HomeMy WebLinkAboutAGENDA REPORT 2020 0603 REG CCSA ITEM 10KCITY OF MOORPARK, 
CALIFORNIA City Council Meeting of June 03, 2020 ACTION Adopted Resolution No. 2020- 3918. BY B.Garza. K. Consider Resolution Amending the Fiscal Year 2019/20 Budget by Appropriating $24,000 from Various Landscape Maintenance Districts for Irrigation Controller Installation and Programming. Staff Recommendation: Adopt Resolution No. 2020-3918, amending the Fiscal Year 2019/20 budget for Irrigation Controller Installation and Calibration. (ROLL CALL VOTE REQUIRED) (Staff: Jeremy Laurentowski) Item: 10.K. MOORPARK CITY COUNCIL AGENDA REPORT TO: Honorable City Council FROM: Jeremy Laurentowski, Parks and Recreation Director DATE: 06/03/2020 Regular Meeting SUBJECT: Consider Resolution Amending the Fiscal Year 2019/20 Budget by Appropriating $24,000 from Various Landscape Maintenance Districts for Irrigation Controller Installation and Programming EXECUTIVE SUMMARY Staff was recently notified by Hydropoint Data Systems (Hydropoint) that the majority of the existing WeatherTRAK Et Pro2 (Pro2) controllers that were installed in 2011 in the Landscape Maintenance Districts (LMD’s) and Parks were manufactured with 2G cellular technology. With the upgrade of cellular signals to 4G/5G it is anticipated that 2G signals will be obsolete in 2020. WeatherTRAK controllers receive real time weather data from Hydropoint’s system software, which allows the controllers to adjust irrigation schedules daily to reduce overall irrigation water use. In order to maintain the water saving functions of the central irrigation system, the Pro2 controllers will need to be upgraded to WeatherTRAK Et Pro3 (Pro3) controllers before the discontinuance of 2G signals. Unfortunately, the existing controllers were manufactured with the cellular technology integral to the unit, requiring a complete replacement of the unit. Fortunately, the cost of the controller replacements is covered by the ten-year warranty the City purchased with the units. However, the warranty does not cover the cost to install and program the upgraded units. The majority of the funding needed to upgrade the park controllers is already included in the fiscal year (FY) 2019/20 budget. Staff is requesting funding for the equipment upgrades and programming in the Landscape Maintenance Districts (LMDs). In addition to upgrading and programming the replacement controllers, staff recommends installing new Pro3 controllers at Miller Park and Arroyo Vista Community Park (AVCP) to complete the central irrigation system capital improvement project (C0019), which is already budgeted in FY 2019/20. BACKGROUND In 2011, the City Council authorized the purchase of forty-four Pro2 irrigation controllers manufactured by Hydropoint to be installed at several City parks and LMD’s. During the design process, it was determined that only 31 of the controllers would actually be Item: 10.K. 661 Honorable City Council 06/03/2020 Regular Meeting Page 2 installed during the first phase of this project. This was due to the fact that several of the existing solar controllers could not be replaced without additional costs to install larger solar arrays to handle the electrical demands of the new controllers. Additionally, several of the existing controllers irrigated very small landscape areas, or areas consisting of mature drought tolerant landscaping. Since the cost recovery for these controllers exceeded 15 years, it was determined that these controllers would be replaced at a future date once the controllers exceeded their life expectancy. Ultimately, four controllers were installed in two City parks (Mammoth Highlands Park and Peach Hill Park), and 27 controllers were installed in several LMD’s (Zone’s 2, 5, 10, 12, 15 and 22). The total cost for the first phase of this project was $315,291. This included the cost for the field controllers, new controller enclosures and additional irrigation equipment, such as master valves, flow meters and rain shut-off devices. These devices are necessary to shut down the irrigation system during inclement weather. They also sense flow through the system and will shut down the controllers when the flow meter senses a high flow reading, such as a mainline break, stuck valve or broken irrigation head. The irrigation industry typically recognizes that 2-5% of annual water use results from malfunctioning irrigation systems. The primary advantage of the WeatherTRAK controllers is their ability to receive real- time weather and evapotranspiration (ETo) data via HydroPoint’s system software and adjust irrigation schedules on a daily basis to reduce overall irrigation water use. Evapotranspiration (ETo) is the amount of evaporation (water loss from surfaces such as soil), and transpiration (water loss from vegetation) to the atmosphere. In simple terms, it is the amount of water that is lost to the environment, primarily due to weather conditions. The annual ETo in Moorpark is relatively constant due to the fact that the average weather conditions in Moorpark do not necessarily fluctuate from year to year. However, as precipitation decreases, most non-native plants require supplemental irrigation to make up the deficit of the water that is lost. The advantage to weather- based irrigation systems is that they are able to supplement the water loss only when it is needed, not on a continual basis, resulting in water savings. In 2014, staff presented an analysis to the City Council of the HydroPoint system and the City’s overall water consumption in the LMD’s and parks where the controllers were installed. A baseline of water use was established utilizing water use data from FY 2010/11, as this was the last full year that the City’s complete water use was tracked prior to the installation of the HydroPoint System. It was determined that the City saved approximately 18% in irrigation water use in FY 2011/12 and 11% in FY 2012/13, an average of approximately 14.5%. Since 2014, the City’s water use has equalized. Changes in water use are now generally related to changes in weather. 662 Honorable City Council 06/03/2020 Regular Meeting Page 3 In terms of cost savings, an 18% reduction in water use was equivalent to approximately 15,358 HCF or 11,487,748 gallons of water. In FY 2010/11, the City spent $311,228 in water in the LMD Zones and parks where the WeatherTRAK controllers were installed. In FY 2011/12, the City spent $288,468, resulting in a direct cost saving of $22,760. Even though the City reduced irrigation water use by approximately 18% due to the installation of the WeatherTRAK controllers, the City only saved approximately 7.3% in direct water costs due to relatively proportionate water rate increases at that time. In 2011, the Ventura County Board of Supervisors (Board) approved a 12% rate increase and tier allocation adjustment; in 2012, an 8% increase was approved; and in 2013, a 4.5% rate increase was approved by the Board. Since 2011, staff has installed fourteen additional WeatherTRAK controllers in several City parks (Country Trail Park, Mountain Meadows Park, Campus Park, College View Park, Glenwood Park, Poindexter Park, Tierra Rejada Park and Virginia Colony Park) with the newer version controller, the Pro3. Nine of these were funded through the Ventura County Rule program, which was a pass-thru grant with funding provided by the Proposition 84 Integrated Regional Water Management Grant awarded to the County of Ventura. The remaining five controllers were installed by the City once the existing controllers had exceeded their life expectancy. The Pro3 has several advantages over the Pro2, primarily the ability to stack run times. In a traditional controller, as well as earlier versions of WeatherTRAK controllers, irrigation valves are generally only able to run in sequence. This results in long run times and in many instances, it does not allow a full cycle of irrigation to occur during a normal watering window. The Pro3 has the ability to automatically stack smaller valves and run them at the same time in order to reduce overall run times. Additionally, the Pro3 has the ability to interface with a pump system. Arroyo Vista Community Park (AVCP) is one of the last parks that has not been installed with the WeatherTRAK controllers. This was due to the fact that the earlier versions of the WeatherTRAK controllers were not compatible until now. DISCUSSION As mentioned previously, one of the attractive components of the Pro2 controllers is the ability to receive real-time ETo data from the Internet via cellular signal. However, the cellular signal of the Pro2 controllers was programmed for 2G cellular. With recent upgrades of cellular signals to 4G and 5G, it is anticipated that the 2G cellular equipment will cease to work sometime in 2020. Hydropoint did not anticipate or plan for such a rapid progression in cellular technology, and unfortunately, the earlier versions of the WeatherTRAK controllers have been installed with the cellular interface programmed directly into the controller’s motherboard. There is not a way to upgrade the controllers, aside from complete replacement. 663 Honorable City Council 06/03/2020 Regular Meeting Page 4 The total cost to purchase new Pro3 controllers to replace the soon-to-be obsolete Pro2 controllers is approximately $179,000. However, the City purchased an extended 10- year warranty when the controllers were initially purchased in 2011. Therefore, Hydropoint is providing new Pro3 controllers to the City at no cost. The Pro3 controllers will receive faster cellular signals and have been designed such that future upgrades in cellular technology will not require a complete replacement of the controller. The new controllers simply have an add-on device that can be replaced as the technology changes. Although HydroPoint will replace the controllers at their cost, the installation of the new controllers will need to be paid for by the City. Additionally, each controller will need to be programmed to maximize irrigation efficiencies. Programming is a relatively time consuming process and requires running each irrigation system through a series of tests once the controllers have been installed. Programming is also generally required on an annual basis to monitor performance levels and ensure all irrigation system components are functioning as designed. Historically, annual programming has been completed by the Landscape Maintenance Specialist position assigned to the Parks, Recreation and Community Services Department. This position has been vacant for approximately two and a half years and has only recently been filled by a Senior Maintenance Worker. Additionally, the Landscape/Parks Maintenance Superintendent position that oversees the LMD’s has been vacant for approximately 18 months. Since the existing WeatherTRAK controllers are overdue for this service, staff recommends hiring a consultant to install the new Pro3 controllers, and program all new and existing WeatherTRAK controllers that have been installed in the LMD’s and parks. In addition, capital improvement project C0019 was funded by the City Council in FY 2017/18. This project was approved to complete the installation of new WeatherTRAK controllers at the two remaining parks, Arroyo Vista Community Park (AVCP) and Miller Park. Staff believes there is potential cost savings to have both the upgrade project and the new installation project completed at the same time. Therefore, staff prepared a Request for Proposal (RFP) for a consultant to perform the upgrade from Pro2 to Pro3; install the new Pro3 controllers at Miller Park and AVCP; and program all of the controllers. Two responses to the RFP were received: Brightview and Bird Dog Landscaping and Irrigation, Inc. (Bird Dog). Staff is recommending entering into an agreement with Bird Dog, as they submitted the most cost-effective proposal. Chris Shreenan, owner of Bird Dog, worked as a product specialist for HydroPoint for many years prior to opening his own consulting firm. Mr. Shreenan has the necessary experience to install and program the WeatherTRAK controllers and is considered an expert in the field. The consultant costs for programming and installation work is $41,815. City Council approval of the Agreement is not required at this time, as the contract value for this work falls within the City Manager’s signing authority. 664 Honorable City Council 06/03/2020 Regular Meeting Page 5 The total cost to purchase the new controllers for Miller Park and AVCP, including installation and programming is $54,288. The cost to install and program the upgrade controllers in the parks is $8,104, for a total project cost of $62,392. Capital improvement project C0019 appropriated $85,000 for this project. The project came in under budget by $22,608. Additionally, there is one controller that needs to be programmed at the Ruben Castro Human Services Center (RCHSC) for a total cost of $593. Funding for this work is included in the FY 2019/20 operating budget for the RCHSC. The cost to upgrade and program the existing controllers in the LMDs is $23,719. Funding is not currently appropriated for this work and a budget amendment is needed. The total project cost for the Parks, Facilities, and LMD work is $86,704. FISCAL IMPACT As noted above, the costs for the new and upgraded controllers, installation, and programming at the Parks and Facilities are already included in the FY 2019/20 budget. However, the costs for the controller upgrades and programming in the LMDs were not included in the FY 2019/20 budget. Staff is requesting an aggregate appropriation increase of $24,000 from the following funds: Fund Appropriation 84-2 Steeple Hill (2302) $2,400 84-2 Pheasant Run (2305) $1,200 84-2 Mountain Meadows PC3 (2310) $3,600 84-2 Carlsberg (2312) $3,600 Country Club Estates (2315) $4,200 Moorpark Highlands (2322) $9,900 Total $24,000 Based on current projected FY 2019/20 fund balance estimates, Fund 2302 and 2305 could potentially require an increased subsidy from General and Gas Tax Funds in the amount of $3,600 at the end of FY 2019/20, which would be funded in FY 2020/21. COUNCIL GOAL COMPLIANCE While this action is not tied to a current City Council Strategic Priority, it does further City Council Goals 3.4: Reduce costs through efficiencies; and 5.5: Enhance municipal service delivery through proper maintenance of City facilities and programs. 665 Honorable City Council 06/03/2020 Regular Meeting Page 6 STAFF RECOMMENDATION (ROLL CALL VOTE REQUIRED) Adopt Resolution No. 2020-_____, amending the Fiscal Year 2019/20 budget for Irrigation Controller Installation and Calibration. Attachment: Draft Resolution No. 2020-_____ 666 ATTACHMENT RESOLUTION NO. 2020-_____ A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MOORPARK, CALIFORNIA, AMENDING THE FISCAL YEAR 2019/20 BUDGET BY APPROPRIATING $24,000 FROM VARIOUS LANDSCAPE MAINTENANCE DISTRICT FUNDS FOR IRRIGATION CONTROLLER INSTALLATION AND CALIBRATION WHEREAS, on June 19, 2019, the City Council adopted the Operating and Capital Improvement Projects budget for fiscal year 2019/20; and WHEREAS, a staff report has been presented to the City Council requesting an aggregate budget amendment of $24,000 for irrigation controller installation and calibration in Landscape Maintenance District (LMD) Zone’s 84-2 Steeple Hill (2302) , 84-2 Pheasant Run (2305), 84-2 Mountain Meadows PC-3 (2310), 84-2 Carlsberg (2312), Country Club Estates (2315), and Moorpark Highlands (2322); and WHEREAS, a budget amendment in the amount of $24,000 from the referenced LMD Funds is requested to fund these services; and WHEREAS, Exhibit “A”, attached hereto and made a part hereof, describes said budget amendment and the resultant impact to the budget line items. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF MOORPARK DOES HEREBY RESOLVE AS FOLLOWS: SECTION 1. A budget amendment in the aggregate amount of $24,000 from 84- 2 Steeple Hill Fund (2302), 84-2 Pheasant Run Fund (2305), 84-2 Mountain Meadows PC-3 Fund (2310), 84-2 Carlsberg Fund (2312), Country Club Estates Fund (2315) and Moorpark Highlands Fund (2322), as more particularly described in Exhibit “A”, attached hereto, is hereby approved. SECTION 2. The City Clerk shall certify to the adoption of this resolution and shall cause a certified resolution to be filed in the book of original resolutions. PASSED AND ADOPTED this 3rd day of June, 2020. _____________________________ Janice S. Parvin, Mayor ATTEST: ___________________________________ Ky Spangler, City Clerk Exhibit A – Budget Amendment 667 Resolution No. 2020-_____ Page 2 FUND BALANCE ALLOCATION: Fund-Account Number Amount 84-2 Steeple Hill 2302-000-00000-33990 2,400.00$ 84-2 Pheasant Run 2305-000-00000-33990 1,200.00$ 84-2 Mountain Meadows PC-3 2310-000-00000-33990 3,600.00$ 84-2 Carlsberg 2312-000-00000-33990 3,600.00$ Country Club Estates 2315-000-00000-33990 4,200.00$ 2322-000-00000-33990 9,000.00$ Total 24,000.00$ EXPENDITURE APPROPRIATION: Account Number Current Budget Revision Amended Budget 2302-542-P0004-53000 41,688.00$ 2,400.00$ 44,088.00$ 2305-542-P0004-53000 36,400.00$ 1,200.00$ 37,600.00$ 2310-542-P0004-53000 78,994.00$ 3,600.00$ 82,594.00$ 2312-542-P0004-53000 65,376.00$ 3,600.00$ 68,976.00$ 2315-542-P0004-53000 99,632.00$ 4,200.00$ 103,832.00$ 2322-542-P0004-53000 383,574.00$ 9,000.00$ 392,574.00$ Total 705,664.00$ 24,000.00$ 729,664.00$ Moorpark Highlands EXHIBIT A BUDGET AMENDMENT FOR FY 2019/20 Fund Title LMD FUNDS (2302), (2305), (2310), (2312), (2315), (2322) 668