Loading...
HomeMy WebLinkAboutAGENDA REPORT 2004 0303 CC REG ITEM 10HTO: FROM: DATE: MOORPARK CITY COUNCIL AGENDA REPORT Honorable City Council inm 10 Deborah S. Traffenstedt, ATCM /City Clerk February 25, 2004 (CC Meeting of 3/3/04) SUBJECT: Consider Settlement and Mutual Release Agreement between City and Roy Allan Slurry Seal, Inc., for the 2003 Slurry Seal Project and Claim Filed on February 2, 2004 BACKGROUND AND DISCUSSION The City entered into an Agreement with Roy Allan Slurry Seal, Inc., on May 30, 2003, for the 2003 Slurry Seal Project. The Notice of Completion was recorded on October 1, 2003. On February 2, 2004, a Claim for Damages was received by the City Clerk from Roy Allan Slurry Seal, Inc., pursuant to Chapter 1 (commencing with Section 900) and Chapter 2 (commencing with Section 910) of Part 3 of Division 3.6 of Title 1 of the Government Code requesting payment of $43,965.07 (and made reference to additional interest charges). A final payment for billed charges for the 2003 Slurry Seal Project had not been made by City, due to a disagreement regarding the definition of an "Extra Long Ton" (ELT) of slurry seal. In a letter to Roy Allan Slurry Seal, Inc., dated February 12, 2004 (copy attached), the City's Public Works Director proposed resolution of the claim and payment based upon the actual amount of aggregate applied for an amount totaling $45,607.48, which includes payment for one change order and release of the retentions. A representative for Roy Allan Slurry Seal, Inc., has verbally stated that they concur with the settlement amount of $45,607.48, and the City Attorney has been requested to prepare the settlement and mutual release agreement. Authorization is requested for the City Manager to sign the settlement and mutual 000109 Honorable City Council March 3, 2004, Regular Meeting Page 2 release agreement between the City and Roy Allan Slurry Seal, Inc. A warrant for the settlement amount of $45,607.48 is included on the consent calendar for the March 3 meeting. STAFF RECOMMENDATION Authorize the City Manager to sign a settlement and mutual release agreement for the amount of $45,607.48, with final language of the agreement to be approved by the City Attorney and City Manager. Attachment: Letter from Public Works Director dated 2/12/04 000110 MOORPARK 799 Moorpark Avenue Moorpark, California 93021 (805) 517 -6200 ;I; February 12, 2004 Roy Allan Slurry Seal Att: Roy Allan 11922 Bloomfield Avenue Santa Fe Springs, CA 93021 SUBJECT: 2003 Slurry Seal Project Measurement and Payment of Slurry Seal Material Dear Mr. Allan: In a recent discussion with Mr Coover, Chairman of the Asphalt Task Force for the Greenbook Committee, I was made aware of the fact that the definition of an Extra Long Ton [ELT] of slurry seal set forth in the 2000 edition of the Standard Specifications for Public Works Construction [ "Greenbook "] should be 2,000 pounds of dry aggregate (plus additives), not 2,200 pounds. [Note: This is also true for the subsequent 2003 Edition of the Greenbook]. Accordingly, I will be recommending that the approved quantity of slurry for the subject project be 2,128.5 ELTs (based on a 2,000 ELT, not the previously calculated 1,935 ELTs (based on a 2,200 ELT). Enclosed is a copy of the final Progress Payment Authorization based on this revised calculation. It should be noted that during the construction of the project, the City's inspectors calculated the spread rate for the slurry laid each day, in order to assure that the slurry thickness was correct. The goal we were shooting for was 1,800 sf per ELT — the approximate mid -point of the range set forth in the Greenbook'. The then calculated spread rate was 1,757 sf /ELT2200 I have been advised by Mr. Coover that the spread rate set forth in the 2000 Edition of the Greenbook was calculated for 'a 2,000# -ELT." The revised spread rate calculation based on an ELT2000 is, therefore, 1,565 sf per ELT2000.3 — a figure at the low end of the range. Although this error in the Greenbook caused the slurry to be applied thicker that the City desired, this miscalculation was not the fault of your firm. I believe, therefore, that payment should be made based upon the actual amount of aggregate applied [2,128T of aggregate or 2,128 ELT20001. ` The spread rate for Type II slurry set forth in Section 302 -4.3.1 if the Green Book is 2,120 sf to 1,555 sf per ELT. 2 2,128T x 2,000 / 2,200 = 1,935 ELT22oo. 3,330,939 sf / 1935 ELT2200 = 1,757 sf/ELT2200• 3 3,330,939 sf / 2,128 ELT2. = 1,565 sf /ELT2000. 000111L Slurry-0402 PATRICK HUNTER JANICE S. PARVIN CLINT D. HARPER ROSEANN MIKOS KEITH F MILLHOUSE Mayor Mayor Pro Tem Councilmember Councilmember Councilmember Slurry Seal 2003 February 12, 2004 Page 2 It is unfortunate that the error in the Greenbook created this problem. I am pleased, however, that I was finally able to obtain the information I needed from the Greenbook Committee necessary for me to make the above analysis and judgment. By copy of this letter I am asking the City Clerk to seek a Release of Claim from your firm so that we may process your final payment for the full amount remaining on the contract, based on an ELT2000. If you should have any questions about the matters discussed herein, please feel free to call me at 517 -6255. Sincerely Kenneth C. Gilbert Director of Public Works cc: Steven Kueny, City Manager Deborah Traffenstedt, City Clerk Brad Miller, City Engineer Walter Brown, Assistant City Engineer Bob Morgenstern, Pubic Works Supervisor slurry_0402 0001i P. City of Moorpark 2003 Slurry Seal Project 6- Feb-04 Progress Payment Authorization P O Number. 20020209 Page 1 of 1 Payment No. Final Payment 8 Retention Release Roy Allen Slurry Seal Total Contract Price This Payment Total To Date Item Description Qty Units Unit Pnce $ Total ($) Qty Total ($) Qty Total ($) 1 Mobilization 1 LS 1,500.00 1,500.00 0.00 0.00 1.00 1,500.00 2 Traffic Control 1 LS 2,500.00 2,500.00 0.00 0.00 1.00 2,500.00 3 Public Notice 1 LS 700.00 700.00 0,00 0.00 1.00 700.00 4 Crack Sealing 1 LS 23,000.00 23,000.00 0.00 0.00 1.00 23,000.00 5 Type li Slurry Seal 1,832 ELT 99.54 182,357.28 193.50 19,260.99 2,128.50 211,870.89 6 8" Solid White Line [#5] 4,900 LF 0.75 3,675.00 0.00 0.00 80.00 60.00 7 12" Solid White Line [#8] 1,894 LF 1.80 3,409.20 0.00 0.00 2,771.00 4,987.80 8 Wds / Sym [ #10 - STOP] 121 EA 85.00 10,285.00 0.00 0.00 121.00 10,285.00 9 Wds / Sym [ #10 - Bike Lane] 12 EA 55.00 660.00 0.00 0.00 4.00 220.00 10 4" Solid Yellow Centerline [ #11] 2,500 LF 0.65 1,625.00 0.00 0.00 2.500.00 1,625.00 11 12" Solid Yellow X -walk [ #16] 80 LF 2.10 168.00 0.00 0.00 215.00 451.50 12 Wds / Sym [ #23 - S. Child. Ahd] 2 EA 270.00 540.00 0.00 0.00 2.00 540.00 13 Wds / Sym 1#23 - Dir Wht Arrow] 12 LS 55.00 660.00 0.00 0.00 2.00 110.00 14 Release 1 LS 1.00 1.00 0.00 0.00 1.00 1.00 15 Parking Lots 1 LS 8,674.70 8,674.70 0.00 0.00 1.00 8,674.70 Sub -Total 239,755.18 19,260.99 266,525.89 Change Orders 1.00 1,620.00 1.00 1,620.00 Total Change Orders 1,620.00 1.620.00 Total 239,755.18 Total 20,880.99 268,145.89 Recommended By: Less Ret. (2,088.10) 0.00 Sub -Total 18,792.89 268,145.89 Approved BY Less Pr Pmt (222,538.41) Total Due 45,607.48 Remarks: Accounting _ -Fund -.t_ Park Account Number__. LTF 2603.8310.8002.9640 W -� 20,880.99 259.471.19 Mt Meadow 2400.7800.7810.9103 0.00 1,995.18 Poindwdor 2400.7800.7801.9103 0.00 2,775.90 Pch Hid 2400.7800.7808.9103 0.00 3,903.62 20,880.99 268,145.89 0001.1 -.3