TO: The Honorable City Council
FROM: Kenneth C. Gilbert, Director of Public Works
DATE: March 18, 2004 (Council Meeting 4 -7 -04)
SUBJECT: Corporation Yard Final Conceptual Design
DISCUSSION
A. Background
• In December of 2002, the City Council approved the
selection of Martinez Architects to prepare the design for
the City's new maintenance facility. This project is to be
constructed on property located adjacent to the Caltrans
Maintenance Yard, at the east end of Fitch Avenue (see
Exhibit 1).
• In June of 2003, the City Council approved the preliminary
plans for the project with direction that certain cost
cutting design changes be investigated and that a report
on same be brought back to the City Council.
• In August of 2003, the City Council considered that
analysis and finalized the general scope of the project.
The architect was then directed to finalize the conceptual
design for City Council approval.
B. Maintenance Functions
The maintenance functions to be
Yard are generally defined and
as Exhibit 2.
C. Conceptual Design
located at the new Corporation
described in the list attached
Plans and diagrams depicting the
design are attached as Exhibit
generally summarized as follows:
CorpYard 0404
recommended final conceptual
3. Those components are
Corporation Yard: Conceptual Design
April 7, 2004
Page 2
I. Site Plan:
• Site Utilization: The final design calls for the
development of 2.16 acres [Lot `A'] of the 4.19 acre
site, for the Corporate Yard facility.
• Expansion Area: The plan includes an area of about one
acre (1 ac.) at the easterly end of the property [Lot
"B'], to be held for possible needed future expansion.
Interim uses for this area include temporary storage,
rental to contractors and /or utility companies and
construction staging for City construction contracts.
• Remnant Parcel: The plan also shows a 0.58 acre parcel at
the west end of the property [Lot `C'], possibly to be
subdivided and sold for development (light industrial
use) in order to defray some of the project design and
development costs [See Section D below].
• Rear Parcel Access: The site plan allows independent
access to Lot "B" at the east end.
• Material / Equipment / Vehicle Storage: Ample area has
been provided for the outside storage.
• Covered Parking [North Property Line]: The final plans
will include a Bid Deduct Alternate for the planned
covered parking along the north property line.
• Emergency Generator: The plans call for the installation
of a generator to provide back -up electrical energy
during a power outage.
• Refuse Transfer Station: A facility has been provided to
allow for easy dumping of debris into large trash bins,
as well as easy pick -up of the large trash bins.
• Refueling: Liquid Natural Gas and electric re- fueling
stations have been provided. Gasoline pumps have
purposely been omitted.
• Animal Containment: An area is provided for this purpose.
• Parking: Ample area has been provided for guest and
employee parking.
• Circulation: The site plans provides for good circulation
in, through and out of the facility.
• Landscaping: Landscaped areas will be provided.
• Security: Two (2) security gates are planned for the
yard, plus two (2) more for the south driveway.
• Fencing: Per City Council direction last August, the plan
will provide for wrought iron fencing around the entire
perimeter of the site [Lot A & B]. Wrought iron fencing
is also planned along the north side of the south access
drive. A block wall is planned along the east side of the
refuse transfer area, with chain link separating the main
yard (Lot `A') from the auxiliary yard (Lot `B') north
and south of the refuse area.
CorpYard 0404
Corporation Yard: Conceptual Design
April 7, 2004
Page 3
• Grading /Drainage: Based on a drainage study prepared for
the site, the finished floor elevation will be five and
one -half feet (51;-�') higher than the elevation of the top
of curb at the entry driveway. The site will be graded to
convey flood water away from and around the building.
• Storm Water Quality: Grassy swales will be constructed to
filter pollutants from the site run -off.
2. Floor Plan:
• Building Size - The size of the enclosed building area is
9,456 square feet (sf), plus a covered parking and work
area of approximately 5,000 s.f.
• Main Entry - The south side entry will serve the public
and will also be used for employee access to and from the
employee / guest parking area.
• Security - The main entry door and the gates to the yard
will be locked during business hours. There are no plans
to have anyone work in the reception area. A door bell or
telephone "ring -in" system will be provided to facilitate
public access to City staff at this facility.
• Public Counter - A public reception / waiting area will
be provided.
• Public Restroom - A "unisex" public restroom will be
provided near the reception area.
• Office Space - Office space has been provided for current
personnel, with an office pool area suitable for use by
future expansion, if needed.
• Men's Restroom / Shower / Locker Room - A Men's Restroom
/ Shower / Locker room will be provided.
• Women's Restroom / Shower Lockers - The plans will
include a storage room constructed in a way to be easily
and quickly retrofitted into a Women's Restroom / Shower
/ Locker room, should the need arise.
• West Access - There will be a door at the west end of the
building to provide access to and from the yard.
• Covered Parking - Covered truck parking is provided along
the north facade of the building with locked storage
units and easy access to inside storage and staging
rooms.
• Access to Truck Parking Area - An access hallway and door
will be provided to the truck parking area to facilitate
easy re- stocking of trucks from the material storage
areas.
• Employee Break / Lunch Room - An employee meeting /
break/ training room will be provided.
• Meeting / Conference Room - A meeting / conference room
will also be provided.
CorpYard 0404
Corporation Yard: Conceptual Design
April 7, 2004
Page 4
• Animal Control / Vector Control - Facilities will be
provided for this function, including office and lab
space.
• Auto Repair - The plan does not provide facilities for a
major automotive maintenance function (vehicle lift, lube
facilities, etc.) These functions are planned to continue
to be provided by contract service.
• Storage Rooms - Ample storage rooms will be provided.
• Emergency Supply Storage - An emergency supply storage
room is planned. This room could also be converted to
other uses in the future, should the need arise.
3. Building Design:
• Materials - The building will be constructed of masonry
block and metal studs.
• Roof Design - Components of the roof design include:
Materials: "raised- seam ", light weight, metal roof.
Energy efficiency: skylights and roof vents will be
provided.
Roof mounted equipment: Equipment will be screened
from view from the street.
Photo - Voltaic: The design will accommodate the
possible future installation of photo- voltaic panels.
• Colored Elevations - The color palate uses a mixture of
red and tan concrete blocks, with a copper colored roof.
Colored elevations and material samples will be available
at the April 7 meeting.
D. Lot `C'
The disposition and use of Lot `C' is the potential subject of
a separate report to be considered by the Moorpark
Redevelopment Agency [MRA], as the owner of the property.
E. Fiscal Impact
1. Total Estimated
cost estimate is
Description
Project Cost:
as follows:
Amount ($)
Design
290,000
Environmental Document
25,000
Land Acquisition
920,792
Construction
3,840,000
Inspection
350,000
Total 51425,792
CorpYard 0404
The total estimated project
Corporation Yard: Conceptual Design
April 7, 2004
Page 5
2. Budget: The Budget for the project is summarized as follows:
3. Funding Strategy: Project funding allocation percentages is
as follows:
Component
Design
Land Acquisition
Construction
Inspection
Percent
Endowment Gas Tax
Fund 2800 Fund 2605 Total
70% 300/0 100%
70% 30% 100%
85% 15% 100%
85% 15% 100%
4. Funding Breakdown: A summary of the total appropriations, by
funding source, is as follows:
FY 03/04 Total
Description Prior Year ($) Budget ($) Project ($)
2800 - Endowment Fund 657,623 3,715,261 4,372,884
2605 - Gas Tax 284,939 702,969 987,908
Total 942,562 4,418,230 5,360,792
F. Environmental Document
It is the intent of staff to start work immediately on the
environmental document for this project.
H. Schedule
It is anticipated that the Final Design will be completed in
approximately five (5) months. During that period, staff will
evaluate options for Construction Management for the project
and complete the required Bidder Pre - Qualification process.
Construction should commence by October 2004.
CorpYard 0404
Estimated
FY 03/04
Total
Description
Prior Years ($) Budget ($)
Project ($)
Design
21,770
268,230
290,000
Land Acquisition
920,792
920,792
Construction
3,800,000
3,800,000
Inspection
350,000
350,000
Total 942,562
4,418,230
5,360,792
Note: The Budget is
slightly less that
the current
project cost
estimate. It
is the intent of
staff,
however, to defer
amending the
Budget until the date
of award of a construction
contract.
3. Funding Strategy: Project funding allocation percentages is
as follows:
Component
Design
Land Acquisition
Construction
Inspection
Percent
Endowment Gas Tax
Fund 2800 Fund 2605 Total
70% 300/0 100%
70% 30% 100%
85% 15% 100%
85% 15% 100%
4. Funding Breakdown: A summary of the total appropriations, by
funding source, is as follows:
FY 03/04 Total
Description Prior Year ($) Budget ($) Project ($)
2800 - Endowment Fund 657,623 3,715,261 4,372,884
2605 - Gas Tax 284,939 702,969 987,908
Total 942,562 4,418,230 5,360,792
F. Environmental Document
It is the intent of staff to start work immediately on the
environmental document for this project.
H. Schedule
It is anticipated that the Final Design will be completed in
approximately five (5) months. During that period, staff will
evaluate options for Construction Management for the project
and complete the required Bidder Pre - Qualification process.
Construction should commence by October 2004.
CorpYard 0404
Corporation Yard: Conceptual Design
April 7, 2004
Page 6
STAFF RECOMMENDATIONS
Approve the conceptual design for the project as presented.
Attachments:
Exhibit 1:
Exhibit 2:
Exhibit 3:
CorpYard 0404
Map
List of Maintenance Functions
Site Plan and Floor Plan
B
O
e�
1 1 r Ioo'
i
m v`
�o
N M
N2d 32 150 —
RAIL fLvA�
400'
55
J1 Tract 1266 -1 reversion to %
acreage Per 1949/547. `
Q 21 J
34 p pI b 1.696Ac 20
o ul 5.621 Ac
Lot rAtl
3c lu �rio.ce
_ q
m
Previous AF Noss. 512 - 171 -01
D4 through 512 -171 -15,17
5'7
o I r T
be
Be la
SECOND I 150
STREET
Y
b Q
f
R
f 7 Q i S I N O
VX M
5K. 1 p 1 OI oo' .
t 246.00' FLING
m1 e9- nor>•z °n>-e' �u�r AVENUE p =330 13
' sra•PZeYs" 201.00•
f• q_pp' ne' moo• 8/3v"
'' L -3721 10
so L to
z
�.� to. 1K.4f• 190.Or
�3 0o c
� 16
l g�
15 S ►O
UL � /5
r
A too 00 O
no.00
3 �.n
xln
n Y't
r A CAST
0 Z o 0 Q IO.oO'
Z YlZ IS R G 9
Y
As,2p.s1'
K t�
X70
\ a �e
V
.b,
11.97
I0
i
H0
h
Q
i 19
�M
♦)
PITCH
/
- 170 00
990099073
o &5� e-As T
f a
AVENUE R �`
.3
0
_
:a_es "
L = 59.21 "
Y
aa
>a
50g
8
Iz R
C
w"
QN
Y
173
i'
3
I2.3D'
UL � /5
r
A too 00 O
no.00
3 �.n
xln
n Y't
r A CAST
0 Z o 0 Q IO.oO'
Z YlZ IS R G 9
Y
As,2p.s1'
D099076
44-, �q o.
'�-? v i:
1
N
Cr
K t�
X70
\ a �e
V
.b,
11.97
I0
i
H0
h
Q
i 19
�M
D099076
44-, �q o.
'�-? v i:
1
N
Cr
Exhibit 2
Maintenance Functions
The following is a list of the maintenance and operation
functions to be performed by City staff or contractors, which
shall be accommodated at the Yard.
A Public Works
T. Street Maintenance
• Minor asphalt repair
• Striping / stenciling
• Traffic and Regulatory signs
• Tree Limb lifting / Root Pruning
• Sidewalk Repair
• Roadside debris and weed removal
• Storm drain maintenance
2. Parking Enforcement
3. Crossing Guard Supervision
4. Stormwater Quality Administration & Enforcement [portion]
5. Fleet Maintenance (minor maintenance)
6. Graffiti abatement
7. Contract Services Administration:
• Street sweeping
• Traffic signal maintenance
• Annual storm drain maintenance
• Major vehicle maintenance and repair
B Community Services
1. Landscape Maintenance
• Parkway /median landscape maintenance
• Park maintenance
• Trees
2. Facilities maintenance
• Minor repair
• Janitorial
3. Vector Control
4. Animal Control
S. Contract Services Administration:
• Landscape / Irrigation Maintenance
• Tree trimming / maintenance / removal
• Facilities maintenance and repair
• Janitorial
• Transit Contract Administration
• Refuse Franchise Administration
CorpYard 0404
0 09'
T-1
-----------------------
� I I
I I I
I I
I I I I
I
DIAGRAMATIC SITE FUNCTION & EQUIPMENT PLAN
MARTINEZ
ARCHITECTS, INC.
W
TRWM CONTROL ASRALi lEPNR i%WAN RFPNR
MOId(S PNYULARa
COYNUwi/ VEHICLES
DEWMPOSEa HEMICAL
aEV[E
ASPIfILi
CRNNIE SfaWCE
fft FFF i _
_ _ _
_ _
— _
_
tA_I�p
F�1 YY Y Y
I
I
� CHIP
CHIPS
TREE
REUSE
I
I
I
I
ANIMAL
CIXIfNNMENi
law VEwcLES
_
I
=
TEMP. STORACE AREA
FOR STREET SWEEPER
I
I
NL IERPNN _____________ ___J
ORM DI VE .I,
NNNTENANCE
I
LOT PORTION "A"
1
EL CHARGING STATIONS ECIRM VEHICLE
CORPORATE YARD
_ _
LOT PORTION "C"
2.16 ACRES
____________
/./ DUMP iRUCN
SNIP La/aEfl
ORGWIG
RE HE
'
`
'INS
I
AREA TO BE SOLD OR
C
LEASED (NOT PART OF
j _ � �
SGNAGE
` ax PICKUP ♦---WBN
BIN PIT
)
(RW EaIN
THIS PROJECT)
I
VEHICULAR TRAFAC�
•
EFUSE B
I
0.58 ACRE
I.
I
\
uP
I m
LOT PORTION "B I
I
\ 1RUCK aR
UNLOAD
I
SNIP
KIP
S IOAOEfl
�
I
f
I
I
n
HOTEL)
AREA
YL;
�P ° F7
III
,
UP
OUMPDER OR :
SNIP LEADER
I
_
°
1
•;•
°1•
— L/NANFAI GAS
`®
I
�-
WN PICNUP
I
EaEaNC AREA
R
i1
\
WOW VFJiILYE k�
I ] 1 5
EMPLOYEE PAWING
6 ] R 9 10 11 IT
k VISITOR PARKING
_
T-1
-----------------------
� I I
I I I
I I
I I I I
I
DIAGRAMATIC SITE FUNCTION & EQUIPMENT PLAN
MARTINEZ
ARCHITECTS, INC.
W
rem rsc aim wt l9 °"w (� eicx B' -0'
ARCHITECTURAL SITE PLAN
` StRLICRNIEJ
i N
—' -- -- --- -- - - - - -- -- -- § §
r -0•
YARD
RIX K
!O. J
1
LOT PORTION
•
um a PMT OF T THIS
COW N(kACr
§
– -- YARD
MumSI NCRI RE
I RD. ,
�
o
'T
1 YARD
CIFURE
.
e
-0 –� � NWM 0.W '�•:.
SIRUCNRE
Y . w-z. I
® GIE WIG RP.�
q
H0. 4 I
I
I --
1
Y-q
rem rsc aim wt l9 °"w (� eicx B' -0'
ARCHITECTURAL SITE PLAN
` StRLICRNIEJ
i N
—' -- -- --- -- - - - - -- -- -- § §
r -0•
YARD
RIX K
!O. J
1
LOT PORTION
•
o
SIRUCNRE
H0. 4 I
I
Q Y
Y-q
- - -- §�� Wit- - - - -� - -- -- '�
p
GY
(ryra I
DYf K�iwiYM
TOTAL SITE AREA = 4.13 ACRES
\ C T ACRES
PORATEYAR0 =2. S
OT
\ � L PORTION'S' = 1.06 ACRES
LOT PORTION'C" =0.56 ACRE(NOTA PART OF THIS CONTRACT)
I I I
I
LEGEND
�_.71 RDOHO WAS
MARTINEZ
ARCHITECTS, INC.
I
C7
C6
C5
I
C,
D02 E.1 nE2 (E.3) (F)
\L1, \,�
O
O
FLOOR PLAN
ilk
Milli
v
0
:H)
Di
11
I
I�OK
MARTINEZ
ARCHITECTS, INC.
------
------
--
----
---------
--------
C2:1
5'-4'
---
-------
---
1-4
U-j L
A rill
3 0
1 im 00
EM "I Cal oxi 11m EFITI
J lob
Im III R
Q®
112
om cm
cl 0 D 11 I
0 Li nTn
UULJ 81
I n4 lu
0 0 ,
r ----------------------------------------- i
T
q>
III
O
F
-
4' -0'
-----
11- _ W-C
------------
-
\L1, \,�
O
O
FLOOR PLAN
ilk
Milli
v
0
:H)
Di
11
I
I�OK
MARTINEZ
ARCHITECTS, INC.
r
r
NORTH ELEVATION
EAST ELEVATION
WEST ELEVATION
TT T T i' T T
50U I h ELEVATION
-GEND
wrrww xrtx
sciarx mrrx
w+nnnox iwhn nun ax
x
. s¢ xnxmv
MARTINEZ
ARCHITECTS, INC.
BUILDING SECTION
4
O
MARTINEZ
ARCHITECTS, INC.