Loading...
HomeMy WebLinkAboutAGENDA REPORT 2005 0216 CC REG ITEM 09DTO: FROM: 4 • • CITY OF MOORPARK, CALIFORNIA City Council Meeting Of a -/b - '9'00.5 ACTION: le 4t"�.L,l� Q ds„tr lick Za" A665 -Aa33 MOORPARK CITY COUNCI4Y- - -. AGENDA REPORT The Honorable City Council Kenneth C. Gilbert, Director of Public Works DATE: February 2, 2005 (Council Meeting 2- 16 -05) 0 SUBJECT: Consider Awarding a Contract for the Construction of the Los Angeles Avenue / Beltramo Ranch Road Widening Project and Adoption of a Resolution Amending the FY 2004/05 Budget to Revise the Project Appropriations BACKGROUND • In May of 1999, the City Council approved the Mitigated Negative Declaration for the project. • In March 2001, Boyle Engineering was selected to prepare the design for the project. • In September of 2001, the City Council approved the conceptual design for the project. • In October 2003, the City completed efforts necessary to acquire all of the street rights -of -way required for the project. • In January 2004, the City received the approved Caltrans Street Encroachment Permit for the project. • In February 2004, the City Council approved the project plans and specifications and authorized staff to advertise for receipt of bids upon approval of the grant funding for the project. • In November 2004, the Federal funding for the project was approved and the project was advertised. • In January of 2005, the City Council approved the Caltrans' Supplemental Agreement pertaining to the Federal funding for the project. Beltramo awd 0501 - - 000059 Los Angeles Avenue Widening Beltramo to Maureen Lane Award of Contract February 16, 2005 Page 2 DISCUSSION A. Project Description Attached as Exhibit 1 are diagrams summarizing the conceptual design. The project design calls for widening of the south side of the street to provide for the ultimate street width within the project area. A summary of the project scope is as follows: • Location: The project is located on the south side of Los Angeles Avenue and funs from Beltramo Ranch Road easterly to a point east of Maureen Lane. • Prior Right -of -Way [half- street]: Prior to this project the right -of -way widths were as follows: - at Maureen Lane: fifty feet (50'); and - at and east of Beltramo Ranch Road: thirty feet (30'). • Current Right -of -Way [half - street]: The project now provides the ultimate fifty -nine feet (59') wide half - street. • Landscape Easements: Landscape easements were acquired in certain areas as shown in Exhibit 1. • Proposed Street Improvements: Project street improvements include: - additional pavement width; - curb & gutter; and - a six feet (6') wide sidewalk. - [Note: The south right -of -way line is eight feet (8') from the new curb face. The future landscaped parkway (see below) will include the two feet (2') wide area between the back of the sidewalk and the new south right -of -way line.] • Street Lighting: The installation of conduits and pull boxes will be added to the scope of work via Change Order. These plans were not ready in time to include in the construction bid documents. It is estimated that the cost of this Change Order will be approximately $10,000. • Striping: Upon completion of the project the street in the vicinity of Maureen Lane will be striped for six (6) lanes of traffic, plus eight feet (8') wide paved shoulders and a painted median (see Section F for more details). • Traffic Signal: The project includes the construction of a traffic signal at the Maureen Lane intersection. • Storm Drain: The project includes the construction of a storm drain to convey drainage from Los Angeles Avenue to the south end of Maureen Lane. Beltramo_awd_0501 00006U Los Angeles Avenue Widening Beltramo to Maureen Lane Award of Contract February 16, 2005 Page 3 • Future Parkway Landscaping: Landscaped easements have been acquired, as noted above, for future landscaping. It is intended to include this landscaping effort with a future project to construct parkway landscaping on the south side of Los Angeles Avenue east of Tierra Rejada Road. • Block Wall: Eight feet (8') high block walls will be constructed immediately south of the south line of the landscape easement, except as noted below; and • Block Wrought Iron Wall: Consistent with the wishes of the Sonrise Pacific Church, the wall along the church frontage will have five feet (5') of wrought iron above a three feet (3') high block wall, with pilasters. B. Right -of -Way Acquisition The project required acquisition of additional street right - of -way on the south side of the street, as shown on Exhibit 2. All of the required street - rights -of -way, landscape easements and temporary construction easements have been acquired. The street rights -of -way will ultimately be conveyed to Caltrans. The landscape easements will be retained by the City. Right - of -way acquisition costs are set forth herein under the section entitled Fiscal Impact. C. Parkway Landscaping Landscaped easements have been acquired for future parkway landscaping (see Exhibit 3 for diagram showing the location of future parkway landscaping). Sleeves will be installed to facilitate that project. These improvements will be deferred until the parkway landscaping project planned for the area west of Beltramo Ranch Road is constructed by the City. That project has been deferred pending identification of a funding source for maintenance costs. D. Storm Drain The project requires curbs which concentrate storm flow. During the development of the project design it was determined that it would be necessary to construct a storm drain to handle those concentrated flows - an unforeseen cost. The final project design includes the construction of that storm drain extending from the north end of S. Maureen Lane, to an existing storm drain inlet at the south end of S. Maureen Lane. The cost for this component of the work is listed in the section entitled Fiscal Impact. Beltramo awd 0501 OOOOG1. Los Angeles Avenue Widening Beltramo to Maureen Lane Award of Contract February 16, 2005 Page 4 E. Traffic Signal The project includes the construction of a traffic signal at the intersection of Maureen Lane and Los Angeles Avenue. Costs related to this component of the work are also listed in the section entitled Fiscal Impact. F. Interim Striping Design Proceeding west to east, the striping design provides for a transition from four (4) lanes to six (6) lanes between Tierra Rejada Road and Maureen Lane. The plan then provides for a transition back to the existing four (4) lanes east of Maureen Lane. An ultimate striping plan [not a part of the initial contract] shows the ultimate striping design [six (6) lanes] for the area east of Maureen Lane. This plan would be implemented when Los Angeles Avenue is widened east of the limits of this project. The striping plan for the area immediately east and west of Maureen Lane is compatible with the ultimate striping plan for the highway. G. Future Wideninq Project [Pacific Communities] Staff has been working with Pacific Communities on the development of an Agreement which will allow the City to undertake, on behalf of the developer, the construction of the widening of the south side of the street, east of the subject project. If agreement is reached, it would be the intent of staff to have that project designed and ultimately constructed. That project will include the construction of a traffic signal at the intersection of Los Angeles Avenue and Shasta Avenue. The project will also require the relocation and protection of an existing 24" Calleguas Water line locate in the area of the street widening. It will be necessary, therefore, for the City to enter into a separate Agreement with Calleguas, related to that waterline relocation / protection effort. H. Bid Results Bids for the subject project were received and opened on January 26, 2005. The apparent low bidder is Berry General Engineering, Inc., with a bid of $1,126,554.25. A summary of the bid results is attached as Exhibit 4. Beltramo awd 0501 OOOOG2 Los Angeles Avenue Widening Beltramo to Maureen Lane Award of Contract February 16, 2005 Page 5 It has been determined that the apparent low bidder is qualified to perform the work. Said bidder has confirmed that their bid is valid and that they are prepared to proceed with the construction of the project. At the time of the bid opening the apparent low bidder was J &H Engineering with a bid of $1,125,995.89. It was subsequently discovered that this bidder made an arithmetic error in the tabulation of their bid. With that error corrected, the adjusted bid amount for this bidder was $1,132,495.89, making J &H Engineering the second lowest bidder. I. DBE Compliance The bid documents require the apparent low bidder to compile and present to the City within four (4) calendar days of the bid opening, documents demonstrating either a) attainment of the stated goal for utilization of certified DBE (Disadvantage Business Enterprise) sub - contractors / suppliers, or b) a bonafide good -faith effort to do so. Compliance with Federal DBE requirements is a requirement of the Federal grant. The current DBE goal established by the City is ten percent (100) of the contract price. The documents presented by Berry Engineering listed DBE sub - contractors and suppliers providing work and /or material equal to 11.70 of the contract price. J. Engineer's Estimate The low bid is almost thirty percent (300) higher than the Engineer's Estimate. It is the view of the design Consultant and staff that this difference is primarily due to the recent increase in the cost of materials. Staff and the Consultant do not believe that any cost savings would result from re- advertising the project. We do not, therefore, recommend that the City Council reject all bids and direct staff to re- advertise the project. K. Construction Manaqement The City has retained the services of MSN Engineers to provide construction management and inspection services for this project. The estimated cost of those services is approximately $100,000. Beltramo_awd_0501 000063 Los Angeles Avenue Widening Beltramo to Maureen Lane Award of Contract February 16, 2005 Page 6 L. Traffic Control The contract documents require the contractor to maintain a minimum of two (2) lanes of traffic during peak traffic hours (before 9:00 a.m. and after 3:00 p.m.). M. Schedule It is anticipated that project construction will commence in April and be completed in September. N. Fiscal Impact 1. Bid Breakdown: A breakdown of the bid into grant eligible and non - eligible costs is as follows: 2. Project Cost Estimate: The estimated total project cost is summarized as follows: Description Grant L. A. AOC Total ($) Description Eligible ($) Fund ($) Total ($) Road Widening 211,435 245,764 457,199 Other Work 7,632 7,632 Traffic Signal 489 146,375 146,375 Storm Drain 363,208 1,126,554 363,208 Block Wall 97,008 55,132 152,140 Sub -Total 671,651 454,903 1,126,554 Less Local Share (141,651) 141,651 0 Total 530,000 596,554 1,126,554 2. Project Cost Estimate: The estimated total project cost is summarized as follows: Description Prior Years ($) FY 04/05 ($) Total ($) Design 174,458 15,542 190,000 Right -of -Way 130,079 4,921 135,000 Construction Prior Years 489 0 489 Bid Amount 1,126,554 1,126,554 Plus 10% Contingency 112,655 112,655 Total Construction 489 1,239,209 1,239,698 Inspection 0 100,000 100,000 Total 305,026 1,359,672 1,664,698 Beltramo_awd_0501 000064 Los Angeles Avenue Widening Beltramo to Maureen Lane Award of Contract February 16, 2005 Page 7 3. Prior Year Costs: A summary of project expenditures prior to July 2004, is as follows: Fiscal Year Design ($) R -O -W ($) Constr. ($) Total ($) FY 2000/01 176 0 176 FY 2001/02 97,591 18,565 116,156 FY 2002/03 52,069 111,506 489 164,064 FY 2003/04 24,622 9 0 24,631 Total 174,458 130,080 489 305,027 4. Current Budget Summary: The current Budget for the project is summarized as follows: Prior Years' Budget Total Description Expenses ($) FY04 /05 ($) Appropriations ($) Fund 2501: L A AOC 0 Design 174,458 5,566 180,024 Right -of -Way 130,080 1,993 132,073 Construction 489 544,890 545,379 Inspection 0 100,000 100,000 Sub -Total 305,027 652,449 957,476 Fund 2604: Federal Grant Construction Only 0 544,000 544,000 Total 305,027 1,196,449 1,501,476 5. Federal Grant Funding: The maximum grant funding authorized by the Supplemental Agreement approved by the City Council on January 19, 2005, is $442,789. However, in that the bids came in higher than the estimate used to calculate that figure, staff has been advised that Federal funding will be increased to the amount previously set forth in the STIP (State Transportation Improvement Program) - $530,000. A breakdown of the grant funding calculations for this project is as follows: Description Total ($) Total Participating Costs (Bid Schedule A) 671,650.00 Maximum Eligible Percentage 88.53% Total Eligible Costs 594,612.00 Authorized Funding Amount 530,000.00 Beltramo_awd_0501 000065 Los Angeles Avenue Widening Beltramo to Maureen Lane Award of Contract February 16, 2005 Page 8 6. Funding Sources: The funding sources and amounts shown in the FY 04/05 Budget are as follows: Prior FY 04/05 Funding Source Years ($) Funding ($) Total ($) Federal CMAQ Funds 530,000 530,000 L. A. AOC Fund 305,027 666,449 971,476 Total 305,027 1,196,449 1,501,476 7. Budget Amendment: Based on the above analysis, it will be necessary to amend the Budget as set forth in the attached Resolution (Exhibit 5) and summarized as follows: Current Propsed Revised Description Budget ($) Change ($) Budget ($) Fund 2501: L A AOC Design 5,566 9,976 15,542 Right -of -Way 1,993 2,928 4,921 Construction 544,890 164,319 709,209 Constr. Mgmnt. / Insp. 100,000 0 100,000 Sub -Total 652,449 177,223 829,672 Fund 2604: Federal CMAQ Grant Construction 544,000 (14,000) 530,000 Total FY 04/05 Budget 1,196,449 163,223 1,359,672 Plus Prior Years Expenditures 305,027 Total Project Appropriations 1,664,699 0. Administrative Actions If the recommended action is taken by the City Council, certain administrative actions will be undertaken by staff, including the following: • A construction contract agreement will be forwarded to the contractor for the construction of the project, for the contract price of $1,126,554.25. • When all of the contract documents are in order, the agreement will be executed by the City Manager. • A construction contingency of $112,656.00 (100) will be set aside for the project. Beltramo awd 0501 OOOOGG Los Angeles Avenue Widening Beltramo to Maureen Lane Award of Contract February 16, 2005 Page 9 STAFF RECODMENDATIONS (Roll Call Vote) 1. Approve the award of a construction contract to Berry General Engineering, Inc. for the construction of the subject project. 2. Adopt Resolution No. 2005- Attachmen Exhibit Exhibit Exhibit Exhibit Exhibit ts. 1: 2: 3: 4: 5: Project Plan Right -of -Way Landscape Easements Bid Results Resolution Beltramo_awd_0501 000067 Exhibit 1 ?�- 1 1 . w cc m Q c� Q Q W d! ac � F Seltramol 000068 m rt rt h a 0 SECTION 118' 8' f 59 C – — -- - -- - - - -- 29� 8' C L --- - - - - -- Existing R -O -W 89' 29' DETAIL R -O -W Acquisition and Widening Proposed R -O -W Acquisition and Street Widening 4 8' N a --I M t-� rt ►-+ Exhibit 2. , 54- _ BFLT P-4) Mo Beltramol i X01 29 r 0 z r- 0000'70 tT 16 See FC, J CL I Pill® 1 t. w Lj _j a a oa- cL �� a V SO�o w 0 EXHIBIT 3 — Page j Landscaped Areas L IS 3 � � U H F- a cn a R a � � v o *i l z Lj ci *z9- l o a I EXHIBIT 3 - Page 2 Landscaped Areas WT OA U M G 0000'72 City of Moorpark Bid Results: Los Angeles Avenue Improvements at Beltramo Exhibit 4 [File # bid beltramo] Page I of 4 Bidder » »> Vendor I Vendor 2 Bid Opening: Name: Engineer's Estimate Berry General Engineering, Inc. J & H Engineering, Inc. January 26, 2005 Address: 350 W. Lewis Road 79 Daily Drive, #69 City, State: Ventura, CA 93001 Camarillo, CA 93010 Tel. No.: (805) 643 -7567 (805) 987 -8414 Contact Person: Rob Sainsbury Howard Janotta Item Description Est Qty Units Unit Cost Total Bid Unit Cost Total Bid Unit Cost Total Bid Improvements A. Pedestrian / Bicycle and Related Al Mobilization 1 LS 8,000 8,000.00 55,845.00 55,845.00 26,000.00 26,000.00 A2 Traffic Control 1 LS 25,000 25,000.00 22,575.00 22,575.00 44,275.00 44,275.00 A3 Clearing & Grubbing 1 LS 4,000.00 4,000.00 6,152.00 6,152.00 8,500.00 8,500.00 A4 Potholing Utilities 1 LS 3,500.00 3,500.00 13,158.00 13,158.00 2,800.00 2,800.00 A5 Stret Light Conduits I LS 0.00 0.00 0.00 0.00 A6 Caltrans Permit 1 LS 1,660.00 1,660.00 1,660.00 1,660.00 1,660.00 1,660.00 A7 Remove Trees /Stumps 2 EA 1,500.00 3,000.00 1,101.00 2,202.00 1,850.00 3,700.00 A8 Roadway Excavation 450 M3 15.00 6,750.00 37.90 17,055.00 48.88 21,996.00 A9 Roadway Fill 75 M3 25.00 1,875.00 51.65 3,873.75 47.04 3,528.00 A10 Class II Base 203 M3 42.00 8,526.00 31.40 6,374.20 164.00 33,292.00 All Cold Plane AC Pvmnt 131 M2 1.75 229.25 10.50 1,375.50 30.00 3,930.00 Al2 Reinforcing Fabric 131 M2 1.25 163.75 2.95 386.45 3.83 501.73 A13 A C Pavement 795 T 62.00 49,290.00 56.00 44,520.00 56.20 44,679.00 A14 A2 -200 Curb /Gutter 281 M 60.00 16,860.00 51.10 14,359.10 68.60 19,276.60 A15 Sidewalk 535 M2 60.00 32,100.00 28.30 15,140.50 33.24 17,783.40 A16 Commercial Driveways 58 M2 100.00 5,800.00 45.50 2,639.00 45.43 2,634.94 A17 Curb Ramps 4 EA 2,500.00 10,000.00 514.00 2,056.00 850.00 3,400.00 A18 Modified Curb 12 M 45.00 540.00 50.00 600.00 47.00 564.00 A19 Residential Driveways 18 M2 65.00 1,170.00 31.80 572.40 44.85 807.30 A20 Adjust Water Valves 2 EA 125.00 250.00 445.00 890.00 275.00 550.00 A21 Traffic Control Maureen I LS 10,000 10,000.00 20,545.00 20,545.00 4,500.00 4,500.00 A22 Shoring 1 LS 7,500 7,500.00 3,755.00 3,755.00 2,500.00 2,500.00 A23 450 mm RCP 205 M 300.00 61,500.00 443.00 90,815.00 275.00 56,375.00 A24 C/B [Detail D /S -3] 1 EA 7,000.00 7,000.00 12,331.00 12,331.00 11,525.00 11,525.00 A25 June Structure 1 EA 5,000.00 5,000.00 4,476.00 4,476.00 3,998.00 3,998.00 A26 Catch Basin 2 EA 3,500.00 7,000.00 5,335.00 10,670.00 5,142.00 10,284.00 A27 Local Depression 2 EA 650.00 1,300.00 375.00 750.00 475.00 950.00 A28 SD Manhole 5 EA 4,500.00 22,500.00 4,610.00 23,050.00 4,175.00 20,875.00 A29 RCB 133 M 820.00 109,060.00 1,462.00 194,446.00 1,355.00 180,215.00 A30 80mm Cone Pad 2 M3 330.00 660.00 1,185.00 2,370.00 1,200.00 2,400.00 A31 Masonry 344 M2 215.00 73,960.00 282 97,008.00 265.65 91,383.60 A32 Release I LS 1.00 1.00 1.00 1.00 1.00 1.00 Sub -Total 484,19500 671,650.90 624,884.57 000073 City of Moorpark Bid Results: Los Angeles Avenue Improvements at Beltramo Exhibit 4 [File # bid beltramo] Page 2 of 4 Bidder » »> Vendor 1 Vendor 2 Bid Opening: Name: Engineer's Estimate Berry General Engineering, Inc. J & H Engineering, Inc. January 26, 2005 Address: 671,650.90 350 W. Lewis Road 79 Daily Drive, #69 428,657.83 City, State: 594,612.54 Ventura, CA 93001 Camarillo, CA 93010 530,000.00 Tel. No.: 530,000.00 (805) 643 -7567 428,657.83 (805) 987 -8414 Contact Person: Rob Sainsbury 530,000.00 Howard Janotta 530,000.00 Item Description Est Qty Units Unit Cost Total Bid Unit Cost Total Bid Unit Cost Total Bid 94,884.57 Plus Schedule B I 388,303.50 454,903.35 B. Street & Signal Work B1 Demolition & Removal 1 LS 40,000 40,000.00 30,000.00 30,000.00 6,500 6,500.00 B2 R &R Road Signs 6 EA 150.00 900.00 225.00 1,350.00 210.00 1,260.00 B3 New Signs B4 Roadway Excavation 4 EA 1,050 M3 200.00 15.00 800.00 177.00 708.00 198.00 792.00 15,750.00 37.90 39,795.00 33.35 35,017.50 B5 Roadway Fill 175 M3 25.00 4,375.00 51.65 9,038.75 47.04 8,232.00 B6 Class II Base 567 M3 42.00 23,814.00 31.40 17,803.80 164.00 92,988.00 B7 Cold Plane AC Pvmnt 654 M2 1.75 1,144.50 10.50 6,867.00 7.20 4,708.80 B8 Reinforcing Fabric 784 M2 1.25 980.00 2.95 2,31180 3.83 3,002.72 B9 A C Pavement 1310 1,935 T 6100 1 19,970.00 56.00 108,360.00 59.20 114,552.00 Manhole Adjust 2 EA 350.00 700.00 840.00 1,680.00 350.00 700.00 Bl l Irrigation Sleeves 72 M 33.00 2,376.00 56.00 4,032.00 43.40 3,124.80 B12 Controller Wire Conduit 72 M 23.25 1,674.00 50.00 3,600.00 47.00 3,384.00 B13 Sriping & Marking 1 LS 4,000.00 4,000.00 26,125.00 26,125.00 28,740.00 28,740.00 B14 Pavement Markings l LS 2,000.00 2,000.00 1,340.00 1,340.00 1,475.00 1,475.00 B15 Delineators 8 EA 70.00 560.00 48.00 384.00 54.00 432.00 B16 Signal. Lighting, Elec. 1 LS 140,000 140,000.00 146,375.00 146,375.00 154,000 154,000.00 B17 Block / Wrought Iron 154 M2 190 29,260.00 358.00 55,1 32.00 316 48,702.50 Sub -Total 388,303.50 454,903.35 507,61 1.32 Total 872,498.50 1,126,554.25 1,132,495.89 I. Federal Funding Summary 484,195.00 671,650.90 624,884.57 Total Bid Schedule A Total Participating Costs 484,195.00 671,650.90 624,884.57 Eligible Costs Max Fed. Funding 88.53% 428,657.83 594,612.54 553,210.31 Total Federal Amount 530,000.00 530,000.00 530,000.00 428,657.83 530,000.00 530,000.00 I1. Total Local Cost Local Share Portion of Bid Schedule A 55,537.17 141,650.90 94,884.57 Plus Schedule B I 388,303.50 454,903.35 507,61 1.32 443,840.67 596,554.25 602,495.89 Total Project Funding [I +II] 872,498.50 1,126,554.25 1,132,495.89 I 000074 City of Moorpark Bid Results: Los Angeles Avenue [File # bid beltramo] Improvements at Beltramo Exhibit 4 Page 3 of 4 Bid Opening: Vendor 3 Vendor 4 Vendor 5 Name: Nye & Nelson, Inc. January 26, 2005 Address: 1860 Eastman Avenue, # 108 City, State: Ventura, CA 93003 Tel. No.: (805) 654 -1682 Contact Person: Wendy GorrelI Item Description Est Qty Units Unit Cost Total Bid Total Bid Unit Cost Total Bid Improvements A. Pedestrian / Bicycle and Related Al Mobilization A2 Traffic Control 1 LS 1 LS 66,000 42,000 66,000.00 42,000.00 0.00 0.00 0.00 0.00 A3 Clearing & Grubbing A4 Potholing Utilities 1 LS 1 LS 12,000.00 11,000.00 12,000.00 11,000.00 0.00 0.00 0.00 0.00 A5 Stret Light Conduits A6 Caltrans Permit 1 LS I LS 100.00 1,660.00 100.00 1,660.00 0.00 0.00 0.00 0.00 A7 Remove Trees /Stumps A8 Roadway Excavation 2 EA 450 M3 930.00 38.00 1,860.00 17,100.00 0.00 0.00 0.00 0.00 A9 Roadway Fill A10 Class II Base 75 M3 203 M3 56.00 52.00 4,200.00 10,556.00 0.00 0.00 0.00 0.00 A 1 1 Cold Plane AC Pvmnt Al2 Reinforcing Fabric 131 M2 131 M2 37.00 1.75 4,847.00 229.25 0.00 0.00 0.00 0.00 A13 A C Pavement A14 A2 -200 Curb /Gutter 795 T 281 M 61.50 60.00 48,892.50 16,860.00 0.00 0.00 0.00 0.00 A15 Sidewalk A16 Commercial Driveways 535 M2 58 M2 30.50 51.00 16,317.50 2,958.00 0.00 0.00 0.00 0.00 A17 Curb Ramps A18 Modified Curb 4 EA 12 M 1,400.00 43.00 5,600.00 516.00 0.00 0.00 0.00 0.00 A 19 Residential Driveways A20 Adjust Water Valves 18 M2 2 EA 51.00 330.00 918.00 660.00 0.00 0.00 0.00 0.00 A21 Traffic Control Maureen A22 Shoring 1 LS 1 LS 11,000 4,000 11,000.00 4,000.00 0.00 0.00 0.00 0.00 A23 450 mm RCP A24 C/B [Detail D /S -3] 205 M 1 EA 470.00 13,000.00 96,350.00 13,000.00 0.00 0.00 0.00 0.00 A25 Junc Structure A26 Catch Basin I EA 2 EA 4,600.00 5,500.00 4,600.00 11,000.00 0.00 0.00 0.00 0.00 A27 Local Depression A28 SD Manhole 2 EA 5 EA 400.00 4,800.00 800.00 24,000.00 0.00 0.00 0.00 0.00 A29 RCB A30 80mm Conc Pad 133 M 2 M3 1,500.00 1,400.00 199,500.00 2,800.00 0.00 0.00 0.00 0.00 A31 Masonry A32 Release 344 M2 1 LS 290.00 1.00 99,760.00 1.00 0.00 0.00 0.00 0.00 Sub -Total 731,085.25 0.00 0.00 0000'75 City of Moorpark Bid Results: Los Angeles Avenue [File # bid beltramo] Improvements at Beltram o Exhibit 4 Page 4 of 4 Bid Opening: Vendor 3 Vendor 4 Vendor 5 Name: Nye & Nelson, Inc. January 26, 2005 Address: 1860 Eastman Avenue, # 108 City, State: Ventura, CA 93003 Tel. No.: (805) 654 -1682 Contact Person: Wendy Gorrell Item Description Unit Cost Total Bid Total Bid Est Qty Units Unit Cost Total Bid B. Street & Signal Work B1 Demolition & Removal B2 R &R Road Signs l LS 6 EA 23,000 230.00 23,000.00 1,380.00 0.00 0.00 0.00 0.00 B3 New Signs B4 Roadway Excavation 4 EA 1,050 M3 260.00 38.00 1,040.00 39,900.00 0.00 0.00 0.00 0.00 B5 Roadway Fill B6 Class II Base 175 M3 567 M3 56.00 52.00 9,800.00 29,484.00 0.00 0.00 0.00 0.00 B7 Cold Plane AC Pvmnt B8 Reinforcing Fabric 654 M2 784 M2 7.00 1.75 4,578.00 1,372.00 0.00 0.00 0.00 0.00 B9 A C Pavement BIO Manhole Adjust 1,935 T 2 EA 56.00 600.00 108,360.00 1,200.00 0.00 0.00 0.00 0.00 611 Irrigation Sleeves B12 Controller Wire Conduit 72 M 72 M 38.00 57.00 2,736.00 4,104.00 0.00 0.00 0.00 0.00 B13 Sriping & Marking B14 Pavement Markings 1 LS 1 LS 26,000.00 2,300.00 26,000.00 2,300.00 0.00 0.00 0.00 0.00 B15 Delineators B16 Signal. Lighting, Elec. 8 EA 1 LS 110.00 154,000 880.00 154,000.00 0.00 0.00 0.00 0.00 B17 Block / Wrought Iron 154 M2 462 71,148.00 0.00 0.00 Sub -Total 481,282.00 0.00 0.00 Total 1,212,367.25 0.00 0.00 PROJECT FUNDING BREAKDOWN I. Federal Funding Summary 731,085.25 0.00 0.00 Total Bid Schedule A Total Participating Costs 731,085.25 0.00 0.00 Eligible Costs Max Fed. Funding Total Federal Amount 88.53% 647,229.77 530,000.00 0.00 0.00 0.00 0.00 530,000.00 0.00 0.00 11. Total Local Cost Local Share Portion of Bid Plus Schedule B Schedule A 201,085.25 481,282.00 0.00 0.00 0.00 0.00 682,367.25 0.00 0.00 Total Project Funding [I + II] 1,212,367.25 0.00 0.00 000076 RESOLUTION NO. 2005- Exhibit 5 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MOORPARK, CALIFORNIA, AMENDING THE FY 2004/05 BUDGET TO REVISE THE AMOUNTS OF THE APPROPRIATIONS AND BUDGET FOR PROJECT 8003: LOS ANGELES AVENUE WIDENING BELTRAMO RANCH ROAD TO MAUREEN LANE [L. A. AVE. AOC FUND (FUND 2501) AND ISTEA FEDERAL GRANT FUND (FUND 2604)] WHEREAS, on June 16, 2004, the City Council adopted the Budget for Fiscal Year 2004/05; and WHEREAS, a staff report has been presented to the City Council requesting a budget increase in the aggregate amount of $163,223; and WHEREAS, Exhibit "A ", attached hereto and made a part hereof, describes said budget amendment and its resultant impacts to the budget line item(s). NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF MOORPARK DOES HEREBY RESOLVE AS FOLLOWS: SECTION 1. That a Budget amendment in the aggregate increase of $163,223, as more particularly described in Exhibit "A", is hereby approved. SECTION 2. The City Clerk shall certify to the adoption of this resolution and shall cause a certified resolution to be filed in the book of original resolutions. PASSED AND ADOPTED this 16th day of February, 2005. ATTEST: Patrick Hunter, Mayor Deborah S. Traffenstedt, City Cler Attachment: Exhibit 'A': Appropriation and Budget Detail 00007'7 Resolution No. 2005 - Exhibit "A" Revised Appropriations & Budget For Project 8003: Los Angeles Avenue Widening Beltramo Ranch Road to Maureen Lane A. Fund Allocation ............................................................................................................................................................................................................................................................................................................................................................................................................................... .Fund Account Number ............................... Amount L A Ave AOC Fund 2501.8310.8003.5500 ............. ..............177,223 . .................... . ....................... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..................................................... ax Fund . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2604.8310.8003.5500 . . . . . . . . . . . . . .. . $ (14,000) !, ....................................... . . . . . . . . . ............... . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 163,223 B. FY 04/05 Budget Re -Cap .. ....................................................................................................................................................................................................................................................................................................................... Current: Subject: ............................... Revised: FY 04/05; Appropriation; FY 04/05 :...Account Number . et ,..../ (Reduction) Budget: 2501.8310.8003.xxxx ...................... ............................... ............................Bud $ 652,449: $ 177,000 $ 829,672 2604.8310.8003.xxxx $ 544,000: $ (14,000);$ 530,000: $ 1,196,449 $ 163,223 $ 1,359,672 C. Distribution of Appropriations to Expense Accounts .................. . ............................................... ........... . . . .. . . . . . .................... . . . . . . . . ... ......... . . .............................. . . . . . . ................ . . ............................... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .............. ... . . . . . . . . . . . . . . . . .. .. . . . . . . . . ..... Current: Subject' .. .. . . . . . . . . . . . .. . . . . . .. . . . . . . . . . . . . . . . . . . . . . . .. . . . ... . . FY 04/05; Appropriation; FY 04/05: ..Account Number ! Budget! / (Reduction); Budget. 2501.8310. 8003. 9601: ..................................._........._......................_..............................................:............................................................................_.........................._............................_.. Design $ 5, 566 $ 9, 976 ............._................. _._.........._...._._...._......_.........._... $ 15,542 ............................... _ .. _...: 2..5..0..1... .....8..3_.1..0........8._0..03 ........9..6.1..0...._......... ........_ ................................................................................................................................................................................................................................................... R._.0._W ........:....$.. 1, 993 $ 2, 928 ........................... ......._.._._.............:.._. _...._._................................................._................:...._................................._............................................................_:............................................................. ............................... $ 4, 921 ............................... .................... _.................._........... 2501.8310.8003.9640: _......................................................................................................................................................._................................................................................_............................................_..................... Const. $ 544,890 $ 164,319 .........................._.... $ 709,209 2604.8310.8003.9640: ... . ........ . . . . . . . . . . . . ..... . . . . . . . : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . Const. $ 544,000; $ (14,000): $ 530,000 ............ . . . . . . . ................. . ............................ . .............. . . . . . . . . . . . . ........... ........................................................................................................................................................................................................................................................................................................................................................................................................................................................................ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . 1,088,890 150,319 $1,239,209 ............................... - 2 5 01.....8.3.1..01..8.0 03...E .9..6.5.0_.._ .................... . . . . . ........................................_.. . . . . . . . . . . . ...... . . . . . . . . . . . ...... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .... . . . . . . . . ................. ......._I.n s. p ....... ............................... . $ 100,000 $ 0 . . . . . . . . ......... . . . . . ........................... ............................... $ 100,000; .............._..._..._....................._.........................................................................................._................................. Total ........... ........... .]............................. Pro'ect $1 196,449: $ 163,223 ...... ........ ................. ...... ......... . $1,359 672!. .......... ._. _... , Approved as to form: