Loading...
HomeMy WebLinkAboutAGENDA REPORT 2004 1020 CC REG ITEM 10DITEM- 10' -D. CITY OF MOORPARK, CALIFORNIA City Council Meeting of '/o -Ao -aoo X/ ACTION: /%/►1�w �� �( .tom« a �. t✓e ��- Moorpark City Council ay: �...��. Agenda Report To: The Honorable City Council From: Kenneth C. Gilbert, Director of Public Works Date: October 7, 2004 (Council Meeting 10- 20 -04) Subject: Notice of Completion for the Spring Road Parkway Tree Replacement Project [Project 80541 BACKGROUND • In December of 2003, the City Council approved Project 8054 for the removal of six (6) large eucalyptus trees on the west side of Spring Road south of Peach Hill Road and the installation of twenty -four (24) new tree wells between Peach Hill Road and Christian Barrett Drive. • In May of 2004, the City Council approved the plans for the project and authorized staff to advertise for receipt of bids. The approved plans for the project call for the installation of twenty -four (24) new tree wells along this street segment. • In response to concerns raised by the City Council the plans were revised to call for the planting of Brisbane trees instead of the Crape Myrtles initially proposed. • On July 7, 2004, a contract for the construction of the project was awarded to M &R Landscaping, Inc. DISCUSSION A. Project Description A diagram generally showing the location of the new tree wells is attached as Exhibit 1. The general scope of the project is summarized as follows: 1) removal of the six (6) existing eucalyptus trees; 2) removal and replacement of sidewalk, curb and gutter damaged by the eucalyptus trees; 3) removal of sidewalk and installation of twenty -four (24) new tree wells with tree grates; and Spring Tree Wells_cmp_0410 Spring Road Parkway Tree Replacement October 20, 2004 Page 2 4) installation of an irrigation system to each tree well, fed by the water supply at Monte Vista Nature Park [Note: the water used by the parkway trees will be charged to the Citywide Landscape Maintenance District]. B. Changes 1. Quantity Adjustments: As is typical with public works construction projects, the actual quantities required for the job differed from the engineer's estimate. This project required slightly less quantities of certain bid items resulting in the final cost being only $2.57 less than the bid amount. 2. Change orders: The were no change Orders required for the project. C. Inspection Project Administration and Inspection was managed by the Public Works Supervisor. Total project inspection costs are estimated to be as follows: Element _ Amount ($) Salaries 2,000.00 Soils testing 1,000.00 Total ...... ....... ......................................................... 3,000.00 ---.-_-....................................................................................._...----... ........................... - -.. D. Fiscal Impact 1. Construction Cost Summary: The total final contract construction cost is as follows: ........... Dement Amount ($) 3id Amount 65,857.00 'hange Orders - :)uantity Adjustments (2.57 Total 65,854.43 ....... ......... _..... .._ ........ . - - -. - ....... -- _. 2. Total Project Cost: The total final project cost is summarized as follows: Element Amount ($) Design 1,903 Construction 65,854 Inspection ' 3.000 Total 70,757 * Note: Both design and inspection services for this project were provided by City staff. Spring Tree Wells_cmp_0410 Spring Road Parkway Tree Replacement October 20, 2004 Page 3 3. FY 04105 Budget: The current status of the project budget ;p Phnwn aq fn11nws- All surplus appropriations will be returned to funding sources at the end of the fiscal year. E. Final Inspection and Acceptance The City has completed a final inspection of the project and has found the work to be acceptable. At this time it would be appropriate for the City Council to accept the project as complete and direct the City Clerk to record the Notice of Completion to start the final lien period. Absent the receipt of any Stop Notices from subcontractors or suppliers, the ten percent retention will be released thirty -five (35) days after the date of the recordation of that notice. STAFF RECOMMENDATION Accept the work as complete. Attachments: Exhibit 1: Map Spring Tree Wells_cmp_0410 Total Project Less FY 03/04 Description Bud et Expenses ($) Sur lus 2150: Trees and Landscaping 9601: Design, Etc 1,000 952 48 9640: Construction 39,514 32,927 6,587 9650: Inspection 1,000 1,500 (500) Sub -Total 41,514 35,379 6,135 2605: Gas Tax 9601: Design, Etc 1,000 952 48 9640: Construction 39,514 32,927 6,587 9650: Inspection 1,000 1,500 (500) Sub -Total 41,514 35,379 6,135 Total 83,028 70,758 12,270 All surplus appropriations will be returned to funding sources at the end of the fiscal year. E. Final Inspection and Acceptance The City has completed a final inspection of the project and has found the work to be acceptable. At this time it would be appropriate for the City Council to accept the project as complete and direct the City Clerk to record the Notice of Completion to start the final lien period. Absent the receipt of any Stop Notices from subcontractors or suppliers, the ten percent retention will be released thirty -five (35) days after the date of the recordation of that notice. STAFF RECOMMENDATION Accept the work as complete. Attachments: Exhibit 1: Map Spring Tree Wells_cmp_0410 Exhibit 1: Map all Project Limits PEPS ti O Christian Barrett Drive 9 11) Ol 0 S-1