HomeMy WebLinkAboutAGENDA REPORT 2005 0302 CC REG ITEM 10I�0• _. CITY OF MOORPARK, CALIFORNIA City Council Meeting of 3' AC11ON: MOORPARK CITY COUNCIL sy. AGENDA REPORT TO: Honorable City Council FROM: Barry K. Hogan, Community Development Directo Prepared By: David A. Bobardt, Planning Mana e DATE: February 14, 2005 (CC Meeting of 3/2/2005) SUBJECT: Consider Authorizing Amendment of a Contract with BonTerra Consulting for the Preparation of an Environmental Impact Report (EIR) and Related Documents for the North Park Village and Nature Preserve Specific Plan Project BACKGROUND /DISCUSSION On November 15, 2002, BonTerra Consulting entered into a professional services agreement with the City to provide an EIR and related services for the North Park Village and Nature Preserve Specific Plan. This contract, originally for $580,685.60, was amended once in August 2003, for additional botanical surveys. The current agreement totals $620,433.60. On January 27, 2005, BonTerra Consulting submitted to the City a proposed amendment to the scope of services for the North Park EIR. This proposed amendment, for $183,212.53 would take the total contract to $803,646.13. The proposal includes a number of items previously requested by staff, the Planning Commission, City Council, and other agencies as part of the EIR review process, along with additional anticipated work outside the current scope of services. Staff has reviewed the proposal and has found it in line with the services needed to complete the EIR for this project. The applicant has agreed to cover the expenses in the proposal, plus a 15% City administrative fee. STAFF RECOMMENDATION Authorize the City Manager to negotiate and enter into an amendment to the professional services agreement with BonTerra 000319 Honorable City Council March 2, 2005 Page 2 Consulting for the environmental services included in the January 27, 2005 proposal, at a cost not to exceed $183,212.53, upon receipt of payment from the project applicant, including the City administrative fee. Attachment: BonTerra Proposal (1/27/2005) 000320 C O N S U L T I N G An Environmental Planning /Resource Management Corporation BonTerra Consulting has and continues to be committed to the City of Moorpark to prepare quality products in the most efficient method { Y p possible. This budget augment request includes both costs incurred to date by the BonTerra Consulting l Project Team but not billed to the Cit , and anticipated costs associated with the completion of work tasks by our project team. The requested budget augment is provided to the City as Attachment 1 to this letter. Draft EIR The scope of work assumed the preparation of a Screencheck EIR, one review 151 Kalmus Drive cycle for revisions to the Screencheck EIR, and one "proof check" Draft EIR for review by the City of Moorpark for final approval prior to reproduction and public Suit_- E 200 distribution. While there were several changes during the preparation of the Screencheck EIR, BonTerra Consulting was able to absorb the additional costs. Costa Mesa However, BonTerra Consulting was not able to continue absorbing these costs. Several factors occurred during the preparation of the draft Program EIR which California 92626 required the BonTerra Consulting Project Team to expend additional funds. (714) 444 -9199 17141 444 -9599 [a< CC ATTACHMENT \/V~,1 bonterraconsultin�i r orn 000321 January 27, 2005 Mr. David Bobardt VIA FACSIMILE AND MAIL Planning Manager (805) 529 -8270 Community Development Department City of Moorpark 799 Moorpark Avenue Moorpark, California 93021 Subject: Request for Budget Augment for the North Park Village and Nature Reserve Project Dear Mr. Bobardt: l The purpose of this letter is to request a budget augment for the North Park Village and Nature Preserve (North Park) project. BonTerra Consulting's contract with the City of Moorpark is for the preparation of CEQA documents for the proposed Specific Plan residential development. For each task, a budget was provided to the City based on the anticipated work effort needed to complete each task. I BonTerra Consulting, the City, and the project applicant understood that, because /A of the controversy associated with the proposed project, unanticipated T� occurrences can affect a scope of services. With respect to the North Park Home project, several factors resulted in changes in BonTerra Consulting's scope. These factors included, but were not limited to, an expansion of the scope of services for the BonTerra Consulting Project Team, extensive comments on the Draft EIR, and an extended project schedule. BonTerra Consulting has and continues to be committed to the City of Moorpark to prepare quality products in the most efficient method { Y p possible. This budget augment request includes both costs incurred to date by the BonTerra Consulting l Project Team but not billed to the Cit , and anticipated costs associated with the completion of work tasks by our project team. The requested budget augment is provided to the City as Attachment 1 to this letter. Draft EIR The scope of work assumed the preparation of a Screencheck EIR, one review 151 Kalmus Drive cycle for revisions to the Screencheck EIR, and one "proof check" Draft EIR for review by the City of Moorpark for final approval prior to reproduction and public Suit_- E 200 distribution. While there were several changes during the preparation of the Screencheck EIR, BonTerra Consulting was able to absorb the additional costs. Costa Mesa However, BonTerra Consulting was not able to continue absorbing these costs. Several factors occurred during the preparation of the draft Program EIR which California 92626 required the BonTerra Consulting Project Team to expend additional funds. (714) 444 -9199 17141 444 -9599 [a< CC ATTACHMENT \/V~,1 bonterraconsultin�i r orn 000321 Mr. David Bobardt January 27, 2005 Page 2 BonTerra Consulting was requested to make revisions to the document based on new information. This included the assessment of new /modified alternatives (including Design Alternative 3) and additional geotechnical information regarding the landslide potential and lake feasibility, changes in significance thresholds, and most significantly additional rounds of review by the applicant and the applicant's legal counsel. BonTerra Consulting worked closely with City staff to address comments on /revisions to the Screencheck EIR based on an ongoing dialogue between the City, applicant, and the applicant's legal counsel. The receipt of electronic comments facilitated revisions; however, these included often daily modifications to the CEQA documentation. The second Screencheck EIR was submitted to the City in early March 2003; revisions were made between March and July when the document went out for public review. Responses to Comments BonTerra Consulting's scope of work assumed 140 technical hours for the preparation of responses to comments. The scope noted that a budget augment would be required for additional work. To date, BonTerra Consulting has billed the City $28,207.50 (the task budget was $28,200) and spent 265 hours. We were able to spend more hours for the same budget by using staff at a lower billing rate than assumed in the scope. However, extensive work efforts were accomplished by the BonTerra Consulting Project Team beyond that assumed in our scope of services. Included in this additional work effort were the following tasks: • Preparation of additional responses to comments beyond that assumed in our scope of services, including comments received after the close of the Draft EIR review period. • Preparation of a recirculated Draft EIR for the freeway traffic analysis. Based on comments received on the Draft Program EIR, the City determined that a freeway traffic analysis was required. Because this analysis identified new unavoidable impacts not addressed in the Draft EIR, recirculation was required. Preparation of this document was not assumed in the scope of services. • Preparation of responses to comments on the recirculated Draft EIR. Preparation of responses to comments was not assumed in BonTerra Consulting's scope of services. • Preparation of a redline /strikeout Final EIR integrating the responses to comments, additional analysis, etc. Preparation and distribution of a redline /strikeout document during the Planning Commission phase of the project was not assumed in the scope of services. Although a portion of the costs incurred for this work effort were compensated through the reassignment of funds from Task 7, the work effort was more extensive. Project Management and Coordination The extended project schedule and expanded scope required additional work efforts beyond those assumed in BonTerra Consulting's scope of services. These additional efforts included additional management and coordination hours with City staff, the project applicant, and the project team. BonTerra Consulting's original scope of work assumed a 12 -month schedule. Attendance at Meetings and Hearings BonTerra Consulting attended more meetings and hearings than was assumed in our scope of services. Included in this category are additional telephone conference calls, site visits, project 000322 Mr. David Bobardt January 26, 2005 Page 3 team meetings, and public hearings, as well as staff support for staff reports. Our budget assumed 300 hours of project team meetings /public hearings and that the attendance at additional meetings and hearings would be billed on a time and materials basis. BonTerra Consulting has billed the City $41,254 (332.3 hours). Because of the protracted schedule and the expansion of work efforts, additional costs have been incurred but not billed to the City associated with the attendance at public hearings, site visits with Santa Monica Mountains Conservancy, field investigation following the wildfires, and staff report research of topics including West Nile virus, valley fever, hazardous materials, traffic, and biology. Mitigation Monitoring Program Additional work efforts were required for the preparation of the draft Mitigation Monitoring Program beyond that assumed in our scope. Oak Tree Survey In addition to the above mentioned work efforts, BonTerra Consulting conducted additional work at the request of the City and project applicant. The primary costs were associated with conducting a tree survey. Our scope assumed reliance on tree surveys previously conducted for the project site. In our review of existing documentation, it was determined that portions of the site were never mapped for trees (the trees were outside of the development area proposed for the Hidden Creek project), but would be affected by the North Park Village project. There were portions of the site where oak tree data appeared to have been gathered but the trees were never mapped or tagged, and our field checking of the tree data indicated that the mapping is not accurate. At the direction of the City and applicant, oak tree surveys were conducted for portions of the project site that had not been surveyed and /or accurately surveyed but would be impacted by development. This work effort included oak tree surveys, report preparation and mapping, assessment of impacts based on multiple criteria related to fuel modification assumptions, and direct costs. Support Services: Word Processing, Editing, Graphics BonTerra Consulting has incurred additional costs associated with these services due to additional work efforts, including the conversion of CAD files into usable GIS files. Direct Costs Additional funds were expended by BonTerra Consulting associated with the distribution of project documents. BonTerra Consulting Team Technical Analyses The BonTerra Consulting Team conducted additional technical studies, at the request of the City and project applicant. Specifically, Leighton and Associates, Font Design, and Kenney /Jenks Consultants prepared extensive new and expanded analyses. We have also identified an anticipated budget for completion of the North Park documentation. Funds have been identified for revisions to and /or preparation of the Mitigation Monitoring Program, Findings, and Final EIR, as well as project management, attendance at three public hearings and participation in project team meetings. 000323 Mr. David Bobardt January 26, 2005 Page 4 We look forward to continuing to work with the City of Moorpark on this challenging project. Please contact me at (714) 444 -9199 if have any questions or require additional information on the content of this letter. Sincerely, BONTERRA CONSULTING xl' Dana C. Privitt, AICP Associate Principal Attachment R:1Projects\Moorpark \J003\Aug men t- 012705. doc 000324 City of Moopark North Park Specific Plan No. 2001 -01 EIR Labor Tasks Costs Incurred but Task Initial Task Budget Remaining Budget Not Billed Moving Forward 1. Project Initiation $6,150.00 $0.00 $0.00 $ 2. Screencheck EIR $227,883.00 0.00 $0.00 $ 3. Second Screencheck/Draft EIR $19,020.00 0.00 $28,351.50 $ 4. Responses to Comments $28,200.00 0.00 $28,682.50 $ 5. Mitigation Monitoring Program $3,340.00 0.00 $1,259.00 $ 1,670.00 6. Findings of Fact $4,600.00 $0.00 $0.00 $ 2,300.00 7. Final EIR $4,980.00 $0.00 $0.00 $ 4,980.00 8. Project Management & Coordination $31,385.00 $0.00 $2,695.00 $ 7,560.00 9. Team Meetings & Hearings (inclusive of telephone conference calls, field trips, research) $41,250.00 $0.00 $28,413.00 $ 14,420.00 Word Processing, Editing, Graphics, Clerical $24,663.00 $0.00 $2,276.50 $ 3,000.00 Total Professional Fees $391,471.00 $0.00 $91,677.50 $ 33,930.00 DIRECT EXPENSES Costs Incurred but Item Task Budget Remaining Budget Not Billed Moving Forward Postage (including Draft EIR distribution) $1,250.00 $0.00 POF documentation $6,500.00 $0.00 $ 585.00 In -house reproduction /communication $11,744.00 $0.00 $ 3,768.23 Deliveries /mileage $3,900.00 $0.00 $545.19 $ 395.16 Project expenses $2,500.00 $0.00 $70.27 $ 150.00 Total Direct Fees $25,894.00 $0.00 $615.46 $ 4,898.39 SUBCONSULTANTS AND NEW WORK TASKS Costs Incurred but Item Task Budget Remaining Budget Not Billed Moving Forward Font Design EIR Analysis $24,000.00 $0.00 Oblique Aerial Visual Simulation $4,200.00 $0.00 Additional Visual Simulations $3,000.00 $0.00 Council Requested Visual Simulations $0.00 $0.00 $12,600.00 $3,000.00 JHA Environmental Consultants Air Quality $6,500.00 $0.00 Leighton and Associates Geotechnical Analysis $21,300.00 $0.00 Lake Geotechnical Investigation $16,600.00 $0.00 Water Tank Geotechnical Assessment $11,500.00 $0.00 Public Hearing Attendance $0.00 $0.00 $1,793.83 Mestre Greve Associates Noise $5,400.00 $0.00 RBF Consulting Hydrology and Water Quality $52,100.00 $0.00 Kennedy /Jenks Consultants Lake Water Assessment $0.00 $0.00 $12,925.03 BonTerra Consulting Oak Tree Survey (2002) $0.00 $0.00 $19,650.00 Focused Plant Survey $39,748.00 $0.00 Cultural Resources Assessment $6,800.00 $0.00 Aesthetics Section Revisions $3,000.00 $0.00 Subconsultant Handling $13,008.00 $0.00 $1,912.32 $210.00 Total Subconsultant Fees $207,156.00 $0.00 $48,881.18 $3,210.00 Budget Augment Request (Costs Incurred) $141,174.14 Budget Augment Request (Moving Forward) $42,038.0 A R 1P1- 1-N*4O Pxk1J003V, g9 m' 13-- l- 012705 � s =,7 2