HomeMy WebLinkAboutAGENDA REPORT 2004 0121 CC REG ITEM 10HTo: The Honorable City Council /V
From: Kenneth C. Gilbert, Director of Public Works
Date: January 8, 2004 (Council Meeting 1- 21 -04)
Subject: Notice of Completion for the 2003 Asphalt Overlay
Project [Project 80111
DISCUSSION
A. Project Scope
Attached as Exhibit 1, is a map and chart identifying the
streets included in the subject project.
The project requirements include:
• R & R pavement and base in selected areas;
• Grinding;
• install reinforcing fabric;
• construct asphalt overlay;
• adjust manholes (etc.) to grade;
• restripe as necessary;
• replacement of Signal loop detectors; and
• crack sealing of certain street segments in lieu of R &R or
AC Overlay.
B. Changes
1. Quantity Adjustments: As is typical with public works
construction projects, the actual quantities required for
the job differed from the engineer's estimate. This
project required less quantities of certain bid items
resulting in a savings of $17,418.75. It should be noted
that reductions for some items were offset by additional
work required by one or more Change Orders.
Ac overlay 2003_awd
000095
Asphalt Overlay 2003: Completion
January 8, 2003
Page 2
2. Change Orders: A summary of the approved Change Orders
for
the project is as follows:
year expenses
No.
------------
Description
Amount
1
Revise Cross Section Design: Improved design for no
59,356.18
- ------- -----
FY2002/03 ($)
net cost increase
Fund 2603: TDA 8A
2
Courtney Lane: Add street
5,282.78
3
Added Traffic Control: Added cost resulting from adding
3,625.00
97,879
streets to the project scope
0
4
Crosswalk Sandblasting: At Campus Park / Collins and
2,090.00
0
Campus Park and College View
11,538
5
Added Trffic Control: Required by leaving excavation
3,000.00
274,670
open overnight
6
Mt. Trail St.: Overexcavation to remedy saturated base
62,219.82
7
Tierra Re4ada Rd: Added cost related to re-design
29,760
Total
165,333.78
C. Fiscal Impact
1. Construction Costs: A summary of the final construction
costs is as follows:
- — ------- - — - ---------------- -
Description
Bid Amount
Quantity Adjustment
Change Orders
Total
Amount
1,199,219.69
(17,418.75)
165,333.78
1,347,134.72
2. Total Project Cost: A summary of the final total project
costs is as follows:
Design
Construction
Inspection
TotA
Amount ($)
97,897
1,347,135
97,940
11542,972
3. Prior Year Expenditures: A summary
of prior
year expenses
is as fo-l--lows:
- - --- - ----------
I lDescription
FY2001/02
- ------- -----
FY2002/03 ($)
Total i
Fund 2603: TDA 8A
Design
28,698
69,181
97,879
I Construction
0
165,253
165,253
Inspection
0
11,538
11,538
Total
28,698
245,972
274,670
Ac Overlay 2003—c.no
000096
Asphalt Overlay 2003: Completion
January 8, 2003
Page 3
4. Budget: The FY 2003/04 Budget is shown as follows:
5
Design
Construction
Construction
Constr. Total
Inspection
Total
Fund 2610:
t
Description
Design
Construction
Construction
Constr. Total
Inspection
Total
Fund 2610:
Fund
Total Budget ($)
2603
125,698
2603
1,246,131
2610
144,472
(11,538)
1,390,603
2603
100,000
2603
1,616,301
TDA Article
8A [LTF]
Congestion
Relief Funds
Less Prior FY2003/04
Years Exp. ($) Budget Amt. ($)
(97,879)
27,819
(165,253)
1,080,878
-
144,472
(165,253)
1,225,350
(11,538)
88,462
(274,670)
1,341,631
a: The project surplus is shown as follows:
D. Final Inspection and Acceptance
The City has completed a final inspection of the project and
has found the work to be acceptable. At this time it would be
appropriate for the City Council to accept the project as
complete and direct the City Clerk to record the Notice of
Completion to start the final lien period. Absent the
receipt of any Stop Notices from subcontractors or suppliers,
the ten percent retention will be released thirty -five (35)
days after the date of the recordation of that notice.
STAFF RECOMMMATION
Accept the work as complete.
Ac Overlay 2003_cmp 000097
FY2003/04
Current Yr.
Surplus
Fund
Total Budget ($)
Expenses ($)
(Deficit) ($)
2603
27,819
-
27,819
2603
1,080,878
(1,035,891)
44,987
2610
144,472
(145,991)
(1,519)':.
1,225,350
(1,181,882)
43,468
88,462
(86,402)
2,060
(1,268,284)
73,347
_1,341,631
TDA Article 8A [LTF]
Congestion Relief Funds [Actual expense is higher
than the
budget in order
to expend
all remaining
funds in
Fund 2610.1
D. Final Inspection and Acceptance
The City has completed a final inspection of the project and
has found the work to be acceptable. At this time it would be
appropriate for the City Council to accept the project as
complete and direct the City Clerk to record the Notice of
Completion to start the final lien period. Absent the
receipt of any Stop Notices from subcontractors or suppliers,
the ten percent retention will be released thirty -five (35)
days after the date of the recordation of that notice.
STAFF RECOMMMATION
Accept the work as complete.
Ac Overlay 2003_cmp 000097
wt�
it
2003 OVERLAI
�Q CITY OF MOORPARK
Street
Adlena PI
Amberwick Ln
Avedon Rd
Beregan St
Brookdale Ln
Butter Creek Rd
Butterfield Ln
Campus Park Drive
Clearcreek Ct
Cloverdale St
Coralberry Ct
Cottontail Rd
Courtney Ln
Daisy Ct
Deepwell Ln
Duke St
Fairbrook Ln
Fern Valley Ct
Fireside Ln
Gabbert Rd
Havencrest St
Heatherglen Ct
Hollyglen Ct
Hunters Grove Ct
Inglewood St
Isle Royale St
Kernvale Ave
Kimberwick Ln
Lantern Ln
Laurelhurst Rd
Maplecrest St
McBeth Ct
Meadow Ct
Meadow St
Mesa Verde Dr
Mistygrove St
Mt Trail St
Pepper Mill St
Poppyglen Ct
Quail Summit Rd
Rand St
Robinwood Ct
Rolling Knoll Dr
Talmadge Rd
Street
Tierra Rejada Rd
Vista del Valle
Vista Levana Dr
Vistapark Dr
Wildflower Ct
Willowood Ct
Woodglen Dr
Exhibit 1 (Pg 2 of 2)