Loading...
HomeMy WebLinkAboutAGENDA REPORT 2003 0903 CC REG ITEM 10KITEM 10 • K Nommuffmommuma Moorpark City Council -- - Agenda Report 1� To: The Honorable City Council F " 1 From: Kenneth C. Gilbert, Director of Public Works Date: August 20, 2003 (Council Meeting 9- 03 -03) Subject: Notice of Completion for the 2003 Slurry Seal Project BACKGROUND In May the City Council awarded a contract for the application of a protective slurry seal to certain designated streets. This project is a part of the City's on -going bi- annual pavement surfacing program, in which approximately one -third of the residential streets in the City are slurry sealed every other year. The objective is to resurface every residential street once every six (6) years. DISCUSSION A. Street Resurfacing A summary of the scope of the project is as follows: > Quantity of Slurry: . . . . . . . . . . 2,128 Tons [a] > Total Length of Streets in linear feet: 96,750 l.f. > Total Length of Street in miles: . . . .. 18.3 mi. The project included the application of Type II Slurry on all designated streets. Prior to this work, crack filler material was applied where required. Subsequent to the work, all pavement markings and striping was re- installed. Note: a) 2,128 Tons of aggregate only. This amount equals 1,935 Extra Long Tonnes (Metric Tons). B. Park Parking Lots The project included the resurfacing of the parking lots at the following parks: • Poindexter Park • Peach Hill Park (two lots); and • Mountain Meadows Park. S1ry2003 crop Slurry Seal 2003: Complete August 20, 2003 Page 2 C. Asphalt Overlav Protect The work was coordinated with a separate project to construct an asphalt overlay on certain designated streets. That project is expected to be completed in September. D. Changes 1. Quantity Adjustments: As is typical with public works construction projects, the actual quantities required for the job differed from the engineer's estimate. The added cost resulting from this difference is $10,253. 2. Change Orders: There were no Change Orders required for this project. E. Fiscal Impact 1. Construction Costs: costs is as follows: Element Bid Amount Quantity Adjustment Change Orders Total 2. Total Project Cost: costs is as follows: A summary of the final construction Amount ($) 239,755.18 10,252.62 250,007.80 A summary of the final total project Element Amount ($) Design 14,401 Construction 250,008 Inspection 29,500 Total 293,909 3. Inspection Cost: A portion of the inspection efforts were undertaken by Charles Abbott Associates, and a portion were performed by Public Works staff. A breakdown of these costs is as follows: Element Amount ($) City Engineer Contract Costs 24,500 City Staff 5.000 Total 29,500 S1ry2003 cmp Slurry Seal 2003: Complete August 20, 2003 Page 3 4. Slurry Seal Project Cost: The cost for slurry park parking lots was charged to the park budget. Accordingly, the net cost to the 2003 Project [8002] is shown as follows: Description Amount Total Project Cost 293,909 Less Park Parking Lots (8.675); Total Slurry Seal Project Costs 285,234 5. Budget: The F) costs, is shown Description Design: Fund 2603 Design: Fund 2610 " Design Total }Construction Inspection Total 2003/04 S follows: Prior Years ($) 3,162 9,239 12,401 sealing the maintenance Slurry Seal Budget, along with prior year M 12,401 ** Note: A portion of prior year expe FY2003/04 ($) 10,838 10,838 400,000 24,000 434,838 nseS for design Fund 2610: Congestion Relief Grant funds. Total 14,000 9,239 23,239 400,000 24,000 -- 4.47,239 were charged to 6. Project Surplus: The projected Budget surplus for this project is as follows: Description FY 02/03 Budget Design, Printing, Etc Construction Inspection Total Plus Prior Year Design Project Total Approved Budget 10,838 394,500 29,500 434,838 12,401 F. Final Inspection and Acceptance 447,239 Projected Actual 2,000 241,333 29,500 272,833 12,401 285,234 Surplus ($) (Deficit f$1 ) 8,838 153,167 162,005 162,005 The City has completed a final inspection of the project and has found the work to be acceptable. At this time it would be appropriate for the City Council to accept the project as complete and direct the City Clerk to record the Notice of Completion to start the final lean period. Absent the receipt of any Stop Notices from subcontractors or suppliers, the ten percent retention will be released thirty -five (35) days after the date of the recordation of that notice. STAFF RECOMMENDATION Accept the work as complete. S1ry2003_cmp f` j ^ "I'"_' '' `"`