HomeMy WebLinkAboutAGENDA REPORT 2004 0204 CC REG ITEM 09HITEM 9-4.
MOORPARK CITY COUNCIL
AGENDA REPORT
TO: The Honorable City Council 7c�;
FROM: Kenneth C. Gilbert, Director of Public Works
DATE: January 22, 2004 (Council Meeting 2 -4 -04)
SUBJECT: Consider Approval of Plans and Specs and Authorization
to Advertise for Bids for the Los Angeles Avenue /
Beltramo Ranch Road Widening Project.
BACKGROUND
• In May of 1999, the City Council
Negative Declaration for the project.
• In March 2001, Boyle Engineering was
design for the project.
• In September of 2001, the City Council
design for the project.
approved the Mitigated
selected to prepare the
approved the conceptual
• In October 2003, the City completed efforts necessary to
acquire all of the street rights -of -way required for the
project.
• In January 2004, the City received the approved Caltrans Street
Encroachment Permit for the project.
DISCUSSION
A. Project Description
Attached as Exhibit 1 are diagrams summarizing the conceptual
design. The project design calls for widening of the south
side of the street to provide for the ultimate street width
within the project area. A summary of the project scope is as
follows:
• Location: south side of Los Angeles Avenue from Beltramo
Ranch Road easterly to a point east of Maureen Lane;
• Prior Right -of -Way [half- street]:
- at Maureen Lane: fifty feet (50');
- at and east of Beltramo Ranch Road: thirty feet (30');
Beltramo-ad-0401 `� r-�r -y
O0 0//
Los Angeles Avenue Widening
Beltramo to Maureen Lane
Authorization to Advertise
February 4, 2004
Page 2
• Current Right -of -Way [half- street]: fifty -nine feet
(59');
• Landscape Easements: Landscape easements were acquired in
certain areas as shown in Exhibit 1;
• Proposed Street Improvements:
- additional pavement width;
- curb & gutter;
- six feet (6') wide sidewalk;
- [Note: The south right -of -way line is eight feet (8')
from the new curb face. The future landscaped
parkway (see below) will include the two feet
(2') wide area between the back of the sidewalk
and the new south right -of -way line.]
• Striping: Upon completion of the project, the street will
be wide enough to accommodate six lanes of traffic, plus
an eight feet (8') wide paved shoulder on both the north
side and the south side of the street;
• Traffic Signal: Construction of a traffic signal at the
Maureen Lane intersection;
• Storm Drain: Construction of a storm drain along Los
Angeles Avenue and extending southerly within Maureen
Lane to the south end of that street;
• Future Parkway Landscaping: Landscaped easements have
been acquired as noted above for future parkway
landscaping; and
• Block Walls: Eight feet (8') high block walls will be
constructed immediately south of the south line of the
landscape easement.
B. Right -of -Way Acquisition
The project required acquisition of additional street right -
of -way on the south side of the street, as shown on Exhibit 2.
All of the required street - rights -of -way, landscape easements
and temporary construction easements have been acquired. The
street rights -of -way will ultimately be conveyed to Caltrans.
The landscape easements will be retained by the City.
C. Parkway Landscaping
Landscaped easements have been acquired for future parkway
landscaping (see Exhibit 3 for diagram showing the location
of future parkway landscaping). Sleeves will be installed to
facilitate that project. These improvements will be deferred
until the parkway landscaping to the east or west of Beltramo
Ranch Road is constructed by the City.
Beltramo—ad-0401
000078
Los Angeles Avenue Widening
Beltramo to Maureen Lane
Authorization to Advertise
February 4, 2004
Page 3
D. Storm Drain
The project requires curbs which concentrate storm flow.
During the development of the project design it was determined
that it would be necessary to construct a storm drain to
handle those concentrated flows - an unforeseen cost. The
final project design includes the construction of that storm
drain extending from the north end of S. Maureen Lane, to an
existing storm drain inlet at the south end of S. Maureen
Lane. The cost of this storm drain is estimated to be
approximately $214,000.
E. Traffic Signal
The project includes the construction of a traffic signal at
the intersection of Maureen Lane and Los Angeles Avenue.
F. Interim Striping Design
Proceeding west to east, the striping design provides for a
transition from four (4) lanes to six (6) lanes between Tierra
Rejada Road and Maureen Lane. The plan then provides for a
transition back to the existing four (4) lanes east of Maureen
Lane. An ultimate striping plan [not a part of the initial
contract] shows the ultimate striping design [six (6) lanes]
for the area east of Maureen Lane. This plan would be
implemented when Los Angeles Avenue is widened east of the
limits of this project. The striping layout immediately east
and west of the traffic signal is the ultimate striping for
the highway.
G. Future Widening Project [Pacific Communities]
Staff has been working with Pacific Communities on the
development of an Agreement which will allow the City to
undertake, on behalf of the developer, the construction of the
widening of the south side of the street, east of the subject
project. If agreement is reached, it would be the intent of
staff to have that project designed and ultimately
constructed. This project will include a traffic signal at the
intersection of Los Angeles Avenue and Shasta Avenue. The
project will also require the relocation and protection of an
existing 24" Calleguas Water line locate in the area of the
street widening. It will be necessary for the City to enter
into a separate Agreement with Calleguas, related to that
work.
Beltramo ad 0401
000079
Los Angeles Avenue Widening
Beltramo to Maureen Lane
Authorization to Advertise
February 4, 2004
Page 4
H. Calleguas Water Line Protect
As you know, the Calleguas Municipal Water District is in the
process of constructing a 72" diameter water line down the
middle of Los Angeles Avenue. Staff has been advised that the
Calleguas work in the vicinity of the City's project [subject
project] will be completed before April 1. If the bidding and
award of contract for the City's project proceeds on schedule,
the Notice to Proceed with construction will not be issued
until April 5.
Staff is working with Calleguas to coordinate the traffic
handling plans for both their project and the City's. As with
the Calleguas project, the City's project will maintain two
lanes of traffic in each direction at all times. Staff does
not anticipate any problems with proceeding with the City's
project while construction of the Calleguas project continues
elsewhere on the corridor.
I. Federal Grant
Staff is working with Caltrans on the final approval documents
for the federal Congestion Mitigation Air Quality [CMAQ] grant
for this project. We expect that approval to come shortly. In
order to conform to grant requirements, it is the intent of
staff to defer advertisement for receipt of bids until that
funding approval is received.
J. Plans and Specifications
A review copy of the Plans and Specifications has been placed
in the City Council Conference Room.
K. Project A proval -- Design Immunity
It is recommended below that the City Council approve the
project plans and specifications in order to document City
Council approval of the scope and design of the project. Such
approval is also required for the purpose of establishing
design immunity pursuant to Section 830.6 of the Government
Code of the State of California.
L. Schedule
It is anticipated that bids for the project will be presented
to the City Council on March 17. Construction should commence
in April and be completed by October.
Beltramo ad 0401
000080
Los Angeles Avenue Widening
Beltramo to Maureen Lane
Authorization to Advertise
February 4, 2004
Page 5
M. Fiscal Impact
1. Construction Cost Estimate: The estimated construction
costs are broken down as follows:
Description Total ($)
Road Widening 305,816
Signal 140,000
Storm Drain 213,796
Block Wall 98,470
Sub -Total 758,082
Contingency (10 %) 75,808
Total 833,890 Plus Prior Year $489 = $834,379
Project Cost Estimate: The current estimated project costs
are summarized as follows:
Description
Total ($)
Design
155,306
Right -of -Way
131,788
Construction
834,379
Inspection
100,000
Total
1,221,473
3. Prior Year Costs:
A summary of project
expenditures
prior
to July 2003,
is as follows:
Fiscal Year
Design ($) R -O -W ($)
Constr
($)
Total ($)
FY 00/01
176 0
176
FY 01/02
97,880 18,275
116,155
FY 02/03
52,070 111,505
489
164,064
Total 150,126 129,780
489
280,395
4. Current Budget Summary: The current Budget
for the project
is summarized
as follows:
Description
Prior Years ($) FY03 /04 ($)
Total ($)
Fund 2501: L A AOC
0
Design
150,126
5,189
155,315
Right -of -Way
129,779
13,220
142,999
Construction
489
101,507
101,996
Inspection
0
60,000
60,000
Sub -Total 280,394
179,916
460,310
Fund 2604: Federal Grant (Constr) 0
300,000
300,000
Total 280,394
479,916
760,310
Beltramo ad 0401
00008:1
Los Angeles Avenue Widening
Beltramo to Maureen Lane
Authorization to Advertise
February 4, 2004
Page 6
S. Budget Amendment: The current project Budget is summarized
as follows:
Grand Total
It is the intent
Resolution to the
6. Funding Sources:
as follows:
• Federal CMAQ:
• L A Ave AOC
STAFF RECON4ENDATION
I,LL I,'Ff,+
of staff to present the Budget Amendment
City Council upon award of contract.
The funding sources for the project are
$ 544,000
$ 677,474
$1,221,474
Approve the plans and specifications and authorize staff to
advertise for receipt of bids upon receipt of federal grant
approval.
Attachments:
Exhibit
Exhibit
Exhibit
Beltramo ad 0401
1: Conceptual Plan
2: Right -of -Way Requirements
3: Landscaped Areas
Current
Propsed
Description
Budget ($)
Change ($)
Budget ($)
Fund 2501: L A AOC
Design
5,189
0
5,189
Right -of -Way
13,220
(11,220)
2,000
Construction
101,507
188,383
289,890
Inspection
60,000
40,000
100,000
Sub -Total
179,916
217,163
397,079
Fund 2604: Federal Grant (Constr)
300,000
244,000
544,000
Total
479,916
461,163
941,079
Plus Prior Years Expenditures
qRn Ro-
Grand Total
It is the intent
Resolution to the
6. Funding Sources:
as follows:
• Federal CMAQ:
• L A Ave AOC
STAFF RECON4ENDATION
I,LL I,'Ff,+
of staff to present the Budget Amendment
City Council upon award of contract.
The funding sources for the project are
$ 544,000
$ 677,474
$1,221,474
Approve the plans and specifications and authorize staff to
advertise for receipt of bids upon receipt of federal grant
approval.
Attachments:
Exhibit
Exhibit
Exhibit
Beltramo ad 0401
1: Conceptual Plan
2: Right -of -Way Requirements
3: Landscaped Areas
/ Exhibit 1
F�.
1
1 .
w
m
m
Q
Q
Q
W
X
Q!
V
Beltramol
CL.
Z7
000083
m
r
rt
h
a
0
r
SECTION
118'
8.
CL- - - - - -_
Existing R -O -W
89'
29'
DETAIL
R -O -W Acquisition and Widening
Proposed R -O -W
Acquisition and
Street Widening
8' --::
V)
a
-4
J
M
� b•
N r~t
- c
Exhibit 2.
54-
�• _ FLT czpy MO -
Beltramol
roll-
29
000085
;O
AO
See
w
_J
U-00
EXHIBIT 3 - Page 1
Landscaped Areas
Maureen Lane
00()OSG
\O
U
I
�W
EXHIBIT 3 - Page 2
Landscaped Areas
MACTc u u M
000'087