lanes on Moorpark Avenue (SR 23)
S: \City Manager \Everyone \ccagenda \Objectives 2003 -2004 Draft 0521 2003.doc B.doc
between Casey Road and Los Angeles Avenue (SR 118).
(PW & CD)
12. Coordinate efforts of various developers to construct
improvements to Walnut Canyon Road (SR 23) from Casey
Road to north City limits to provide lane widening,
paved shoulders, and striped median. (CD & PW -& GB)
13. Complete report on alternative road
......_._.....- - --
alignments for SR 23 between Broadway and Los Angeles
Avenue. (CD, PW &-7--CE —& GB)
. .................. __ ...... _._ ....................
............................ -- _..._.. -- -- -..._................_.._....................._....._._..._..._....._._._.._._.._....._...._... .......__....................._
Street west of Moorpark Avenue (SR 23) as a local
collector street. (CD)
D. Strengthen the City's fiscal stability and long -range
financial growth.
1. Develop proposed Business License Program for
consideration by the City Council. (AS)
2. Prepare a City marketing brochure and related materials
for business attraction and retention. (MRA)
3. Revise park land dedication ordinance and Park Master
Plan- and evaluate adequacy of current parks
improvements fee for commercial and industrial
development. Evaluate the feasibility ef establishing
repla-eeFaent at par-ks . (CS, CD & AS)
4. Submit the seven -year Capital Improvement Program (CIP)
for City Council's consideration by December 31, 20032 -.
(PW)
5. Complete a comprehensive fee study for development
related fees for consistency with current direct and
indirect costs. (AS)
6. Implement Cost Recovery Program for Code Enforcement.
(CD & AS)
7. Develop improved cost and time accounting addressing
when to use flat fee amounts instead of deposits for
planning and engineering fees and develop real time
billing rates for all departments. (AS & CD)
7
S: \City Manager \Everyone \ccagenda \Objectives 2003 -2004 Draft 0521 2003.doc B.doc
8. Develop plan for expenditure of Traffic Systems
Management monies collected from development projects
for improvement of air quality. (CD & CS —& OB)
preteeting -- assets. • Completed
!8- 9.Develop an equitable basis for requirement on new
development projects to provide Affordable Housing
units and /or pay in lieu fees and for calculating the
amount of Traffic Systems Management (TSM) fees. ( .......... . _.......
MRA & AS)
44=10. Implement an electronic imaging system fee to be
eellee -e, paid prior . — ..__......__._....._ - -- -- ....__..— _Y.._.._.. - -- --
building permit issuance ap -eval —to pay the City's
costs for scanning approved building permits and plans.
inte an e ,,e ren -^ ±Fffaging (CD & CC —& GB) —
x-11. Complete efforts to implement GASB
34 requirements to record infrastructure as capital
assets and modify annual financial reports to include a
government -wide component. (AS, PW & CS)
X3.12. Evaluate potential uses for parcels deeded to City
by SDI. (ACM)
x-13. Conduct citywide mail ballot to seek increase in
assessments for street lighting and landscaping. (PW &
CS - -& NO
vehieles. •• Completed
1fr -14. Develop a fee program for businesses requiring
inspection to insure NPDES compliance. (PW & AS)
15. Evaluate feasibility of establishing a fee on all
building permits for new construction to assist with
funding updates of General Plan elements. (CD & AS)
16. Complete a commercial demand study to determine
appropriate range of commercial - acreage for city at
build out for City Council consideration by October 31,
2003. (CD)
y7
S: \City Manager \Everyone \ccagenda \Objectives 2003 -2004 Draft 0521 2003.doc B.doc
17. Conduct a comprehensive analysis of Moorpark
Redevelopment Agency finance projections, including
cash flow and bondinq capacity. (MRA)
E. Reduce the potential for juvenile crime through intervention
and prevention efforts.
1. Develop a Youth Master Plan in collaboration with the
various agencies that serve Moorpark youth, including
MUSD and Moorpark Boys and Girls Club, and interested
residents to identify existing needs, services and
programs. (CS)
2. Work with community groups and school district to
address violence intervention and drug use among
teenagers. (PD & CS)
3. Determine a location and construct a permanent
skatepark. (CS)
F. Enhance the delivery of services and expand program
efficiencies.
1. Coordinate City's efforts for proposed transfer of
Waterworks District No. 1 to the City. (CM)
2. Develop conceptual design proposal for new City Hall,
council chambers, and other government offices and
complete necessary property acquisition. (ACM)
3. Prepare a prepesed Complete construction Ong !an
€ems- d-e=ee�ent of Arroyo . Vista Community Park Phase II
and evaluate feasibility of a seeend-reqular-vehicular
aeeessuse of the pedestrian bridge. (CS & PW)
4 Prepare Complete standard development project
conditions of approval used for each type of
entitlement. (CD)
5. Update and revise the Subdivision Ordinance and present
it to the for City Council consideration and f-e-r-
adoption by December 31, 2003. (CD, CA & CE)
6. Complete a policy and procedures manual for code
enforcement activities. (CD)
9
S: \City Manager \Everyone \ccagenda \Objectives 2003 -2004 Draft 0521 2003.doc B.doc
7 De ^-elef Complete a Citing Procedures Ordinance
Ce'cneil aetien —c^cnd prepare uinanee making any
violation of a City Ordinance subject to an
administrative fine or penalty for City Council
consideration and adoption by December 31, 2003. (CD &
-- --._..._._........_._._............_ ... ........................._.._.. -- -- ._._..._.... - - - - - - -- - - - - -- ............._.... ---._..........................._._..........._...---
CA)
8. Prepare- Complete Guidelines for Preparation of
Landscape and Irrigation Plans. (CD)
9. Prepare an Accounting Policies and Procedures Manual
and revise Purchasing Ordinance and related procedures.
(AS)
10. Complete negotiation of cable television franchise
renewals with Adelphia for City Council consideration
by -ire- ;G December 31, 2003. (ACM)
Completed
x-11. Evaluate the feasibility of on -line park
reservations and registration for recreation programs.
(CS & AS)
13.12. Consider options for funding construction and
maintenance of a community aquatic facility. (CS)
14. in eenjidnelcien with ether- interested a(
.. + Completed
13. . ......................................................_._._.__._._..........................................._............... ._...._.._....._............ - -- - - - -- ..............----._. ..._...._..............._.._..- -
preparation of the conceptual plan, design and
financing plan and construction of the Moorpark Human
Services Complex for the provision of health and social
services to the residents of Moorpark. (MRA)
serviee by Beeefabei= 31, 2002. (GS) Completed
36.14. Evaluate City's law enforcement needs and
priorities and related allocation of resources. (CM &
PD) .
10
S: \City Manager \Everyone \ccagenda \Objectives 2003 -2004 Draft 0521 2003.doc B.doc
17-15. Develop final design for police
.... _ .... . - --
station including space for and determine feasibility
of siting-California Highway Patrol offices and
emergency serviees -at same lee and initiate
construction. (ACM & PD)
14-16. Evaluate feasibility and implement addilt anal_
energy er=v �c=ct i e n measures few City f^_ i l i} i_
ineluding the epties few pheteveltaie system and
dDetermine feasibility and cost for electrical
generator to serve Arroyo Vista Recreation Center. (A-S
S---C S )
x-17. Update City's Record Retention Schedule to conform
to federal and state law and prepare for increased
destruction of paper records. (CC)
20-18. Develop final design
Yard for the Public Works
maintenance functions and
CS)
p3-a*5 -for a new Corporate
and Community Services
initiate construction. (PW &
22.2G.Install mutt mitt dispensers at all City parks. NGG-�
Completed.
Arreye Vista Gemmunity Park by September 39, 20G2.
Completed
243 19. Construct a play lot and half court basketball
court at Villa Campesina Park. (CS)
24-20. Install new playground equipment in both play lot
. ......... _._...- --
areas at Mountain Meadows Park. (CS)
2"4--- - --iT] stZZZT new park name m'ent signs at Villa Campesina
Park, Park, .
(GS) Completed
206 21. I-mplem Complete initial phase of GIS
application. (AS)
27.1mplement new database system fen traeking, ana
staff time- eha-rges (AS &--GO Completed
11
S: \City Manager \Everyone \ccagenda \Objectives 2003 -2004 Draft 0521 2003.doc B.doc
Muni- p -- Completed
22. Construct a canine park at Colleqe View Park. (CS)
23. Evaluate feasibility of using a contractor to perform a
citywide canvassing for animal licensing. (CS)
24. Evaluate feasibility of in -house processing of parki
citations. (PW & AS)
25. Evaluate feasibility of constructing a second point of
................._........_..---...._................................_......._............_.__.._...._.._._......_..---.._...._._..............._...- ---- ------- ...._....._..._......_... - - -- — - --
egress for the south Metrolink parking lot. (CS, PW &
MRA)
26. Develop guidelines and procedures implementing a Youth
Scholarship Program for eligible low income
participants in city recreation programs. (CS)
G. Reinforce and enhance Moorpark's attractive community
character and safeguard its desirable resources.
1. Work with Ventura County Fire Prevention District to
consider siting a fire station in the Campus Park area
of the City. (ACM)
2. Plan and conduct an emergency response exercise
involving the City Council and a simulated emergency
response drill and update City's SEMS Multi Hazard
Functional Plan (Emergency Plan) and improve
communication capabilities of the City's EOC. (ACM &
PD)
3. Develop Ordinances and related policies and program
guidelines for collection and use of Art in Public
Places and Tree and Landscape fees. (CS & CD)
4. Complete an t
General Plan,
environmental
Plan by Jane.-
OSCAR Element
he updated of the OSCAR Element of the
the related _ -rd'? pre____ -GPA and
documentation and adpdate –the Park Master
Y^i M993- to be consistent with the updated
by June 30, 2004. (CD & CS)
5. Develop options to enhance open space and greenbelt
areas for consideration by the City Council. (CM & CD)
12
S: \City Manager \Everyone \ccagenda \Objectives 2003 -2004 Draft 0521 2003.doc B.doc
6. Process General Plan amendment and Zoning Code
amendment to create a Natural Open Space land use
designation and zone district as initiated by City
Council in 1995. (CD)
7. Prepare a Business Recovery Plan. (AS)
8. Develop affordable housing assistance programs in
conjunction with residential development projects in
the City and develop a program for affordable housing
assistance projects utilizing redevelopment set aside
funds and other available funding sources to increase
the affordable housing stock in Moorpark. (MRA)
9. Work with State of California to achieve appropriate
reuse of former Caltrans yard including widening of Los
Angeles Avenue. (CD & MRA)
10. Develop plan and conceptual design for City entry
signs. (GS & PW, CS & CD)
11. Initiate comprehensive update to General Plan Land Use
and Circulation Elements and insure internal
consistency among all General Plan Elements. (CD)
12. Consider amendments to the Zoning Ordinance to allow
greater use of a variety of residential development
concepts to ensure optimum open space and recreation
amenities while achieving appropriate densities. (CD)
13. Establish design standards for commercial, industrial,
and residential development projects. (CD)
14. Complete landscaping improvements on south side of Los
Angeles Avenue east of Tierra Rejada Road. (PW & CS)
15. Conduct study to determine feasibility of establishing
a trail system along the Arroyo Simi through the City
and east to connect to trail system in Simi Valley.
(PW & CD)
16. Process amendments to City Zoninge Ordinance including
l;gparking, entitlements, signage and second
dwelling units. (CD)
17. Analyze feasibility and if feasible, prepare policy and
standards requiring installation of a photovoltaic
13
S: \City Manager \Everyone \ccagenda \Objectives 2003 -2004 Draft 0521 2003.doc B.doc
system for residential projects for consideration by
Planning Commission and City Council by June- 3ODecember
31, 2003. (CD)
18. Plan - Implement activities to celebrate City's 20th
anniversary of incorporation. (CS)
19. Initiate Tree Lighting Ceremony community event in
conjunction with the Metrolink Santa Train program.
.......... ...._.. -- . _......_.
20. Process proposed North Park Specific Plan and related
environmental document, GPA,_ Zone Change, development
agreement, sphere of influence amendment and annexation
for City Council consideration. (CD, CM & CC)
21_ Install landscaping in the Tierra Rejada Road _median_
from Spring Road to easterly city limits. (PW & CS)
22. Update city's 1995 Master Drainage Plan and incorporate
needed improvements into Capital Improvement Program.
(PW & CD)
23. Prepare Specific Plan for the Virginia Colony area of
city. (CD)
24. Establish Underground Utility District to underground
electrical transmission lines on Los Angeles Avenue (SR
118) from Shasta Avenue to Millard Street. (PW)
14