Loading...
HomeMy WebLinkAboutAGENDA REPORT 2004 1006 CC REG ITEM 10DTO: FROM: DATE: SUBJECT: DISCUSSION M t0•"n. CITY OF MOORPARK, CALIFORNIA City Council Meeting Of MOORPARK CITY COUNCIL BY AGENDA REPORT The Honorable City Council Kenneth C. Gilbert, Director of Public Works September 23, 2004 (Council Meeting 10 -6 -04) Consider Approval of a New Traffic Signal Maintenance Services Agreement A. Backqround 1. 1984 Agreement: In 1984 the City approved a Traffic Signal Maintenance Agreement with Peek Traffic [then called Signal Maintenance Inc.]. When the term of that agreement expired, that agreement reverted to a month -to -month Agreement which has extended through the present date. 2. New Specifications: A new set of Traffic Signal Maintenance Specifications were developed by staff, to be consistent with the standards and requirements commonly required for Agreement traffic signal maintenance services. In July of this year a copy of the new specifications were provided to the City Council for review and comment. 3. Request for Proposals: A copy of the new Traffic Signal Maintenance Specifications and a Request for Proposals (RFP) was distributed to seven (7) known possible service providers in this area. 4. Change of Ownership: It should be noted that in recent weeks Peek Traffic was acquired by Republic Electric. Republic Electric continued to provide the traffic maintenance services previously provided by Peek Traffic. B. Proposals On September 13, 2004, Proposals were received from two (2) firms, Republic Electric and Traffic Signal Maintenance Inc. (TSM) . Sig2004 rpt 0410 Traffic Signal Maintenance Services October 6, 2004 Page 2 C. Qualifications Staff has reviewed the two proposals and has determined that both firms are qualified to provide the required services. D. Scope of Services The Agreement documents require the Contractor to provide for the maintenance of seventeen (17) traffic signals, at the intersections listed and depicted on the list and map attached as Exhibit 1. E. Routine Maintenance Cost The amounts bid by each vendor for Routine Maintenance is as follows: Estimated Cost Per Year Description Republic ($) TSM ($) Rate per Signal per Month 85 84 Monthly Cost 1,445 1,428 Annual Cost 17,340 17,136 F. Extraordinary Maintenance Costs In addition to the monthly service charge for Routine Maintenance bid by each of the vendors, amounts were also included in the proposals for providing Extraordinary Maintenance Services. Those bid amounts were for additional services listed in the following categories: • Labor (per hour) ; • Equipment (per trip); • Material mark -up (percent); • Loop Replacement (per job); and • Controller cabinet rental (amount per month). G. Comparison of Quoted Costs A comparison of the rates quoted by the two vendors is set forth in the charts attached as Exhibit 2. In those charts staff has assigned estimated amounts to the number of hours, number of trips, material mark -up costs, etc. for an average or typical month. Those estimated amounts when applied to the Sig2004 rpt 0410 Traffic Signal Maintenance Services October 6, 2004 Page 3 rates quoted and multiplied by twelve (12), yield the estimated total annual costs for Extraordinary Maintenance services. The calculations listed in Exhibit 2 are summarized as follows: Item Service Change Labor Equipment Material (not Shown) Material Mark -up Loop Replacement Cabinet Rental Estimated Cost Per Year Republic 17,340 7,744 4,350 0 1,800 15% 3,320 1,200 Total 35,754 H. Comparison of Total Costs TSM 17,136 9,370 16,328 0 2,160 18% 5,825 1,000 51,819 As you can see from the above analysis, although the monthly services charge offered by TSM is one dollar per month per traffic signal less than that offered by Republic, the rates quoted for Extraordinary Maintenance services are considerably higher, causing the estimated total annual cost of the services to be provided by TSM to be much higher than Republic. For this reason, it is recommended below that the City Council approve the selection of Republic Electric. I. Republic Electric As mentioned above, Republic Electric recently acquired the firm which had been providing traffic signal maintenance services to the City [PEEK Signal]. Staff has been advised that many of the same personnel will used to provide these services. J. Term The term of the subject Agreement shall extend to June 30, 2010. The Agreement may be extended by mutual consent of the parties. In order to assure that the Agreement does not lapse due to failure of the parties to take formal action to extend it, Agreement language provides that if no action is taken by the parties to extend or terminate the Agreement, subsequent to June 2010 the term of the Agreement is deemed to be extended on a month -to -month basis until such time formal written action is taken to terminate or extend the Agreement. K. Agreement / Specification A copy of the Agreement and Specifications for Traffic Signal Maintenance was previously distributed to the City Council in June of this year. Sig2004 rpt 0410 IG,13 3 Traffic Signal Maintenance Services October 6, 2004 Page 4 STAFF RECONMNDATION Authorize the City Manager to sign Agreement with Republic Electric, to provide traffic signal maintenance services to the City. Sig2004 rpt 0410 ,,,0324 Exhibit 1 (Page 1 of 2) Signalized Intersections Maintained by the City of Moorpark No. Signalized Intersections 1. Campus Park Drive and Delfen Street 2. Campus Park Drive and Collins Drive 3. Los Angeles Ave. and Condor Drive 4. Los Angeles Ave / High St. / Spring Road 5. Spring Road / Flinn Avenue / Second Street 6. Miller Parkway and Patriot Drive 7. Spring Road and Peach Hill Road 8. Miller Pkwy and Peach Hill Road 9. Tierra Rejada Road and Sunset Valley Road 10. Tierra Rejada Road / Miller Pkwy / Moorpark Road 11. Tierra Rejada Road and Spring Road 12. Tierra Rejada Road and Peach Hill Road 13. Tierra Rejada Road and Walnut Creek Road 14. Tierra Rejada Road and Mountain Meadow Drive 15. Tierra Rejada Road and Mountain Trail Street 16. Tierra Rejada Road and High School Entrance 17. Tierra Rejada Road and Countrywood Drive sig2004 000,325 Traffic Signal Locations City of Moorpark Exhibit 2 Bid Results: Traffic Signal Maintenance Page 1 of 2 [File # bid signal mainteance] Bidder » »> Vendor] Bid Opening: Name: Engineer's Estimate Republic Electric September 14, 2004 Address: 7120 Redwood Blvd. City, State: Novato, CA 94945 Tel. No.: 415- 898 -8897 Contact Person: James Wagner Per Month Unit Total ($) Total ($) Unit Total ($) Total ($) Item Description Est Qty Units Cost ($ Per Month Per Year Cost ($) Per Month Per Year Routine Maintenance 1 Monthly Serive Charge 17 Signals 90.00 1,530.00 18,360.00 85.00 1,445.00 17,340.00 Extraordinary Maintenance Labor (per Month) Hrly Rate Hrly Rate 2 Operations Superintendent 0.1667 Hrs 100.00 16.67 200.00 76.00 12.67 152.00 3 Engineering Tech 0.1667 Hrs 90.00 15.00 180.00 76.00 12.67 152.00 4 Leadman 1 Hrs 70.00 70.00 840.00 60.00 60.00 720.00 5 Traf Signal Tech -Field 1 Hrs 60.00 60.00 720.00 60.00 60.00 720.00 6 Traf Signal Tech -Lab I Hrs 60.00 60.00 720.00 60.00 60.00 720.00 7 TrafSignalman 3 Hrs 60.00 180.00 2,160.00 55.00 165.00 1,980.00 8 Traf Signalman Laborer 5 Hrs 50.00 250.00 3,000.00 55.00 275.00 3,300.00 7,820.00 7,744.00 Equipment (per Mouth) Per Trip Rate Per Trip Rate 9 Vehicle 2 trips 50.00 100.00 1,200.00 20.00 40.00 480.00 10 Pick -up truck 2 trips 50.00 100.00 1,200.00 20.00 40.00 480.00 11 Utility Truck 2 trips 70.00 140.00 1,680.00 60.00 120.00 1,440.00 12 Service ladder truck 0 trips 100.00 0.00 0.00 0.00 0.00 0.00 13 Boom / Ladder truck 0 trips 100.00 0.00 0.00 0.00 0.00 0.00 14 Paint Rig Truck 0.0833 trips 100.00 8.33 100.00 50.00 4.17 50.00 15 Telsta Truck 0.0833 trips 152.00 12.67 152.00 75.00 6.25 75.00 16 Air compressor 2 trips 40.00 80.00 960.00 25.00 50.00 600.00 17 Water truck 0.0833 trips 100.00 8.33 100.00 25.00 2.08 25.00 18 Concrete saw 4 trips 100.00 400.00 4,800.00 25.00 100.00 1,200.00 10,192.00 4,350.00 Material Mark -up Cost / Mo Est Materials / Mo, percent percent 19 Material Cost Mark -up 1,000.00 $ 0.10 100.00 1,200.00 0.15 150.00 1,800.00 Loop Installations (Cost / Mo) 20 1 to 4 loops 0.50 EA 700.00 350.00 4,200.00 350.00 175.00 2,100.00 21 5 to 12 loops 0.1667 EA 500.00 83.33 1,000.00 320.00 53.33 640.00 22 13 to 20 loops 0.0833 EA 400.00 33.33 400.00 300.00 25.00 300.00 23 over 20 loops 0.0833 EA 300.00 25.00 300.00 280.00 23.33 280.00 5,900.00 3,320.00 Rental Rates (Cost / Mo) 24 Controller Cabinet 0.1667 EA 1,000.00 166.67 2,000.00 600.00 100.00 1,200.00 Sub -Total Extraordinary Maintenance 2,259.33 27,112.00 1,534.50 18,414.00 Notes: 0.0833 times per month = 1 time per year 0.1667 times per month = 2 time per year 0.50 times per month = 6 time per year Total 3,789.33 45,472.00 2,979.50 35,754.00 900,32 City of Moorpark Exhibit 2 Bid Results: Traffic Signal Maintenance Page 2 of 2 [File # bid signal mainteance] Bidder » »> Vendor 2 Bid Opening: Name: Traffic Signal Maintenace September 14, 2004 Address: 5455 8th Street, #50 City, State: Carpenteria, CA 93013 Tel. No.: 805- 684 -5054 Contact Person: Rob Eaton Per Month Unit Total ($) Total ($) Unit Total ($) Total ($) Item Description Est Qty Units Cost ($) Per Month Per Year Cost ($) Per Month Per Year Routine Maintenance 1 Monthly Serive Charge 17 Signals 84.00 1,428.00 17,136.00 Extraordinary Maintenance Labor (per Month) Hrly Rate 2 Operations Superintendent 0.1667 Hrs 80.00 13.33 160.00 3 Engineering Tech 0.1667 Hrs 75.00 12.50 150.00 4 Leadman 1 Hrs 75.00 75.00 900.00 5 Traf Signal Tech -Field 1 Hrs 68.00 68.00 816.00 6 Traf Signal Tech -Lab 1 Hrs 68.00 68.00 816.00 7 Traf Signalman 3 Hrs 68.00 204.00 2,448.00 8 Traf Signalman Laborer 5 Hrs 68.00 340.00 4,080.00 9,370.00 Equipment (per Month) Per Trip Rate 9 Vehicle 2 trips 18.40 36.80 441.60 10 Pick -up truck 2 trips 18.40 36.80 441.60 11 Utility Truck 2 trips 30.00 60.00 720.00 12 Service ladder truck 0 trips 50.00 0.00 0.00 13 Boom / Ladder truck 0 trips 50.00 0.00 0.00 14 Paint Rig Truck 0.0833 trips 75.00 6.25 75.00 15 Telsta Truck 0.0833 trips 50.00 4.17 50.00 16 Air compressor 2 trips 200.00 400.00 4,800.00 17 Water truck 0.0833 trips 200.00 16.67 200.00 18 Concrete saw 4 trips 200.00 800.00 9,600.00 16,328.20 Material Mark -up Cost 1 Mo Est Materials / Mo. percent 19 Material Cost Mark -up ( 1,000.00 $ 0.18 180.00 2,160.00 Loop Installations (Cost / Mo) 20 1 to 4 loops 0.50 EA 600.00 300.00 3,600.00 21 5 to 12 loops 0.1667 EA 575.00 95.83 1,150.00 22 13 to 20 loops 0.0833 EA 550.00 45.83 550.00 23 over 20 loops 0.0833 EA 525.00 43.75 525.00 5,825.00 Rental Rates (Cost / Mo) 24 Controller Cabinet 0.1667 EA 500.00 83.33 1,000.00 Sub -Total Extraordinary Maintenance 2,890.27 34,683.20 Notes: 0.0833 time per month = 1 time per year 0.1667 times per month = 2 time per year 0.50 times per month = 6 time per year Total 4,318.27 51,819.20