Moorpark City Council
Agenda Report
To: The Honorable City Council f
From: Kenneth C. Gilbert, Director of Public Works 7
Date: May 9, 2003 (Council Meeting 5- 21 -03)
Subject: Award Contract for the 2003 Slurry Seal Project
BACKGROUND
One of the elements of the City's pavement maintenance program is
the periodic application of a protective slurry seal to the
pavement surface of all of the streets in the City. The program
objective is to maintain a bi- annual program (construct a project
every other year) in which each project addresses approximately
one -third of the residential streets in the City. In this way,
every residential street in the City should be slurry sealed once
every six (6) years.
DISCUSSION
A. Proposed Scope of Work
The streets included in the 2003 Slurry Seal Project are
shown on the maps attached as Exhibit 1.
A summary of the scope of the project is as follows:
Quantity of Slurry: . . . . . . . . . . . . . 1,832 Tons
Total Length of Streets in linear feet: . . 91,500 l.f.
Total Length of Street in miles: . . . . . . . 17.3 mi.
The project will include the application of Type II Slurry on
all designated streets. It is anticipated that this year's
project will not require any removal and replacement of
asphalt pavement, or the construction of any "leveling"
courses, prior to the application of slurry seal. The project
will include the installation of crack filler material as
required, and re- striping subsequent to the application of
slurry seal.
S1ry2003_awd
000:161-
Slurry Seal 2003: Award Contract
May 9, 2003
Page 2
B. Park Parkinq Lots
An Addendum to the plans was distributed to all plan holders,
adding to the scope of work the application of Slurry Seal to
certain park parking lots listed as follows:
• Poindexter Park
• Peach Hill Park (two lots); and
• Mountain Meadows Park.
C. No Parkinq / Restricted Access
The plans and specifications require the contractor to place
signs on the street and distribute "Door- Hangers" to all
affected properties, notifying residents of the date Slurry
will be applied to their street. Parking is not permitted on
the street the day of the work and vehicular access to and
from the property is prohibited. It will be necessary for
residents to park their vehicles on an adjacent street the
night before the work is to be done, in order to be able to
use those vehicles on the day of the work.
D. Towing
It is not uncommon to find on the day of the work, a few
vehicles parked on the street. The City inspectors and the
contractor will attempt to locate the owners of such vehicles
in order to have such vehicles moved. If we are unable to
locate the vehicle owner, it is the intent of staff to have
such vehicles towed. Although this is common practice by
most cities, for the City of Moorpark this will be a
departure from past practices. In prior years, slurry
application would "go around" parked cars, and the "missed"
spots would be slurried on another day. This practice yielded
a final product with an uneven appearance. By towing parked
cars we will be able to remedy this problem.
In order to claim their vehicle, the owner of a "towed" car
would have to pay $200, plus $22 per day storage fee.
E. Asphalt Overlay Project
On May 7th the City Council approved the award of a contract
for the 2003 Asphalt Overlay Project. Attached as Exhibit 2
are maps showing the streets to be resurfaced by both Slurry
Seal and AC Overlay. Also included is an alphabetical list of
the streets included in both projects.
Slry2003_awd
0001 2
Slurry Seal 2003: Award Contract
May 9, 2003
Page 3
F. Bid Results
Bids for the subject project were received and opened on May
5, 2003. The apparent low bidder is Roy Allan Slurry Seal,
Inc., with a bid of $239,755.18. A summary of the bid results
is attached as Exhibit 3.
It has been determined that the apparent low bidder is
qualified to perform the work. Said bidder has confirmed that
their bid is valid and that they are prepared to proceed with
the construction of the project.
G. Fiscal Impact
1. Total Project Cost: The estimated total project cost is
summarized as follows:
Element Amount ($)
Design 14,401
Construction 239,755
Constr Contingency (10 %) 23,976
Inspection 24,000
Total 302,132
....................................................................................................................................................................................................................................................................... ............................... _ ...................................
* Note: Inspection services provided by the consultant City Engineer
will be augmented by in -house inspection efforts.
2. Budget: The FY 2002/03 Budget provides funding for this
project [Project 8002] from the TDA Article 8 Fund [Fund
2603] (Local Transportation Fund [LTF]). The Project
Account Number is 2603.8310.8002.xxxx. A summary of the
present status of the budget for this project is as
follows:
Description Prior Year ($) FY2002/03 ($)
Design: Fund 2603 3,162 10,838
Design: Fund 2610'' 9,239 -
Design Total 12,401 10,838
Construction - 400,000
Inspection 0 24,000
Total 12,401 434,838
............................... ............................... ................................................................................................................................................................................................................................ ..........................._...
** Note: A portion of prior year expenses for design
Fund 2610: Congestion Relief Grant funds.
Total
14,000
9,239
23,239
400,000
24,000
447,239
......................................... ..............................:
were charged to
Slry2003_awd 0 0 0 1 cia
Slurry Seal 2003: Award Contract
May 9, 2003
Page 4
3. Park Parking Lots: The cost for slurry sealing and re-
striping the four park parking lots mentioned in Section
C, is $8,675.70 [Bid Item #15]. It is not anticipated that
these costs will be incurred until FY03 /04. The
recommended Budget for FY 03/04 will include funding for
these expenses. The net construction cost to be funded by
Fund 2603 is as follows:
Element
Bid Amount, plus contingency
Item 15: Park Parking Lots * *"
Total Construction Cost to Fund 2603
.. . . ...... . .......... . . . ... . . . . ....................... . . . . . . . . ........................ . . . . . . . . ........................ . . . . . . . . . . . . . . . . . ................... . . . . . . . . . . . ......... . . . . . .
* ** Note: Costs for the slurry
charged to certain park
in the FY 03/04 Budget.
Amount
263,731
(8.675)
255,056
............... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..........................
.
sealing of park parking lots will be
maintenance line item accounts included
4. Projected Expenditure Requirements: The anticipated total
net costs to Fund 2603 [LTF Fund] is summarized as
follows:
Description
FY 02/03 Budget
Design, Printing, Etc
Construction (inc. Conten.)
Inspection
Total
Plus Prior Year Design
Total
H. Project Inspection
Approved
Budget
10,838
400,000
24,000
434,838
12,401
447,239
.................................................. ..._......_ .............................
..
Projected
Surplus ($)
Actual
(Deficit [$1)
2,000
8,838
256,000
144,000
24,000
-
282,000
152,838
12,401
-
294,401
........... _._ ...................... ---- .......................... - .................................................................
152,838
_..................................
As mentioned in the Note in Section G -1, contract
administration and inspection services will be provided by
both the City Engineer's Office and by the Public Works
Supervisor. In past years we have found that one inspector at
the stockpile site and one inspector in the field, is the
best way to assure a quality job with adequate cost control.
I. Schedule
It is anticipated that the project will be under construction
in July and be completed by September.
Slry2003_awd 0 00104
Slurry Seal 2003:
May 9, 2003
Page 5
Award Contract
J. Administrative Actions
If the recommended action is taken by the City Council,
certain administrative actions will be undertaken by staff,
including the following:
• A contract agreement will be forwarded to Roy Allan Slurry
Seal, Inc., for the construction of the subject project,
for the contract price of $239,755.18.
• When all of the contract documents are in order, the
agreement will be executed by the City Manager.
• A construction contingency of $23,976 (100) will be set
aside for the project.
STAFF RECOMMENDATION
Approve the award of a construction contract to Roy Allan Slurry
Seal, Inc. for the construction of the subject project.
Attachments:
Exhibit 1:
Exhibit 2:
Exhibit 3:
Slurry Seal Maps
Slurry Seal & AC Overlay Maps and Lists
Bid Results
Slry2 003_awd 000105
PG 4
wo—Rk ro
,
c ,E .E
f-'-
ma"'a Z01)3 SLURRY CC--AL Jo
P 6 3
Tl�!= �CITY OF MOORPARKt-'..
i
y
r
1
C
�
w
m
(HWY. i!e) u
f
)DRILL DR.
R�\\R,k t 1 ?_2
F..R
Av j aC:w x:
}TAG .�I� FtC1ABl =1 I )
CHAPARRAL <
MIDDLE
i SCHOOL zI
Cj 'L > AvE'" u'I
a o rA SEN ASSEN
Z HE:T j W yAVE. L oO TCR
Z N a Z r AVE Av W
HAL LAGER Y' fl aW Z
l J
S .
•DISC ^' Ear Z F A
a u
o ^ EvfREST v
< i �AVE.
AIE LCS ANGELES aJ
CI1r LIMITS
3 DEER MEADOW ST.
I TERRACE MEADOW CT.
S SUNRISE, MEADOW CT.
000107
3
�i
! of
ANGE'. S a! I :21
5 SuNR�SE wEA00w CT,
Sj... L
t�
V
1,19 I
V T iO_`C:.Lc
<I I So-= �I'''w ♦N AVE.1 \Z
'IJ
s:la
a
U, A \161 i 1 P. 3
10 ",el
VI NEW
t 4 T PINES
CAHOEw cL . CT.
CITY UMI'S
0 00 Il 08
w 1
f
0
N _GNP
r�
O
/P
Q�
4�2
h
J
�IQIIl
Flt- -
TT7
PE CA AyE R,VN Cr
S
CdLL"1 QnVCR 4
OF 't4
t � C
CT
Sp A Tly�av
\ FT
STA�FY
A
ITY LIMITS ` VOmFt
N ASE
ARYJ Sf C RRV I 1 _
2
i LOYOLA PL
e} y
'wom Z
(�'• e PARK A CT. U
Q //� lAN1 R SL
d A y > VAR ITY c wt u
4 (PRIVATE) a
i
' I NRCDNIA COLONY P CITY LIMITS
18 FREEWAY
T
1
�q HART C
�R
3 pC21 �
Cl
I 7MAOPE C7
1 91AKE SK ME PL
MOORPARK COMMUNITY
COLLEGE
CR.
Z
1 0ELnN
Z EIERAGAN S°
Q
- - - _ SAN FERNq
NGO VALLEY
_ A'..
1 ' ,
). _ ..... ,..
i
- 111
s
Y
f
y � h
v
` r` �+ •ll '` x+111 � .,
t
r
-. • � err I
0
�cin of
LEGEND
- -- Slurry Seal
AC Overlay
MOORPARK
RE
x
J y
N
Exhibit 2 [Page 2]
List of Slurry Seal Streets
Street Name
Alderbook St.
Amhurst St.
Annette St.
Arborhill St.
Ashtree St.
Aspen Tree St.
Auburn Ave.
Baylor Cir.
Bear Valley Rd.
Bending Oak Ct.
Berkeley Ct.
Berkley Cir.
Berrybrook Ct.
Bitner PI.
Blacksmith Ct.
Blossomwood Ct.
Borges Ct.
Braun Ct.
Brookhurst Ct.
Bubbling Brook St.
Cambridge St.
Camden Ct.
Canyonlands Rd.
Cedar Branch Ct.
Chesterfield Dr.
Chestnut Ridge St.
Clavelle Ave.
Clavelle Ct.
Clemson St.
College Heights Dr.
Columbia Ave.
Commerce Ave.
Condor Dr.
Conejo Mesa St.
Coralcrest ct.
Cornell Cir.
Creighton Cir.
Dartmouth Cir.
Delfen St.
Doris Ct.
Dracena Ave.
Flowerwood Ct.
Freshman Ct.
Graduate Cir.
Grand Isle Rd.
Grandsen Ct.
Portion
Street Name
Griffith Lane
Gunsmoke Rd.
Hartford St.
Harvard St.
Hastings St.
Havencrest St.
Hearon Dr.
Hillshire Ct.
Honeybee St.
Honeybrook Ct.
Huntercrest Ct.
Inglewood St.
Kernvale Ave.
Lafayette Ct.
Laurelhurst Rd.
Linville Ct.
Loyola St.
Mahan Ct.
Mallory Ct.
Maplecrest St.
Marquette St.
Melray St.
Mill Valley Rd.
Millerton Dr.
Milne Cir.
Overly St.
Oxford Cir.
Painted Sky St.
Pepperdine Cir.
Pheasant Run St.
Pine Ridge Ct.
Purdue St.
Portion Quailwood St.
Rains Ct.
Rivergrove Ct.
Rivergrove St.
Rolling Knoll Rd.
Rutger Cir.
Seitz Ct.
Shakespeare PI.
Silver Creek St.
Silvercrest St.
Skidmore Ct.
Skylark Ct.
Sleepy Wind St.
Sophomore Ct.
portion
Portion
Portion
Fke 10 t.
Street Name
Sosna Ct.
Stanford St.
Stanley Ct.
Sugar Maple Ct.
Swift PI.
Thionet PI.
Thomasville Ct.
Timerview Ct.
Trollope Ct.
Tulane Ave.
University Dr.
Vassar Cir.
View Mesa St.
Westport St.
Westwood St.
Wildwest Cir.
Winterwood Ct.
Yale Ave.
4001..3
Exhibit 2 [Page 3]
List of AC Overlay Streets
Street Name
Adlena PI.
Amberwick Lane
Avedon Rd.
Beragan St.
Brookdale Lane
Butter Creek Rd.
Butterfield Lane
Campus Park Dr.
Portion
Clearcreek Ct.
Cloverdale St.
Coralberry Ct.
Cottontail Rd.
Daisy Ct.
Deepwell Lane
Duke Street
Fairbrook Lane
Fern Valley Ct.
Fireside Lane
Gabbert Rd.
Portion
Havencrest St.
Portion
Heatherglen Ct.
Hollyglen Ct.
Hunters Grove Ct.
Isle Royale
Kernvale Ave.
Portion
Kimerwick Lane
Lantern Lane
Laurelhurst Rd.
Portion
Maplecrest St.
Portion
McBeth Ct.
Meadow Ct.
Meadow St.
Mesa Verde Dr.
Mistygrove St.
Portion
Mt. Trail St.
Portion
Pepper Mill St.
Poppyglen Ct.
Quail Summit Rd.
Rand Street
Robinwood Lane
Rolling Knoll Rd.
Talmade Rd.
Portion
Street Name
Tierra Rejada Rd.
Vista Del Valle Dr.
Vista Lavana Dr.
Vistapark Dr.
Westgate Rd.
Wildflower Ct.
Willowwood Ct.
Woodglen Dr.
0001.,...x:
2003 Slurry Seal Project
Bid Opening: 05/05/03
Engineer's Estimate
Roy Allan Slurry Seal
CPM, Inc.
marks an allowance
11922 Bloomfield Ave
Santa Fe Springs, CA 90670 -4701
US
9390 Elder Creek Rd
Sacramento, CA 95829 -9326
US
2003 Slurry Seal Bid Items
Item #
I Item Description
Quantity
Unit or Measure
Unit Price
Item Total
Unit Price
Item Total
Unit Price
Item Total
1
MOBILIZATION
1
LS
$5,000.00
$5,000.00
$1,500.00
$1,500.00
$4,500.00
$4,500.00
2
TRAFFIC CONTROL
1
LS
$5,000.00
$5,000.00
$2,500.00
$2,500.00
$18,500.00
$18,500.00
3
PUBLIC NOTICE
1
LS
$2,000.00
$2,000.00
$700.00
$700.00
$750.00
$750.00
4
CRACK SEALING
1
LS
$5,000.00
$5,000.00
$23,000.00
$23,000.00
$18,705.00
$18,705.00
5
TYPE 11 SLURRY
1832
ELT
$88.27
$161,710.64
$99.54
$182,357.28
$97.72
$179,023.04
618"
SOLID WHITE LINE
4900
LF
$0.50
$2,450.00
$0.75
1 $3,675.00
$0.50
$2,450.00
7112"
WHITE RR & STOP LINES
1894
LF
$0.50
$947.00
$1.80
$3,409.20
$1.55
$2,935.70
8
WORDS & SYMBOLS "STOP"
121
EA
$42.00
$5,082.00
$85.00
$10,285.00
$50.50
$6,110.50
9
WORDS /SYMBOLS "BIKE PATH"
12
EA
$8.40
$100.80
$55.00
$660.00
$65.22
$782.64
10
SOLID YELLOW CENTERLINE
2500
LF
$0.20
$500.00
$0.65
$1,625.00
$0.27
$675.00
11
SOLID YELLOW CROSSWALK
80
LF
$0.50
$40.00
$2.10
$168.00
$1.95
$156.00
12
WORDS /SYMBOLS "SLOW CHILDREN
2
EA
$50.00
$100.00
$270.00
$540.00
$231.441
$462.88
13
SOLID WHITE DIRECTIONAL ARROW
12
EA
$8.40
$100.80
$55.00
1 $660.00
$39.98
$479.76
14
RELEASE
1
LS
$1.00
$1.00
$1.00
$1.00
$1.00
$1.00
15
SLURRY PARK PARKING LOTS
1
LS
$8,900.00
' $8,900.00
' $8,674.70
' $8,674.70
$7,861.44
$7,861.44
List
$196,932.24
$239,755.18
$243,392.96
Total Bid
Amount
$196,932.24
$239,755.18
$243,392.96
t�
F--
a'
N•
rt
W
0
4 "-
F '
2003 Slurry Seal Proiect
Bid Opening: 05/05/03
Engineer's Estimate
Pavement Coatings Co.
American Asphalt South, Inc
marks an allowance
5312 Cypress Street
Cypress, CA 906302216
US
14436 Santa Ana Ave
Fontana, CA 92337 -7141
US
2003 Slurry Seal Bid Items
Item #
I Item Description
Quantity
Unit of Measure
Unit Price
Item Total
Unit Price
Item Total
Unit Price
Item Total
1
MOBILIZATION
1
LS
$5,000.00
$5,000.00
$5,400.00
$5,400.00
$10,000.00
$10,000.00
2
TRAFFIC CONTROL
1
LS
$5,000.00
$5,000.00
$12,300.00
$12,300.00
$7,500.00
$7,500.00
3
PUBLIC NOTICE
1
LS
$2,000.00
$2,000.00
$4,800.00
$4,800.00
$7,500.00
$7,500.00
4
CRACK SEALING
1
LS
$5,000.00
$5,000.00
$18,662.00
$18,662.00
$25,000.00
$25,000.00
5
TYPE II SLURRY
1832
ELT
$88.27
$161,710.64
$108.04
$197,929.28
$108.00
$197,856.00
6
8" SOLID WHITE LINE
4900
LF
$0.50
1 $2,450.00
1 $0.50
1 $2,450.00
1 $0.52
$2,548.00
7112"
WHITE RR & STOP LINES
1894
LF
$0.50
$947.00
$1.54
$2,916.76
$1.60
$3,030.40
8
WORDS & SYMBOLS "STOP"
121
EA
$42.00
$5,082.00
$51.00
$6,171.00
$52.00
$6,292.00
9
WORDS /SYMBOLS "BIKE PATH"
12
EA
$8.40
$100.80
$64.00
$768.00
$68.00
$816.00
10
SOLID YELLOW CENTERLINE
2500
LF
$0.20
$500.00
$0.27
$675.00
$0.28
$700.00
11
SOLID YELLOW CROSSWALK
80
LF
$0.50
$40.00
$1.94
$155.20
$2.00
$160.00
12
WORDS /SYMBOLS "SLOW CHILDREN
2
EA
$50.00
$100.00
$230.00
$460.00
$250.00
$500.00
13
SOLID WHITE DIRECTIONAL ARROW
1 121
EA
$8.40
1 $100.80
$39.00
$468.00
$40.00
$480.00
14
RELEASE
11
LS
$1.00
$1.00
$1.00
$1.00
$1.00
$1.00
15
SLURRY PARK PARKING LOTS
1
LS
$8,900.00
' $8,900.00
' $9,557.25
' $9,557.25
$9,500.00
' $9,500.00
List
$196,932.24
$262,713.49
$271,883.40
Total Bid
Amount
$196,932.24
$262,713.49
$271,883.40
Q
Lim
t�
r•
rY
W
2003 Slurry Seal Project
Bid Opening: 05/05/03
Engineer's Estimate
Valley Slurry Seal, Inc.
Intermountain Slurry Seal
' marks an allowance
3050 Beacon Blvd Ste 205
West Sacramento, CA 95691 -3467
US
6225 Walnut Street
Suite C
Loomis, CA 95650
US
2003 Sl try Seal Bid Items
item #
Item Description
Quantity
Unit of Measure
Unit Price
Item Total
Unit Price
Item Total
Unit Price
Item Total
1
MOBILIZATION
1
LS
$5,000.00
$5,000.00
$12,000.00
$12,000.00
$6,894.17
$6,894.17
2
TRAFFIC CONTROL
1
LS
$5,000.00
$5,000.00
$25,000.00
$25,000.00
$22,945.76
$22,945.76
3
PUBLIC NOTICE
1
LS
$2,000.00
$2,000.00
$5,000.00
$5,000.00
$2,165.98
$2,165.98
4
CRACK SEALING
1
LS
$5,000.00
$5,000.00
$18,500.00
$18,500.00
$18,667.95
$18,667.95
5
TYPE 11 SLURRY
1832
ELT
$88.27
$161,710.64
$108.10
$198,039.20
$127.37
$233,345.50
6
8" SOLID WHITE LINE
4900
LF
$0.50
$2,450.00
$0.17
$833.00
$0.50
$2,445.10
7
12" WHITE RR & STOP LINES
1894
LF
$0.50
$947.00
$1.55
$2,935.70
$1.54
$2,924.34
8
WORDS & SYMBOLS "STOP"
121
EA
$42.00
$5,082.00
$50.40
$6,098.40
$50.40
$6,098.40
9
WORDS /SYMBOLS "BIKE PATH"
12
EA
$8.40
$100.80
$65.10
$781.20
$65.10
$781.20
10
SOLID YELLOW CENTERLINE
2500
LF
$0.20
$500.00
$0.13
$325.00
$0.27
$680.00
11
SOLID YELLOW CROSSWALK
80
LF
$0.50
$40.00
$1.95
$156.00
$1.94
$155.44
12
WORDS /SYMBOLS "SLOW CHILDREN
2
EA
$50.00
$100.00
$231.00
$462.00
$231.001
$462.00
13
SOLID WHITE DIRECTIONAL ARROW
12
EA
$8.40
$100.80
$40.00
$480.00
$39.90
$478.80
14
RELEASE
1
LS
$1.00
$1.00
$1.00
$1.00
$1.00
$1.00
15
SLURRY PARK PARKING LOTS
1
LS
$8,900.00
' $8,900.00
' $13,000.00
$13,000.00
$11,500.00
' $11,500.00
'
List
$196,932.24
$283,611.50
$309,545.64
Total Bid
Amount
$196,932.24
$283,611.501
$309,545.641