Loading...
HomeMy WebLinkAboutAGENDA REPORT 2004 0505 CC REG ITEM 10GITEM 10-G. G . Moorpark City Council `-� --° Moorpark Redevelopment Agehidy Agenda Report -o> To: The Honorable City Council I Chairman and Members of the Moorpark Redevelopment Agency From: Kenneth C. Gilbert, Director of Public Works(. E Date: April 23, 2004 (Council Meeting 5 -5 -04) Subj: Consider Awarding a Contract for the Civic Center Driveway Modification Project [Project 8053] and the Adoption of Resolutions Amending the FY 03/04 Budget to Fully Fund the Project BACKGROUND • In September of 2003, the City Council approved a new project to construct certain improvements at the Civic Center site to improve vehicular access. • In November of 2003, the City Council approved the conceptual design for that project. • In February of 2004, the City Council approved the plans and specifications and authorized staff to advertise for bids upon receipt of the required Caltrans Permit. • In March of 2004, the City received the Caltrans Permit and the project was advertised. DISCUSSION A. Project Description The scope of the project includes: 1) the widening and re- striping of the driveway onto Moorpark Avenue, to provide a left /thru lane plus a right -turn lane for egress traffic; and 2) the construction of site modifications to facilitate ingress and egress traffic between the west end of the Library parking lot and High Street, through the old mobile home park property. A diagram showing the proposed improvements is attached as Exhibit 1. civic center driveway_awd 00008'7 Civic Center Driveway Modifications May 5, 2004 Page 2 B. Bid Results Bids for the subject project were received and opened on April 20, 2004. The apparent low bidder is Lee Construction Company, with a bid of $48,383.00. A summary of the bid results is attached as Exhibit 2. It has been determined that the apparent low bidder is qualified to perform the work. Said bidder has confirmed that their bid is valid and that they are prepared to proceed with the construction of the project. C. Fiscal Impact 1. Total Project Cost: The estimated total project cost is ciimmari ZPH a. fn110WS: ........ . ........... _ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Element Design Construction Constr Contingency (20 %) Inspection " Total . _............................ _ ...................... Amount 4,000 48,383 9,677 2,000 64, 060 ...... . ......................................................... . ................. _ . ........................................ * Note: Inspection services provided by the City's Public Works Supervisor. 2. Budget Amendment: It is necessary to Budget to fully fund this project. proposed change .is as follows: .......... _........ _......... _ ................... _. _................... _ .......................................................... amend the FY 03/04 A summary of that ......................................... ............................... Current Proposed Description Budget Chan e Design, Printing, Etc 3,000 1,000 Construction (inc. Conten.) 26,000 32,060 Inspection 1,000 1,000 21,353 Total 30,000 34,060 Revised Budget 4,000 58,060 2,000 64,060 3. Funding Sources: Per City Council direction, allocation of project funding is to be revised to be two- thirds [2/3] General Fund [Fund 100] and one -third [1/3] the Moorpark Redevelopment Agency. A breakdown of the project funding is aq fnllnws: ...-...........-..-........._-....- ..............................._........................_........_..._..........._........._.__..._.._............._............_...._.._._.............._......................_._......_............_.............................................................................._._....................................... Current Proposed ..............................; Revised Description Budget Change Budget General Fund (Fund 1000) 30,000 12,707 42,707 ' MRA (Fund 2902) - 21,353 21,353 Total .................................................................................._.........................................__........................_..........................................................._................ 30,000 ................................................................ 34, 060 ........................ ..........................._... . ................ 64,060..._; Civic center driveway awd Civic Center Driveway Modifications May 5, 2004 Page 3 4. Resolutions: City Council and Moorpark Redevelopment Agency [MRA] Resolutions have been prepared to effect the Budget changes summarized herein. D. Schedule It is anticipated that the project will be under construction in June and be completed by August. E. Administrative Actions If the recommended action is taken by the City Council, certain administrative actions will be undertaken by staff, including the following: • A construction contract agreement will be forwarded to the contractor for the construction of the project, for the contract price of $48,383.00. • When all of the contract documents are in order, the agreement will be executed by the City Manager. • A construction contingency of $9,677.00 (20 %) will be set aside for the project. STAFF RECObMNDATIONS (Roll Call Vote) City Council: 1. Approve the award of a construction contract to Lee Construction Company for the construction of the subject project. 2. Adopt the attached City Council Resolution No. 2004 - (Exhibit 3) amending the FY 03/04 Budget for this project. Moorpark Redevelopment Agency: 1. Adopt the attached MRA Resolution No. 2004- _ amending the FY 03/04 Budget for this project. Attachments: Exhibit 1: Plan Exhibit 2: Bid Results Exhibit 3: City Council Resolution Exhibit 4: MRA Resolution civic center driveway_awd (Exhibit 4) ........ ... ............. .... .. ........... .... ...... . . . .............. ........... . . ........ ..... .. ................ ...... ........ .. .. .. .......... . . . . . . . . . . .. .... ........... . . . . . . . . . . . . ............ 1. . . . . . . . . . . . . . . .. . .. . . ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . t. . ..... ..... ........ ... ............. .... .. ........... .... ...... . . . .............. ........... . . ........ ..... .. ................ ...... ........ .. .. .. .......... . . . . . . . . . . .. .... ........... . . . . . . . . . . . . ............ 1. . . . . . . . . . . . . . . .. . .. . . ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . City of Moorpark Total Bid 5,000.00 5,000.00 246.00 Bid Results: Civic Center Driveway Modification Project 2,500.00 575.00 [File # bid civic center drive] 1,200.00 1,200.00 0.00 0.00 5,319.00 5,319.00 Bidder » »> 225.00 10,000.00 Name: 14.00 Engineer's Estimate 1.75 Bid Opening: 2.15 April 20, 2004 Address: 2,200.00 500.00 1,000.00 1.00 1.00 City, State: 2,500.00 3.00 270.00 Tel. No.: 5,724.00 16.00 9,040.00 Contact Person: 9,390.00 Item Description Est Qty Units Unit Cost 3,750.00 Total Bid 2,200.00 1.00 1.00 1 Mobilization / Surveying 1 LS 4,000.00 4,000.00 2 Caltrans Permit 1 LS 246.00 246.00 3 Traffic Control 1 LS 500.00 500.00 4 Remove Striping I LS 500.00 500.00 5 Install Striping 1 LS 1,000.00 1,000.00 6 Relcoate Utility Pole 1 EA 0.00 0.00 7 Relocate Light Pole 1 EA 5,000.00 5,000.00 8 Sawcutting 90 LF 2.00 180.00 9 Removals 1 LS 4,000.00 4,000.00 10 PCC Curb (6 ") 565 LF 15.00 8,475.00 11 Base 3,130 SF 1.35 4,225.50 12 Asphalt 3,130 SF 6.25 19,562.50 13 Concrete Cross Gutter 250 SF 6.00 1,500.00 14 Wheel Chair Ramp 2 EA 500.00 1,000.00 15 Release 1 LS 1.00 1.00 Total 50,190.00 Vendor 1 Lee Construction Comp 3354 Lathrop Ave Simi Valley, CA 93065 805 -522 -5195 Ronald Smith Unit Cost Total Bid 5,000.00 5,000.00 246.00 246.00 2,500.00 2,500.00 575.00 575.00 1,200.00 1,200.00 0.00 0.00 5,319.00 5,319.00 2.50 225.00 10,000.00 10,000.00 14.00 7,910.00 1.75 5,477.50 2.15 6,729.50 8.80 2,200.00 500.00 1,000.00 1.00 1.00 48,383.00 Exhibit 2 Page 1 of 2 Vendor 2 Nye & Nelson 1860 Eastman Ave. # 108 Ventura, CA 93003 805- 494 -5013 Ruric Nye Unit Cost Total Bid 5,000.00 5,000.00 246.00 246.00 1,500.00 1,500.00 1,500.00 1,500.00 1,700.00 1,700.00 0.00 0.00 2,500.00 2,500.00 3.00 270.00 5,724.00 5,724.00 16.00 9,040.00 3.00 9,390.00 2.50 7,825.00 15.00 3,750.00 1,100.00 2,200.00 1.00 1.00 50,646.00 000091. 000092 Exhibit 3 RESOLUTION NO. 2004- A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MOORPARK, CALIFORNIA, AMENDING THE FY 2003/04 BUDGET TO REVISE THE AMOUNTS OF THE APPROPRIATIONS AND BUDGET FOR PROJECT 8053: CIVIC CENTER DRIVEWAY MODIFICATION PROJECT [GENERAL FUND (FUND 1000)] WHEREAS, on June 18, 2003, the City Council adopted the Budget for Fiscal Year 2003/04; and WHEREAS, a staff report has been presented to the City Council requesting a budget increase in the aggregate amount of $34,060, $12,707 of which is funded by the City; and WHEREAS, Exhibit "A ", attached hereto and made a part hereof, describes said budget amendment and its resultant impacts to the budget line item(s). NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF MOORPARK DOES HEREBY RESOLVE AS FOLLOWS: SECTION 1. That a Budget amendment in the aggregate increase of $34,060 [$12,707 of which is to be funded by the City], as more particularly described in Exhibit "A ", is hereby approved. SECTION 2. The City Clerk shall certify to the adoption of this resolution and shall cause a certified resolution to be filed in the book of original resolutions. PASSED AND ADOPTED this 5th day of May, 2004. Patrick Hunter, Mayor ATTEST: Deborah S. Traffenstedt, City Clerk Attachment: Exhibit 'A': Appropriation and Budget Detail 000093 Resolution No. 2004 - Exhibit "A" Revised Appropriations & Budget For Project 8053: Civic Center Driveway Modification Project A. Fund Allocation C. Distribution of Current; Subject FY 03/04 Appropriation Budget (Reduction) 30,000' 12,707 $ 30,000 34,060 iations to Expense Accounts ........ .... ............................................................... ......................................................... . .. .... ............. Current: Subject FY 03/04 Appropriation Budcret (Reduction) . r VWV .- - . . . . ............... .... 0 .. Y .............. . 333 3,000; 000 ............ . .... . ......... ..... 6,000: . ..... . .. $ 12,707 ....... . .............................. ........... . .......... .. -....-- , 353 6,000 32,060 ...... . ........... ................. 11000 ............................. - ........................ ... ............... $ 333 ................ ...... ......................... ............. -6.7- FY 03/04 I ReV3.SeCL FY 03/04 Budget $ 2,667 ... . .................. - - ......... . .. -- $ 1,333 $4,000 I ..... . ... . $ . 3.8. ,.. 7.0.7 - .. ... . ... . $ 19,353 $ 58,060 .--1 -..- . - .............. - $ 1,333 ,060 $ 64,0 Exhibit 4 RESOLUTION NO. 2004- A RESOLUTION OF REDEVELOPMENT AGENCY OF THE CITY OF MOORPARK, CALIFORNIA, AMENDING THE FY 2003/04 BUDGET TO REVISE THE AMOUNTS OF THE APPROPRIATIONS AND BUDGET FOR PROJECT 8053: CIVIC CENTER DRIVEWAY MODIFICATION PROJECT [MRA AREA 1 OPERATIONS FUND (FUND 2902)] WHEREAS, on June 18, 2003, the Moorpark Redevelopment Agency adopted the Budget for Fiscal Year 2003/04; and WHEREAS, a staff report has been presented to the City Council requesting a budget increase in the aggregate amount of $34,060, $21,353 of which is funded by the Moorpark Redevelopment Agency; and WHEREAS, Exhibit "A ", attached hereto and made a part hereof, describes said budget amendment and its resultant impacts to the budget line item(s). NOW, THEREFORE, THE REDEVELOPMENT AGENCY OF THE CITY OF MOORPARK DOES HEREBY RESOLVE AS FOLLOWS: SECTION 1. That a Budget amendment in the aggregate increase of $34,060 [$21,353 of which is to be funded by the Moorpark Redevelopment Agency] , as more particularly described in Exhibit "A ", is hereby approved. SECTION 2. The Agency Secretary shall certify to the adoption of this resolution and shall cause a certified resolution to be filed in the book of original resolutions. PASSED AND ADOPTED this 5th day of May, 2004. Patrick Hunter, Chair ATTEST: Deborah S. Traffenstedt, Agency Secretary Attachment: Exhibit 'A': Appropriation and Budget Detail 000095 B. FY 03/04 Budget Re-Ca Account Number 1000.8310.8053.xxxx 2902.8310.8053.xxxx x x ....... . .......... . Current': Subject FY 03/04 Appropriation Budget! / (Reduction) $ 30,0001 $ 12,707 ... . ......... .............. .... ......... . ..................... . ....... . .. . .... . ................ . .. . ......... . . .. . .... . . . . .... . ..... 0.- $ $ 21,353 . ........... . ........... $ 30,0001 $ 34,060 at 07 Revised FY 03/04 Budget $ 42,707 ........................................................ $ 21,353 $ 64,060 C Distribution of Appropriations to Expense Accounts ...... ....... . . ....... ...... .... ...... ............ ............ .............. . ........... . .... . . .......... . . ...... . ............. . ............. . ......... . ....... . ..... . . . . ..................... . .. . ... .......... ...... . .... ........................ . - Current; - - - -* —, -, Subject. FY 03/04 Appropriation FY 03/04; Account Number Budget , (Reduction) Budget .... X1000.8310.8053.9601: ......... Design $ 3,0001 $ (333) ... . . ..................... .......... $ 2,667 ..... ...... ...... ............. .............. ....... . .. ... ..... . ....... . .. . ...... . 2902.8310.8053.9601: . . . ............ . .............. . .......... ... . ...... . .... Design 1 Design ...... . . .............. . ..... . . ... . ........ . .... ........ $ 0 ........... . . .. . .. . . ............................ $ 1,333 1 $ 1,3331 .................... .................... . .. .... ....... . ..... . ............. . ..... . ...... .............................. . ... . ................................... . ..... . ... ..._..._ $ 3,000 ........... . . . ..... 1,000` 000 . . ... ........... . . ........ . ............ . ......... . ............ . ...... . .......... . . 10 b.8310.8053.9640: .. . ............ . ........ . ............ . .................... ..... . ... . . . . Const ........... . .............. . ...... ........ $ 26,000 1 . ................ ............. . ......... . ............. $ 1* 707 F . * ... . ....... $ 38,707 .. ........... ........ . . .................... .. ..... .............. . . .......... - ................... 2902.8310.8053.9640: . .......... . . .. .......... .................. . . ............ Const .. ....... . .. . . ........ . ................ $ 0 .. . ............... . ............... . ............. $ 19,353 19,353 ... .... ......... .................... ....... . . ...... ....................... . ............. ... . ...... . .............. .......... ... . . ...... . $ 26, 000 ........... ......... $ 32rO60 $ 58,060. ....... . ... ... .. .. . ... .. . . . .. .. ....... . . 1000.8310.8053.9650: .. .... .... .. Insp. 1 $ 1,000 ........................ . .. ........... .............. r 33 ............. ...... .. ........... . .. 8053.9650: .. .. .......... - .................... .2902.8310. ........... . .. ....... ......... . ......... Insp. ... . . . .... . ....... ................ ...... ............. $ 0 ................ 1,000 ....... ... $ 677 1,000 677 ]�2, 000 ........ .. ............. ......... ............. ............... ................................ ... . ..................... Total . ...... . .... Project $30,000 $ 34,060 $ 64,060 ............. .. ............. . . ................. I .......... . ........... ....... . ........... .... ......... . Approved as to form: . . ................ . . . .. lb . ....... 000096