Loading...
HomeMy WebLinkAboutAGENDA REPORT 2005 0105 CC REG ITEM 09BITEM-1.6. CITY OF MOORPARK, CALIFORNIA City Council Meeting Of--- I —S -pS ACTION:_ADt Vqd Ct0'4_ MOORPARK CITY COUNCILmm�'�`�O` }� AGENDA REPORT BY:��, TO: The Honorable City Council FROM: Kenneth C. Gilbert Director G of Public Works DATE: December 23, 2004 (Council Meeting 1 -5 -05) SUBJECT: Consider Awarding a Contract for the Construction of a Double Left Turn Lane on Spring Road at Tierra Rejada Road DISCUSSION A. Backaround In March of 2004, the City Council approved the conceptual design for the subject project. The approved design provided for the elimination of the northbound left -turn lane into the shopping center, immediately north of the subject intersection. This design was approved by the City Council subsequent to a number of meetings with the property and business owners affected by the project, which were held in order to thoroughly discuss available design options. Subsequent to conceptual design approval, a civil engineering consultant was retained to prepare the final project plans and specifications. In October of this year the City Council approved those plans and authorized staff to advertise the project for receipt of bids. This matter was considered by the City Council on December 15, 2004, and continued to January 5, 2005, in order to allow staff to clarify the construction schedule for the project. B. Project Description The general scope of the project is shown on the diagram attached as Exhibit 1. The project generally entails the modification of the median and the construction of additional pavement at the north leg of the Spring Road and Tierra Rejada Road intersection, to allow for two (2) southbound left -turn lanes. Tree wells will be provided in the four feet (4') wide median in the area of the double left -turn lane. Spring TR Double Left awd 0412 D . t'l °8 a v A6. l.i Spring Road / Tierra Rejada Road Double Left Turn Lane January 5, 2005 Page 2 C. Traffic Management The work will not require any reduction to the number of travel lanes to and through the subject intersection. It is anticipated, therefore, that the planned construction will not adversely impact the flow of traffic. D. Deferred Construction Date On December 15, 2004, the City Council asked if the project could be delayed a short period so that it did not follow on the heels of the Water Line project on Los Angeles Avenue. The low bidder has agreed to postpone the start of construction to March 1, 2005. E. Bid Results Bids for the subject project were received and opened on November 30. The apparent low bidder is GPM Sealrite, with a bid of $72,840.00. A summary of the bid results is attached as Exhibit 2. It has been determined that the apparent low bidder is qualified to perform the work. Said bidder has confirmed that their bid is valid and that they are prepared to proceed with the construction of the project. F. Fiscal Impact 1. Cost Estimate: An estimate of project costs is as follows: Element Amount ($) Design Conceptual Design [Keith Co.] 2,034 Final Design [Giron Eng.] 2,400 Printing, Etc. 500 4,934 Construction [Bid Amount] 72,840 Constr Contingency (20 %) 14,568 Inspection 200 Total 92, 542 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Jote: Inspections will be performed by City staff. 2. Budget: Except for preliminary design costs (as noted below), this project is funded by the Spring Road / Tierra Rejada Road AOC Fund [Fund 2502] . The FY 2004/05 Budget Spring TR Double Left awd 0412 f4v-0011 Spring Road / Tierra Rejada Road Double Left Turn Lane January 5, 2005 Page 3 for the project [Project 8055], as well as the prior year preliminary design costs, are summarized as follows: ........ ......... ..... ............ ..... . ........... ................... Budget FY 04/05 Projected Surplus Description Budget Actual Cost ($) (Deficit [$1 ) Project 8055 Design, Printing, Etc Construction Inspection Project 8055 Total Budget Plus Prior Year Actual Design Costs (Gas Tax Fund) Project Total 10,000 2,900 7,100 86,000 87,408 (1,408) 4,000 200 3,800 100,000 90,508 9,492 2,034 2,034 102,034 92,542 The approved Budget for the project exceeds the current project cost estimate. G. Schedule It is anticipated that construction should start in March and be completed in May. H. Administrative Actions If the recommended action is taken by the City Council, certain administrative actions will be undertaken by staff, including the following: • A construction contract agreement will be forwarded to the contractor for the construction of the project, for the contract price of $72,840.00. • When all of the contract documents are in order, the agreement will be executed by the City Manager. • A construction contingency of $14,568.00 (200) will be set aside for the project. STAFF RECOMMENDATIONS (Roll Call Vote) Approve the award of a construction contract to GPM Sealrite for the construction of the subject project. Attachments: Exhibit l: Plan Exhibit 2: Bid Results Spring TR Double Left awd 0412 .w., v r. S I i I i i, j i i� r PREPARED ra. CITY OF MOORPARK Sam 1 - +0' 10' 0 +o• BO• GRAPHIC SC4LE SPRING RD./TIERRA REJADA PROPOSED LEFT TURN IMPROVEMENT �.�► OPTION 2 I � . I , The Keith Campeniee OESTMtr JEK � ORArTED BC AMW 4165 a I Odu B%d Svilr 730 rtovo d Oda. G 91,667 (ao) 495 -SM WOO Br. JEK 2/4, PREPARED ra. CITY OF MOORPARK Sam 1 - +0' 10' 0 +o• BO• GRAPHIC SC4LE SPRING RD./TIERRA REJADA PROPOSED LEFT TURN IMPROVEMENT �.�► OPTION 2 City of Moorpark Exhibit 2 Bid Results: Spring Road Double Left at Tierra Rejada Road Page 1 of 1 [File # bid spring double left 2004] Bidder » »> Vendor 1 Vendor 2 Bid Opening: Name: Engineer's Estimate GPM Sealrite Nye & Nelson November 30, 2004 Address: 240 Quail Court 1860 Eastman Ave. [# 108] City, State: Santa Paula, CA 93060 Ventura, CA 93003 Tel. No.: 805- 933 -0909 805- 654 -1682 Contact Person: Gordon Miller Ruric Nye Item Description Est Qty Units Unit Cost Total Bid Unit Cost Total Bid Unit Cost Total Bid I Mobilization 1 LS 700.00 700.00 5,000.00 5,000.00 10,000.00 10,000.00 2 Traffic Control 1 LS 2,100.00 2,100.00 3,000.00 3,000.00 10,000.00 10,000.00 3 Removals I LS 14,480.00 14,480.00 10,411.00 10,411.00 11,550.00 11,550.00 4 PCC Curb 626 LF 8.84 5,533.84 14.00 8,764.00 20.00 12,520.00 5 AC Pavement & Base 3,553 SF 3.82 13,572.46 5.00 17,765.00 6.00 21,318.00 6 Irrigation 1 LS 2,800.00 2,800.00 2,000.00 2,000.00 8,000.00 8,000.00 7 Pavers I LS 9,780.00 9,780.00 23,000.00 23,000.00 17,000.00 17,000.00 8 Stiping I LS 1,750.00 1,750.00 2,900.00 2,900.00 1,200.00 1,200.00 9 Release I EA 1.00 1.00 1.00 1.00 1.00 1.00 Total 50,717.30 72,841.00 91,589.00