Loading...
HomeMy WebLinkAboutAGENDA REPORT 2020 0617 CCSA REG JNT DC ITEM 10OCITY OF MOORPARK, 
CALIFORNIA City Council Meeting of June 17, 2020 ACTION Approved staff recommendation. BY B.Garza. O. Consider Amendment No. 1 to Siemens Mobility, Inc., for Streetlight Turnkey Services. Staff Recommendation: Authorize the City Manager to sign Amendment No. 1 to the Agreement with Siemens Mobility, Inc., increasing the not-to-exceed amount of $726,621.48 to $762,462.18, subject to final language approval of the City Manager. (Staff: Shaun Kroes) Item: 10.O. MOORPARK CITY COUNCIL AGENDA REPORT TO: Honorable City Council FROM: Sean Corrigan, City Engineer/Public Works Director BY: Shaun Kroes, Program Manager DATE: 06/17/2020 Regular Meeting SUBJECT: Consider Amendment No. 1 to Siemens Mobility, Inc., for Streetlight Turnkey Services BACKGROUND AND DISCUSSION On November 30, 2018, the City executed an Agreement with Siemens Mobility, Inc. (Siemens), for streetlight turnkey services for the purpose of acquiring streetlights from Southern California Edison (SCE) and then converting them from high pressure sodium (HPS) to light emitting diode (LED) fixtures. The first phase of the service was performing a system-wide field audit of approximately 2,627 SCE poles, identifying which poles could be purchased from SCE. The first phase also included Siemens developing up to five photometric studies of roadways, such as major arterial roadways, collector streets, residential streets, commercial streets, and industrial streets. The studies and evaluation of typical roadway geometries guided Siemens and the City in determining fixture selection and design process. Eventually, the City acquired 2,229 SCE poles, with a combined 2,363 fixture heads (including decorative lights on High Street, single-mast poles and double-mast poles). As City Council recalls, the City took ownership of approximately 2,219 poles in September 2019, and the remaining 10 poles later in the year. Staff originally expected the conversion of HPS to LED lights to occur within the first two months of acquisition of the streetlights; however, selection of the LED fixture took longer than expected as the City extended the length of time that sample LED fixtures were under display for a thorough evaluation by staff and the community. An additional fixture was added (increasing the total number of models from 3 to 4). A fixture comparison document was provided to the City January 13, 2020, and after a follow-up meeting with Siemens staff, a revised fixture selection was submitted on January 22, 2020. During February 2020 the City worked with Siemens to select a pole tag design. During the last two weeks of February, Siemens updated their supplier quotes and prepared the fixture selection document as well as initiated pole tag orders. The final fixture design Agreement was signed by the City on March 5, 2020, which laid out the final fixture selection for procurement. Item: 10.O. 423 Honorable City Council 06/17/2020 Regular Meeting Page 2 During Siemens’ purchase order process, suppliers began to warn Siemens of potential delivery delays due to Coronavirus Disease 2019 pandemic (COVID-19) and ultimately Siemens’ supplier confirmed lead times were running longer than expected due to closures at manufacturing plants. During the first week of April, Siemens was informed that the Leotek facility (fixture manufacturer) had been shut down. At the time of the drafting of this staff report, delivery of the LED fixtures, known as “cobra heads”, has been completed and conversion of the majority of the streetlights to LED has started beginning the week of June 8, 2020. The City is also in the process of evaluating a specialized LED fixture for the decorative lights on High Street. After a model fixture is demonstrated and approved, those 45 fixtures will be ordered and installed as well. During the evaluation and selection of the cobra head fixtures, Siemens and City staff worked together to identify an additional 108 HPS City safety lights at intersection traffic signals. These safety lights are very similar to regular streetlights but are powered and controlled from the traffic signal cabinet at the intersection. And, their lighting pattern is a little different than a typical streetlight due to the geometry of an intersection. Staff determined that, in an effort to achieve economies of scale and achieve additional savings in electricity costs, those 108 HPS lights would be added to the list of fixture exchanges. The additional 108 fixtures will cost $35,840.70. The additional cost exceeds the original Agreement’s not-to-exceed amount; consequently, an Amendment to the Agreement (attached) is necessary; increasing the total not-to-exceed amount of $726,621.48 to $762,462.18. The original Agreement includes a $94,777 contingency; however, the majority of the contingency is necessary to cover additional expenses of the standard cobra head streetlight costs as well as anticipated cost increases for the decorative streetlights on High Street. FISCAL IMPACT Costs for the HPS to LED conversion of City Safety lights at intersection traffic signals are proposed to be covered by the Traffic Signal Cabinet Upgrade Project M0033, funded by Local TDA Article 8A Fund (2412), with expense line 2412-311-M0033- 55200. There is $44,062.40 available in this expense line in Fiscal Year 2019/20, with $35,840.70 needed to cover the 108 fixtures at the City’s intersections. As previously mentioned, staff is proposing to increase Siemens’ total not-to-exceed Agreement amount by an additional $35,840.70; for a total not-to-exceed of $762,462.18, which includes a contingency of $94,777. COUNCIL GOAL COMPLIANCE This action is consistent with City Council Strategy 5, Goal 2, Objective 3 (5.2.3): “Complete Purchase and Convert Streetlights.” 424 Honorable City Council 06/17/2020 Regular Meeting Page 3 STAFF RECOMMENDATION Authorize the City Manager to sign Amendment No. 1 to the Agreement with Siemens Mobility, Inc., increasing the not-to-exceed amount of $726,621.48 to $762,462.18, subject to final language approval of the City Manager. Attachment: Siemens Mobility, Inc. Amendment No. 1 425 ATTACHMENT AMENDMENT NO. 1 AGREEMENT BETWEEN THE CITY OF MOORPARK AND SIEMENS MOBILITY, INC., FOR STREETLIGHT TURNKEY SERVICES This Amendment No. 1 to the Agreement between the City of Moorpark, a municipal corporation (“City”), and Siemens Mobility, Inc., a corporation (“Contractor”), for streetlight turnkey services (“Agreement”), is made and entered into on this ___ day of ____________________, 202__. RECITALS WHEREAS, on November 30, 2018, the City and Contractor entered into an Agreement to have the Contractor provide construction and other services related to acquisition and light emitting diode (LED) retrofit for the streetlighting system in the City of Moorpark; and WHEREAS, the City and Contractor now desire to amend the Agreement to include conversion of one hundred eight (108) high pressure sodium (HPS) City Safety lights to LED at the City’s intersections controlled by City-owned traffic signals; and WHEREAS, Contractor has provided a price quote that includes costs for the conversion of the one hundred eight (108) Safety lights in the amount of thirty-five thousand eight hundred forty and seventy cents ($35,840.70), as detailed in Exhibit E; and WHEREAS, the City and Contractor now desire to amend the Agreement to increase the compensation for services to be performed by Contractor from seven hundred twenty-six thousand six hundred twenty-one dollars and forty-eight cents ($726,621.48) by a value of thirty-five thousand eight hundred forty and seventy cents ($35,840.70) for a total contract value of seven hundred sixty-two thousand four hundred sixty-two dollars and eighteen cents ($762,462.18), and document said agreement to amend by jointly approving Amendment No. 1 to the Agreement. NOW, THEREFORE, it is mutually agreed by and between the parties to the Agreement as follows: I. Section 1, TERM, is amended by replacing this section in its entirety as follows: “The term of the Agreement shall be from the date of City Council approval on November 7, 2018, until completion of the work identified in the Scope of Services and in conformance with Exhibits C, D, and E, unless this Agreement is terminated or suspended consistent with Section 6 of this Agreement.” II. Section 2, SCOPE OF SERVICES, is amended by replacing paragraphs one (1), two (2), and three (3) of the section in their entirety as follows: 426 Amendment No. 1 to Agreement between City of Moorpark and Siemens Mobility, Inc. Page 2 “City does hereby retain Contractor in a contractual capacity to provide construction and other services related to acquisition and retrofit for the streetlighting system in the City of Moorpark, as set forth in Exhibit C: Contractor’s Bid Proposal, which exhibit is attached hereto and incorporated herein by this reference as though set forth in full and hereinafter referred to as the “Proposal” and as set forth in Exhibit D: City Request for Proposal Documents, which exhibit is attached hereto and incorporated herein by this reference as though set forth in full and hereinafter referred to as “Bid Documents” and as set forth in Exhibit E: Price Schedule for Additional LED Safety lights to be Installed at Intersections with City-owned Traffic Signals, which exhibit is attached hereto and incorporated herein by this reference as though set forth in full and hereinafter referred to as “Safety lights”. Where said services as set forth in Exhibits C, D, and E are modified by this Agreement, or in the event there is a conflict between the provisions of Exhibit C, Exhibit D, Exhibit E, and this Agreement, the language contained in this Agreement shall take precedence. Contractor shall perform the tasks described and set forth in Exhibit C, Exhibit D, and Exhibit E. Contractor shall complete the tasks according to the schedule of performance which is also set forth in Exhibit D. Compensation for the services to be performed by Contractor shall be in accordance with Exhibit C and Exhibit E. Compensation shall not exceed the rates or total value of six hundred sixty-seven thousand six hundred eighty-five dollars and eighteen cents ($667,685.18) as stated in Exhibit C and Exhibit E plus a contingency of ninety-four thousand seven hundred seventy-seven dollars ($94,777.00) for a total contract value of seven hundred sixty-two thousand four hundred sixty-two dollars and eighteen cents ($762,462.18) without a written amendment to the agreement executed by both parties. Payment by City to Contractor shall be as referred to in this Agreement.” III. Section 5, PAYMENT, is amended by replacing paragraph one (1) in its entirety as follows: “The City agrees to pay Contractor monthly, in accordance with the terms and the schedule of payment as set forth in Exhibit C, Exhibit D, and Exhibit E attached hereto and incorporated herein by this reference as though set forth in full based upon percentage of completion of the Scope of Work in Exhibit C, Exhibit D, and Exhibit E. This amount shall not exceed six hundred sixty-seven thousand six hundred eighty-five dollars and eighteen cents ($667,685.18) plus a contingency of ninety-four thousand seven hundred seventy-seven dollars ($94,777.00) for a total contract value of seven hundred sixty-two thousand four hundred sixty-two dollars and eighteen cents ($762,462.18) for the total term of the Agreement unless additional payment is approved as provided in this Agreement.” 427 Amendment No. 1 to Agreement between City of Moorpark and Siemens Mobility, Inc. Page 3 IV. Section 27, PRECEDENCE, is amended by replacing this Section in its entirety as follows: “Contractor is bound by the contents of City’s Bid Documents (Exhibit D), Proposal (Exhibit C) and Safety lights (Exhibit E) attached hereto and incorporated herein by this reference as though set forth in full. In the event of conflict, the requirements of the City’s Bid Documents and this Agreement shall take precedence over those contained in the Proposal and Safety lights.” V. Remaining Provisions: Except as revised by this Amendment No. 1, all of the provisions of the Agreement shall remain in full force and effect. In W itness W hereof, the parties hereto have caused this Amendment to be executed the day and year first above written. CITY OF MOORPARK SIEMENS MOBILITY, INC. _______________________________ _______________________________ Troy Brown City Manager Steven Teal Director of Services _______________________________ Michael Hutchens Operations Manager Attest: _______________________________ Ky Spangler City Clerk 428 Amendment No. 1 to Agreement between City of Moorpark and Siemens Mobility, Inc. Page 4 EXHIBIT E PRICE SCHEDULE FOR ADDITIONAL LED SAFETY LIGHTS TO BE INSTALLED AT INTERSECTIONS WITH CITY-OWNED TRAFFIC SIGNALS ID Leotek Catalog Code Unit Price Qty Extended Price Comment I1 GCJ3 30J MV 30K GY 080 PCR7 WL $277.90 87 $24,177.30 City Owned Intersection Lights I2 GCM1 60J MV 30K 4 GY 110 PCR7 WL $555.40 21 $11,663.40 City Owned Intersection Lights Total 108 $35,840.70 429