K. Consider Agreements with R.A Atmore & Sons, Inc. and Venco Western, Inc. for
Seasonal Weed Abatement Services. Staff Recommendation: 1) Approve
Agreement with Venco Western, Inc. and authorize the City Manager to sign the
agreement subject to final language approval of the City Manager; and 2)
Approve Agreement with R.A. Atmore & Sons, Inc., and authorize the City
Manager to sign the agreement subject to final language approval of the City
Manager. (Staff: Jessica Sandifer)
Item: 10.K.
MOORPARK CITY COUNCIL
AGENDA REPORT
TO: Honorable City Council
FROM: Jessica Sandifer, Community Services Manager
DATE: 09/02/2020 Regular Meeting
SUBJECT: Consider Agreements with R.A Atmore & Sons, Inc. and Venco
Western, Inc. for Seasonal Weed Abatement Services
BACKGROUND & DISCUSSION
City-owned properties require regular weed abatement and removal of debris. Staff
requires the work to be handled in a timely and professional manner and uses contract
weed abatement services. A request for proposals (RFP) was issued June 23, 2020,
for seasonal weed abatement services. Staff received six proposals by the deadline of
July 17, 2020. All proposers were considered qualified to perform the services
requested in the RFP.
The nature of weed abatement work is intermittent and not all properties need to be
abated each year. In addition, the prices per property vary between the proposers. To
provide a fair review, staff analyzed the RFP responses based on an average weed
abatement cost per property. The proposers and their average cost per property are
outlined below:
Proposer Average Cost/Property
Brightview Landscape Services, Inc. $ 1,145.31
Green Coast Landscapes, Inc. $ 1,136.33
International Environmental
Corporation $ 3,521.55
Oakridge Landscape, Inc. $ 677.42
R.A. Atmore & Sons, Inc. $ 431.99
Venco Western, Inc. $ 292.76
After completion of the analysis, staff is recommending that an agreement be awarded
to both Venco Western, Inc. (Venco) and R.A. Atmore & Sons, Inc. (R.A. Atmore). Both
Item: 10.K.
438
Honorable City Council
09/02/2020 Regular Meeting
Page 2
contractors have worked for the City before and have the required knowledge and
experience to perform the work.
While R.A. Atmore had a higher average cost per property, it’s important to note that the
costs from property to property vary between the contractors. This means that Venco
has a higher cost on some properties then R.A. Atmore and R.A. Atmore has a higher
cost on some properties then Venco. Staff is recommending awarding contracts to two
contractors in order to ensure timely completion of weed abatement activities prior to
the clearance deadlines imposed by the Ventura County Fire Department (VCFD).
Weed abatement contractors are very busy in Spring and early Summer, which means
that sometimes we have to wait two to three weeks for a contractor’s schedule to clear
before our lots can be abated. If they are not abated in a timely fashion, the City can
face fines from Ventura County Fire Department for failing to abate weeds as required
by Ventura County Fire Protection District Ordinance 31 (Fire Code). In addition to
allowing better scheduling options for weed abatement, having two contractors will also
provide us options for competitive quotes when special weed abatement or clean-up
activities are needed.
The Agreements are for two years and are $20,000 annually with two additional one-
year extension periods allowed upon the mutual consent of both parties.
FISCAL IMPACT
Weed abatement costs vary year to year but on average run around $14,000 per year.
Funding for seasonal weed abatement activities is included in the Fiscal Year 2020/21
budget.
COUNCIL GOAL COMPLIANCE
This action does not support a current strategic directive.
STAFF RECOMMENDATION
1.Approve Agreement with Venco Western, Inc. and authorize the City Manager to
sign the agreement subject to final language approval of the City Manager; and
2.Approve Agreement with R.A. Atmore & Sons, Inc., and authorize the City
Manager to sign the agreement subject to final language approval of the City
Manager.
Attachment 1: R.A. Atmore & Sons, Inc. Agreement
Attachment 2: R Venco Western, Inc. Agreement
439
AGREEMENT BETWEEN THE CITY OF MOORPARK AND
R.A. ATMORE & SONS, INC. FOR SEASONAL WEED ABATEMENT SERVICES
THIS AGREEMENT, is made and effective as of this _________ day of
________________________, 2020, between the City of Moorpark, a municipal
corporation (“City”) and R.A. Atmore & Sons, Inc., a corporation (“Contractor”). In
consideration of the mutual covenants and conditions set forth herein, the parties agree
as follows:
WHEREAS, City has the need for seasonal weed abatement services; and
WHEREAS, Contractor specializes in providing such services and has the proper
work experience, certifications, and background to carry out the duties involved; and
WHEREAS, Contractor has submitted to City a Proposal dated July 17, 2020,
which is attached hereto as Exhibit C.
NOW, THEREFORE, in consideration of the mutual covenants, benefits, and
premises herein stated, the parties hereto agree as follows:
1.TERM
The term of this Agreement shall be from September 1, 2020 to June 30, 2022,
unless this Agreement is terminated or suspended pursuant to this Agreement.
The Agreement may be extended for two (2) additional one-year terms, upon a
written amendment to the agreement executed by both parties.
2.SCOPE OF SERVICES
City does hereby retain Contractor, as an independent contractor, in a
contractual capacity to provide seasonal weed abatement services, as set forth in
Exhibits C (Contractor Proposal) and Exhibit D (Scope of Work). In the event there is a
conflict between the provisions of Exhibit C and Exhibit D and this Agreement, the
language contained in this Agreement shall take precedence.
Contractor shall perform the tasks described and set forth in Exhibit C and
Exhibit D. Compensation for the services to be performed by Contractor shall be in
accordance with Exhibit C. Compensation shall not exceed the rates or total contract
value of twenty thousand dollars ($20,000.00) annually, without a written amendment to
the agreement executed by both parties. Payment by City to Contractor shall be in
accordance with the provisions of this Agreement.
City and Contractor acknowledge that this project is a public work to which
prevailing wages apply, and that a public work project is subject to compliance
monitoring and enforcement by the California Department of Industrial Relations (DIR).
Contractor agrees to comply with and be bound by all the terms, rules and regulations
described in (a) Division 2, Part 7, Chapter 1 (commencing with Section 1720) of the
ATTACHMENT 1
440
California Labor Code, including without limitation Labor Code Section 1771 and (b) the
rules and regulations established by the DIR implementing such statutes, as though set
forth in full herein, including any applicable amendments made thereto during the term
of this Agreement. For every subcontractor who will perform work on this project,
Contractor shall be responsible for subcontractor’s compliance with (a) and (b), and
Contractor shall take all necessary actions to ensure subcontractor’s compliance. Labor
Code Section 1725.5 requires all contractors and subcontractors to annually register
with the DIR before bidding or performing on any public work contract.
3.PERFORMANCE
Contractor shall at all times faithfully, competently and to the best of their ability,
experience, standard of care, and talent, perform all tasks described herein. Contractor
shall employ, at a minimum, generally accepted standards and practices utilized by
persons engaged in providing similar services as are required of Contractor hereunder
in meeting its obligations under this Agreement.
4.MANAGEMENT
The individual directly responsible for Contractor’s overall performance of the
Agreement provisions herein above set forth and to serve as principal liaison between
City and Contractor shall be Richard Atmore, and no other individual may be substituted
without the prior written approval of the City Manager.
The City’s contact person in charge of administration of this Agreement, and to
serve as principal liaison between Contractor and City, shall be the City Manager or the
City Manager’s designee.
5.PAYMENT
Taxpayer ID or Social Security numbers must be provided, on an IRS W-9 form,
before payments may be made to vendors.
The City agrees to pay Contractor monthly, in accordance with the payment rates
and terms and the schedule of payment as set forth in Exhibit C, based upon actual
time spent on the above tasks. This amount shall not exceed twenty thousand dollars
($20,000.00) annually for the term of the Agreement unless additional payment is
approved as provided in this Agreement.
Contractor shall not be compensated for any additional services rendered in
connection with its performance of this Agreement, unless such additional services and
compensation are authorized, in advance, in a written amendment to the agreement
executed by both parties. The City Manager may approve additional work not to exceed
ten percent (10%) of the amount of the Agreement.
Contractor shall submit invoices monthly for actual services performed. Invoices
shall be submitted on or about the first business day of each month, or as soon
thereafter as practical, for services provided in the previous month. Payment shall be
R.A. Atmore & Sons, Inc. Page 2 of 18
441
made within thirty (30) days of receipt of each invoice as to all non-disputed fees. Any
expense or reimbursable cost appearing on any invoice shall be accompanied by a
receipt or other documentation subject to approval of the City Manager. If the City
disputes any of Contractor’s fees or expenses it shall give written notice to Contractor
within thirty (30) days of receipt of any disputed fees set forth on the invoice.
6.TERMINATION OR SUSPENSION WITHOUT CAUSE
The City may at any time, for any reason, with or without cause, suspend or
terminate this Agreement, or any portion hereof, by serving upon the Contractor at least
ten (10) days prior written notice. Upon receipt of said notice, the Contractor shall
immediately cease all work under this Agreement, unless the notice provides otherwise.
If the City suspends or terminates a portion of this Agreement such suspension or
termination shall not make void or invalidate the remainder of this Agreement.
The Contractor may terminate this Agreement only by providing City with written
notice no less than thirty (30) days in advance of such termination.
In the event this Agreement is terminated or suspended pursuant to this Section,
the City shall pay to Contractor the actual value of the work performed up to the time of
termination or suspension, provided that the work performed is of value to the City.
Upon termination or suspension of the Agreement pursuant to this Section, the
Contractor will submit an invoice to the City pursuant to this Agreement.
7.DEFAULT OF CONTRACTOR
The Contractor’s failure to comply with the provisions of this Agreement shall
constitute a default. In the event that Contractor is in default for cause under the terms
of this Agreement, City shall have no obligation or duty to continue compensating
Contractor for any work performed after the date of default and can terminate or
suspend this Agreement immediately by written notice to the Contractor. If such failure
by the Contractor to make progress in the performance of work hereunder arises out of
causes beyond the Contractor’s control, and without fault or negligence of the
Contractor, it shall not be considered a default.
If the City Manager or the City Manager’s designee determines that the
Contractor is in default in the performance of any of the terms or conditions of this
Agreement, designee shall cause to be served upon the Contractor a written notice of
the default. The Contractor shall have seven (7) days after service upon it of said notice
in which to cure the default by rendering a satisfactory performance. In the event that
the Contractor fails to cure its default within such period of time, the City shall have the
right, notwithstanding any other provision of this Agreement, to terminate this
Agreement without further notice and without prejudice to any other remedy to which it
may be entitled at law, in equity or under this Agreement.
R.A. Atmore & Sons, Inc. Page 3 of 18
442
8.LIQUIDATED DAMAGES
If the Contractor fails to complete the work, or any portion thereof, within the time
period required by this Agreement, or as duly extended in writing by the City Manager,
Contractor shall forfeit and pay to the City, as liquidated damages, the sum of fifty
dollars ($50.00) per day for each calendar day the work, or portion thereof, remains
uncompleted after the above specified completion date. Liquidated damages shall be
deducted from any payments due or to become due to the Contractor under the terms
of this Agreement. Progress payments made by the City after the above specified
completion date shall not constitute a waiver of liquidated damages by the City.
9.OWNERSHIP OF DOCUMENTS
Contractor shall maintain complete and accurate records with respect to sales,
costs, expenses, receipts, and other such information required by City that relate to the
performance of services under this Agreement. Contractor shall maintain adequate
records of services provided in sufficient detail to permit an evaluation of services. All
such records shall be maintained in accordance with generally accepted accounting
principles and shall be clearly identified and readily accessible. Contractor shall provide
free access to the representatives of City or the City’s designees at reasonable times to
such books and records; shall give the City the right to examine and audit said books
and records; shall permit City to make transcripts therefrom as necessary; and shall
allow inspection of all work, data, documents, proceedings, and activities related to this
Agreement. Notification of audit shall be provided at least thirty (30) days before any
such audit is conducted. Such records, together with supporting documents, shall be
maintained for a period of three (3) years after receipt of final payment.
Upon completion of, or in the event of termination or suspension without cause of
this Agreement, all original documents, designs, drawings, maps, models, computer
files, surveys, notes, and other documents prepared in the course of providing the
services to be performed pursuant to this Agreement shall become the sole property of
the City and may be used, reused, or otherwise disposed of by the City without the
permission of the Contractor. With respect to computer files, Contractor shall make
available to the City, at the Contractor’s office and upon reasonable written request by
the City, the necessary computer software and hardware for purposes of accessing,
compiling, transferring, and printing computer files.
10.INDEMNIFICATION AND HOLD HARMLESS
Contractor shall indemnify, defend and hold harmless City, and any and all of its
officers, employees, and agents (“City Indemnitees”) from and against any and all
causes of action, claims, liabilities, obligations, judgments, or damages, including
reasonable legal counsels’ fees and costs of litigation (“claims”), arising out of the
Contractor’s performance of its obligations under this Agreement or out of the
operations conducted by Contractor, including the City’s active or passive negligence,
except for such loss or damage arising from the sole negligence or willful misconduct of
the City. In the event the City Indemnitees are made a party to any action, lawsuit, or
other adversarial proceeding arising from Contractor’s performance of this Agreement,
R.A. Atmore & Sons, Inc. Page 4 of 18
443
the Contractor shall provide a defense to the City Indemnitees or at the City’s option
reimburse the City Indemnitees their costs of defense, including reasonable legal
counsels’ fees incurred in defense of such claims.
Contractor agrees to obtain executed indemnity agreements with provisions
identical to those set forth in this Section from each and every subcontractor, or any
other person or entity involved by, for, with, or on behalf of Contractor in the
performance of this Agreement. In the event Contractor fails to obtain such indemnity
obligations from others as required here, Contractor agrees to be fully responsible
according to the terms of this Section. Failure of City to monitor compliance with these
requirements imposes no additional obligations on City and will in no way act as a
waiver of any rights hereunder. This obligation to indemnify and defend City as set forth
here is binding on the successors, assigns, or heirs of Contractor and shall survive the
termination of this Agreement or this Section.
City does not and shall not waive any rights that it may have against Contractor
by reason of this Section, because of the acceptance by City, or the deposit with City, of
any insurance policy or certificate required pursuant to this Agreement. The hold
harmless and indemnification provisions shall apply regardless of whether or not said
insurance policies are determined to be applicable to any losses, liabilities, damages,
costs, and expenses described in this Section.
This Indemnity shall survive termination of the Agreement or Final Payment
hereunder. This Indemnity is in addition to any other rights or remedies that the
Indemnitees may have under the law or under any other Contract Documents or
Agreements. In the event of any claim or demand made against any party which is
entitled to be indemnified hereunder, City may, in its sole discretion, reserve, retain, or
apply any monies to the Contractor under this Agreement for the purpose of resolving
such claims; provided, however, City may release such funds if the Contractor provides
City with reasonable assurance of protection of the Indemnitees’ interests. City shall, in
its sole discretion, determine whether such assurances are reasonable.
11. INSURANCE
Contractor shall maintain prior to the beginning of and for the duration of this
Agreement insurance coverage as specified in Exhibit A attached hereto and
incorporated herein by this reference as though set forth in full.
12. INDEPENDENT CONTRACTOR
Contractor is and shall at all times remain as to the City a wholly independent
Contractor. The personnel performing the services under this Agreement on behalf of
Contractor shall at all times be under Contractor’s exclusive direction and control.
Neither City nor any of its officers, employees, or agents shall have control over the
conduct of Contractor or any of Contractor’s officers, employees, or agents, except as
set forth in this Agreement. Contractor shall not at any time or in any manner represent
that it or any of its officers, employees, or agents are in any manner officers,
R.A. Atmore & Sons, Inc. Page 5 of 18
444
employees, or agents of the City. Contractor shall not incur or have the power to incur
any debt, obligation, or liability against City, or bind City in any manner.
No employee benefits shall be available to Contractor in connection with the
performance of this Agreement. Except for the fees paid to Contractor as provided in
the Agreement, City shall not pay salaries, wages, or other compensation to Contractor
for performing services hereunder for City. City shall not be liable for compensation or
indemnification to Contractor for injury or sickness arising out of performing services
hereunder.
13.LEGAL RESPONSIBILITIES
The Contractor shall keep itself informed of local, state and federal laws and
regulations which in any manner affect those employed by it or in any way affect the
performance of its service pursuant to this Agreement. The Contractor shall at all times
observe and comply with all such laws and regulations, including but not limited to the
Americans with Disabilities Act and Occupational Safety and Health Administration laws
and regulations. The City and Contractor shall comply with Exhibit B, California Public
Contract Code Section 9204, when applicable. The City, and its officers and
employees, shall not be liable at law or in equity occasioned by failure of the Contractor
to comply with this Section.
14.ANTI DISCRIMINATION
Neither the Contractor, nor any subcontractor under the Contractor, shall
discriminate in employment of persons upon the work because of race, religious creed,
color, national origin, ancestry, physical disability, mental disability, medical condition,
genetic information, marital status, sex, gender, gender identity, gender expression,
age, sexual orientation, or military and veteran status of such person; or any other basis
protected by applicable federal, state, or local law, except as provided in Section 12940
of the Government Code. The Contractor shall have responsibility for compliance with
this Section, if applicable [Labor Code Sec. 1735].
15.UNDUE INFLUENCE
Contractor declares and warrants that no undue influence or pressure is used
against or in concert with any officer or employee of the City in connection with the
award, terms or implementation of this Agreement, including any method of coercion,
confidential financial arrangement, or financial inducement. No officer or employee of
the City will receive compensation, directly or indirectly from Contractor, or any officer,
employee or agent of Contractor, in connection with the award of this Agreement or any
work to be conducted as a result of this Agreement. Violation of this Section shall be a
material breach of this Agreement entitling the City to any and all remedies at law or in
equity.
R.A. Atmore & Sons, Inc. Page 6 of 18
445
16.NO BENEFIT TO ARISE TO LOCAL EMPLOYEES
No member, officer, or employee of the City, or their designees or agents, and no
public official who exercises authority over or responsibilities with respect to the
Services during his/her tenure or for one (1) year thereafter, shall have any interest,
direct or indirect, in any agreement or sub-agreement, or the proceeds thereof, for work
to be performed in connection with the Services performed under this Agreement.
17.CONFLICT OF INTEREST
Contractor covenants that neither they nor any officer or principal of their firm
have any interests, nor shall they acquire any interest, directly or indirectly, which will
conflict in any manner or degree with the performance of their services hereunder.
Contractor further covenants that in the performance of this Agreement, they shall
employ no person having such interest as an officer, employee, agent, or subcontractor.
Contractor further covenants that Contractor has not contracted with nor is performing
any services directly or indirectly, with the developer(s) and/or property owner(s) and/or
firm(s) and/or partnership(s) and/or public agency(ies) owning property and/or
processing an entitlement application for property in the City or its Area of Interest, now
or within the past one (1) year, and further covenants and agrees that Contractor and/or
its subcontractors shall provide no service or enter into any contract with any
developer(s) and/or property owner(s) and/or firm(s) and/or partnership(s) and/or public
agency(ies) owning property and/or processing an entitlement application for property in
the City or its Area of Interest, while under contract with the City and for a one (1) year
time period following termination of this Agreement.
18.NOTICE
Any notice to be given pursuant to this Agreement shall be in writing, and all such
notices and any other document to be delivered shall be delivered by personal service
or by deposit in the United States mail, certified or registered, return receipt requested,
with postage prepaid, and addressed to the party for whom intended as follows:
To: City Manager
City of Moorpark
799 Moorpark Ave.
Moorpark, CA 93021
To: Richard Atmore
R.A. Atmore & Sons, Inc.
2977 Sexton Canyon Road
Ventura, CA 93003
Either party may, from time to time, by written notice to the other, designate a
different address or contact person, which shall be substituted for the one above
specified. Notices, payments and other documents shall be deemed delivered upon
receipt by personal service or as of the third (3rd) day after deposit in the United States
mail.
R.A. Atmore & Sons, Inc. Page 7 of 18
446
19.CHANGE IN NAME
Should a change be contemplated in the name or nature of the Contractor’s legal
entity, the Contractor shall first notify the City in order that proper steps may be taken to
have the change reflected in the Agreement documents.
20.ASSIGNMENT
Contractor shall not assign this Agreement or any of the rights, duties or
obligations hereunder. It is understood and acknowledged by the parties that Contractor
is uniquely qualified to perform the services provided for in this Agreement.
21.LICENSES
At all times during the term of this Agreement, Contractor shall have in full force
and effect, all licenses required of it by law for the performance of the services in this
Agreement.
22.VENUE AND GOVERNING LAW
This Agreement is made, entered into, and executed in Ventura County,
California, and any action filed in any court or for arbitration for the interpretation,
enforcement or other action of the terms, conditions, or covenants referred to herein
shall be filed in the applicable court in Ventura County, California. The City and
Contractor understand and agree that the laws of the State of California shall govern the
rights, obligations, duties, and liabilities of the parties to this Agreement and also govern
the interpretation of this Agreement.
23.COST RECOVERY
In the event any action, suit or proceeding is brought for the enforcement of, or
the declaration of any right or obligation pursuant to this Agreement or as a result of any
alleged breach of any provision of this Agreement, the prevailing party shall be entitled
to recover its costs and expenses from the losing party, and any judgment or decree
rendered in such a proceeding shall include an award thereof.
24.ENTIRE AGREEMENT
This Agreement and the Exhibits attached hereto contain the entire
understanding between the parties relating to the obligations of the parties described in
this Agreement. All prior or contemporaneous agreements, understandings,
representations, and statements, oral or written, are merged into this Agreement and
shall be of no further force or effect. Each party is entering into this Agreement based
solely upon the representations set forth herein and upon each party’s own independent
investigation of any and all facts such party deems material.
R.A. Atmore & Sons, Inc. Page 8 of 18
447
25.CAPTIONS OR HEADINGS
The captions and headings of the various Articles, Paragraphs, and Exhibits of
this Agreement are for convenience and identification only and shall not be deemed to
limit or define the content of the respective Articles, Paragraphs, and Exhibits hereof.
26.AMENDMENTS
Any amendment, modification, or variation from the terms of this Agreement shall
be in writing and shall be effective only upon approval by both parties to this Agreement.
27.PRECEDENCE
In the event of conflict, the requirements of the City’s Request for Proposal, if
any, and this Agreement shall take precedence over those contained in the Contractor’s
Proposal.
28.INTERPRETATION OF AGREEMENT
Should interpretation of this Agreement, or any portion thereof, be necessary, it is
deemed that this Agreement was prepared by the parties jointly and equally, and shall
not be interpreted against either party on the ground that the party prepared the
Agreement or caused it to be prepared.
29.WAIVER
No waiver of any provision of this Agreement shall be deemed, or shall
constitute, a waiver of any other provision, whether or not similar, nor shall any such
waiver constitute a continuing or subsequent waiver of the same provision. No waiver
shall be binding unless executed in writing by the party making the waiver.
30.AUTHORITY TO EXECUTE
The person or persons executing this Agreement on behalf of the Contractor
warrants and represents that he/she has the authority to execute this Agreement on
behalf of the Contractor and has the authority to bind Contractor to the performance of
obligations hereunder.
R.A. Atmore & Sons, Inc. Page 9 of 18
448
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be
executed the day and year first above written.
CITY OF MOORPARK R.A. ATMORE & SONS, INC.
By:_______________________________ By:_______________________________
Troy Brown, City Manager Richard A. Atmore, Chief Executive Officer
Attest:
__________________________________
Ky Spangler, City Clerk
R.A. Atmore & Sons, Inc. Page 10 of 18
449
Exhibit A
INSURANCE REQUIREMENTS
Prior to the beginning of and throughout the duration of Work, Contractor will maintain
insurance in conformance with the requirements set forth below. Contractor will use
existing coverage to comply with these requirements. If that existing coverage does not
meet requirements set forth here, Contractor agrees to amend, supplement or endorse
the existing coverage to do so. Contractor acknowledges that the insurance coverage
and policy limits set forth in this section constitute the minimum amount of coverage
required. Any insurance proceeds available to the City in excess of the limits and
coverage required in this Agreement and which is applicable to a given loss, will be
available to the City.
Contractor shall provide the following types and amounts of insurance:
Commercial General Liability Insurance using Insurance Services Office (ISO)
“Commercial General Liability” policy form CG 00 01 or the exact equivalent. Defense
costs must be paid in addition to limits. There shall be no cross liability exclusion for
claims or suits by one insured against another. Limits are subject to review but in no
event less than $1,000,000 per occurrence for all covered losses and no less than
$2,000,000 general aggregate.
Business Auto Coverage on ISO Business Auto Coverage form CA 00 01 including
symbol 1 (Any Auto) or the exact equivalent. Limits are subject to review, but in no
event to be less than $1,000,000 per accident. If Contractor owns no vehicles, this
requirement may be satisfied by a non-owned auto endorsement to the general liability
policy described above. If Contractor or Contractor’s employees will use personal autos
in any way on this project, Contractor shall provide evidence of personal auto liability for
each such person.
Workers’ Compensation on a state-approved policy form providing statutory benefits as
required by law with employer’s liability limits no less than $1,000,000 per accident or
disease.
Excess or Umbrella Liability Insurance (Over Primary) if used to meet limit
requirements, shall provide coverage at least as broad as specified for the underlying
coverages. Coverage shall be provided on a “pay on behalf” basis, with defense costs
payable in addition to policy limits. Policy shall contain a provision obligating insurer at
the time insured’s liability is determined, not requiring actual payment by the insured
first. There shall be no cross liability exclusion precluding coverage for claims or suits by
one insured against another. Coverage shall be applicable to the City for injury to
employees of Contractor, subcontractors or others involved in the Work. The scope of
coverage provided is subject to approval by the City following receipt of proof of
insurance as required herein. Limits are subject to review.
R.A. Atmore & Sons, Inc. Page 11 of 18
450
Insurance procured pursuant to these requirements shall be written by insurers that are
admitted carriers in the State of California and with an A.M. Bests rating of A- or better
and a minimum financial size of VII.
General conditions pertaining to provision of insurance coverage by Contractor.
Contractor and the City agree to the following with respect to insurance provided by
Contractor:
1. Contractor agrees to have its insurer endorse the third party general liability
coverage required herein to include as additional insureds the City, its officials,
employees, and agents, using standard ISO endorsement CG 2010 and CG
2037 with edition acceptable to the City. Contractor also agrees to require all
contractors and subcontractors to do likewise.
2.No liability insurance coverage provided to comply with this Agreement shall
prohibit Contractor, or Contractor’s employees, or agents, from waiving the right
to subrogation prior to a loss. Contractor agrees to waive subrogation rights
against the City regardless of the applicability of any insurance proceeds, and to
require all contractors and subcontractors to do likewise.
3.All insurance coverage and limits provided by Contractor and available or
applicable to this Agreement are intended to apply to the full extent of the
policies. Nothing contained in this Agreement or any other agreement relating to
the City or its operation limits the application of such insurance coverage.
4.None of the coverages required herein will be in compliance with these
requirements if they include limiting endorsement of any kind that has not been
first submitted to the City and approved in writing.
5.No liability policy shall contain any provision or definition that would serve to
eliminate so-called “third party action over” claims, including any exclusion for
bodily injury to an employee of the insured or of any contractor or subcontractor.
6.All coverage types and limits required are subject to approval, modification, and
additional requirements by the City, as the need arises. Contractor shall not
make any reductions in scope of coverage (e.g. elimination of contractual liability
or reduction of discovery period) that may affect the City’s protection without the
City’s prior written consent.
7.Proof of compliance with these insurance requirements, consisting of certificates
of insurance evidencing all of the coverages required and an additional insured
endorsement to Contractor’s general liability policy, shall be delivered to city at or
prior to the execution of this Agreement. In the event such proof of any insurance
is not delivered as required, or in the event such insurance is canceled or
reduced at any time and no replacement coverage is provided, the City has the
right, but not the duty, to obtain any insurance it deems necessary to protect its
interests under this or any other Agreement and to pay the premium. Any
R.A. Atmore & Sons, Inc. Page 12 of 18
451
premium so paid by the City shall be charged to and promptly paid by Contractor
or deducted from sums due Contractor, at the City’s option.
8. Certificate(s) are to reflect that the insurer will provide 30 days notice to the City
of any cancellation or reduction of coverage. Contractor agrees to require its
insurer to modify such certificates to delete any exculpatory wording stating that
failure of the insurer to mail written notice of cancellation or reduction of coverage
imposes no obligation, or that any party will “endeavor” (as opposed to being
required) to comply with the requirements of the certificate.
9. It is acknowledged by the parties of this Agreement that all insurance coverage
required to be provided by Contractor or any subcontractor, is intended to apply
first and on a primary, non-contributing basis in relation to any other insurance or
self-insurance available to the City.
10. Contractor agrees to ensure that subcontractors, and any other party involved
with the Work who is brought onto or involved in the Work by Contractor, provide
the same minimum insurance required of Contractor. Contractor agrees to
monitor and review all such coverage and assumes all responsibility for ensuring
that such coverage is provided in conformity with the requirements of this
section. Contractor agrees that upon request, all agreements with subcontractors
and others engaged in the Work will be submitted to the City for review.
11. Contractor agrees not to self-insure or to use any self-insured retentions or
deductibles on any portion of the insurance required herein and further agrees
that it will not allow any contractor, subcontractor, Architect, Engineer, or other
entity or person in any way involved in the performance of Work contemplated by
this Agreement to self-insure its obligations to the City. If Contractor’s existing
coverage includes a deductible or self-insured retention, the deductible or self-
insured retention must be declared to the City. At that time, the City shall review
options with the Contractor, which may include reduction or elimination of the
deductible or self-insured retention, substitution of other coverage, or other
solutions.
12. The City reserves the right at any time during the term of the Agreement to
change the amounts and types of insurance required by giving the Contractor 90
days advance written notice of such change. If such change results in substantial
additional cost to the Contractor, the City will negotiate additional compensation
proportional to the increased benefit to the City.
13. For purposes of applying insurance coverage only, this Agreement will be
deemed to have been executed immediately upon any party hereto taking any
steps that can be deemed to be in furtherance of or towards performance of this
Agreement.
14. Contractor acknowledges and agrees that any actual or alleged failure on the
part of the City to inform Contractor of non-compliance with an insurance
R.A. Atmore & Sons, Inc. Page 13 of 18
452
requirement in no way imposes any additional obligations to the City nor does it
waive any rights hereunder in this or any other regard.
15. Contractor will renew the required coverage annually as long as the City, or its
employees or agents face an exposure from operations of any type pursuant to
this Agreement. This obligation applies whether or not the Agreement is canceled
or terminated for any reason. Termination of this obligation is not effective until
the City executes a written statement to that effect.
16. Contractor shall provide proof that policies of insurance required herein expiring
during the term of this Agreement have been renewed or replaced with other
policies providing at least the same coverage. Proof that such coverage has
been ordered shall be submitted prior to expiration. A coverage binder or letter
from Contractor’s insurance agent to this effect is acceptable. A certificate of
insurance and/or additional insured endorsement as required in these
specification applicable to the renewing or new coverage must be provided to the
City within five days of the expiration of coverage.
17.The provisions of any Workers’ Compensation or similar act will not limit the
obligations of Contractor under this Agreement. Contractor expressly agrees not
to use any statutory immunity defenses under such laws with respect to the City,
its employees, officials, and agents.
18.Requirements of specific coverage features or limits contained in this section are
not intended as limitations on coverage, limits, or other requirements nor as a
waiver of any coverage normally provided by any given policy. Specific reference
to a given coverage feature is for purposes of clarification only as it pertains to a
given issue, and is not intended by any party or insured to be limiting or all-
inclusive.
19.These insurance requirements are intended to be separate and distinct from any
other provision in this Agreement and are intended by the parties here to be
interpreted as such.
20.The requirements in this section supersede all other sections and provisions of
this Agreement to the extent that any other section or provision conflicts or
impairs the provisions of this section.
21. Contractor agrees to be responsible for ensuring that no contract used by any
party involved in any way with the Work reserves the right to charge the City or
Contractor for the cost of additional insurance coverage required by this
Agreement. Any such provisions are to be deleted with reference to the City. It is
not the intent of the City to reimburse any third party for the cost of complying
with these requirements. There shall be no recourse against the City for payment
of premiums or other amounts with respect thereto.
22. Contractor agrees to provide immediate notice to City of any claim or loss against
Contractor arising out of the work performed under this Agreement. The City
R.A. Atmore & Sons, Inc. Page 14 of 18
453
assumes no obligation or liability by such notice, but has the right (but not the
duty) to monitor the handling of any such claim or claims if they are likely to
involve the City.
23.Contractor agrees to obtain and provide to City a copy of Professional Liability
coverage for Architects or Engineers on this project, when required by City. City
shall determine the liability limit.
R.A. Atmore & Sons, Inc. Page 15 of 18
454
EXHIBIT B
PUBLIC CONTRACT CODE SECTION 9204
9204. (a) The Legislature finds and declares that it is in the best interests of the state
and its citizens to ensure that all construction business performed on a public works
project in the state that is complete and not in dispute is paid in full and in a timely
manner.
(b) Notwithstanding any other law, including, but not limited to, Article 7.1 (commencing
with Section 10240) of Chapter 1 of Part 2, Chapter 10 (commencing with Section
19100) of Part 2, and Article 1.5 (commencing with Section 20104) of Chapter 1 of Part
3, this section shall apply to any claim by a contractor in connection with a public works
project.
(c) For purposes of this section:
(1) “Claim” means a separate demand by a contractor sent by registered mail or
certified mail with return receipt requested, for one or more of the following:
(A) A time extension, including, without limitation, for relief from damages or penalties
for delay assessed by a public entity under a contract for a public works project.
(B) Payment by the public entity of money or damages arising from work done by, or on
behalf of, the contractor pursuant to the contract for a public works project and payment
for which is not otherwise expressly provided or to which the claimant is not otherwise
entitled.
(C) Payment of an amount that is disputed by the public entity.
(2) “Contractor” means any type of contractor within the meaning of Chapter 9
(commencing with Section 7000) of Division 3 of the Business and Professions Code
who has entered into a direct contract with a public entity for a public works project.
(3) (A) “Public entity” means, without limitation, except as provided in subparagraph (B),
a state agency, department, office, division, bureau, board, or commission, the
California State University, the University of California, a city, including a charter city,
county, including a charter county, city and county, including a charter city and county,
district, special district, public authority, political subdivision, public corporation, or
nonprofit transit corporation wholly owned by a public agency and formed to carry out
the purposes of the public agency.
(B) “Public entity” shall not include the following:
(i) The Department of Water Resources as to any project under the jurisdiction of that
department.
(ii) The Department of Transportation as to any project under the jurisdiction of that
department.
(iii) The Department of Parks and Recreation as to any project under the jurisdiction of
that department.
(iv) The Department of Corrections and Rehabilitation with respect to any project under
its jurisdiction pursuant to Chapter 11 (commencing with Section 7000) of Title 7 of Part
3 of the Penal Code.
(v) The Military Department as to any project under the jurisdiction of that department.
(vi) The Department of General Services as to all other projects.
(vii) The High-Speed Rail Authority.
R.A. Atmore & Sons, Inc. Page 16 of 18
455
(4) “Public works project” means the erection, construction, alteration, repair, or
improvement of any public structure, building, road, or other public improvement of any
kind.
(5) “Subcontractor” means any type of contractor within the meaning of Chapter 9
(commencing with Section 7000) of Division 3 of the Business and Professions Code
who either is in direct contract with a contractor or is a lower tier subcontractor.
(d) (1) (A) Upon receipt of a claim pursuant to this section, the public entity to which the
claim applies shall conduct a reasonable review of the claim and, within a period not to
exceed 45 days, shall provide the claimant a written statement identifying what portion
of the claim is disputed and what portion is undisputed. Upon receipt of a claim, a public
entity and a contractor may, by mutual agreement, extend the time period provided in
this subdivision.
(B) The claimant shall furnish reasonable documentation to support the claim.
(C) If the public entity needs approval from its governing body to provide the claimant a
written statement identifying the disputed portion and the undisputed portion of the
claim, and the governing body does not meet within the 45 days or within the mutually
agreed to extension of time following receipt of a claim sent by registered mail or
certified mail, return receipt requested, the public entity shall have up to three days
following the next duly publicly noticed meeting of the governing body after the 45-day
period, or extension, expires to provide the claimant a written statement identifying the
disputed portion and the undisputed portion.
(D) Any payment due on an undisputed portion of the claim shall be processed and
made within 60 days after the public entity issues its written statement. If the public
entity fails to issue a written statement, paragraph (3) shall apply.
(2) (A) If the claimant disputes the public entity’s written response, or if the public entity
fails to respond to a claim issued pursuant to this section within the time prescribed, the
claimant may demand in writing an informal conference to meet and confer for
settlement of the issues in dispute. Upon receipt of a demand in writing sent by
registered mail or certified mail, return receipt requested, the public entity shall schedule
a meet and confer conference within 30 days for settlement of the dispute.
(B) Within 10 business days following the conclusion of the meet and confer
conference, if the claim or any portion of the claim remains in dispute, the public entity
shall provide the claimant a written statement identifying the portion of the claim that
remains in dispute and the portion that is undisputed. Any payment due on an
undisputed portion of the claim shall be processed and made within 60 days after the
public entity issues its written statement. Any disputed portion of the claim, as identified
by the contractor in writing, shall be submitted to nonbinding mediation, with the public
entity and the claimant sharing the associated costs equally. The public entity and
claimant shall mutually agree to a mediator within 10 business days after the disputed
portion of the claim has been identified in writing. If the parties cannot agree upon a
mediator, each party shall select a mediator and those mediators shall select a qualified
neutral third party to mediate with regard to the disputed portion of the claim. Each party
shall bear the fees and costs charged by its respective mediator in connection with the
selection of the neutral mediator. If mediation is unsuccessful, the parts of the claim
remaining in dispute shall be subject to applicable procedures outside this section.
(C) For purposes of this section, mediation includes any nonbinding process, including,
but not limited to, neutral evaluation or a dispute review board, in which an independent
third party or board assists the parties in dispute resolution through negotiation or by
R.A. Atmore & Sons, Inc. Page 17 of 18
456
issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this
section.
(D) Unless otherwise agreed to by the public entity and the contractor in writing, the
mediation conducted pursuant to this section shall excuse any further obligation under
Section 20104.4 to mediate after litigation has been commenced.
(E) This section does not preclude a public entity from requiring arbitration of disputes
under private arbitration or the Public Works Contract Arbitration Program, if mediation
under this section does not resolve the parties’ dispute.
(3) Failure by the public entity to respond to a claim from a contractor within the time
periods described in this subdivision or to otherwise meet the time requirements of this
section shall result in the claim being deemed rejected in its entirety. A claim that is
denied by reason of the public entity’s failure to have responded to a claim, or its failure
to otherwise meet the time requirements of this section, shall not constitute an adverse
finding with regard to the merits of the claim or the responsibility or qualifications of the
claimant.
(4) Amounts not paid in a timely manner as required by this section shall bear interest at
7 percent per annum.
(5) If a subcontractor or a lower tier subcontractor lacks legal standing to assert a claim
against a public entity because privity of contract does not exist, the contractor may
present to the public entity a claim on behalf of a subcontractor or lower tier
subcontractor. A subcontractor may request in writing, either on his or her own behalf or
on behalf of a lower tier subcontractor, that the contractor present a claim for work
which was performed by the subcontractor or by a lower tier subcontractor on behalf of
the subcontractor. The subcontractor requesting that the claim be presented to the
public entity shall furnish reasonable documentation to support the claim. Within 45
days of receipt of this written request, the contractor shall notify the subcontractor in
writing as to whether the contractor presented the claim to the public entity and, if the
original contractor did not present the claim, provide the subcontractor with a statement
of the reasons for not having done so.
(e) The text of this section or a summary of it shall be set forth in the plans or
specifications for any public works project that may give rise to a claim under this
section.
(f) A waiver of the rights granted by this section is void and contrary to public policy,
provided, however, that (1) upon receipt of a claim, the parties may mutually agree to
waive, in writing, mediation and proceed directly to the commencement of a civil action
or binding arbitration, as applicable; and (2) a public entity may prescribe reasonable
change order, claim, and dispute resolution procedures and requirements in addition to
the provisions of this section, so long as the contractual provisions do not conflict with or
otherwise impair the timeframes and procedures set forth in this section.
(g) This section applies to contracts entered into on or after January 1, 2017.
(h) Nothing in this section shall impose liability upon a public entity that makes loans or
grants available through a competitive application process, for the failure of an awardee
to meet its contractual obligations.
(i) This section shall remain in effect only until January 1, 2020, and as of that date is
repealed, unless a later enacted statute, that is enacted before January 1, 2020, deletes
or extends that date.
(Added by Stats. 2016, Ch. 810, Sec. 1. (AB 626) Effective January 1, 2017. Repealed
as of January 1, 2020, by its own provisions.)
R.A. Atmore & Sons, Inc. Page 18 of 18
457
EXHIBIT C7/17/2020Location#Location Map Page APNAddress/DescriptionType of WorkLot Square Footage (approximate)Cost Notes11511‐0‐050‐080 / 511‐0‐050‐09047‐51 High StreetWeed Abatement27,910$200.8521511‐0‐050‐17583 West High StreetWeed Abatement16,316$339.90 partially paved lot31511‐0‐050‐140661 Moorpark AvenueWeed Abatement14,600$268.8341NO APNWest End High Street, N. SideFire Brush Clearance ‐ structuresverify$300.0051512‐0‐090‐115192 High StreetWeed Abatement12,655$255.43 partial concrete61512‐0‐090‐115220 High StreetWeed Abatement4,500$255.4372512‐0‐081‐110467 High StreetWeed Abatement21,750$316.2082512‐0‐081‐080 / 512‐0‐081‐090484 Charles StreetWeed Abatement19,622$372.8692512‐0‐081‐050 / 512‐0‐081‐060450/460 Charles StreetWeed Abatement15,500$255.4310 1512‐0‐093‐020 / 512‐0‐093‐030224 / 236 Charles StreetWeed Abatement15,000$255.4311 1512‐0‐063‐010780 Walnut StreetWeed Abatement5,625$316.2012 1511‐0‐090‐420West End High Street, S. SideWeed Abatement14,000$306.9413 3512‐0‐102‐100 / 512‐0‐102‐110 / 512‐0‐102‐120112/124/136 First StreetWeed Abatement22,500$216.3014 3511‐0‐101‐350347 Moorpark AvenueWeed Abatement18,212$262.6415 4506‐0‐020‐240282 Fremont StreetWeed Abatement7,312$248.2316 4506‐0‐020‐525South of Millard, North of ArroyoWeed Abatement31,000$740.0017 5513‐0‐024‐10515404 Princeton AvenueFire Brush Clearance ‐structuresverify$355.3518 5513‐0‐050‐285 / 513‐0‐050‐295Arroyo Open SpaceFire Brush Clearance ‐ structuresverify$400.0019 6511‐0‐030‐3001063 Walnut Canyon RoadWeed Abatement11,167$277.0719 6511‐0‐030‐2901073 Walnut Canyon RoadWeed Abatement11,225$277.0719 6511‐0‐030‐2801083 Walnut Canyon RoadWeed Abatement5,694$277.07 partial foundations still present19 6511‐0‐030‐2701095 Walnut Canyon RoadWeed Abatement11,421$277.0719 6511‐0‐030‐2601113 Walnut Canyon RoadWeed Abatement11,421$277.0719 6511‐0‐030‐2501123 Walnut Canyon RoadWeed Abatement11,421$277.0720 6511‐0‐040‐140 / 511‐0‐040‐1301293 Walnut Canyon RoadWeed Abatement23,436$189.5220 6511‐0‐040‐1201331 Walnut Canyon RoadWeed Abatement11,718$189.5221 7502‐0‐160‐085Aspen Hills/Darlene Open SpaceFire Brush Clearance ‐ structuresverify$501.61CONTRACTOR PROPOSAL ‐ R.A. ATMORE & SONS, INC.458
EXHIBIT CLocation#Location Map Page APNAddress/DescriptionType of WorkLot Square Footage (approximate)Cost Notes22 8506‐0‐020‐060148 Los Angeles AvenueWeed Abatement8,815$185.7023 9507‐0‐122‐155Monte Vista Nature ParkFire Brush Clearance ‐ structuresverify$2,120.0024 10504‐0‐030‐265 / 504‐0‐030‐275 Buttercreek Park AreaWeed Abatement55,000 $3,711.8325 11NO APNHighlands Basin ‐ TimberhollowFire Brush Clearance ‐ structuresverify$530.00located at the intersection of Timberhollow Road and Swift Run Street26 12NO APNHighlands basin ‐ RidgecrestFire Brush Clerance ‐ structuresverify$265.00Located at the north east corner of Elk Run Loop and Ridgecrest Drive27 13513‐0‐023‐035 / 513‐0‐031‐025 / 513‐0‐031‐045Princeton PropertiesFire Brush Clerance ‐ structuresverify$265.0028 14519‐0‐210‐05580 AcresFire Brush Clearance ‐ structuresverify$265.00Provide hourly crew rate for less then 3 propertieshourly crew rate $113.00**pricing assumes that 3 or more properties will be scheduled*weed abatement assumes full lot clearance** Fire brush clearance assumes removal of weeds/shrubs etc within 100 foot of structure 459
AGREEMENT BETWEEN THE CITY OF MOORPARK AND
VENCO WESTERN, INC. FOR SEASONAL WEED ABATEMENT SERVICES
THIS AGREEMENT, is made and effective as of this _________ day of
________________________, 2020, between the City of Moorpark, a municipal
corporation (“City”) and Venco Western, Inc., a corporation (“Contractor”). In
consideration of the mutual covenants and conditions set forth herein, the parties agree
as follows:
WHEREAS, City has the need for seasonal weed abatement services; and
WHEREAS, Contractor specializes in providing such services and has the proper
work experience, certifications, and background to carry out the duties involved; and
WHEREAS, Contractor has submitted to City a Proposal dated July 16, 2020,
which is attached hereto as Exhibit C.
NOW, THEREFORE, in consideration of the mutual covenants, benefits, and
premises herein stated, the parties hereto agree as follows:
1.TERM
The term of this Agreement shall be from September 1, 2020 to June 30, 2022,
unless this Agreement is terminated or suspended pursuant to this Agreement.
The Agreement may be extended for two (2) additional one-year terms, upon a
written amendment to the agreement executed by both parties.
2.SCOPE OF SERVICES
City does hereby retain Contractor, as an independent contractor, in a
contractual capacity to provide seasonal weed abatement services, as set forth in
Exhibits C (Contractor Proposal) and Exhibit D (Scope of Work). In the event there is a
conflict between the provisions of Exhibit C and Exhibit D and this Agreement, the
language contained in this Agreement shall take precedence.
Contractor shall perform the tasks described and set forth in Exhibit C and
Exhibit D. Compensation for the services to be performed by Contractor shall be in
accordance with Exhibit C. Compensation shall not exceed the rates or total contract
value of twenty thousand dollars ($20,000.00) annually, without a written amendment to
the agreement executed by both parties. Payment by City to Contractor shall be in
accordance with the provisions of this Agreement.
City and Contractor acknowledge that this project is a public work to which
prevailing wages apply, and that a public work project is subject to compliance
monitoring and enforcement by the California Department of Industrial Relations (DIR).
Contractor agrees to comply with and be bound by all the terms, rules and regulations
described in (a) Division 2, Part 7, Chapter 1 (commencing with Section 1720) of the
ATTACHMENT 2
460
California Labor Code, including without limitation Labor Code Section 1771 and (b) the
rules and regulations established by the DIR implementing such statutes, as though set
forth in full herein, including any applicable amendments made thereto during the term
of this Agreement. For every subcontractor who will perform work on this project,
Contractor shall be responsible for subcontractor’s compliance with (a) and (b), and
Contractor shall take all necessary actions to ensure subcontractor’s compliance. Labor
Code Section 1725.5 requires all contractors and subcontractors to annually register
with the DIR before bidding or performing on any public work contract.
3.PERFORMANCE
Contractor shall at all times faithfully, competently and to the best of their ability,
experience, standard of care, and talent, perform all tasks described herein. Contractor
shall employ, at a minimum, generally accepted standards and practices utilized by
persons engaged in providing similar services as are required of Contractor hereunder
in meeting its obligations under this Agreement.
4.MANAGEMENT
The individual directly responsible for Contractor’s overall performance of the
Agreement provisions herein above set forth and to serve as principal liaison between
City and Contractor shall be Linda Burr, and no other individual may be substituted
without the prior written approval of the City Manager.
The City’s contact person in charge of administration of this Agreement, and to
serve as principal liaison between Contractor and City, shall be the City Manager or the
City Manager’s designee.
5.PAYMENT
Taxpayer ID or Social Security numbers must be provided, on an IRS W-9 form,
before payments may be made to vendors.
The City agrees to pay Contractor monthly, in accordance with the payment rates
and terms and the schedule of payment as set forth in Exhibit C, based upon actual
time spent on the above tasks. This amount shall not exceed twenty thousand dollars
($20,000.00) annually for the term of the Agreement unless additional payment is
approved as provided in this Agreement.
Contractor shall not be compensated for any additional services rendered in
connection with its performance of this Agreement, unless such additional services and
compensation are authorized, in advance, in a written amendment to the agreement
executed by both parties. The City Manager may approve additional work not to exceed
ten percent (10%) of the amount of the Agreement.
Contractor shall submit invoices monthly for actual services performed. Invoices
shall be submitted on or about the first business day of each month, or as soon
thereafter as practical, for services provided in the previous month. Payment shall be
Venco Western, Inc. Page 2 of 18
461
made within thirty (30) days of receipt of each invoice as to all non-disputed fees. Any
expense or reimbursable cost appearing on any invoice shall be accompanied by a
receipt or other documentation subject to approval of the City Manager. If the City
disputes any of Contractor’s fees or expenses it shall give written notice to Contractor
within thirty (30) days of receipt of any disputed fees set forth on the invoice.
6. TERMINATION OR SUSPENSION WITHOUT CAUSE
The City may at any time, for any reason, with or without cause, suspend or
terminate this Agreement, or any portion hereof, by serving upon the Contractor at least
ten (10) days prior written notice. Upon receipt of said notice, the Contractor shall
immediately cease all work under this Agreement, unless the notice provides otherwise.
If the City suspends or terminates a portion of this Agreement such suspension or
termination shall not make void or invalidate the remainder of this Agreement.
The Contractor may terminate this Agreement only by providing City with written
notice no less than thirty (30) days in advance of such termination.
In the event this Agreement is terminated or suspended pursuant to this Section,
the City shall pay to Contractor the actual value of the work performed up to the time of
termination or suspension, provided that the work performed is of value to the City.
Upon termination or suspension of the Agreement pursuant to this Section, the
Contractor will submit an invoice to the City pursuant to this Agreement.
7. DEFAULT OF CONTRACTOR
The Contractor’s failure to comply with the provisions of this Agreement shall
constitute a default. In the event that Contractor is in default for cause under the terms
of this Agreement, City shall have no obligation or duty to continue compensating
Contractor for any work performed after the date of default and can terminate or
suspend this Agreement immediately by written notice to the Contractor. If such failure
by the Contractor to make progress in the performance of work hereunder arises out of
causes beyond the Contractor’s control, and without fault or negligence of the
Contractor, it shall not be considered a default.
If the City Manager or the City Manager’s designee determines that the
Contractor is in default in the performance of any of the terms or conditions of this
Agreement, designee shall cause to be served upon the Contractor a written notice of
the default. The Contractor shall have seven (7) days after service upon it of said notice
in which to cure the default by rendering a satisfactory performance. In the event that
the Contractor fails to cure its default within such period of time, the City shall have the
right, notwithstanding any other provision of this Agreement, to terminate this
Agreement without further notice and without prejudice to any other remedy to which it
may be entitled at law, in equity or under this Agreement.
Venco Western, Inc. Page 3 of 18
462
8.LIQUIDATED DAMAGES
If the Contractor fails to complete the work, or any portion thereof, within the time
period required by this Agreement, or as duly extended in writing by the City Manager,
Contractor shall forfeit and pay to the City, as liquidated damages, the sum of fifty
dollars ($50.00) per day for each calendar day the work, or portion thereof, remains
uncompleted after the above specified completion date. Liquidated damages shall be
deducted from any payments due or to become due to the Contractor under the terms
of this Agreement. Progress payments made by the City after the above specified
completion date shall not constitute a waiver of liquidated damages by the City.
9.OWNERSHIP OF DOCUMENTS
Contractor shall maintain complete and accurate records with respect to sales,
costs, expenses, receipts, and other such information required by City that relate to the
performance of services under this Agreement. Contractor shall maintain adequate
records of services provided in sufficient detail to permit an evaluation of services. All
such records shall be maintained in accordance with generally accepted accounting
principles and shall be clearly identified and readily accessible. Contractor shall provide
free access to the representatives of City or the City’s designees at reasonable times to
such books and records; shall give the City the right to examine and audit said books
and records; shall permit City to make transcripts therefrom as necessary; and shall
allow inspection of all work, data, documents, proceedings, and activities related to this
Agreement. Notification of audit shall be provided at least thirty (30) days before any
such audit is conducted. Such records, together with supporting documents, shall be
maintained for a period of three (3) years after receipt of final payment.
Upon completion of, or in the event of termination or suspension without cause of
this Agreement, all original documents, designs, drawings, maps, models, computer
files, surveys, notes, and other documents prepared in the course of providing the
services to be performed pursuant to this Agreement shall become the sole property of
the City and may be used, reused, or otherwise disposed of by the City without the
permission of the Contractor. With respect to computer files, Contractor shall make
available to the City, at the Contractor’s office and upon reasonable written request by
the City, the necessary computer software and hardware for purposes of accessing,
compiling, transferring, and printing computer files.
10.INDEMNIFICATION AND HOLD HARMLESS
Contractor shall indemnify, defend and hold harmless City, and any and all of its
officers, employees, and agents (“City Indemnitees”) from and against any and all
causes of action, claims, liabilities, obligations, judgments, or damages, including
reasonable legal counsels’ fees and costs of litigation (“claims”), arising out of the
Contractor’s performance of its obligations under this Agreement or out of the
operations conducted by Contractor, including the City’s active or passive negligence,
except for such loss or damage arising from the sole negligence or willful misconduct of
the City. In the event the City Indemnitees are made a party to any action, lawsuit, or
other adversarial proceeding arising from Contractor’s performance of this Agreement,
Venco Western, Inc. Page 4 of 18
463
the Contractor shall provide a defense to the City Indemnitees or at the City’s option
reimburse the City Indemnitees their costs of defense, including reasonable legal
counsels’ fees incurred in defense of such claims.
Contractor agrees to obtain executed indemnity agreements with provisions
identical to those set forth in this Section from each and every subcontractor, or any
other person or entity involved by, for, with, or on behalf of Contractor in the
performance of this Agreement. In the event Contractor fails to obtain such indemnity
obligations from others as required here, Contractor agrees to be fully responsible
according to the terms of this Section. Failure of City to monitor compliance with these
requirements imposes no additional obligations on City and will in no way act as a
waiver of any rights hereunder. This obligation to indemnify and defend City as set forth
here is binding on the successors, assigns, or heirs of Contractor and shall survive the
termination of this Agreement or this Section.
City does not and shall not waive any rights that it may have against Contractor
by reason of this Section, because of the acceptance by City, or the deposit with City, of
any insurance policy or certificate required pursuant to this Agreement. The hold
harmless and indemnification provisions shall apply regardless of whether or not said
insurance policies are determined to be applicable to any losses, liabilities, damages,
costs, and expenses described in this Section.
This Indemnity shall survive termination of the Agreement or Final Payment
hereunder. This Indemnity is in addition to any other rights or remedies that the
Indemnitees may have under the law or under any other Contract Documents or
Agreements. In the event of any claim or demand made against any party which is
entitled to be indemnified hereunder, City may, in its sole discretion, reserve, retain, or
apply any monies to the Contractor under this Agreement for the purpose of resolving
such claims; provided, however, City may release such funds if the Contractor provides
City with reasonable assurance of protection of the Indemnitees’ interests. City shall, in
its sole discretion, determine whether such assurances are reasonable.
11.INSURANCE
Contractor shall maintain prior to the beginning of and for the duration of this
Agreement insurance coverage as specified in Exhibit A attached hereto and
incorporated herein by this reference as though set forth in full.
12.INDEPENDENT CONTRACTOR
Contractor is and shall at all times remain as to the City a wholly independent
Contractor. The personnel performing the services under this Agreement on behalf of
Contractor shall at all times be under Contractor’s exclusive direction and control.
Neither City nor any of its officers, employees, or agents shall have control over the
conduct of Contractor or any of Contractor’s officers, employees, or agents, except as
set forth in this Agreement. Contractor shall not at any time or in any manner represent
that it or any of its officers, employees, or agents are in any manner officers,
Venco Western, Inc. Page 5 of 18
464
employees, or agents of the City. Contractor shall not incur or have the power to incur
any debt, obligation, or liability against City, or bind City in any manner.
No employee benefits shall be available to Contractor in connection with the
performance of this Agreement. Except for the fees paid to Contractor as provided in
the Agreement, City shall not pay salaries, wages, or other compensation to Contractor
for performing services hereunder for City. City shall not be liable for compensation or
indemnification to Contractor for injury or sickness arising out of performing services
hereunder.
13.LEGAL RESPONSIBILITIES
The Contractor shall keep itself informed of local, state and federal laws and
regulations which in any manner affect those employed by it or in any way affect the
performance of its service pursuant to this Agreement. The Contractor shall at all times
observe and comply with all such laws and regulations, including but not limited to the
Americans with Disabilities Act and Occupational Safety and Health Administration laws
and regulations. The City and Contractor shall comply with Exhibit B, California Public
Contract Code Section 9204, when applicable. The City, and its officers and
employees, shall not be liable at law or in equity occasioned by failure of the Contractor
to comply with this Section.
14.ANTI DISCRIMINATION
Neither the Contractor, nor any subcontractor under the Contractor, shall
discriminate in employment of persons upon the work because of race, religious creed,
color, national origin, ancestry, physical disability, mental disability, medical condition,
genetic information, marital status, sex, gender, gender identity, gender expression,
age, sexual orientation, or military and veteran status of such person; or any other basis
protected by applicable federal, state, or local law, except as provided in Section 12940
of the Government Code. The Contractor shall have responsibility for compliance with
this Section, if applicable [Labor Code Sec. 1735].
15.UNDUE INFLUENCE
Contractor declares and warrants that no undue influence or pressure is used
against or in concert with any officer or employee of the City in connection with the
award, terms or implementation of this Agreement, including any method of coercion,
confidential financial arrangement, or financial inducement. No officer or employee of
the City will receive compensation, directly or indirectly from Contractor, or any officer,
employee or agent of Contractor, in connection with the award of this Agreement or any
work to be conducted as a result of this Agreement. Violation of this Section shall be a
material breach of this Agreement entitling the City to any and all remedies at law or in
equity.
Venco Western, Inc. Page 6 of 18
465
16.NO BENEFIT TO ARISE TO LOCAL EMPLOYEES
No member, officer, or employee of the City, or their designees or agents, and no
public official who exercises authority over or responsibilities with respect to the
Services during his/her tenure or for one (1) year thereafter, shall have any interest,
direct or indirect, in any agreement or sub-agreement, or the proceeds thereof, for work
to be performed in connection with the Services performed under this Agreement.
17.CONFLICT OF INTEREST
Contractor covenants that neither they nor any officer or principal of their firm
have any interests, nor shall they acquire any interest, directly or indirectly, which will
conflict in any manner or degree with the performance of their services hereunder.
Contractor further covenants that in the performance of this Agreement, they shall
employ no person having such interest as an officer, employee, agent, or subcontractor.
Contractor further covenants that Contractor has not contracted with nor is performing
any services directly or indirectly, with the developer(s) and/or property owner(s) and/or
firm(s) and/or partnership(s) and/or public agency(ies) owning property and/or
processing an entitlement application for property in the City or its Area of Interest, now
or within the past one (1) year, and further covenants and agrees that Contractor and/or
its subcontractors shall provide no service or enter into any contract with any
developer(s) and/or property owner(s) and/or firm(s) and/or partnership(s) and/or public
agency(ies) owning property and/or processing an entitlement application for property in
the City or its Area of Interest, while under contract with the City and for a one (1) year
time period following termination of this Agreement.
18.NOTICE
Any notice to be given pursuant to this Agreement shall be in writing, and all such
notices and any other document to be delivered shall be delivered by personal service
or by deposit in the United States mail, certified or registered, return receipt requested,
with postage prepaid, and addressed to the party for whom intended as follows:
To: City Manager
City of Moorpark
799 Moorpark Ave.
Moorpark, CA 93021
To: Linda Burr, President
Venco Western, Inc.
2400 Eastman Avenue
Oxnard, CA 93030
Either party may, from time to time, by written notice to the other, designate a
different address or contact person, which shall be substituted for the one above
specified. Notices, payments and other documents shall be deemed delivered upon
receipt by personal service or as of the third (3rd) day after deposit in the United States
mail.
Venco Western, Inc. Page 7 of 18
466
19.CHANGE IN NAME
Should a change be contemplated in the name or nature of the Contractor’s legal
entity, the Contractor shall first notify the City in order that proper steps may be taken to
have the change reflected in the Agreement documents.
20.ASSIGNMENT
Contractor shall not assign this Agreement or any of the rights, duties or
obligations hereunder. It is understood and acknowledged by the parties that Contractor
is uniquely qualified to perform the services provided for in this Agreement.
21.LICENSES
At all times during the term of this Agreement, Contractor shall have in full force
and effect, all licenses required of it by law for the performance of the services in this
Agreement.
22.VENUE AND GOVERNING LAW
This Agreement is made, entered into, and executed in Ventura County,
California, and any action filed in any court or for arbitration for the interpretation,
enforcement or other action of the terms, conditions, or covenants referred to herein
shall be filed in the applicable court in Ventura County, California. The City and
Contractor understand and agree that the laws of the State of California shall govern the
rights, obligations, duties, and liabilities of the parties to this Agreement and also govern
the interpretation of this Agreement.
23.COST RECOVERY
In the event any action, suit or proceeding is brought for the enforcement of, or
the declaration of any right or obligation pursuant to this Agreement or as a result of any
alleged breach of any provision of this Agreement, the prevailing party shall be entitled
to recover its costs and expenses from the losing party, and any judgment or decree
rendered in such a proceeding shall include an award thereof.
24.ENTIRE AGREEMENT
This Agreement and the Exhibits attached hereto contain the entire
understanding between the parties relating to the obligations of the parties described in
this Agreement. All prior or contemporaneous agreements, understandings,
representations, and statements, oral or written, are merged into this Agreement and
shall be of no further force or effect. Each party is entering into this Agreement based
solely upon the representations set forth herein and upon each party’s own independent
investigation of any and all facts such party deems material.
Venco Western, Inc. Page 8 of 18
467
25.CAPTIONS OR HEADINGS
The captions and headings of the various Articles, Paragraphs, and Exhibits of
this Agreement are for convenience and identification only and shall not be deemed to
limit or define the content of the respective Articles, Paragraphs, and Exhibits hereof.
26.AMENDMENTS
Any amendment, modification, or variation from the terms of this Agreement shall
be in writing and shall be effective only upon approval by both parties to this Agreement.
27.PRECEDENCE
In the event of conflict, the requirements of the City’s Request for Proposal, if
any, and this Agreement shall take precedence over those contained in the Contractor’s
Proposal.
28.INTERPRETATION OF AGREEMENT
Should interpretation of this Agreement, or any portion thereof, be necessary, it is
deemed that this Agreement was prepared by the parties jointly and equally, and shall
not be interpreted against either party on the ground that the party prepared the
Agreement or caused it to be prepared.
29.WAIVER
No waiver of any provision of this Agreement shall be deemed, or shall
constitute, a waiver of any other provision, whether or not similar, nor shall any such
waiver constitute a continuing or subsequent waiver of the same provision. No waiver
shall be binding unless executed in writing by the party making the waiver.
30.AUTHORITY TO EXECUTE
The person or persons executing this Agreement on behalf of the Contractor
warrants and represents that he/she has the authority to execute this Agreement on
behalf of the Contractor and has the authority to bind Contractor to the performance of
obligations hereunder.
Venco Western, Inc. Page 9 of 18
468
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be
executed the day and year first above written.
CITY OF MOORPARK VENCO WESTERN, INC.
By:_______________________________ By:_______________________________
Troy Brown, City Manager Linda Burr, President
Attest:
__________________________________
Ky Spangler, City Clerk
Venco Western, Inc. Page 10 of 18
469
Exhibit A
INSURANCE REQUIREMENTS
Prior to the beginning of and throughout the duration of Work, Contractor will maintain
insurance in conformance with the requirements set forth below. Contractor will use
existing coverage to comply with these requirements. If that existing coverage does not
meet requirements set forth here, Contractor agrees to amend, supplement or endorse
the existing coverage to do so. Contractor acknowledges that the insurance coverage
and policy limits set forth in this section constitute the minimum amount of coverage
required. Any insurance proceeds available to the City in excess of the limits and
coverage required in this Agreement and which is applicable to a given loss, will be
available to the City.
Contractor shall provide the following types and amounts of insurance:
Commercial General Liability Insurance using Insurance Services Office (ISO)
“Commercial General Liability” policy form CG 00 01 or the exact equivalent. Defense
costs must be paid in addition to limits. There shall be no cross liability exclusion for
claims or suits by one insured against another. Limits are subject to review but in no
event less than $1,000,000 per occurrence for all covered losses and no less than
$2,000,000 general aggregate.
Business Auto Coverage on ISO Business Auto Coverage form CA 00 01 including
symbol 1 (Any Auto) or the exact equivalent. Limits are subject to review, but in no
event to be less than $1,000,000 per accident. If Contractor owns no vehicles, this
requirement may be satisfied by a non-owned auto endorsement to the general liability
policy described above. If Contractor or Contractor’s employees will use personal autos
in any way on this project, Contractor shall provide evidence of personal auto liability for
each such person.
Workers’ Compensation on a state-approved policy form providing statutory benefits as
required by law with employer’s liability limits no less than $1,000,000 per accident or
disease.
Excess or Umbrella Liability Insurance (Over Primary) if used to meet limit
requirements, shall provide coverage at least as broad as specified for the underlying
coverages. Coverage shall be provided on a “pay on behalf” basis, with defense costs
payable in addition to policy limits. Policy shall contain a provision obligating insurer at
the time insured’s liability is determined, not requiring actual payment by the insured
first. There shall be no cross liability exclusion precluding coverage for claims or suits by
one insured against another. Coverage shall be applicable to the City for injury to
employees of Contractor, subcontractors or others involved in the Work. The scope of
coverage provided is subject to approval by the City following receipt of proof of
insurance as required herein. Limits are subject to review.
Venco Western, Inc. Page 11 of 18
470
Insurance procured pursuant to these requirements shall be written by insurers that are
admitted carriers in the State of California and with an A.M. Bests rating of A- or better
and a minimum financial size of VII.
General conditions pertaining to provision of insurance coverage by Contractor.
Contractor and the City agree to the following with respect to insurance provided by
Contractor:
1. Contractor agrees to have its insurer endorse the third party general liability
coverage required herein to include as additional insureds the City, its officials,
employees, and agents, using standard ISO endorsement CG 2010 and CG
2037 with edition acceptable to the City. Contractor also agrees to require all
contractors and subcontractors to do likewise.
2.No liability insurance coverage provided to comply with this Agreement shall
prohibit Contractor, or Contractor’s employees, or agents, from waiving the right
to subrogation prior to a loss. Contractor agrees to waive subrogation rights
against the City regardless of the applicability of any insurance proceeds, and to
require all contractors and subcontractors to do likewise.
3.All insurance coverage and limits provided by Contractor and available or
applicable to this Agreement are intended to apply to the full extent of the
policies. Nothing contained in this Agreement or any other agreement relating to
the City or its operation limits the application of such insurance coverage.
4.None of the coverages required herein will be in compliance with these
requirements if they include limiting endorsement of any kind that has not been
first submitted to the City and approved in writing.
5.No liability policy shall contain any provision or definition that would serve to
eliminate so-called “third party action over” claims, including any exclusion for
bodily injury to an employee of the insured or of any contractor or subcontractor.
6.All coverage types and limits required are subject to approval, modification, and
additional requirements by the City, as the need arises. Contractor shall not
make any reductions in scope of coverage (e.g. elimination of contractual liability
or reduction of discovery period) that may affect the City’s protection without the
City’s prior written consent.
7.Proof of compliance with these insurance requirements, consisting of certificates
of insurance evidencing all of the coverages required and an additional insured
endorsement to Contractor’s general liability policy, shall be delivered to city at or
prior to the execution of this Agreement. In the event such proof of any insurance
is not delivered as required, or in the event such insurance is canceled or
reduced at any time and no replacement coverage is provided, the City has the
right, but not the duty, to obtain any insurance it deems necessary to protect its
interests under this or any other Agreement and to pay the premium. Any
Venco Western, Inc. Page 12 of 18
471
premium so paid by the City shall be charged to and promptly paid by Contractor
or deducted from sums due Contractor, at the City’s option.
8. Certificate(s) are to reflect that the insurer will provide 30 days notice to the City
of any cancellation or reduction of coverage. Contractor agrees to require its
insurer to modify such certificates to delete any exculpatory wording stating that
failure of the insurer to mail written notice of cancellation or reduction of coverage
imposes no obligation, or that any party will “endeavor” (as opposed to being
required) to comply with the requirements of the certificate.
9. It is acknowledged by the parties of this Agreement that all insurance coverage
required to be provided by Contractor or any subcontractor, is intended to apply
first and on a primary, non-contributing basis in relation to any other insurance or
self-insurance available to the City.
10. Contractor agrees to ensure that subcontractors, and any other party involved
with the Work who is brought onto or involved in the Work by Contractor, provide
the same minimum insurance required of Contractor. Contractor agrees to
monitor and review all such coverage and assumes all responsibility for ensuring
that such coverage is provided in conformity with the requirements of this
section. Contractor agrees that upon request, all agreements with subcontractors
and others engaged in the Work will be submitted to the City for review.
11. Contractor agrees not to self-insure or to use any self-insured retentions or
deductibles on any portion of the insurance required herein and further agrees
that it will not allow any contractor, subcontractor, Architect, Engineer, or other
entity or person in any way involved in the performance of Work contemplated by
this Agreement to self-insure its obligations to the City. If Contractor’s existing
coverage includes a deductible or self-insured retention, the deductible or self-
insured retention must be declared to the City. At that time, the City shall review
options with the Contractor, which may include reduction or elimination of the
deductible or self-insured retention, substitution of other coverage, or other
solutions.
12. The City reserves the right at any time during the term of the Agreement to
change the amounts and types of insurance required by giving the Contractor 90
days advance written notice of such change. If such change results in substantial
additional cost to the Contractor, the City will negotiate additional compensation
proportional to the increased benefit to the City.
13. For purposes of applying insurance coverage only, this Agreement will be
deemed to have been executed immediately upon any party hereto taking any
steps that can be deemed to be in furtherance of or towards performance of this
Agreement.
14. Contractor acknowledges and agrees that any actual or alleged failure on the
part of the City to inform Contractor of non-compliance with an insurance
Venco Western, Inc. Page 13 of 18
472
requirement in no way imposes any additional obligations to the City nor does it
waive any rights hereunder in this or any other regard.
15. Contractor will renew the required coverage annually as long as the City, or its
employees or agents face an exposure from operations of any type pursuant to
this Agreement. This obligation applies whether or not the Agreement is canceled
or terminated for any reason. Termination of this obligation is not effective until
the City executes a written statement to that effect.
16. Contractor shall provide proof that policies of insurance required herein expiring
during the term of this Agreement have been renewed or replaced with other
policies providing at least the same coverage. Proof that such coverage has
been ordered shall be submitted prior to expiration. A coverage binder or letter
from Contractor’s insurance agent to this effect is acceptable. A certificate of
insurance and/or additional insured endorsement as required in these
specification applicable to the renewing or new coverage must be provided to the
City within five days of the expiration of coverage.
17.The provisions of any Workers’ Compensation or similar act will not limit the
obligations of Contractor under this Agreement. Contractor expressly agrees not
to use any statutory immunity defenses under such laws with respect to the City,
its employees, officials, and agents.
18.Requirements of specific coverage features or limits contained in this section are
not intended as limitations on coverage, limits, or other requirements nor as a
waiver of any coverage normally provided by any given policy. Specific reference
to a given coverage feature is for purposes of clarification only as it pertains to a
given issue, and is not intended by any party or insured to be limiting or all-
inclusive.
19.These insurance requirements are intended to be separate and distinct from any
other provision in this Agreement and are intended by the parties here to be
interpreted as such.
20.The requirements in this section supersede all other sections and provisions of
this Agreement to the extent that any other section or provision conflicts or
impairs the provisions of this section.
21. Contractor agrees to be responsible for ensuring that no contract used by any
party involved in any way with the Work reserves the right to charge the City or
Contractor for the cost of additional insurance coverage required by this
Agreement. Any such provisions are to be deleted with reference to the City. It is
not the intent of the City to reimburse any third party for the cost of complying
with these requirements. There shall be no recourse against the City for payment
of premiums or other amounts with respect thereto.
22. Contractor agrees to provide immediate notice to City of any claim or loss against
Contractor arising out of the work performed under this Agreement. The City
Venco Western, Inc. Page 14 of 18
473
assumes no obligation or liability by such notice, but has the right (but not the
duty) to monitor the handling of any such claim or claims if they are likely to
involve the City.
23.Contractor agrees to obtain and provide to City a copy of Professional Liability
coverage for Architects or Engineers on this project, when required by City. City
shall determine the liability limit.
Venco Western, Inc. Page 15 of 18
474
EXHIBIT B
PUBLIC CONTRACT CODE SECTION 9204
9204. (a) The Legislature finds and declares that it is in the best interests of the state
and its citizens to ensure that all construction business performed on a public works
project in the state that is complete and not in dispute is paid in full and in a timely
manner.
(b) Notwithstanding any other law, including, but not limited to, Article 7.1 (commencing
with Section 10240) of Chapter 1 of Part 2, Chapter 10 (commencing with Section
19100) of Part 2, and Article 1.5 (commencing with Section 20104) of Chapter 1 of Part
3, this section shall apply to any claim by a contractor in connection with a public works
project.
(c) For purposes of this section:
(1) “Claim” means a separate demand by a contractor sent by registered mail or
certified mail with return receipt requested, for one or more of the following:
(A) A time extension, including, without limitation, for relief from damages or penalties
for delay assessed by a public entity under a contract for a public works project.
(B) Payment by the public entity of money or damages arising from work done by, or on
behalf of, the contractor pursuant to the contract for a public works project and payment
for which is not otherwise expressly provided or to which the claimant is not otherwise
entitled.
(C) Payment of an amount that is disputed by the public entity.
(2) “Contractor” means any type of contractor within the meaning of Chapter 9
(commencing with Section 7000) of Division 3 of the Business and Professions Code
who has entered into a direct contract with a public entity for a public works project.
(3) (A) “Public entity” means, without limitation, except as provided in subparagraph (B),
a state agency, department, office, division, bureau, board, or commission, the
California State University, the University of California, a city, including a charter city,
county, including a charter county, city and county, including a charter city and county,
district, special district, public authority, political subdivision, public corporation, or
nonprofit transit corporation wholly owned by a public agency and formed to carry out
the purposes of the public agency.
(B) “Public entity” shall not include the following:
(i) The Department of Water Resources as to any project under the jurisdiction of that
department.
(ii) The Department of Transportation as to any project under the jurisdiction of that
department.
(iii) The Department of Parks and Recreation as to any project under the jurisdiction of
that department.
(iv) The Department of Corrections and Rehabilitation with respect to any project under
its jurisdiction pursuant to Chapter 11 (commencing with Section 7000) of Title 7 of Part
3 of the Penal Code.
(v) The Military Department as to any project under the jurisdiction of that department.
(vi) The Department of General Services as to all other projects.
(vii) The High-Speed Rail Authority.
Venco Western, Inc. Page 16 of 18
475
(4) “Public works project” means the erection, construction, alteration, repair, or
improvement of any public structure, building, road, or other public improvement of any
kind.
(5) “Subcontractor” means any type of contractor within the meaning of Chapter 9
(commencing with Section 7000) of Division 3 of the Business and Professions Code
who either is in direct contract with a contractor or is a lower tier subcontractor.
(d) (1) (A) Upon receipt of a claim pursuant to this section, the public entity to which the
claim applies shall conduct a reasonable review of the claim and, within a period not to
exceed 45 days, shall provide the claimant a written statement identifying what portion
of the claim is disputed and what portion is undisputed. Upon receipt of a claim, a public
entity and a contractor may, by mutual agreement, extend the time period provided in
this subdivision.
(B) The claimant shall furnish reasonable documentation to support the claim.
(C) If the public entity needs approval from its governing body to provide the claimant a
written statement identifying the disputed portion and the undisputed portion of the
claim, and the governing body does not meet within the 45 days or within the mutually
agreed to extension of time following receipt of a claim sent by registered mail or
certified mail, return receipt requested, the public entity shall have up to three days
following the next duly publicly noticed meeting of the governing body after the 45-day
period, or extension, expires to provide the claimant a written statement identifying the
disputed portion and the undisputed portion.
(D) Any payment due on an undisputed portion of the claim shall be processed and
made within 60 days after the public entity issues its written statement. If the public
entity fails to issue a written statement, paragraph (3) shall apply.
(2) (A) If the claimant disputes the public entity’s written response, or if the public entity
fails to respond to a claim issued pursuant to this section within the time prescribed, the
claimant may demand in writing an informal conference to meet and confer for
settlement of the issues in dispute. Upon receipt of a demand in writing sent by
registered mail or certified mail, return receipt requested, the public entity shall schedule
a meet and confer conference within 30 days for settlement of the dispute.
(B) Within 10 business days following the conclusion of the meet and confer
conference, if the claim or any portion of the claim remains in dispute, the public entity
shall provide the claimant a written statement identifying the portion of the claim that
remains in dispute and the portion that is undisputed. Any payment due on an
undisputed portion of the claim shall be processed and made within 60 days after the
public entity issues its written statement. Any disputed portion of the claim, as identified
by the contractor in writing, shall be submitted to nonbinding mediation, with the public
entity and the claimant sharing the associated costs equally. The public entity and
claimant shall mutually agree to a mediator within 10 business days after the disputed
portion of the claim has been identified in writing. If the parties cannot agree upon a
mediator, each party shall select a mediator and those mediators shall select a qualified
neutral third party to mediate with regard to the disputed portion of the claim. Each party
shall bear the fees and costs charged by its respective mediator in connection with the
selection of the neutral mediator. If mediation is unsuccessful, the parts of the claim
remaining in dispute shall be subject to applicable procedures outside this section.
(C) For purposes of this section, mediation includes any nonbinding process, including,
but not limited to, neutral evaluation or a dispute review board, in which an independent
third party or board assists the parties in dispute resolution through negotiation or by
Venco Western, Inc. Page 17 of 18
476
issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this
section.
(D) Unless otherwise agreed to by the public entity and the contractor in writing, the
mediation conducted pursuant to this section shall excuse any further obligation under
Section 20104.4 to mediate after litigation has been commenced.
(E) This section does not preclude a public entity from requiring arbitration of disputes
under private arbitration or the Public Works Contract Arbitration Program, if mediation
under this section does not resolve the parties’ dispute.
(3) Failure by the public entity to respond to a claim from a contractor within the time
periods described in this subdivision or to otherwise meet the time requirements of this
section shall result in the claim being deemed rejected in its entirety. A claim that is
denied by reason of the public entity’s failure to have responded to a claim, or its failure
to otherwise meet the time requirements of this section, shall not constitute an adverse
finding with regard to the merits of the claim or the responsibility or qualifications of the
claimant.
(4) Amounts not paid in a timely manner as required by this section shall bear interest at
7 percent per annum.
(5) If a subcontractor or a lower tier subcontractor lacks legal standing to assert a claim
against a public entity because privity of contract does not exist, the contractor may
present to the public entity a claim on behalf of a subcontractor or lower tier
subcontractor. A subcontractor may request in writing, either on his or her own behalf or
on behalf of a lower tier subcontractor, that the contractor present a claim for work
which was performed by the subcontractor or by a lower tier subcontractor on behalf of
the subcontractor. The subcontractor requesting that the claim be presented to the
public entity shall furnish reasonable documentation to support the claim. Within 45
days of receipt of this written request, the contractor shall notify the subcontractor in
writing as to whether the contractor presented the claim to the public entity and, if the
original contractor did not present the claim, provide the subcontractor with a statement
of the reasons for not having done so.
(e) The text of this section or a summary of it shall be set forth in the plans or
specifications for any public works project that may give rise to a claim under this
section.
(f) A waiver of the rights granted by this section is void and contrary to public policy,
provided, however, that (1) upon receipt of a claim, the parties may mutually agree to
waive, in writing, mediation and proceed directly to the commencement of a civil action
or binding arbitration, as applicable; and (2) a public entity may prescribe reasonable
change order, claim, and dispute resolution procedures and requirements in addition to
the provisions of this section, so long as the contractual provisions do not conflict with or
otherwise impair the timeframes and procedures set forth in this section.
(g) This section applies to contracts entered into on or after January 1, 2017.
(h) Nothing in this section shall impose liability upon a public entity that makes loans or
grants available through a competitive application process, for the failure of an awardee
to meet its contractual obligations.
(i) This section shall remain in effect only until January 1, 2020, and as of that date is
repealed, unless a later enacted statute, that is enacted before January 1, 2020, deletes
or extends that date.
(Added by Stats. 2016, Ch. 810, Sec. 1. (AB 626) Effective January 1, 2017. Repealed
as of January 1, 2020, by its own provisions.)
Venco Western, Inc. Page 18 of 18
477
EXHIBIT C7/16/2020Location#Location Map Page APNAddress/DescriptionType of WorkLot Square Footage (approximate)Cost Notes11511‐0‐050‐080 / 511‐0‐050‐09047‐51 High StreetWeed Abatement27,910$558.2021511‐0‐050‐17583 West High StreetWeed Abatement16,316$326.32 partially paved lot31511‐0‐050‐140661 Moorpark AvenueWeed Abatement14,600$292.0041NO APNWest End High Street, N. SideFire Brush Clearance ‐ structuresverify$260.0051512‐0‐090‐115192 High StreetWeed Abatement12,655$253.10 partial concrete61512‐0‐090‐115220 High StreetWeed Abatement4,500$90.0072512‐0‐081‐110467 High StreetWeed Abatement21,750$435.0082512‐0‐081‐080 / 512‐0‐081‐090484 Charles StreetWeed Abatement19,622$392.4492512‐0‐081‐050 / 512‐0‐081‐060450/460 Charles StreetWeed Abatement15,500$310.0010 1512‐0‐093‐020 / 512‐0‐093‐030224 / 236 Charles StreetWeed Abatement15,000$300.0011 1512‐0‐063‐010780 Walnut StreetWeed Abatement5,625$112.5012 1511‐0‐090‐420West End High Street, S. SideWeed Abatement14,000$280.0013 3512‐0‐102‐100 / 512‐0‐102‐110 / 512‐0‐102‐120112/124/136 First StreetWeed Abatement22,500$450.0014 3511‐0‐101‐350347 Moorpark AvenueWeed Abatement18,212$364.2415 4506‐0‐020‐240282 Fremont StreetWeed Abatement7,312$146.2416 4506‐0‐020‐525South of Millard, North of ArroyoWeed Abatement31,000$620.0017 5513‐0‐024‐10515404 Princeton AvenueFire Brush Clearance ‐structuresverify$40.0018 5513‐0‐050‐285 / 513‐0‐050‐295Arroyo Open SpaceFire Brush Clearance ‐ structuresverify$500.0019 6511‐0‐030‐3001063 Walnut Canyon RoadWeed Abatement11,167$223.2419 6511‐0‐030‐2901073 Walnut Canyon RoadWeed Abatement11,225$224.5019 6511‐0‐030‐2801083 Walnut Canyon RoadWeed Abatement5,694$113.88 partial foundations still present19 6511‐0‐030‐2701095 Walnut Canyon RoadWeed Abatement11,421$228.4219 6511‐0‐030‐2601113 Walnut Canyon RoadWeed Abatement11,421$228.4219 6511‐0‐030‐2501123 Walnut Canyon RoadWeed Abatement11,421$228.4220 6511‐0‐040‐140 / 511‐0‐040‐1301293 Walnut Canyon RoadWeed Abatement23,436$468.7220 6511‐0‐040‐1201331 Walnut Canyon RoadWeed Abatement11,718$234.4621 7502‐0‐160‐085Aspen Hills/Darlene Open SpaceFire Brush Clearance ‐ structuresverify$72.00CONTRACTOR PROPOSAL ‐ VENCO WESTERN478
EXHIBIT CLocation#Location Map Page APNAddress/DescriptionType of WorkLot Square Footage (approximate)Cost Notes22 8506‐0‐020‐060148 Los Angeles AvenueWeed Abatement8,815$176.3023 9507‐0‐122‐155Monte Vista Nature ParkFire Brush Clearance ‐ structuresverify$120.0024 10504‐0‐030‐265 / 504‐0‐030‐275 Buttercreek Park AreaWeed Abatement55,000 $1,100.0025 11NO APNHighlands Basin ‐ TimberhollowFire Brush Clearance ‐ structuresverify$470.08located at the intersection of Timberhollow Road and Swift Run Street26 12NO APNHighlands basin ‐ RidgecrestFire Brush Clerance ‐ structuresverify$183.54Located at the north east corner of Elk Run Loop and Ridgecrest Drive27 13513‐0‐023‐035 / 513‐0‐031‐025 / 513‐0‐031‐045Princeton PropertiesFire Brush Clerance ‐ structuresverify$371.1428 14519‐0‐210‐05580 AcresFire Brush Clearance ‐ structuresverify$366.04Provide hourly crew rate for less then 3 propertieshourly crew rate $32.00 PER HOUR**pricing assumes that 3 or more properties will be scheduled*weed abatement assumes full lot clearance** Fire brush clearance assumes removal of weeds/shrubs etc within 100 foot of structure 479
EXHIBIT D
SCOPE OF WORK
Full Lot Weed Abatement Scope: For the properties listed as weed abatement the
Contractor is responsible for cutting down all weeds, shrubs, and small nuisance trees
on the property, raking and removing the cut material, as well as collecting and throwing
away any accumulated trash or other small debris on the site. Pricing proposed for this
scope should assume general litter and small debris. Large debris such as pallets,
couches or other similar items, will be removed by City staff.
Fire Clearance Requirement Scope: For the properties marked fire clearance, weed
abatement is to take place to comply with Ventura County Fire Protection District Fire
Hazard requirements. Generally this requires cutting back weeds, shrubs, and other
small vegetation to create a 100’ buffer from any adjacent structures and rake and
remove the debris.
Prevailing Wage: The work under this contract is subject to Prevailing Wage. All pricing
should be drafted as such. Contractor is required to submit certified payroll and comply
with all apprenticeship requirements as outlined in Labor Code Sections 1720 et seq.
and 1770 et seq. and 1777 et seq. Any violations of LC Section 1776 will forfeit a
$100/day/worker fine for all workers paid less than the prevailing wage rate.
General Requirements:
Price quotes are to be provided assuming that work will be done in batches of
three (3) properties or more. Pricing is also requested for an hourly crew rate to
be used when less than three (3) properties are worked on.
No chemical herbicides are to be used in the performance of the scope of work.
Contractor shall be responsible for all damages to persons or property that occur
as a result of its fault or negligence in the performance of this contract.
Contractor shall take all necessary precautions for the safety of workers on the
project and shall comply with all applicable federal, state, local and other safety
laws, standards, orders, rules, regulations, and building codes to prevent
accidents or injury to persons on, about, or adjacent to the premises where work
is being performed and to provide a safe and healthful place of employment.
480