HomeMy WebLinkAboutAGENDA REPORT 2005 0202 CC REG ITEM 10BI T E M 10. B. CITY OF MOORPARK, CALIFORNIA City Council Meeting ACTION: %K CA Moorpark City Council Agenda Report BY' To: The Honorable City Council 4 From: Kenneth C. Gilbert, Director of Public Works Date: January 20, 2005 (Council Meeting 2 -2 -05) Subject: Consider Awarding a Contract for a Project to Construct the Spring Road Median Landscaping North of Second Street and to Replace the Parkway Trees on the East Side of Tierra Rejada Road South of Courtney Lane DISCUSSION A. Project Description 1. Spring Road Median Landscaping: The median in Spring Road north of Second Street (see Exhibit 1) was constructed as a part of the Flinn Avenue Realignment and Reconstruction Project. That project included the installation of a water meter and a water line stub to the median for the future landscaping. 2. Tierra Rejada Road Parkway Tree Replacement: The parkway trees along the east side of Tierra Rejada Road south of Courtney Lane (see Exhibit 1) have caused damage to the sidewalks in that area. The subject project provides for the repair of the sidewalk, replacement of the trees and the installation of tree grates. B. Project Approval In November of 2004, the City Council approved the plans and specifications for this combined project and authorized staff to advertise for receipt of bids. C. Bid Results Bids for the subject project were received and opened on January 18, 2005. The apparent low bidder is Martinez Landscape, Inc. (Sylmar), with a bid of $69,929.00. A summary of the bid results is attached as Exhibit 2. Spring Med awd 0501 00604i i Spring Road Median / Tierra Rejada Road Parkway Trees Award Contract February 2, 2005 Page 2 It has been determined that the apparent low bidder is qualified to perform the work. Said bidder has confirmed that their bid is valid and that they are prepared to proceed with the construction of the project. D. Fiscal Impact: Construction 1. Construction Cost Estimate: A preliminary estimate of project costs is as . . . . . . . . . . . .. . .. . . . . . . . . ..... . . . . . . . . . follows: . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ........... . ........ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Spring Rd. . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . .................................. . Tierra Rejada . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Element Median Trees ($) Total Design 10,000 500 10,500 Construction 33,691 36,238 69,929 Constr Contingency (15 %) 5,054 5,436 10,489 Inspection ** 1,000 500 1,500 Total 49,745 42,674 92,418 ** Note: Inspections will be performed by City staff. 2. Budget: The approved Budget for these projects is summarized as follows: .................. _ ... _........................._......................................................................._.._. ....................................................... _ ............. _.............................................................._.............................................................................................. Proj.8026 Proj.8033 ............................... Spring Rd. Tierra Rejada Element Median Trees ($) Total Design 52,086 2,272 54,358 R -O -W Acquisition 158,760 - 158,760 :Construction 700,000 281,013 981,013 Inspection 70,000 5,000 75,000 Total 980,846 288,285 1,269,131 ... .........................._ .. ..... ...._._ Note A Note B Note A: The subject median landscaping project is a part of the larger Spring Road Widening Project. As discussed above in this report, that portion of the Spring Road Widening project north of Second Street has already been constructed. The City is still in the process of acquiring rights -of -way for that portion of the project south of Second Street. Construction of the Spring Road Widening Project is scheduled for 2005. Note B: The subject parkway tree replacement project is part of a larger project for the construction of parkway medians along the south side of Los Angeles Avenue east and west of Tierra Rejada Road and along the west side of Tierra Rejada Road south of Los Angeles Avenue. Construction of that project has been deferred indefinitely pending a determination regarding increased funding for parkway /median landscape maintenance. 3. Tierra Rejada Road Parkway Tree Replacement Budget: In September 2004, the City Council approved a Budget amendment funding this project to be a part of a larger parkway project to be constructed in the vicinity of the intersection of Tierra Rejada Road and Los Angeles Avenue [Project 8033]. A comparison of the funds appropriated for Spring Med awd 0501 0OU04G Spring Road Median / Tierra Rejada Road Parkway Trees Award Contract February 2, 2005 Page 3 this project last September and the current project cost estimate is as follows: Portion of Project 8033 Current Surplus Element Budget Estimate ($) Deficit Design 2,000 500 1,500 Construction 60,000 41,674 18,326 Inspection 2,000 1,000 1,000 Total .........._ __ ................................._....................... ............. ........................................................ ................................._................... 64,000 ....._.................... ..........._...._............_..................... 43,174 ._._...._............................ ..._.................... 20,826 .._...._ - - - - -- 4. Funding Sources: The funding sources construction project are a follows: ......................... _ ... . ................ . .................... . ................... . . . . . . . . . . . . . . . . . . ...................... . .............. . . . . . . . . . . . . . . . . . . . . . . . . ................. . . . . . . . . . . . ......................... . ................................. . . . . . . . . ........................... . . . Proiect Project 8026: Spring Road Widening Fund 2501 - L. A. Ave. AOC Fund Project 8033: L. A. Ave. / Tierra Rejada Rd. Parkways Fund 2150 - Trees and Landscaping A Fund 2300 - Citywide US Maint. Dist. Fund 2501 - L. A. Ave. AOC Fund Fund 2605 - Gas Tax Fund A for the subject Budget Amt. ($) 980,846 32,000 7,315 216,970 32,000 288,285 Note A: Funding Source for the subject Tierra Rejada Parkway Tree Replacement Project. Total Budget for this work is $64,000. 5. Prior Year Estimated Costs / Total Appropriations: The estimated prior year costs (FY 03/04 year -end actual expenses have not yet been determined) and total project appropriations are summarized as follows: ...................... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ...................................................... . . . . . . . . . . .......... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . _ . . _ . . . . . . . . . . . . ............................................... , Spring Rd. Tierra Rejada Element Median Trees ($) FY 04/05 Budget 980,846 288,285 Plus Estimated Prior Year Expenses 269,154 7,715 Total Budget Appropriations 1,250,000 296,000 E. Maintenance Cost Impact 1. Spring Road Median: The estimated annual maintenance cost for this new landscaped median is $3,300 [3,700 sf x $0.90 /sf /yr. j . 2. Tierra Rejada Road Parkway Trees: In that this project only replaces existing parkway trees, there will be no maintenance cost increase resulting from this project. oOU0 r, Spring Med awd 0501 Spring Road Median / Tierra Rejada Road Parkway Trees Award Contract February 2, 2005 Page 4 F. Administrative Actions If the recommended action is taken by the City Council, certain administrative actions will be undertaken by staff, including the following: • A construction contract agreement will be forwarded to the contractor for the construction of the project, for the contract price of $69,929.00. • When all of the contract documents are in order, the agreement will be executed by the City Manager. • A construction contingency of $10,489.00 (15 %) will be set aside for the project. G. Schedule It is anticipated that construction will commence in March and be completed in June. STAFF RECOrMENDATIONS (Roll Call Vote) Approve the award of a construction contract to Martinez Landscape Company for the construction of the subject project. Attachments: Exhibit 1: Location Maps Exhibit 2: Bid Results Spring Med awd 0501 V O U O 4 v Exhibit 1 ( '6-1 1) Spring Road Median an as •♦ s• w • •e SECOW STREET s� w p �r i.l Spring Med ad 0911 LAST - 600. A W «nu'`A 00 049 I N Exhibit ; % -Z) Tierra Rejada Road Parkway Trees .• , 'n Spring Med—,d-0411 YC r 16 50 17e .5 '60 rel \31 8.1 re3 'S red (6-6 190 19) TN 0 () (3 0 LS 0 LOS ANGELES m AVENUE J. (14 —s. 11 —s, it J. t. i 19 2 7 (;,q� 20 21 ?? 23 ' E'rl 24 2 25 1' .1' 26 28 Z9 ".3f., 13 , I �q (12 .2. NIGHTINGALE 34 STREET V 3t— Z-- 10 '..As 1..33 s, UJQ A .10 99 m -1 20 67 16Z c rn 91 58 —.S2 1 7 72 141- 37 19 C) 24 88 W ..•, 90 ,,— 4 56 I�z , %. . rl C : 6 tod It's. rr! a 91 55 I of 77- is — . 95 11 — —.. . , f. • '.1 .. 92 at.. 4 r;--, (i� P 5, at 1, 84 ct, 44 of •7 4� _— — .3 Sir* p 53 cs;) 94 M 5z c 7:7 z 44 78 �R% o7' 4- 8 9 • 6 96 976 C— Q ",I I$ 9. Zy 5Cr UZE ALL 1", 0• "So I.I. COURTNEY k ."•3r3a*. LANE 3 1'1! Z 41 8 ! .• , 'n Spring Med—,d-0411 YC r 16 50 17e .5 '60 rel \31 8.1 re3 'S red (6-6 190 19) TN 0 () (3 0 LS 0 City of Moorpark Bid Results: Spring Road Median [File # bid spring median 2004] / Tierra Rejada Parkway Trees Exhibit 2 Page I of 5 Bid Opening: January 18, 2005 Bidder » »> Vendor 1 Vendor 2 Name: Address: Engineer's Estimate Martinez Landscape Co. 14862 Ryan Street Limco Landscape Services 412 De La Vina Street City, State: Sylmar, CA 91342 Santa Barbara, CA 93101 Tel. No.: (818) 364 -9188 (805) 962 -7344 Contact Person: Sal Martinez Vicente Arroyo Item Description Est Qty Units Unit Cost Total Bid Unit Cost Total Bid Unit Cost Total Bid 1 Remove Trees (parkway) 10 EA 1,000.00 10,000.00 875.00 8,750.00 210.00 2,100.00 2 R &R Sidewak (parkway) 2,197 SF 15.00 32,955.00 4.00 8,788.00 10.49 23,046.53 3 Parkway Irrigation 1 LS 1,500.00 1,500.00 1,000.00 1,000.00 3,000.00 3,000.00 4 Tree Wells / Grates (parkway) 10 EA 800.00 8,000.00 1,360.00 13,600.00 1,137.30 11,373.00 5 Plant Trees (Parkway) 10 EA 150.00 1,500.00 200.00 2,000.00 220.00 2,200.00 6 Median Irrigation 1 LS 5,000.00 5,000.00 9,375.00 9,375.00 5,100.00 5,100.00 7 Median Landscaping 1 LS 20,000 20,000.00 10,415.00 10,415.00 21,000 21,000.00 8 Water Line for Future Median 1 LS 5,000.00 5,000.00 11,800.00 11,800.00 4,179.00 4,179.00 9 Traffic Control 1 LS 10,000.00 10,000.00 4,200.00 4,200.00 4,900.00 4,900.00 10 Release 1 EA 1.00 1.00 1.00 1.00 1.00 1.00 Spring Rd. Median 35,001.00 33,691.00 32,730.00 T. R. Rd. Parkway 58,955.00 36,238.00 44,169.53 93,956.00 69,929.00 76,899.53 Total 93,956.00 69,929.00 76,899.53 0 €Z€r0E--v1 City of Moorpark Bid Results: Spring Road Median [File # bid spring median 2004] / Tierra Rejada Parkway Trees Exhibit 2 Page 2 of 5 Bid Opening: January 18, 2005 Vendor 3 Vendor 4 Vendor 5 Name: Address: Belaire West Landscape 7371 Walnut Avenue FS Construction 13368 Aldergrove Street Pro West Landscaping 2060 Ave. De Los Ambles City, State: Buena Park, CA 90620 Sylmar, CA 91342 Thousand Oaks, CA 91362 Tel. No.: (714) 523 -9200 (818) 974 -0895 (805) 300 -3010 Contact Person: Jan Strvinksma Angel Fierros Scott Koss Item Description Est Qty Units Unit Cost Total Bid Unit Cost Total Bid Unit Cost Total Bid 1 Remove Trees (parkway) 10 EA 200.00 2,000.00 700.00 7,000.00 400.00 4,000.00 2 R&R Sidewak (parkway) 2,197 SF 10.00 21,970.00 6.00 13,182.00 9.25 20,322.25 3 Parkway Irrigation 1 LS 5,000.00 5,000.00 8,000.00 8,000.00 4,200.00 4,200.00 4 Tree Wells / Grates (parkway) 10 EA 1,700.00 17,000.00 1,500.00 15,000.00 1,600.00 16,000.00 5 Plant Trees (Parkway) 10 EA 200.00 2,000.00 300.00 3,000.00 250.00 2,500.00 6 Median Irrigation 1 LS 15,000.00 15,000.00 14,000.00 14,000.00 12,640.00 12,640.00 7 Median Landscaping I LS 14,428 14,428.00 16,000 16,000.00 10,410 10,410.00 8 Water Line for Future Median I LS 5,000.00 5,000.00 5,000.00 5,000.00 10,320.00 10,320.00 9 Traffic Control 1 LS 1,850.00 1,850.00 4,000.00 4,000.00 6,000.00 6,000.00 10 Release 1 EA 1.00 1.00 1.00 1.00 1.00 1.00 Spring Rd. Median 35,354.00 37,001.00 36,371.00 T. R. Rd. Parkway 48,895.00 48,182.00 50,022.25 84249.00 85,183.00 86,393.25 Total 84,249.00 85,183.00 86,393.25 006050 City of Moorpark Exhibit 2 Bid Results: Spring Road Median / Tierra Rejada Parkway Trees [File # bid spring median 2004] Vendor 7 Vendor 8 Vendor 6 Bid Opening: Name: Joha Construction January 18, 2005 Address: 19934 Rhona Place (562) 803 -6800 City, State: Santa Clarita, CA 91350 Tel. No.: (661) 263 -1739 87,501.00 Contact Person: Louie Joha Item Description 1 Remove Trees Exhibit 2 Unit Cost Page 3 of 5 Vendor 7 Vendor 8 Environmental Construction America West Landscape 3844 Davids Road 12328 Woodruff Avenue Agoura Hills, CA 91301 Downey, CA 90241 (818) 254 -5018 (562) 803 -6800 Farid Soroudi Ronald Garcia Duane Groen Item Description 1 Remove Trees Est Qty Units Unit Cost Total Bid Unit Cost Total Bid Unit Cost Total Bid 10 EA 500.00 5,000.00 500.00 5,000.00 798.00 7,980.00 (parkway) 87,501.00 87,771.00 2 R &R Sidewak 2,197 SF 8.00 17,576.00 10.00 21,970.00 11.13 24,452.61 (parkway) 3 Parkway Irrigation 1 LS 5,924.00 5,924.00 2,300.00 2,300.00 4,987.01 4,987.01 4 Tree Wells / Grates 10 EA 800.00 8,000.00 1,500.00 15,000.00 1,440.48 14,404.80 (parkway) 5 Plant Trees (Parkway) 10 EA 700.00 7,000.00 150.00 1,500.00 93.14 931.40 6 Median Irrigation 1 LS 12,000.00 12,000.00 18,000.00 18,000.00 13,386.30 13,386.30 7 Median Landscaping 1 LS 15,000 15,000.00 18,000 18,000.00 17,915 17,915.30 8 Water Line for Future 1 LS 10,000.00 10,000.00 1,000.00 1,000.00 3,657.01 3,657.01 Median 9 Traffic Control 1 LS 7,000.00 7,000.00 5,000.00 5,000.00 3,325.00 3,325.00 10 Release 1 EA 1.00 1.00 1.00 1.00 1.00 1.00 Spring Rd. Median 40,501.00 39,501.00 36,622.11 T. R. Rd. Parkway 47,000.00 48,270.00 54,418.32 87,501.00 87,771.00 91,040.43 Total I I 87,501.00 I 87,771.00 I 91,040.43 I O000513 City of Moorpark 23,401.00 45,705.00 45,731.00 Exhibit 2 Bid Results: Spring Road Median / Tierra Rejada Parkway Trees 67,964.00 52,080.50 Page 4 of 5 [File # bid spring median 2004] 91,365.00 97,785.50 99,401.00 Vendor 9 Vendor 10 Vendor 11 Bid Opening: Name: M & R Landscape HH Construction Thomsen Landscape January 18, 2005 Address: 530 Moorpark Ave, #180 2828 Cochran Street, #320 18800 Erwin Street City, State: Moorpark, CA 93021 Simi Valley, Ca 93065 Reseda, CA 91335 Tel. No.: (805) 529 -4779 (805) 526 -9437 (818) 344 -0158 Contact Person: Ronald Garcia Jake Hunsaker Merle Thomsen Item Description Est Qty Units Unit Cost Total Bid Unit Cost Total Bid Unit Cost Total Bid 1 Remove Trees 10 EA 1,600.00 16,000.00 500.00 5,000.00 950.00 9,500.00 (parkway) 2 R &R Sidewak 2,197 SF 12.00 26,364.00 8.50 18,674.50 10.00 21,970.00 (parkway) 3 Parkway Irrigation 1 LS 1,800.00 1,800.00 3,656.00 3,656.00 7,000.00 7,000.00 4 Tree Wells / Grates 10 EA 1,600.00 16,000.00 1,550.00 15,500.00 1,050.00 10,500.00 (parkway) 5 Plant Trees (Parkway) 10 EA 510.00 5,100.00 150.00 1,500.00 320.00 3,200.00 6 Median Irrigation 1 LS 7,900.00 7,900.00 13,000.00 13,000.00 14,200.00 14,200.00 7 Median Landscaping 1 LS 10,400 10,400.00 20,229 20,229.00 24,200 24,200.00 8 Water Line for Future 1 LS 2,400.00 2,400.00 4,725.00 4,725.00 5,830.00 5,830.00 Median 9 Traffic Control 1 LS 5,400.00 5,400.00 15,500.00 15,500.00 3,000.00 3,000.00 10 Release I EA 1.00 1.00 1.00 1.00 1.00 1.00 Spring Rd. Median 23,401.00 45,705.00 45,731.00 T. R. Rd. Parkway 67,964.00 52,080.50 53,670.00 91,365.00 97,785.50 99,401.00 Total I I 91,365.00 I 97,785.50 I 99,401.00 I 0()OOrZa City of Moorpark Bid Results: Spring Road Median / Tierra Rejada Parkway Trees [File # bid spring median 2004] Vendor 12 Bid Opening: Name: Nye & Nelson January 18, 2005 Address: 1860 Eastman Avenue, #108 City, State: Ventura, CA 93003 Tel. No.: (805) 654 -1682 Contact Person: Wendy Gorrell Item Description Est Qty Units Unit Cost Total Bid 1 Remove Trees 10 EA 1,600.00 16,000.00 (parkway) 2 R &R Sidewak 2,197 SF 7.50 16,477.50 (parkway) 3 Parkway Irrigation 1 LS 2,600.00 2,600.00 4 Tree Wells / Grates 10 EA 1,200.00 12,000.00 (parkway) 5 Plant Trees (Parkway) 10 EA 425.00 4,250.00 6 Median Irrigation 1 LS 10,000.00 10,000.00 7 Median Landscaping 1 LS 17,000 17,000.00 8 Water Line for Future 1 LS 2,000.00 2,000.00 Median 9 Traffic Control 1 LS 22,000 22,000.00 10 Release 1 EA 1.00 1.00 Spring Rd. Median 40,001.00 T. R. Rd. Parkway 62,327.50 102,328.50 Total I I 102,328.50 0.00 Exhibit 2 Page 5 of 5 0.00 00(305